001-46606
|
Executed
|
12/12/2023
|
|
|
1
|
1
|
Various
|
|
This work shall consist of raised reflective pavement marker removal and replacement, replacement of raised reflective pavement marker reflectors on various Interstate routes.
|
01X-72K47
|
Active
|
10/02/2023
|
1 / 1 |
|
4
|
6
|
Cass, Schuyler
|
|
Bridge replacement on US 67 over the Illinois River in Beardstown.
|
002-46629
|
Executed
|
12/13/2023
|
|
1 |
5
|
8
|
Madison, St. Clair
|
|
Installation of new ground-mounted signs on various routes in Madison and St. Clair Counties.
|
002X-78057
|
Active
|
10/13/2023
|
|
|
5
|
9
|
|
|
|
003-46635
|
Executed
|
12/12/2023
|
|
|
2
|
3
|
Various
|
|
Repairing various widths of pavement marking including, lines, letters, numbers, and symbols on various roads throughout District 3.
|
004-46636
|
Executed
|
12/12/2023
|
1 / 1 |
1 |
2
|
2
|
Various
|
|
Placing various widths of Preformed Plastic and Modified_Urethane pavement marking lines, letters and symbols within the limits specified on each individual work order.
|
005-46637
|
Executed
|
12/13/2023
|
|
|
0
|
0
|
Various
|
|
Repair, maintenance, or replacements of damaged sign components, furnishing new overhead sign structures or repairs, installing new signs or supports at locations as described in a work order including all traffic control in regions 2 adn 3.
|
006-61J35
|
Executed
|
01/05/2024
|
2 / 1 |
1 |
1
|
1
|
Kane
|
|
HMA Pavement widening and resurfacing with sidewalks, ADA ramps, curb and gutter, storm sewer, pavement markings and signing at the intersecton of Prairie Street and Wilson Street in Batavia.
|
007-61J45
|
Executed
|
01/10/2024
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
Pavement widening and traffic signal modifications on 71st Street at Harlem Avenue in Bedford Park.
|
008-61J69
|
Executed
|
01/30/2024
|
3 / 3 |
|
1
|
1
|
Kane
|
|
Shoulder widening, rumble strips, ditch reshaping and pavement markings on Plank Road from Engel Road to Waughon Road.
|
009-61J74
|
Withdrawn
|
11/15/2023
|
7 / 6 |
2 |
1
|
1
|
Cook
|
|
Sidewalk replacement with curb and gutter, pavement marking, signage, and landscaping along various routes in the Village of Niles.
|
010-61J77
|
Executed
|
01/12/2024
|
|
|
1
|
1
|
DuPage
|
|
Resurfacing Edgewater Drive from Bloomingdale Road to Glen Ellyn Road, and Lakeview Lane from Edgewater Drive to South Circle Avenue in Bloomingdale.
|
011-61J78
|
Executed
|
01/02/2024
|
1 / 1 |
|
1
|
1
|
Will
|
|
Resurfacing 191st Street from Wolf Road to LaGrange Road in Mokena.
|
012-61J79
|
Executed
|
01/12/2024
|
17 / 13 |
1 |
1
|
1
|
McHenry
|
|
Removal and replacement of strutures carrying Milstream Road over the Kishwaukee River and the South Branch of the Kishwaukee River. The proposed structures are three span, 27" PPC IL Beams with an 8" concrete deck on solid wall piers and integral abutments. Also included will be HMA resurfacing, HMA shoulders, guardrail, driveways, pavment markings, landscaping and other necessary work.
|
013-61J80
|
Executed
|
01/10/2024
|
|
|
1
|
1
|
Will
|
|
HMA resurfacing with patching, sidewalks, ADA improvements, multi-use path construction, traffic signal modifications, lighting, drainage adjustments, pavement markings, and other necessary work on 135th Street from Weber Road to IL 53 in the Village of Romeoville.
|
014-61J81
|
Executed
|
01/02/2024
|
|
|
1
|
1
|
Cook
|
|
HMA resurfacing with patching, driveway replacement, sidewalks, drainage adjustments, and pavement markings on Kostner Avenue from 123rd Street to 127th Street in Alsip.
|
015-61J83
|
Executed
|
01/19/2024
|
|
1 |
1
|
1
|
Cook
|
|
Full depth HMA pavment with curb and gutter, drainage improvements, water mains , sidewalks and pavement markings on Balmoral Avenue from Roosevelt Road to Canterbury Street in Westchester.
|
016-61J85
|
Executed
|
12/13/2023
|
|
|
1
|
1
|
DuPage
|
|
Resurfacing Fullerton Avenue from Schmale Road to Bloomingdale Road in Glendale Heights.
|
017-61J88
|
Executed
|
01/02/2024
|
6 / 5 |
|
1
|
1
|
Cook
|
|
Pavement widening and resurfacing, construction of a bike path, bridge modifications and traffic signal modernization on Beverly Road from Prairie Stone Parkway to Beacon Pointe Drive in Hoffman Estates.
|
018-61J89
|
Executed
|
01/10/2024
|
4 / 4 |
1 |
1
|
1
|
Cook
|
|
Reconstruction of Dubois Boulevard from Ogden Avenue to Burlington Avenue, and the reconstruction of Burlington Avenue from Dubois Boulevard to Grove Ave. in Brookfield.
|
019-61J92
|
Executed
|
01/05/2024
|
1 / 1 |
|
1
|
1
|
Kane
|
|
Improve the intersection of Farnsworth Avenue at Marshal Boulevard and at the Illinois Prairie Path intersection in Aurora.
|
020-62H25
|
Executed
|
12/08/2023
|
2 / 2 |
1 |
1
|
1
|
McHenry
|
|
The proposed improvement consists of culvert removal and replacement of the structure located on IL 23 over Drainage Ditch (0.1 Mile N of IL 176) in the City of Marengo in McHenry County. Total gross length and net length = 164 FT ( 0.031 MI)
|
021-62H63
|
Executed
|
01/10/2024
|
1 / 1 |
|
1
|
1
|
Will
|
|
Parking lot and drainage improvement. Full depth removal and replacement of existing pavement. Location: I-55 Maintenance Yard (151 E South Frontage Rd, Bolingbrook) in Will County.
|
022-62K70
|
Executed
|
01/02/2024
|
8 / 8 |
1 |
1
|
1
|
Cook
|
|
(0.2-Mile) Bridge Replacement and Roadway Improvement. The work includes of replacing the bridge that carries FAU 1332 (Oakton Street) over FAI 94 (Edens Expressway) in Cook County.
|
023-62N37
|
Executed
|
01/02/2024
|
|
1 |
1
|
1
|
Cook
|
|
The proposed improvement consists of traffic signal modernization and ADA ramp improvements at the intersection of Touhy Avenue and Kostner Avenue in the Village of Lincolnwood, Cook County. Total gross length= 526 FT (0.10 Ml) and net length = 526 FT (0.10 Ml).
|
024-62N96
|
Executed
|
01/02/2024
|
2 / 2 |
3 |
1
|
1
|
Cook
|
|
This is a Bridge Preservation Project: bridge repair, joint replace/ repair and deck overlay on bridges carrying I-80 over Cicero Ave, 175th St and Kedzie Ave. Located in the Villages of Country Club Hills and Hazel Crest in Cook County. The gross and net length of the project is 2.33-miles (12,308-feet) and 0.35- miles (1,852-feet) respectively.
|
025-62P09
|
Executed
|
12/08/2023
|
12 / 12 |
2 |
1
|
1
|
Lake
|
|
The proposed improvement consists of bridge deck replacement of the structures carrying IL 120 over Des Plaines River. Also includes bridge overlay and substructure repairs of the structures carrying Belvidere Road Tributary over IL 120 and IL 120 NW ramp at IL 21. It also includes minor substructure repair and riprap placement at IL 21 over Belvidere Road tributary. The project is in the Village of Gurnee in Lake County. Total gross length and net length 1033 (0.2 Mile) and 625 Feet (0.12 Mile).
|
026-62R28
|
Executed
|
01/02/2024
|
23 / 22 |
1 |
1
|
1
|
Will
|
|
The project consists of the reconstruction of the existing I-80 mainline pavement from east of River Road to west of Houbolt Road and the partial reconstruction of the entrance and exit ramps at the I-80 and I-55 interchange and the W. Frontage Road. The work also includes reconstruction and widening of the EB/WB I-80 Bridges over DuPage River, EB/WB I-80 Bridges over Frontage Road, EB/WB I-80 Bridges over I-55, EB/WB I-80 Bridges over Rock Run Creek, and EB/WB I-80 Bridges over future Ramp AA. Other work includes drainage system improvements, signing, lighting, temporary traffic signals, ITS improvements, noise abatement walls. The project is located in the Village of Shorewood, City of Joliet, and Troy Township in Will County. Gross and Net Length: 10,450 ft (1.979 mile).
|
027-62R83
|
Executed
|
12/13/2023
|
|
|
1
|
1
|
Cook
|
|
Installation of new fiber optic cable, conduit, PTZ cameras, network switches along four different corridors. This project located in Cook County located primarily within Village of Worth, Blue Island, and Hazel Crest.
|
028-62R87
|
Executed
|
12/13/2023
|
|
|
1
|
1
|
Will
|
|
(282-Ft) Bridge Preservation Project: bridge repair, joint replace/ repair and deck overlay on bridge carrying Old Chicago Road over Forked Creek (0.5 mi N of Manteno Rd) Located in Wesley Township in Will County.
|
029-62T12
|
Executed
|
12/13/2023
|
|
|
1
|
1
|
DuPage
|
|
The proposed improvement consists of bridge deck overlay and joint replacement of IL 83 over BNSF RR (S of Bluff Road) in the Downers Grove Township, DuPage County. Total gross length and net length= 5442.65 FT (1.031 Ml), and 4811.44FT (0.911 Ml)
|
030-62T18
|
Executed
|
12/13/2023
|
2 / 2 |
2 |
1
|
1
|
Cook
|
|
The scope of work consists of overlay of SN 016-2598 bridge deck overlay, parapet and railing repairs, deck scarification, pavement markings, and traffic control and protection. The project is located over UPRR in the Village of Northbrook in Cook County. Gross Length= Net Length =2658 FT (0.50 Mile).
|
031-62T36
|
Executed
|
12/13/2023
|
|
1 |
1
|
1
|
Cook
|
|
(392-Ft) Bridge rehabilitation project and the scope consists of deck scarification, latex concrete overlay, joint replacement, approach slab and slope wall repairs on Tower Road over I-94/US41 (Edens Expressway) in the Villages of Glencoe and Northfield in Cook County. (SN 016-0815).
|
032-62T52
|
Executed
|
01/02/2024
|
|
1 |
1
|
1
|
Cook
|
|
Length: 452 ft (0.09 mi); Bridge Preservation Project: Bridge deck overlay and joint repair of SN 016-2038 carrying Wilson Avenue over I-94 (Edens Expwy) and ADA improvements in Cook County.
|
033-62T57
|
Executed
|
01/02/2024
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
(3.54-Mile) SMART Overlay and ADA Improvements on US 6 from Carol Avenue to IL 83 (Torrence Avenune). This project is located in the City of Harvey, Calumet City and the Village of South Holland in Cook County.
|
034-62T65
|
Executed
|
01/02/2024
|
|
|
1
|
1
|
DuPage
|
|
(2.09-Mile) SMART Overlay and pedestrian ramps (ADA) project. The scope included pavement patching, HMA surface removal and resurfacing, pedestrian ramp improvements, drainage structure adjustments, cleaning and placement of permanent pavement markings. This project begins on Beaumont Dr./ Shandrew Dr. at Ogden Ave. (US 34) and extends southwest of Aurora Rd. and is located within the City of Naperville in DuPage County.
|
035-62T74
|
Executed
|
01/02/2024
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
(2.33-Mile) Smart Overlay, crack and joint seal, ADA Improvements project consists of pavement patching, PCC curb and gutter removal and replacement, pedestrian curb ramps improvements (ADA), hot-mix asphalt surface removal and resurfacing and sealing of existing longitudinal joints and cracks. This project begins at IL-59 (FAP 338) at Dundee/Old Dundee Rd and extends northerly to Lake Cook Rd/Main St. The project is located within Barrington Township in Cook Co.
|
036-62U75
|
Withdrawn
|
11/17/2023
|
|
|
1
|
1
|
Various
|
|
The work to be completed under this contract consists of expressway daytime sweeping throughout District 1.
|
037-62U86
|
Executed
|
12/12/2023
|
|
|
1
|
1
|
Various
|
|
Upgrading existing pedestrian push buttons to APS push buttons at various D1 ADA compliant intersections.
|
038-62V23
|
Executed
|
12/26/2023
|
|
|
1
|
1
|
Cook
|
|
This improvement is a Bridge Painting on I-57 Under 175th St in the City of Country Club Hills in Cook County. (SN 016-1095)
|
039-62W13
|
Executed
|
12/12/2023
|
|
|
1
|
1
|
Various
|
|
Upgrading existing pedestrian push buttons to APS push buttons at various D1 ADA compliant intersections.
|
040-62W14
|
Executed
|
12/12/2023
|
|
|
1
|
1
|
Cook
|
|
The project consists of removing trees, as well as all incidental and collateral work necessary to complete the project as shown on the plans and as described herein. 3,360 ft. (0.64 mi.) along IL 43, and 2,970 ft. (0.56 mi.) along 95th Street, tree removal, in Bridgeview, Oak Lawn, and Chicago Ridge, Cook County, IL.
|
041-64918
|
Executed
|
01/02/2024
|
1 / 1 |
1 |
2
|
2
|
Carroll
|
|
Patching, Resurfacing and ADA improvements on IL 78 from 0.2 mile N. of US 52/IL 64 to Carroll Creek in Mt. Carroll.
|
042-64K73
|
Executed
|
01/05/2024
|
10 / 10 |
|
2
|
2
|
Winnebago
|
|
Removal and replacement of twin structures carrying IL Route 2 over the Rock River in Rockton.
|
043-64S39
|
Executed
|
12/15/2023
|
2 / 2 |
|
2
|
2
|
Whiteside
|
|
Bridge deck overlay, joint replacement and miscellaneous repairs on SN 098-0086, carrying IL 40 over I-88, 1 mile south of US 30.
|
044-64S40
|
Executed
|
12/15/2023
|
|
|
2
|
2
|
Whiteside
|
|
Bridge deck overlay, joint replacement, and miscellaneous repairs on SN 098-0091, carrying US 30 over I-88, 3 miles east of Rock Falls.
|
045-64S43
|
Executed
|
12/26/2023
|
|
|
2
|
2
|
Rock Island
|
|
Bridge washing of SN 081-0011 over the Mississippi River in Rock Island County.
|
046-64S44
|
Executed
|
12/26/2023
|
|
|
2
|
2
|
Rock Island
|
|
Bridge washing of SN 081-0106 over the Mississippi River in Rock Island County.
|
047-64S45
|
Executed
|
12/26/2023
|
|
|
2
|
2
|
Various
|
|
Bridge washing of SN 008-0052, 098-6003 and 081-9905 over the Mississippi River in various counties.
|
048-66N21
|
Active
|
09/26/2023
|
|
|
2
|
3
|
Grundy, Kankakee
|
|
This project consists of repairing and maintaining traffic signals, flashing beacons, and roadway lighting in Grundy and Kankakee Counties.
|
049-66N39
|
Executed
|
01/05/2024
|
|
|
2
|
3
|
Various
|
|
This project consists on performing Bridge Deck Concrete Sealing with the parapets/curbs on various routes at various locations throughout Ford, Iroquois, and Kankakee Counties.
|
050-66N83
|
Executed
|
12/12/2023
|
|
|
2
|
3
|
Various
|
|
Tree Removal located within Bureau, DeKalb, Ford, Grundy, La Salle, and Livings on counties.
|
051-66N99
|
Executed
|
01/12/2024
|
|
|
2
|
3
|
Various
|
|
This project consists of repairing and maintaining traffic signals, flashing beacons, and roadway lighting in Ford, Iroquois, and Livingston Counties.
|
052-68C00
|
Executed
|
01/02/2024
|
11 / 11 |
2 |
3
|
4
|
Tazewell
|
|
3R project has a length of 0.58 miles extending from the east end of the Cedar St Bridge over the Illinois River to just east of Center St, including the Edmund St interchange. Work includes pavement patching, milling, resurfacing, and bridge rehabilitation.
|
053-68D36
|
Executed
|
01/10/2024
|
|
|
3
|
4
|
McDonough
|
|
Stream stabilization with riprap placement at various locations along Spring Creek, northwest of Macomb bypass.
|
054-68G39
|
Executed
|
01/02/2024
|
|
1 |
3
|
4
|
Marshall
|
|
Bridge repair and bridge deck overlay to S.N. 062-0056 over Thenius Creek 1/4 mi. N. of Sparland; S.N. 062-0057 over Gimlet Creek at the IL 29/IL 17 junction and S.N. 062-0059 over Senachwine Creek, 4 mi. W. of Sparland.
|
055-68H77
|
Executed
|
12/15/2023
|
|
2 |
3
|
4
|
Various
|
|
District-wide replacement of pedestrian pushbuttons with APS push buttons.
|
056-68H79
|
Executed
|
12/15/2023
|
|
|
3
|
4
|
Various
|
|
Bridge painting: S.N. 072-0106 SB IL 6, S.N. 072-0107 NB I-474 Ramp 109, S.N. 072-0108 SB I-474 Ramp, 072-0109 NB I-474 Ramp 109, S.N. 048-0078 W. Knox Rd., S.N. 094-0028 Cameron Rd., S.N. 055-0021 CH 8, S.N. 048-0080 IL 180, S.N. 090-0043 US 150, S.N. 072-0228 US 24/IL 9.
|
057-70G12
|
Executed
|
12/15/2023
|
|
1 |
3
|
5
|
McLean
|
|
Bridge painting of 3 structures on FAI 55 (I-55) and FAP 704 (I-55 Busn).
|
058-72122
|
Deleted
|
10/12/2023
|
|
|
4
|
6
|
Sangamon
|
|
1.7 miles of pavement reconstruction, milling and resurfacing, sidewalk ramp improvements and accessible pedestrian traffic signals on Dirksen Parkway from 0.1 miles south of Peoria Road to north of Northfield Drive in Springfield.
|
059-72717
|
Executed
|
12/22/2023
|
10 / 10 |
1 |
4
|
6
|
Brown, Pike
|
|
Spray-applied pipe liner on IL 107 in Brown and Pike Counties.
|
060-72719
|
Executed
|
12/22/2023
|
|
|
4
|
6
|
Sangamon
|
|
Lot improvements to the Riverton Maintenance Yard.
|
061-72807
|
Executed
|
12/12/2023
|
|
|
4
|
6
|
Montgomery
|
|
Tree removal at the Coalfield Rest Area.
|
062-72B88
|
Withdrawn
|
11/15/2023
|
1 / 1 |
|
4
|
6
|
Mason
|
|
1.9 miles of resurfacing, pavement replacement, ADA improvements, drainage improvements, culvert replacements, parking lot improvements, tree removal and storm sewer reconstruction on IL 10, in Mason City, from 0.1 miles east of IL IL 29 to west of Price Street, east of Mason City. , 1.9 miles of resurfacing, pavement replacement, ADA improvements, drainage improvements, culvert replacements, parking lot improvements, tree removal and storm sewer reconstruction on IL 10, in Mason City, from 0.1 miles east of IL 29 to west of Price Street, east of Mason City.
|
063-72F14
|
Executed
|
01/02/2024
|
4 / 4 |
1 |
4
|
6
|
Schuyler
|
|
7.3 miles of milling, resurfacing, bridge overlay (SN 085-0004), slope stabilization and guardrail replacement on IL 103 from 0.1 miles east of US 24 to 1.7 miles west of US 67.
|
064-72F26
|
Executed
|
01/10/2024
|
1 / 1 |
|
4
|
6
|
Adams
|
|
Culvert replacement on IL 96 over a ditch, 1 mile north of Kochs Lane, north of Qunicy.
|
065-72F59
|
Executed
|
01/02/2024
|
|
|
4
|
6
|
Cass
|
|
Culvert replacement (SN 009-7002) carrying IL 125 over a ditch 0.6 miles east of Warrior Hill Road.
|
066-72H57
|
Executed
|
01/02/2024
|
3 / 3 |
|
4
|
6
|
Hancock
|
|
Hydro-scarification, microsilica concrete overlay, expansion joint replacement and steel repairs on SN 034-0062 carrying US 136 over the Mississippi River from Hamilton, IL to Keokuk, IA.
|
067-72K83
|
Executed
|
01/10/2024
|
|
|
4
|
6
|
Sangamon
|
|
Culvert replacement on IL 104 at Little Panther Creek, 1.9 miles west of IL 4 (SN 084-7061).
|
068-72K96
|
Executed
|
01/10/2024
|
1 / 1 |
|
4
|
6
|
Morgan
|
|
5.2 miles of resurfacing on IL 78 from the Cass County line to just north of Snake Creek.
|
069-72M34
|
Executed
|
01/02/2024
|
|
|
4
|
6
|
Morgan
|
|
Painting portions of 7 bridges near Jacksonville.
|
070-72M71
|
Executed
|
01/10/2024
|
3 / 3 |
1 |
4
|
6
|
Brown
|
|
4.8 miles of milling, patching, resurfacing and shoulders on US 24 from 0.5 miles east of Timewell Road to 0.3 miles west of Buckhorn / Damon Road in Mount Sterling.
|
071-72M79
|
Deleted
|
10/12/2023
|
|
|
4
|
6
|
Menard
|
|
1.9 miles of resurfacing and culvert improvements on IL 97 south of Petersburg, from 0.1 miles north of North Shore Drive to 0.3 miles north of Boy Scout Road.
|
072-72M82
|
Deleted
|
10/12/2023
|
|
|
4
|
6
|
Sangamon
|
|
1 mile of standard overlay, concrete curb and gutter ADA improvements and traffic signal upgrades on Business 55 / 6th Street in Springfield from north of Myrtle Street to Stanford Avenue.
|
073-74471
|
Executed
|
02/06/2024
|
1 / 1 |
1 |
4
|
7
|
Fayette
|
|
3.4 miles of resurfacing on US 40 from 0.5 miles west of the I-70 interchange to IL 185 in Vandalia, resurfacing the I-70 / US 40 ramps at the Vandalia Vandalia interchange and joint repairs and overlay to SN 026-0087.
|
074-74562
|
Withdrawn
|
11/14/2023
|
1 / 1 |
1 |
4
|
7
|
Clark
|
|
Replacement of SN 012-0018 carrying US 40 over North Fork Embarras River, 0.6 miles west of Washington Street in Martinsville.
|
075-74B29
|
Executed
|
12/22/2023
|
|
|
4
|
7
|
Macon
|
|
Bridge deck overlay, joint replacement / repair and other bridge deck repairs on 3 structures: 1) SN 058-0060 carrying TR 4 (South Acom Road) over I-72; 2) SN 058-0062 carrying CH 27 (Lincoln Memorial Parkway) over I-72; 3) SN 058-0065 carrying Twin Lakes Road over I-72 just west of Decatur.
|
076-74B30
|
Executed
|
01/02/2024
|
|
|
4
|
7
|
Macon
|
|
Bridge deck overlay, joint repair and approach pavement on I-72 over Spring Creek, 1.3 miles east of Forsyth.
|
077-74B31
|
Executed
|
12/15/2023
|
|
|
4
|
7
|
Fayette
|
|
Bridge repairs on SN 026-0071 carrying IL 185 over I-57 in Farina.
|
078-74B33
|
Executed
|
12/22/2023
|
|
|
4
|
7
|
Macon
|
|
Bridge deck repair and overlay on SN 058-0129 carrying IL 121 over South Fork Creek, 0.7 miles east of the Logan County line.
|
079-74B34
|
Executed
|
01/10/2024
|
|
|
4
|
7
|
Effingham
|
|
Bridge deck overlay, bridge joint replacement, deck drain replacement, bridge deck patching on SN 025-0089 carrying IL 37 over the Little Wabash River, 0.5 miles south of I-57.
|
080-74B35
|
Executed
|
01/10/2024
|
|
|
4
|
7
|
Clark
|
|
Bridge deck overlay and joint replacement and repairs on SN 012-0025 carrying US 40 over I-70.
|
081-74B37
|
Executed
|
03/05/2024
|
1 / 1 |
|
4
|
7
|
Wabash
|
|
Washing the bridge deck on SN 093-0021 carrying IL 15 over the Wabash River in Mt. Carmel.
|
082-74B39
|
Executed
|
12/22/2023
|
|
|
4
|
7
|
Macon
|
|
Bridge deck overlay, joint replacement, deck patching, structural concrete repair, crashwall extensions and HMA approaches on SN 058-0087 carrying Kirby Road over I-72, northeast of Decatur.
|
083-74B41
|
Deleted
|
10/12/2023
|
|
|
4
|
7
|
Cumberland
|
|
Bridge deck overlay, bridge joint replacement and repair, bridge approach roadway and bridge deck repairs on SN 018-0044 and 018-0054 carrying I-70 over Cottonwood Creek, 0.1 miles east of County Road 1125E.
|
084-74C65
|
Executed
|
01/10/2024
|
1 / 1 |
|
4
|
7
|
Cumberland
|
|
Bridge joint replacement / repair, bridge deck repairs and bridge deck overlay on SN 018-0003 and 018-0004 carrying I-57 over US 45 and SN 018-0001 and 018-0002 carrying I-57 over the Decatur and Eastern Illinois Railroad, all located northeast of Neoga.
|
085-76F84
|
Deleted
|
10/13/2023
|
|
|
5
|
8
|
Madison
|
|
Intersection reconstruction to create roundabouts on IL 3 at Delmar Avenue and IL 3 at Pierce Lane in Godfrey.
|
086-76F88
|
Withdrawn
|
11/06/2023
|
|
|
5
|
8
|
Madison
|
|
Superstructure replacement on the north Southern Illinois University - Edwardsville entrance road over the Norfolk Southern Railroad (SN 060-0142 and SN 060-0143).
|
087-76M88
|
Executed
|
01/10/2024
|
|
|
5
|
8
|
Washington
|
|
Culvert replacement on IL 127 at South Middle Tributary of Locust Creek, 6.7 miles south of IL 15 and the town of Nashville. (SN 095-2496)
|
088-76M90
|
Executed
|
01/02/2024
|
|
|
5
|
8
|
Washington
|
|
Culvert replacement on IL 177 at West Tributary to Grand Point, 0.5 miles east of Hoyleton. (SN 095-2496)
|
089-76N16
|
Executed
|
01/05/2024
|
2 / 2 |
1 |
5
|
8
|
Madison
|
|
Bridge repairs, flood wall work and pavement reconstruction on IL 11 over Cahokia Diversion Channel (SN 060-0121), 3 miles north of I-270.
|
090-76N43
|
Executed
|
01/10/2024
|
8 / 8 |
3 |
5
|
8
|
Madison
|
|
Intersection reconstruction and ADA upgrades on IL 3 at 20th Street in Granite City.
|
091-76T01
|
Executed
|
01/05/2024
|
|
|
5
|
8
|
Various
|
|
Traffic signal modernization at various locations within District 8.
|
092-76T39
|
Executed
|
01/05/2024
|
3 / 3 |
2 |
5
|
8
|
St. Clair
|
|
1.96 miles of patching and a standard overlay on I-55/64/US 40 from 0.9 miles east of the Mississippi River to I-64 (Tri-Level) Interchange in East St. Louis
|
093-78199
|
Executed
|
01/10/2024
|
|
|
5
|
9
|
Perry
|
|
Replacement of a bridge with a double reinforced concrete box culvert on US 51 north of Tamaroa. (SN 073-0002)
|
094-78771
|
Executed
|
01/10/2024
|
|
|
5
|
9
|
Saline
|
|
Intersection reconstruction at the intersection of US 45 and Poplar (Old IL 13) in Harrisburg.
|
095-78814
|
Executed
|
01/02/2024
|
2 / 2 |
1 |
5
|
9
|
Franklin
|
|
Conversion of the I-57 and IL 149 ramp terminals into roundabouts, pavement reconstruction and bridge modifications in the city of West Frankfort.
|
096-78929
|
Executed
|
01/02/2024
|
|
|
5
|
9
|
Jackson
|
|
0.75 miles of resurfacing on North 6th Street in Murphysboro.
|
097-78A02
|
Executed
|
01/10/2024
|
4 / 4 |
1 |
5
|
9
|
Alexander, Jackson, Union
|
|
25.4 miles of patching, milling, resurfacing and shoulders on IL 3 from Howardton Road, near Grand Tower, to the Cape T intersection.
|
098-85727
|
Executed
|
01/02/2024
|
6 / 6 |
1 |
2
|
2
|
Winnebago
|
|
Sidewalk construction along Parkview Avenue from Spring Creek Road to Birchwood Drive in Rockford.
|
099-89815
|
Executed
|
01/05/2024
|
2 / 2 |
1 |
3
|
4
|
Peoria
|
|
Structure rehabilitation with replacement of approach slabs, bridge deck, parapets, beams, expansion joints, bearings, concrete slope walls. Also included will be PCC pavement with curb and gutter, and storm sewers on Maxwell Road over the Union Pacific Railroad, 0.2 miles south of IL 116.
|
100-89824
|
Executed
|
01/02/2024
|
|
|
3
|
4
|
Tazewell
|
|
Resurfacing Fischer Road from IL 29 to Creve Coeur Avenue in Creve Coeur.
|
101-91622
|
Executed
|
01/02/2024
|
|
|
3
|
5
|
Vermilion
|
|
Resurfacing, patching and sidewalks on Williams Street from Bowman Avenue to State Street in Danville.
|
102-93775
|
Executed
|
01/10/2024
|
1 / 1 |
|
4
|
6
|
Menard
|
|
Widening and HMA resurfacing with aggregate shoulders and pipe culverts on Athens Blacktop from Cantrall Road to Kent Street.
|
103-93812
|
Executed
|
01/10/2024
|
|
|
4
|
6
|
Sangamon
|
|
HMA resurfacing with pavement markings on Cardinal Hill Road from New City Road to north of IL 104.
|
104-95941
|
Executed
|
01/17/2024
|
|
|
4
|
7
|
Moultrie
|
|
Sidewalk Construction on various routes within the City of Sullivan.
|
105-97793
|
Rejected
|
12/27/2023
|
|
|
5
|
8
|
Madison
|
|
Reconstruction of the IL 159 and Glen Carbon Road intersection to establish north bound and east bound right turn lanes. Includes, HMA resurfacing, sidewalks, ADA ramps, traffic signal modifications, and drainage improvements. Located in Glen Carbon.
|
106-61H25
|
Executed
|
01/12/2024
|
3 / 3 |
1 |
1
|
1
|
Will
|
|
Remove existing dual metal pipe culverts and replace with double-barrel box culvert to carry Indian Boundary Road over Spring Hole Creek in Plainfield.
|
107-97790
|
Executed
|
01/12/2024
|
7 / 7 |
2 |
5
|
8
|
Madison
|
|
Reconstruction of Lebanon Road on new alignment to facilitate closure of two underpass structures. Work includes structure removal, construction of a 6-span steel plate girder bridge, construction of a 1-span PC slabl bridge, box culverts, pavement removal, building removal, processing lime modified soil, PPC Pavement, HMA Pavement, HMA shoulders, combination curb and gutter, and storm sewer. Located 0.19 miles east of Clay School Road to 0.16 miles of Locmann Road over the CSX Railroad.
|
108-97815
|
Executed
|
01/02/2024
|
|
|
5
|
8
|
St. Clair
|
|
Resurfacing Jerome Lane from Nash Street to Range Lane in Cahokia.
|
109-97817
|
Rejected
|
12/12/2023
|
|
|
5
|
8
|
St. Clair
|
|
Construction of a PCC sidewalk from the Boul Avenue Trailhead entrance to the intersection of Boul Avenue and IL 159 in Swansea.
|
110-97822
|
Executed
|
01/30/2024
|
|
|
5
|
8
|
Madison
|
|
Resurfacing West Airline Drive from Main Street to 9th Street in East Alton.
|
111-99673
|
Executed
|
12/15/2023
|
4 / 4 |
|
5
|
9
|
Williamson
|
|
Resurfacing East Grand Avenue from Hurricane Road to IL 148.
|
112-99711
|
Executed
|
01/10/2024
|
2 / 2 |
1 |
5
|
9
|
Jackson
|
|
Resurfacing North Marion Street from East Fischer Street to Dillinger Road.
|
113-99713
|
Executed
|
01/10/2024
|
|
|
5
|
9
|
Jackson
|
|
Replace existing structure with a precast concrete box culvert with pre-cast box culvert end sections, PCC pavement, sidewalk, curb and gutter, on East College Street over Piles Fork Creek in Carbondale.
|
114-99716
|
Executed
|
01/10/2024
|
2 / 1 |
|
5
|
9
|
Williamson
|
|
Remove and replace sidewalks, ADA ramps and crosswalks along North 18 Street from East Herrin Street to West Monroe Street in Herrin.
|
115-99720
|
Executed
|
01/05/2024
|
|
|
5
|
9
|
Williamson
|
|
HMA resurfacing on Lake of Egypt Road from IL 37 to South Market Road, and on Power Plant Road from Lake of Egypt Road to County Club Road. Includes HMA and aggregate shoulders, guardrail adjustments and replacements, and raised pavement markers.
|
116-78809
|
Executed
|
01/10/2024
|
1 / 1 |
|
5
|
9
|
Gallatin
|
|
Slope stabilization at SN 030-0021 carrying IL 1 over the Saline River, 2.5 miles south of IL 13, southeast of Equality.
|
117-62W19
|
Withdrawn
|
11/17/2023
|
|
|
1
|
1
|
DuPage
|
|
This contract consists of arterial road sweeping in DuPage County.
|
118-62W35
|
Withdrawn
|
11/17/2023
|
|
|
1
|
1
|
Will
|
|
This contract consists of arterial road sweeping in Will County.
|
119-62W36
|
Withdrawn
|
11/17/2023
|
|
|
1
|
1
|
Cook
|
|
This contract consists of arterial road sweeping in north Cook County.
|
120-62W37
|
Withdrawn
|
11/17/2023
|
|
|
1
|
1
|
Cook
|
|
This contract consists of arterial road sweeping in south Cook County.
|
121-62U70
|
Withdrawn
|
11/17/2023
|
|
1 |
1
|
1
|
Various
|
|
This contract consists of nighttime sweeping along various expressways in District 1.
|
122-62V15
|
Executed
|
12/15/2023
|
|
|
1
|
1
|
Various
|
|
The roadside development work to be completed consists of repairing and installing landscape materials and features. This work is located along various state-maintained routes located within the counties of Cook, DuPage, Lake, McHenry, Will, and Kane.
|
123-74C38
|
Executed
|
12/15/2023
|
1 / 1 |
|
4
|
7
|
Richland
|
|
Emulsion tank installation at the Olney Maintenance Yard.
|
124-76R56
|
Active
|
10/05/2023
|
|
|
5
|
8
|
Calhoun
|
|
Repair and maintenance of electrical equipment at the Joe Page Bridge in Hardin (SN 031-0001).
|
01A-MC029
|
Rejected
|
12/19/2023
|
|
|
4
|
7
|
Lawrence
|
|
Replace Runway End Identifier Lights (REILs) on Runway 4/22
|
02A-OL018
|
Rejected
|
03/29/2024
|
|
|
4
|
7
|
Richland
|
|
Rehabilitate Aircraft Hangar Access Pavements
|
03A-FL035
|
Rejected
|
12/20/2023
|
|
|
4
|
7
|
Clay
|
|
Reconstruct Auto Parking Lot and Aircraft Hangar Access Pavements
|
04A-KA052
|
Rejected
|
01/05/2024
|
1 / 1 |
2 |
2
|
3
|
Kankakee
|
|
Widen Taxiway Fillet at Runway 22 End and Relocate Taxiway A4
|
05A-AU072
|
Awarded
|
07/02/2024
|
4 / 4 |
1 |
1
|
1
|
Kane
|
|
Rehabilitate Auto Parking Lots and Entrance Road
|
06A-AU073
|
Executed
|
09/16/2024
|
|
1 |
1
|
1
|
Kane
|
|
Overlay SE Quadrant Airport Perimeter Roadways - Phase 2
|
07A-RB022
|
Rejected
|
07/01/2024
|
|
2 |
4
|
7
|
Crawford
|
|
Install LED Precision Approach Path Indicator (PAPI) System and Associated Electrical Improvements of Duct, Structures, Cabling, and Vault Work
|
08A-PE003
|
Executed
|
08/30/2024
|
2 / 2 |
1 |
3
|
4
|
Peoria
|
|
Rehabilitate Hanna City T-Hangar Taxiway Pavements - Phase 2
|
09A-PO020
|
Executed
|
08/21/2024
|
|
|
2
|
3
|
Livingston
|
|
Rehabilitate Aircraft Taxilane and Airport Entrance Road
|
10A-SR097
|
Executed
|
07/22/2024
|
|
|
5
|
8
|
Madison
|
|
Rehabilitate Automobile Parking Lots
|
11A-LO034
|
Active
|
10/10/2023
|
1 / 1 |
|
4
|
6
|
Logan
|
|
Replace Airport Perimeter Fencing, Phase 1
|
12A-FR047
|
Executed
|
05/29/2024
|
|
|
2
|
2
|
Stephenson
|
|
Construct Southwest Terminal Area Entrance Road, Phase 2
|
13A-JO027
|
Executed
|
07/17/2024
|
|
|
1
|
1
|
Will
|
|
Rehabilitate Airport Automobile Parking Lot
|