001-46616
|
Executed
|
07/28/2023
|
|
|
3
|
4
|
Various
|
|
D4 Reflector replacement on various routes in various counties throughout District 4.
|
002-46617
|
Executed
|
07/26/2023
|
|
|
3
|
5
|
Champaign, Douglas
|
|
Pavement marking repair on I-57 and I-74 in Douglas and Champaign Counties.
|
003-46619
|
Executed
|
07/26/2023
|
|
|
3
|
5
|
Champaign
|
|
Pavement marking at various locations in District 5.
|
004-61J42
|
Withdrawn
|
08/04/2023
|
1 / 1 |
|
1
|
1
|
Cook
|
|
Install push button actuated flashing pedestrian beacons, sidewalk improvements , signage, and pavement markings at Midblock Crossing on Wolf Road in Burr Ridge.
|
005-61J44
|
Executed
|
09/05/2023
|
|
|
1
|
1
|
Kane
|
|
Resurfacing Highland Avenue from Randall Road to McLean Boulevard, Coombs Road from Highland Avenue to 0.7 mile south of Highland Avenue, and McDonald Road from 1,700 feet east of Dittman Road to Corron Road in Elgin.
|
006-61J59
|
Executed
|
07/26/2023
|
|
|
1
|
1
|
Cook
|
|
Resurfacing Northgate Parkway from north of Dundee Road(IL 68) to Lake-Cook Road in Wheeling.
|
007-61J60
|
Executed
|
07/24/2023
|
|
|
1
|
1
|
Will
|
|
Resurfacing Normantown Road from 135th Street to Weber Road in Romeoville.
|
008-61J61
|
Executed
|
07/24/2023
|
|
|
1
|
1
|
Will
|
|
HMA resurfacing with patching, sidewalk replacement, ADA improvements, detector loop replacements, and pavement markings on Normantown Road, from Crossroads Parkway to Montrose Drive, in Romeoville.
|
009-61J62
|
Executed
|
07/24/2023
|
|
|
1
|
1
|
Will
|
|
Resurfacing 135th Street from the Chicago Ship and Sanitary Cnal Bridge to New Avenue in Romeoville.
|
010-62P08
|
Executed
|
08/04/2023
|
|
1 |
1
|
1
|
Cook
|
|
(552-Ft) The proposed improvement consists of culvert repair of IL 58 (Golf Road) over Poplar Creek Tributary in the Village of Hoffman Estates, Cook Co.
|
011-62T16
|
Executed
|
07/24/2023
|
1 / 1 |
1 |
1
|
1
|
DuPage
|
|
(700-Ft) This is a bridge preservation project and scope of work includes deck scarification, latex concrete overlay, joint sealing and replacement and approach slab repair on IL Route 38 over Winfield Creek in the City of Wheaton in DuPage County.
|
012-62T67
|
Executed
|
07/24/2023
|
|
|
1
|
1
|
Will
|
|
(1.9-Mile) Crack and Joint Sealing project consisting of crack routing and filling of longitudinal joints, grading and shaping shoulders and pavement re-striping on IL 7 and IL 53 (Broadway Street) from Renwick Road to North of Caton Farm Road in the Cities of Lockport and Crest Hill in Will County.
|
013-62T70
|
Executed
|
08/15/2023
|
|
|
1
|
1
|
Cook, DuPage
|
|
(5.6-Mile) Crack and Joint Sealing project along IL Route 38, from East of Edson Ave to East of I-294 in the Villages of Elmhurst, Hillside, Lombard, Oakbrook Terrace and Villa Park in DuPage and Cook Counties.
|
014-62T76
|
Executed
|
07/24/2023
|
|
|
1
|
1
|
Kane
|
|
(1.838-Mile) Crack and Joint Sealing; Location: FAP 341 IL72 from Industrial Dr to 0.2 Mile West Of Highland Dr in the Village of Gilberts in Kane County.
|
015-62U63
|
Executed
|
07/24/2023
|
1 / 1 |
|
1
|
1
|
Cook
|
|
(1565-Ft) The proposed improvement consists of bridge deck (SN: 016-1056) overlay and joint repair of the structure located at 1-55 (EB) Ramp to Franklin Avenue (NB) in the City of Chicago, Cook County.
|
016-64F57
|
Executed
|
07/24/2023
|
|
1 |
2
|
2
|
Ogle, Whiteside
|
|
Removal and Replacment of two structures carrying Freeport Rd. over Jordan Creek: SN 071-1001 located 0.5M (N) of Pilgrim Rd. in Ogle Co. and SN 098-0049 located 0.2M (S) of Pilgrim Rd. in Whiteside Co., Jordan Creek 6 Mi N of Sterling and Sterling and Jordan Creek 0.4 Mi N of Lee/Whiteside Co Line.
|
017-64R55
|
Executed
|
07/24/2023
|
2 / 2 |
|
2
|
2
|
Carroll
|
|
Expansion joint replacement, miscellaneous repairs and deck concrete wearing surface on SN 008-0028 carrying IL 84 over Plum River, 1.0 miles South of US 52/IL 64 South of Savanna and SN 008-0040 carrying IL 84 over BNSF RR, 0.3 miles South of US 52/IL 64 in Savanna.
|
018-64R57
|
Executed
|
07/28/2023
|
|
|
2
|
2
|
Winnebago
|
|
Lighting on US 20 at Alpine Rd interchange.
|
019-64R58
|
Executed
|
07/28/2023
|
|
|
2
|
2
|
Lee
|
|
Lighting at I-39 AT US 30.
|
020-64S03
|
Executed
|
07/28/2023
|
|
|
2
|
2
|
Rock Island
|
|
Bridge joint replacement, misc bridge repair carrying SN 081-0121 over I-88.
|
021-64S08
|
Executed
|
07/24/2023
|
|
|
2
|
2
|
Rock Island
|
|
Bridge joint replacement, misc bridge repair carrying SN 081-0126 over I-88.
|
022-64S09
|
Executed
|
07/25/2023
|
|
|
2
|
2
|
Rock Island
|
|
Bridge joint replacement, misc bridge repair carrying SN 081-0133 over I-88.
|
023-64S16
|
Executed
|
07/24/2023
|
1 / 1 |
1 |
2
|
2
|
Jo Daviess
|
|
House and Garage Demolition of 420 Wall St. in East Dubuque.
|
024-66B05
|
Executed
|
07/24/2023
|
1 / 1 |
|
2
|
3
|
LaSalle, Livingston
|
|
Milling and resurfacing with a designed overlay of IL 18 including storm_sewer construction, drainage and ADA ramp improvements. From the intersection of IL 17 and IL 18 in south eastern Streator and ends at the intersection of Otter Creek Road and IL 18 in Streator.
|
025-66M71
|
Executed
|
07/24/2023
|
|
|
2
|
3
|
Grundy
|
|
Crack Filling on FAP 326 (IL 47) 0.1 MI S of Southmor Rd to 0.2 MI S of IL 113 for a total of 3.59 MI.
|
026-66M76
|
Executed
|
07/26/2023
|
1 / 1 |
1 |
2
|
3
|
LaSalle
|
|
This work is located at two box culverts on IL Route 170: SN 050-2542 and SN 050-2543.
|
027-66N15
|
Withdrawn
|
08/04/2023
|
|
|
2
|
3
|
Kankakee
|
|
This project is located at the intersection of IL-17 and IL-1 in Kankakee County, to replace two traffic signal mast arms in northbound and southbound traffic.
|
028-66N26
|
Executed
|
07/26/2023
|
|
|
2
|
3
|
Grundy
|
|
Pavement widening with resurfacing of Morey Road and Seneca Road including minor drainage improvements.
|
029-66N28
|
Executed
|
09/15/2023
|
|
|
2
|
3
|
Various
|
|
Repair damaged High Tension Cable Median Barrier, Guardrail, Attenuators, etc., caused by motorists along various routes in District 3. One year contract.
|
030-66N43
|
Executed
|
07/26/2023
|
|
|
2
|
3
|
Grundy, LaSalle
|
|
This project consists of washing the bridge components and replacing the elastomeric (expansion) trough on SN 050-0079 and the structure carrying IL 47 over the Illinois River and the IandM Canal approximately 1.2 miles south of US 6 in Morris.
|
031-68H15
|
Executed
|
07/26/2023
|
1 / 1 |
|
3
|
4
|
Tazewell
|
|
Replace expansion joints and substructure repairs to structures carrying I-155 over IL 98 and TPandWRR.
|
032-68H36
|
Executed
|
07/28/2023
|
|
|
3
|
4
|
Peoria
|
|
Riprap for scour countermeasures at 1-74 over Kickapoo Creek and Swab Run; IL 91 over Kickapoo Creek.
|
033-68H38
|
Executed
|
07/28/2023
|
|
|
3
|
4
|
Various
|
|
Weed Spraying at various locations throughout District 4.
|
034-68H61
|
Executed
|
07/24/2023
|
|
|
3
|
4
|
Various
|
|
Traffic signal and highway lighting improvements at various locations in Peoria, Tazewell, Woodford and McDonough Counties.
|
035-68H62
|
Executed
|
07/24/2023
|
|
|
3
|
4
|
Knox
|
|
HMA patching on IL 167 from Knox Road 2000 East to IL 180 in Knox County.
|
036-68H63
|
Executed
|
07/28/2023
|
3 / 3 |
|
3
|
4
|
Peoria
|
|
Expansion joints, patching, and, substructure repairs to S.N. 072-0149, IL 6 ramp overpass, west of IL 29.
|
037-68H64
|
Executed
|
07/24/2023
|
|
|
3
|
4
|
Peoria
|
|
Longitudinal Joint Repair on IL 116 from Route 9 to Kingston Mines.
|
038-68H66
|
Executed
|
07/28/2023
|
3 / 3 |
1 |
3
|
4
|
Fulton
|
|
PCC Pavement Resurfacing of Lewistown Maintenance Yard.
|
039-68H67
|
Executed
|
08/22/2023
|
2 / 2 |
1 |
3
|
4
|
Peoria
|
|
PCC and HMA Pavement Resurfacing of D4 Traffic Maintenance Yard.
|
040-68H69
|
Executed
|
07/24/2023
|
|
|
3
|
4
|
Knox
|
|
12.6 miles, HMA edgeline repairs.
|
041-68H70
|
Executed
|
08/01/2023
|
|
|
3
|
4
|
Peoria
|
|
3.75 miles, HMA Partial Depth Patching.
|
042-70581
|
Executed
|
07/24/2023
|
4 / 4 |
3 |
3
|
5
|
Champaign
|
|
0.16 mi bridge replacement, ILL 10 (Springfield Ave) at Copper Slough E of Duncan Rd in Champaign.
|
043-70908
|
Executed
|
07/24/2023
|
2 / 2 |
1 |
3
|
5
|
Champaign
|
|
Bridge Replacement On FAI 57 Under CH 17 Mi E of Sadorus.
|
044-70A88
|
Executed
|
07/26/2023
|
|
|
3
|
5
|
McLean
|
|
6.79 Mi., Standard Overlay 0.4 Mi. E of Grant St in Chenoa to Livingston Co. Line.
|
045-70D69
|
Executed
|
07/28/2023
|
1 / 1 |
1 |
3
|
5
|
Champaign
|
|
Bridge Deck Overlay at Ramps over I-74 at ECL of Urbana.
|
046-70G15
|
Executed
|
07/26/2023
|
|
|
3
|
5
|
McLean
|
|
0.292 Miles of Standard Overlay on FAS 488 (CH 53) from NB Ramp to SB Ramp of I-74 at Carlock Interchange.
|
047-70G18
|
Executed
|
07/26/2023
|
|
1 |
3
|
5
|
McLean
|
|
1.08 miles, Longitudinal Joint Repair, W. of Mt. Vernon Dr. to Carnahan Dr. in Bloomington.
|
048-70G27
|
Executed
|
07/24/2023
|
|
|
3
|
5
|
Vermilion
|
|
1.21 Miles of High Tension Median Cable Barrier Improvements.
|
049-70G43
|
Executed
|
08/01/2023
|
|
|
3
|
5
|
Edgar
|
|
Mast arm removal RAP 332, U.S. 150/IL. 1 (SB Central St; NB Main St.) at Madison St.
|
050-70G45
|
Executed
|
08/15/2023
|
|
|
3
|
5
|
Various
|
|
District-wide On-Call Tree Removal.
|
051-70G54
|
Executed
|
08/01/2023
|
|
|
3
|
5
|
Various
|
|
On-call lighting repairs in the District East Field Areas consisting of Champaign, Douglas, Edgar and Vermilion Counties.
|
052-70G55
|
Executed
|
07/28/2023
|
|
|
3
|
5
|
Various
|
|
On-call lighting repairs in the District West Field Areas consisting of DeWitt, Mclean and Piatt Counties.
|
053-72044
|
Executed
|
07/24/2023
|
|
|
4
|
6
|
Sangamon
|
|
Deck patching and joint repairs SN 084-0043 carrying IL 29 southbound over the South Fork of Sangamon River, 2.4 miles southeast of Springfield.
|
054-72056
|
Executed
|
07/28/2023
|
|
|
4
|
6
|
Macoupin
|
|
Deck patching and substructure repair on SN 059-0007 carrying IL 4 over Macoupin Creek, 1.7 miles south of IL 108 near Carlinville.
|
055-72114
|
Executed
|
07/26/2023
|
|
|
4
|
6
|
Schuyler
|
|
Spray-applied pipe liner on IL 100 approximately 0.2 miles east of Old US 67 (Adams Road) in Frederick.
|
056-72236
|
Executed
|
07/28/2023
|
|
|
4
|
6
|
Montgomery
|
|
3.3 miles of chip seal and guardrail replacement on I-55 East Frontage Road from north of North 19th Avenue and east of the I-55 / IL 108 interchange to IL 48 / 127.
|
057-72656
|
Executed
|
07/24/2023
|
|
|
4
|
6
|
Brown
|
|
7.3 miles of milling, resurfacing, drilled shafts and pipe culverts on IL 99 from the Schuyler County line to 0.3 miles north of the northern city limits of Mt. Sterling.
|
058-72707
|
Executed
|
07/26/2023
|
|
|
4
|
6
|
Hancock
|
|
Spray-applied pipe liner on IL 94, 110, 336 approximately 0.5 miles north of IL-94.
|
059-72708
|
Executed
|
07/26/2023
|
|
|
4
|
6
|
Montgomery
|
|
Substructure repair on SN 068-0105 carrying Township Road 1 over I-55 at the Sangamon / Montgomery County line.
|
060-72709
|
Executed
|
07/26/2023
|
|
|
4
|
6
|
Logan
|
|
Patching on I-55 from the Sangamon County line to the McLean County line.
|
061-72710
|
Executed
|
08/15/2023
|
2 / 2 |
1 |
4
|
6
|
Sangamon
|
|
Tree removal and seeding on IL 54 from Primrose Lane in Spaulding to the Logan County line.
|
062-72799
|
Executed
|
07/24/2023
|
1 / 1 |
|
4
|
6
|
Christian
|
|
14 miles of resurfacing, ADA upgrades and drainage improvements on IL 48 from 0.4 miles southwest of South Fork Sangamon River, southwest of Taylorville, to the Montgomery County line.
|
063-72F56
|
Executed
|
08/04/2023
|
1 / 1 |
|
4
|
6
|
Cass
|
|
7.7 miles of resurfacing on IL 125 from 0.5 miles east of South Bluff Springs Road to 0.1 miles southeast of IL 78 in Virginia and on IL 78 from 0.1 miles northeast of IL 125 to southwest of IL 125.
|
064-72G51
|
Executed
|
07/28/2023
|
|
|
4
|
6
|
Morgan
|
|
5.3 miles of milling, resurfacing, gutter replacement and patching on IL 267 from 0.3 miles south of I-72 to 1.1 miles south of Woodson southern city limits.
|
065-72N45
|
Executed
|
08/04/2023
|
|
|
4
|
6
|
Sangamon
|
|
Bridge bearing replacements on SN 084-0134 and SN 084-0135 carrying IL 4 over the abandoned IC Railroad, 0.3 miles north of I-72 in Springfield.
|
066-74651
|
Executed
|
07/24/2023
|
3 / 3 |
|
4
|
7
|
Wayne
|
|
Removing and replacing SN 096-0005 carrying IL 15 over Miller Creek, 1 mile west of Sims Road.
|
067-74799
|
Executed
|
07/24/2023
|
|
|
4
|
7
|
Moultrie
|
|
11.1 miles of designed overlay, inlay resurfacing and ADA improvements on IL 121 from 0.7 miles southeast of Dalton City to 0.2 miles west of IL 32, west of Sullivan.
|
068-74800
|
Executed
|
07/24/2023
|
|
1 |
4
|
7
|
Macon
|
|
8 miles of patching, pipe underdrain replacement and resurfacing on US 51 from the DeWitt County line to 0.1 miles north of Forsyth Road.
|
069-74975
|
Executed
|
08/15/2023
|
|
|
4
|
7
|
Jasper
|
|
10.3 miles of patching, milling, resurfacing, HMA shoulders, aggregate wedge shoulders and rumble strips on IL 130 from Edwards Street in Newton to the Richland County line.
|
070-74977
|
Executed
|
07/24/2023
|
1 / 1 |
1 |
4
|
7
|
Clay, Richland
|
|
Resurfacing on US 50 from 2.5 miles east of US 45, east of Flora, to 1.6 miles east of the Richland County line.
|
071-74A06
|
Executed
|
07/28/2023
|
2 / 2 |
|
4
|
7
|
Clark, Crawford
|
|
11.7 miles of patching, milling, resurfacing and aggregate shoulders on IL 1 from 0.3 miles north of the Clark County line to IL 33.
|
072-74A88
|
Executed
|
08/15/2023
|
|
|
4
|
7
|
Effingham
|
|
Patching, resurfacing and aggregate shoulders on IL 33 from Salt Creek in Effingham to west of Pine Street in Dietrich.
|
073-74B09
|
Executed
|
07/24/2023
|
|
|
4
|
7
|
Wayne
|
|
7.3 miles of standard overlay on IL 15 from 0.1 miles west of County Road 870E, north of Sims, to 0.3 miles west of US 45, west of Fairfield.
|
074-74B98
|
Executed
|
07/26/2023
|
|
|
4
|
7
|
Various
|
|
Bridge rail repairs at 4 locations: 1) I-70 over Lick Creek, 1.7 miles east of the Bond County line; 2) Old IL 250 over a stream 0.6 miles west of Claremont Road; 3) Old IL 140 over a stream 0.2 miles east of Hagarstown; 4) US 45 over Buttermilk Ditch, at Etna Road.
|
075-74C05
|
Executed
|
07/28/2023
|
|
|
4
|
7
|
Cumberland
|
|
Patching on IL 130 and resurfacing on the I-70 exit ramps, both located at the I-70 and IL 130 interchange.
|
076-76R00
|
Executed
|
07/24/2023
|
|
|
5
|
8
|
St. Clair
|
|
New wiring and LED luminaires on I-255 at I-64.
|
077-76R01
|
Executed
|
07/24/2023
|
|
|
5
|
8
|
St. Clair
|
|
New wiring and LED luminaires on I-255 at IL 15.
|
078-76R40
|
Executed
|
07/14/2023
|
2 / 2 |
1 |
5
|
8
|
Madison
|
|
10 miles of resurfacing on IL 255 from IL 143 to 0.1 miles north of Seminary Road.
|
079-76R69
|
Executed
|
07/28/2023
|
|
|
5
|
8
|
Madison
|
|
Patching on the I-270 eastbound collector distributor at the I-270 and I-255 interchange.
|
080-76R73
|
Executed
|
07/18/2023
|
1 / 1 |
1 |
5
|
8
|
St. Clair
|
|
2.4 miles of patching on 6th Street from IL 161 to IL 177 in Mascoutah.
|
081-76R74
|
Executed
|
07/28/2023
|
|
|
5
|
8
|
Clinton
|
|
Pavement patching and resurfacing on the ramp between US 50 and St. Rose Road.
|
082-76R80
|
Executed
|
08/01/2023
|
2 / 2 |
|
5
|
8
|
St. Clair
|
|
Painting on SN 082-0144 at the Poplar Street Bridge Complex on I-55 / I-64.
|
083-76R87
|
Executed
|
07/26/2023
|
|
1 |
5
|
8
|
Madison, St. Clair
|
|
Dynamic message sign replacement at various locations in Madison and St. Clair Counties.
|
084-76R92
|
Executed
|
08/04/2023
|
|
1 |
5
|
8
|
Randolph
|
|
Bridge painting on SN 079-0036 carrying IL 3 over the Kaskaskia River.
|
085-76R93
|
Executed
|
07/24/2023
|
1 / 1 |
|
5
|
8
|
St. Clair
|
|
Bridge joint replacement / repair on SN 082-0017 carrying I-55 / 70 over BandO, Conrail and TRRA Railroad in East St. Louis.
|
086-76R98
|
Withdrawn
|
06/15/2023
|
1 / 1 |
|
5
|
8
|
Various
|
|
Weed spraying for Johnson Grass along various interstates throughout District 8.
|
087-76T02
|
Executed
|
08/15/2023
|
3 / 3 |
|
5
|
8
|
Various
|
|
Pump station security project at various District 8 pump stations in various counties.
|
088-76T05
|
Rejected
|
06/28/2023
|
|
|
5
|
8
|
Various
|
|
Tree removal in various counties of District 8.
|
089-78599
|
Executed
|
07/26/2023
|
|
|
5
|
9
|
Johnson, Union
|
|
12.7 miles of PCC overlay on I-57 northbound from just north of IL 146 to the Williamson / Johnson County line. Also includes resurfacing northbound ramps at the Goreville and Lick Creek interchanges.
|
090-78917
|
Executed
|
07/24/2023
|
|
1 |
5
|
9
|
Jefferson
|
|
Substructure and superstructure repairs on SN 041-0083 and SN 041-0084 carrying I-64 over CN/IC Railroad, east of the Belle River interchange.
|
091-78960
|
Executed
|
07/26/2023
|
|
|
5
|
9
|
Williamson
|
|
3 miles of patching and resurfacing, with ADA upgrades and safety shoulders in sections of the project, on IL 149 from the Jackson County line to the Franklin County line.
|
092-78995
|
Executed
|
07/24/2023
|
|
|
5
|
9
|
Various
|
|
Electrical repair and/or maintenance on various routes throughout District 9.
|
093-78996
|
Executed
|
07/26/2023
|
|
|
5
|
9
|
Massac
|
|
Concrete bridge pier repair due to damage caused by barge impact on SN 064-0035 carrying I-24 over the Ohio River.
|
094-89779
|
Executed
|
07/26/2023
|
1 / 1 |
|
3
|
4
|
Woodford
|
|
Removal and replacement of a three-span and four-span PPC deck beam superstructure with concrete bent substructures, HMA approaches, on CH 7 over Panther Creek, 2.5 miles south of US 24.
|
095-89809
|
Rejected
|
06/28/2023
|
2 / 0 |
|
3
|
4
|
McDonough
|
|
Removal and resurfacing of HMA pavement with storm sewer construction, driveway and sidewalk improvements, utility adjustments, seeding, and erosion control along Johnson Street from Grant Street to Harmony Lane, and on Grant Street at the intersection with Harmony lane in Macomb.
|
096-91622
|
Rejected
|
06/28/2023
|
1 / 1 |
|
3
|
5
|
Vermilion
|
|
Resurfacing, patching and ADA ramps on Williams Street from Bowman Avenue to State Street in Danville.
|
097-91624
|
Executed
|
08/01/2023
|
|
|
3
|
5
|
Vermilion
|
|
Resurfacing and patching Vermilion Street from US 150 to 0.1 mile south of US 150. Includes pavement grinding and drainage improvements on Batestown Road from west of God's Acre Road to Jackson Street.
|
098-91632
|
Executed
|
08/15/2023
|
1 / 1 |
|
3
|
5
|
Champaign
|
|
Replace existing superstructure with PPC deck beams on Windsor Road over Kaskaskia Ditch.
|
099-91633
|
Executed
|
08/02/2023
|
1 / 1 |
|
3
|
5
|
Champaign
|
|
Replace existing superstructure with PPC deck beams on Kirby Avenue over Kaskaskia Ditch.
|
100-91634
|
Executed
|
08/01/2023
|
1 / 1 |
|
3
|
5
|
Champaign
|
|
Replace existing superstructure with PPC deck beams on 3200 North Road over Upper Salt Creek.
|
101-93804
|
Executed
|
07/25/2023
|
1 / 1 |
|
4
|
6
|
Cass
|
|
Replace the bridge carrying CH 4 over Cox Creek located 1.5 miles southwest of Newmansville.
|
102-93805
|
Executed
|
07/25/2023
|
|
|
4
|
6
|
Morgan
|
|
Resurfacing CH 123 from the Morgan/Cass County line to Old US 36.
|
103-97770
|
Executed
|
08/01/2023
|
|
|
5
|
8
|
Monroe
|
|
Roadway reconstruction on Moore Street from IL 3 to 0.2 mile north of Columbia Avenue in Waterloo.
|
104-97801
|
Executed
|
08/15/2023
|
1 / 1 |
|
5
|
8
|
Madison
|
|
Construction of a Shared-Use Path along Rock Springs Drive from Memorial Drive to Brown Street, and along College Avenue at the intersection of Rock Springs Drive in Alton.
|
105-97804
|
Executed
|
07/28/2023
|
|
|
5
|
8
|
Monroe
|
|
HMA Resurfacing and shoulders with rumble strips on Floraville Road from the Waterloo Corporate Limits to the St. Clair County Line.
|
106-97806
|
Executed
|
08/15/2023
|
|
|
5
|
8
|
Madison
|
|
HMA resurfacing, curb and gutter, driveways, storm sewers, and pavement markings on University Drive from IL 157 to Devon Court in Edwardsville.
|
107-97812
|
Executed
|
08/01/2023
|
|
|
5
|
8
|
St. Clair
|
|
Replace existing structure with a three-span PPC deck beam bridge with concrete wearing surface, approach slabs, HMA approach pavement, and traffic barrier terminals, on IMBS Station Road over Prairie DuPont Creek, 2.0 miles west of IL 163.
|
108-99666
|
Executed
|
07/26/2023
|
|
|
5
|
9
|
Williamson
|
|
HMA resurfacing with pavement patching, sidewalks, ADA ramps, and pavement markings on East Herrin Street from IL 148 to North 3rd Street, and on North 3rd Street from Bond Street to East Herrin Street in Herrin.
|
109-99703
|
Executed
|
08/01/2023
|
|
|
5
|
9
|
Gallatin
|
|
Resurfacing Eldorado Road from the Saline County Line to IL 1.
|
110-46620
|
Executed
|
07/26/2023
|
|
|
1
|
1
|
Cook
|
|
This work shall consist of applying water borne, lead free, white and yellow paint pavement marking lines of 4,6, and 8 inches in width. The locations of the work will be on various State-maintained highways in Cook County.
|
111-46623
|
Executed
|
07/26/2023
|
|
|
4
|
6
|
Various
|
|
Pavement marking on various routes in various counties throughout District 6.
|
112-46626
|
Executed
|
07/25/2023
|
|
|
1
|
1
|
Lake
|
|
This work shall consist of removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and placing new raised pavement marker castings within the limits shown. The work to be completed in various routes throughout Lake County.
|
113-46627
|
Executed
|
07/25/2023
|
|
|
1
|
1
|
McHenry
|
|
This work shall consist of removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and placing new raised pavement marker castings within the limits shown. The work to be completed will be performed on various routes throughout McHenry County.
|
114-46932
|
Executed
|
07/25/2023
|
|
|
5
|
9
|
Franklin
|
|
Parking lot resurfacing, sealing, striping, ADA sidewalk improvements, lighting and signing at the Wayne Fitzgerrell State Recreation Area.
|
115-62B66
|
Deleted
|
05/11/2023
|
|
|
1
|
1
|
Lake
|
|
The project consists of decommissioning of existing Pump Station 37 located in the bridge abutment (SN 049-0131), and construction of a new pump station in the northeast quadrant of the US 41 and IL 176 intersection, with a new outfall pipe to the Skokie River.
|
116-62G37
|
Executed
|
07/25/2023
|
2 / 2 |
2 |
1
|
1
|
Cook
|
|
(8,538.08-Ft) 3R resurfacing and widening along 55th. ADA, traffic signal, drainage, shared path improvements. The Project extends in an east/west direction through the Village of Western Springs, Lyons township, the City of Countryside, and the Village of La Grange in Cook County, Illinois.
|
117-62G38
|
Executed
|
07/26/2023
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
(0.73-Mile) ADA, Traffic Signal Modernization and Channelization at IL Route 50 in Matteson, IL, Cook County.
|
118-62G41
|
Executed
|
08/15/2023
|
3 / 3 |
1 |
1
|
1
|
Kane
|
|
(1.174-Mile) This project consists of replacing the existing (SN 045-0017) single span IL 31 bridge with a proposed (SN 045-2106) two span structure. Also roadway reconstruction along IL 31, US 20 and entrance and exit ramps. In addition, a 10 ft shared-use path, 7 ft sidewalk will be constructed. Traffic signals and lighting will be replaced. Also included in this contract is replacement of City of Elgin's watermain, sanitary sewer and fiber optic conduit installation. Project is located in the City of Elgin.
|
119-62H52
|
Executed
|
07/26/2023
|
6 / 6 |
4 |
1
|
1
|
Cook
|
|
(1,056-Mile) Bridge Deck and approach slab replacement, superstructure and substructure repairs, cleaning and painting of the steel members, bridge lighting, navigational lighting, sidewalk and multi-use path construction. The bridge carrying IL 83 over the Cal Sag Channel in the Village of Alsip and Crestwood.
|
120-62H82
|
Executed
|
08/22/2023
|
4 / 4 |
2 |
1
|
1
|
Cook
|
|
(1.22-Mile) Reconstruction, Resurfacing, Drainage Improvements, Culvert Replacement, Traffic Signal Modernization, Pedestrian Accommodations, and Ditch Cleaning in Orland Park, IL in Cook County.
|
121-62K04
|
Executed
|
07/25/2023
|
|
|
1
|
1
|
DuPage
|
|
(3847-Ft) Channelization and traffic signal modernization project on US 20 at Gary Avenue within the Village of Hanover Park, the Village of Roselle, and Bloomingdale Township in DuPage County.
|
122-62K05
|
Executed
|
07/25/2023
|
|
1 |
1
|
1
|
Lake
|
|
This improvement consists of the demolition of 3 (three) single family residences, 1 (one) shed, and culvert repair at various locations on IL 22 between Quentin Rd and West of IL 83 in the Villages of Long Grove and Kildeer in Lake County, IL.
|
123-62L51
|
Executed
|
08/01/2023
|
|
|
1
|
1
|
Cook
|
|
(1.51-Mile) Improvement consists of smart overlay resurfacing on Pulaski Road from 1-290 (Eisenhower Expressway) to Cermak Road (22nd Avenue) in the City of Chicago, Cook County.
|
124-62N88
|
Executed
|
08/15/2023
|
4 / 4 |
1 |
1
|
1
|
Will
|
|
(2052-Ft); IL 394 at Burville Road: Intersection Improvement Conversion of the intersection to a Restricted Crossing U-Turn (RCUT)Ù; IL 394 at Exchange Street: Lengthening of the southbound left turn lane storage. The project is located on IL 394 in Unincorporated Crete Township in Will County.
|
125-62R88
|
Executed
|
07/26/2023
|
|
|
1
|
1
|
Cook
|
|
(2,404-Ft) The proposed improvement consists of bridge deck (SN 016-2665) overlay and joint repairs of I 55 (Stevenson Expressway) at US 12/20/45 (La- Grange Road) (overpass) in the Village of Hodgkins and the City of Countryside, Cook County.
|
126-62T47
|
Executed
|
08/04/2023
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
(245.72-Ft) This is a Bridge Preservation Project: bridge repair, joint replace / repair and deck overlay on bridge carrying Pulaski Road over North Branch Chicago River. Located in the City of Chicago.
|
127-62T99
|
Executed
|
08/04/2023
|
|
|
1
|
1
|
McHenry
|
|
The proposed improvement consists of partial removal and extension of the culverts located on IL 173 (328.55-Ft) over Ditch (1.43 Mile, East of US 14) in Alden Township, and IL 176 (452.45-Ft) over Ditch (1.9 Mile East of IL 47) in the City of Crystal Lake, McHenry County.
|
128-62U03
|
Executed
|
07/25/2023
|
|
1 |
1
|
1
|
Kane
|
|
This improvement consists of substructure masonry repairs of the structure (SN-045-0020) carrying over Mill Creek in the Batavia Township on Kane County.
|
129-62U17
|
Executed
|
08/01/2023
|
|
1 |
1
|
1
|
Lake
|
|
This improvement consists of bridge painting of the structures at IL 137 over 24th St (049-0163) in North Chicago, IL 137 over Washington St (049-0164) in Waukegan, and US 41 over Mill Creek (049-0028) in Wadsworth in Lake County.
|
130-62U18
|
Rejected
|
06/28/2023
|
2 / 2 |
1 |
1
|
1
|
Cook
|
|
This improvement consists of a full bridge painting of span 2 of the structure (016-1110) carrying 1-90/94 over 15th to 16th Streets in the City of Chicago in Cook County.
|
131-62U20
|
Executed
|
09/05/2023
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
This improvement is a Bridge Repairs project with Partial Bridge Painting, on IL-7 over Cal-Sag Channel 0.5 miles. NE of IL-83 in the City of Palos Heights and Palos Hills in Cook County.
|
132-68698
|
Withdrawn
|
06/07/2023
|
|
|
3
|
4
|
Stark
|
|
Replacement of the structure carrying IL 17/ IL 91 over the Spoon River SN 088-0002 (existing; SN 088-0030 (proposed)Ù, 0.6 miles West of Wyoming in Stark County. The project is 2887 feet (0.55 mile) in length. The project also includes roadway profile adjustments, regrading of sideslopes, and construction of the stream barbs.
|
133-68F89
|
Executed
|
08/01/2023
|
|
|
3
|
4
|
Henry, Knox
|
|
Resurfacing on I-74/IL 110 from North of Woodhull to North of US 34.
|
134-68H03
|
Executed
|
07/25/2023
|
|
|
3
|
4
|
McDonough
|
|
HMA Patching.
|
135-68H65
|
Executed
|
07/25/2023
|
|
|
3
|
4
|
Knox
|
|
HMA patching on Main Street in East Galesburg from 1-74 to CH 9 in Knox County.
|
136-70A87
|
Executed
|
07/25/2023
|
8 / 8 |
2 |
3
|
5
|
Champaign
|
|
Bridge Superstructure Replacement Over US 45 at Pesotum.
|
137-70A93
|
Executed
|
08/22/2023
|
3 / 3 |
1 |
3
|
5
|
Champaign
|
|
5.785 MI; Resurfacing (3P), ADA Improvements, and Culvert Replacement of FAP 709 (US 136) from McLean Co Line to ECL of Fisher.
|
138-70D61
|
Executed
|
08/04/2023
|
1 / 1 |
1 |
3
|
5
|
Piatt
|
|
0.2 Mi., Bridge Replacement Under Bridge St 0.5 Mi W of Monticello.
|
139-72115
|
Executed
|
07/26/2023
|
|
|
4
|
6
|
Adams
|
|
Cured-in-place pipe liner on I-172 at the IL 96 interchange.
|
140-72M78
|
Executed
|
07/26/2023
|
|
|
4
|
6
|
Macoupin
|
|
9 miles of resurfacing on IL 108 from east of IL 4 (South) in Carlinville to the Montgomery County line.
|
141-72M80
|
Executed
|
07/25/2023
|
|
|
4
|
6
|
Adams
|
|
Bridge deck sealing and repair on the Quincy Bayview Bridge (SN 001-0068) carrying US 24 westbound over the Mississippi River.
|
142-72N44
|
Executed
|
08/04/2023
|
|
|
4
|
6
|
Morgan
|
|
Bridge bearing replacements on SN 069-0035 and SN 069-0036 carrying I-72 over KCS Railroad, 0.5 miles east of IL 267 near Jacksonville.
|
143-74812
|
Executed
|
08/15/2023
|
1 / 1 |
|
4
|
7
|
Coles
|
|
2.7 miles of patching and resurfacing on IL 130 from Madison Avenue to 1.8 miles south of IL 16 in Charleston.
|
144-74B23
|
Executed
|
07/28/2023
|
|
|
4
|
7
|
Coles
|
|
5 miles of milling, resurfacing and aggregate shoulders on IL 130 from Fairgrange Road, north of Charleston, to 0.1 miles north of Maple Avenue in Charleston.
|
145-76L48
|
Executed
|
07/25/2023
|
|
|
5
|
8
|
St. Clair
|
|
Pump replacement at the Keller Pump Station on I-255 south of Collinsville Road.
|
146-76M86
|
Rejected
|
06/28/2023
|
1 / 1 |
|
5
|
8
|
St. Clair
|
|
Lighting on I-55/70/64 from the Mississippi River to east of the I-64 (Tri-Level) Interchange.
|
147-76P08
|
Executed
|
07/26/2023
|
|
|
5
|
8
|
St. Clair
|
|
Storm water pump station rehab at the 25th Street Pump Station south of I-64.
|
148-76R27
|
Withdrawn
|
08/04/2023
|
|
|
5
|
8
|
Madison
|
|
Lighting upgrades on I-55 at IL 140.
|
149-76R38
|
Executed
|
08/25/2023
|
|
|
5
|
8
|
Bond
|
|
4.8 miles of crack and joint seal on I-70 from BN Railroad to the Fayette County line.
|
150-76R50
|
Executed
|
07/25/2023
|
|
|
5
|
8
|
Various
|
|
Pavement patching at various locations throughout District 8.
|
151-76R52
|
Executed
|
07/25/2023
|
|
|
5
|
8
|
Various
|
|
Highway lighting, traffic signal repair and maintenance at various locations throughout District 8.
|
152-76R54
|
Executed
|
07/25/2023
|
|
|
5
|
8
|
Various
|
|
Maintain and service all ITS equipment at various locations throughout District 8.
|
153-76R58
|
Executed
|
07/25/2023
|
|
|
5
|
8
|
Randolph
|
|
Patching on IL 3 from the Monroe County line to the Jackson County line and on IL 150 from the Mississippi River to the Perry County line.
|
154-76R64
|
Withdrawn
|
06/05/2023
|
|
|
5
|
8
|
Clinton
|
|
Bridge joint replacement and repair on SN 014-0015 carrying IL 127 over NS Railroad, 0.2 miles north of IL 161.
|
155-76R83
|
Executed
|
07/28/2023
|
|
|
5
|
8
|
Washington
|
|
8 miles of patching on I-64 from 0.9 miles west of CH 11 to the Jefferson County line.
|
156-76T08
|
Executed
|
07/25/2023
|
|
|
5
|
8
|
St. Clair
|
|
0.5 miles of pavement patching on 26th Street (CH 52) from IL 15 to Bond Avenue in East St. Louis.
|
157-76T12
|
Executed
|
07/26/2023
|
|
|
5
|
8
|
St. Clair
|
|
Pump replacement at the Bowman Pump Station in East St. Louis, on the north side of I-70, at 728 Exchange Avenue.
|
158-78790
|
Executed
|
07/25/2023
|
3 / 3 |
1 |
5
|
9
|
Jackson
|
|
Replacement of 3 culverts on IL 3: SN 039-2013(E) over a stream 1.8 miles east of the Randolph County line; SN 039-2014(E) over a drainage ditch 0.1 miles southeast of Raddle Road; SN 039-2015(E) over Talbott Hollow Creek 1.1 miles northwest of IL 151.
|
159-78792
|
Executed
|
07/25/2023
|
|
|
5
|
9
|
Pope
|
|
Removal and replacement of SN 076-0019 carrying IL 145 over Bear Creek Ditch, 0.6 miles north of the Massac County line.
|
160-78861
|
Deleted
|
05/12/2023
|
|
|
5
|
9
|
|
|
|
161-78882
|
Executed
|
08/04/2023
|
1 / 1 |
|
5
|
9
|
Various
|
|
Painting of three bridges: One in Williamson County, one in Alexander County and one in Jefferson County. (SN 100-0003, SN 002-0026, SN 041-0060)
|
162-78974
|
Executed
|
07/25/2023
|
|
|
5
|
9
|
White
|
|
Patching on IL 1 under I-64 and on the I-64 ramps.
|
163-95893
|
Executed
|
08/04/2023
|
3 / 3 |
2 |
4
|
7
|
Macon
|
|
Construction of a grade separation structure to carry Brush College Road over the Norfold Southern Railroad and Fairies Parkway in Decatur.
|
164-46606
|
Rejected
|
06/28/2023
|
|
|
1
|
1
|
Various
|
|
This work shall consist of raised reflective pavement marker removal and replacement and replacement of raised reflective pavement marker reflectors. The work to be completed on various Interstates routes throughout District 1.
|
165-46624
|
Executed
|
07/25/2023
|
|
|
1
|
1
|
Cook
|
|
This work shall consist of removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and placing new raised pavement marker castings within the limits shown. Located in various routes throughout South Cook County.
|
166-46628
|
Executed
|
08/01/2023
|
|
|
4
|
6
|
Various
|
|
Replacing sign components of interstate signs on I-72 and I-55 in various counties of District 6.
|
167-61J38
|
Executed
|
08/04/2023
|
5 / 5 |
1 |
1
|
1
|
Cook
|
|
Replace the bridge carrying Brookwood Drive over Butterfield Creek, 0.2 mile west of Western Avenue in Flossmor.
|
168-62L31
|
Withdrawn
|
06/12/2023
|
2 / 2 |
1 |
1
|
1
|
Cook
|
|
(1,560-Ft) Bridge structural repairs, bridge deck overlay removal and replacement, joint replacement, and bridge drainage repairs, for the Ohio St. bascule bridge over the North Branch Chicago River, and the west and east approach bridges, in the City of Chicago, Cook County, IL.
|
169-62P71
|
Executed
|
07/26/2023
|
27 / 26 |
2 |
1
|
1
|
Various
|
|
(2.78-Mile) Reconstruction of new continuously reinforced concrete pavement, concrete median barrier wall, Portland cement concrete shoulders, grading work, drainage improvements, erosion control, pavement marking and signage installation, maintenance of traffic, construction layout, landscaping, etc. Located in the Villages of Minooka and Shorewood and the Township of Troy in various Counties.
|
170-62R59
|
Deleted
|
05/11/2023
|
|
|
1
|
1
|
Cook
|
|
Along the ramp from I-290 / IL53 northbound to I-90 eastbound and the ramp from I-90 westbound to I-290 / IL53 northbound, increase pavement friction by applying a high-friction surface treatment (HFST). Along I-290 eastbound near I-88, Increase pavement friction by grooving the existing PCC Pavement.
|
171-62U26
|
Executed
|
08/22/2023
|
1 / 1 |
1 |
1
|
1
|
Will
|
|
(1.98-Mile) The project consists of the furnishing and storage of structural steel beams and bearings for the bridges along I-80 between east of River Road and west of Houbolt Road (EB/WB I-80 over I-55 bridges) located in the Villages of Minooka and Shorewood and Township of Troy in Will County.
|
172-64P63
|
Executed
|
08/01/2023
|
|
|
2
|
2
|
Whiteside
|
|
Expansion joint replacement, deck patching and concrete overlay, and other miscellaneous repairs on SN 098-0095 and 098-0096.
|
173-68862
|
Executed
|
07/28/2023
|
|
|
3
|
4
|
Peoria
|
|
This is a bridge replacement project on IL 8 over the West Fork of Kickapoo Creek, 0.5 mile East of Oak Hill in Peoria County.
|
174-68H11
|
Executed
|
07/25/2023
|
2 / 2 |
|
3
|
4
|
Peoria
|
|
Pavement widening for WB left-turn lane, resurfacing, and drainage improvements at the intersection of IL 116 and Cameron Lane in Peoria County.
|
175-68H55
|
Executed
|
08/02/2023
|
|
|
3
|
4
|
Fulton, Peoria
|
|
Remove and replace traffic signal mast arms and posts at Ash and Vine Streets along North Main Street in Canton and at Adams and Spring Streets in Peoria in Fulton and Peoria Counties.
|
176-68H56
|
Executed
|
07/25/2023
|
|
|
3
|
4
|
Peoria
|
|
Replace traffic signal mast arm at IL 8/ IL 116 (MacArthur Hwy.) and Washington St. in Peoria.
|
177-68H58
|
Executed
|
08/01/2023
|
2 / 2 |
1 |
3
|
4
|
Various
|
|
Bridge painting.
|
178-72075
|
Executed
|
08/25/2023
|
|
|
4
|
6
|
Sangamon
|
|
4.2 miles of crack and joint seal at two locations: 1) IL29 from 0.4 miles south of Andrew Road to Estill Drive, 1.6 miles north of of IL 4 in Springfield; 2) East Lake Shore Drive / Palm Road from Old US 66 to 0.6 miles north of Chatham Road.
|
179-74A13
|
Executed
|
07/25/2023
|
|
|
4
|
7
|
Effingham
|
|
Deck replacement on SN 025-0083 carrying US 45 over Big Salt Creek, 3 miles south of IL 37.
|
180-76R53
|
Executed
|
07/28/2023
|
|
|
5
|
8
|
Various
|
|
Guardrail and cable median repair at various locations in District 8.
|
181-78912
|
Executed
|
07/26/2023
|
2 / 2 |
|
5
|
9
|
Johnson, Williamson
|
|
13 miles of patching, resurfacing, shoulder work, repairs to 5 bridges and cleaning/painting of 2 bridges.
|
182-78915
|
Executed
|
07/28/2023
|
1 / 1 |
|
5
|
9
|
Franklin
|
|
Replacement of two structures on IL 149: SN 028-7061 in Royalton and SN 028-7078 east of West Frankfort.
|
183-78945
|
Executed
|
07/26/2023
|
|
1 |
5
|
9
|
Williamson
|
|
Replacing SN 100-0044 carrying Grassy Road (CH 25) over I-57.
|
184-78982
|
Executed
|
07/25/2023
|
|
1 |
5
|
9
|
Massac
|
|
Removal and replacement of HMA overlay at various locations, cleaning of deck drains and removal of debris from the shoulders on SN 064-0035 carrying I-24 over the Ohio River.
|
185-78983
|
Executed
|
07/25/2023
|
1 / 1 |
|
5
|
9
|
Various
|
|
Replacement of high-pressure sodium luminaires with LED luminaires at high mast light towers on various routes in various counties of District 9.
|
186-78986
|
Executed
|
07/25/2023
|
|
|
5
|
9
|
Pulaski
|
|
Structural repair of concrete and replacement of seismic restrainer cables on piers 1-15 on SN 077-0001 carrying I-57 northbound over Old US 51, south of Mounds.
|
187-85741
|
Executed
|
07/26/2023
|
1 / 1 |
|
2
|
2
|
Winnebago
|
|
Construction of an HMA shared-use path with storm sewer, curb and gutter, PCC pavement, sidewalk and landscaping along Perryville Road from Anjel Way to Willowbrook Lane in the Village of Machesney Park.
|
188-85745
|
Executed
|
07/25/2023
|
|
|
2
|
2
|
Stephenson
|
|
Replace the bridge carrying TR 222 over Crane Grove Creek, 4.5 miles west of German Valley.
|
189-87790
|
Executed
|
08/04/2023
|
|
|
2
|
3
|
Ford
|
|
Replace the bridge carrying Buckingham Road over Kelly Creek located 3.3 mile north of IL 116.
|
190-87806
|
Executed
|
08/01/2023
|
|
|
2
|
3
|
Bureau
|
|
HMA resurfacing with ADA curb ramps, curb and gutter, sidewalks, and Pavement markings on 4th Street from Strong Avenue to Greenwood Street in Spring Valley.
|
191-87807
|
Executed
|
07/25/2023
|
|
|
2
|
3
|
LaSalle
|
|
Resurface Chartres Street from 24th Street to Pershing Road in LaSalle. , Resurface Chartre Street from 24th Street to Pershing Road in LaSalle.
|
192-87809
|
Executed
|
08/15/2023
|
|
|
2
|
3
|
Iroquois
|
|
Resurfacing various routes within the City of Watseka.
|
193-87836
|
Executed
|
08/01/2023
|
|
|
2
|
3
|
LaSalle
|
|
Resurface Chartres Street Raccuglia Drive to 24th Street in La Salle.
|
194-87837
|
Executed
|
07/28/2023
|
|
|
2
|
3
|
LaSalle
|
|
Sidewalk reconstruction with ADA accommodations along Shooting Park Road from Sycamore Street to Parkside School entrance in Peru.
|
195-93807
|
Executed
|
07/28/2023
|
|
|
4
|
6
|
Sangamon
|
|
HMA resurfacing on 7th Street from Lincoln Street to IL 54 in Riverton.
|
196-95935
|
Executed
|
07/26/2023
|
2 / 2 |
|
4
|
7
|
Effingham
|
|
HMA resurfacing with aggregate shoulders, and guardrail replacement on East 1600th Avenue from North 700th Street to North 1000th Street.
|
197-95937
|
Executed
|
08/01/2023
|
|
|
4
|
7
|
Lawrence
|
|
HMA resurfacing with pip culvert replacement on Lancaster Road from Sand Barrens Lane to the Wabash County line.
|
198-95938
|
Active
|
05/03/2023
|
|
|
4
|
7
|
Lawrence
|
|
Resurfacing on Lexington Avenue from IL 1 to 12th Street, and sidewalk improvements at four intersections in Lawrenceville.
|
199-95939
|
Rejected
|
04/24/2024
|
1 / 0 |
|
4
|
7
|
Moultrie
|
|
Remove and replace guardrail at various locations in Moultrie County.
|
200-97713
|
Executed
|
07/28/2023
|
3 / 2 |
1 |
5
|
8
|
Madison
|
|
Replace existing structure with a single span steel beam structure with poured concrete deck, aggregate approaches and guardrail on Silver Creek Road over a branch of Silver Creek.
|
201-97813
|
Executed
|
07/28/2023
|
|
|
5
|
8
|
St. Clair
|
|
Resurfacing Sullivan Drive from south of Frank Scott Parkway to Huntwood Drive.
|
202-99683
|
Executed
|
08/01/2023
|
|
|
5
|
9
|
Jackson
|
|
Construct an offset right turn lane and install traffic signal equipment at the intersection of Giant City Road and East Pleasant Hill Road in Carbondale.
|
203-99698
|
Executed
|
07/25/2023
|
|
|
5
|
9
|
Pulaski
|
|
Resurfacing Tick Ridge Road from IL 37 to the Massac County line.
|
204-99700
|
Executed
|
07/26/2023
|
2 / 2 |
2 |
5
|
9
|
Williamson
|
Voluntary
|
Construction of a concrete multi-use trail from the Marion High School Sports Complex to Prison Road within the Crab Orchard National Wildlife Refuge.
|
205-99701
|
Executed
|
07/25/2023
|
|
|
5
|
9
|
Union
|
|
Resurface Wing Hill Road from 0.4 mile east of Cbden to US 51.
|
206-99702
|
Executed
|
07/25/2023
|
3 / 3 |
|
5
|
9
|
Massac
|
|
Remove and replace guardrail on New Columbia Road, 7.6 miles northeast of Joppa and on Unionville Road, 3.2 miles east of Brookport.
|
207-99705
|
Executed
|
07/28/2023
|
|
|
5
|
9
|
Saline
|
|
HMA resurfacing with aggregate shoulders, precast box culvert extensions, and pavement markings on College Road from IL 142 to IL 13.
|
208-99708
|
Executed
|
07/26/2023
|
1 / 1 |
1 |
5
|
9
|
Williamson
|
|
Resurface Pentecost Road from south of West DeYoung Street to Old Route 13, and Old Bainbridge Trail from Crab Orchard and Eqyptian Railroad to Old Route 13, and south of West DeYoung Street to Crab Orchard and Eqyptian Railroad, all within the City of Marion.
|
209-99710
|
Executed
|
07/25/2023
|
|
|
5
|
9
|
Hamilton
|
|
HMA resurfacing and aggregate shoulders on Dahlgren Road from 1900 North Road to IL 14.
|
210-78877
|
Executed
|
07/26/2023
|
1 / 1 |
|
5
|
9
|
Alexander
|
|
Joint replacement on SN 002-0005 carrying US 60/62 over the Mississippi River.
|
211-78964
|
Withdrawn
|
06/26/2023
|
|
|
5
|
9
|
Alexander
|
|
Navigation lighting upgrade on SN 002-0005 on US 60/62 over the Mississippi River in Cairo.
|
212-62J41
|
Executed
|
07/28/2023
|
|
|
1
|
1
|
Lake
|
|
This project consists of replacing the existing 8-x10- double box culvert (SN 049-0214) and replacing it with a 12'x12' triple box culvert (SN 049-0700). Also included is the construction of a 7' PCC sidewalk on the east side and an 8' multi-use path on the west side of IL 137. In addition, light pole relocation, guardrail replacement, and watermain, sanitary sewer relocation and embankment stabilization.
|
213-64S04
|
Executed
|
07/25/2023
|
|
|
2
|
2
|
Whiteside
|
|
Bridge joint replacement and misc bridge repairs carrying SN 098-0065 over I-88.
|
214-72984
|
Executed
|
08/01/2023
|
|
|
4
|
6
|
Christian, Montgomery
|
|
Culvert replacement on IL 16, 0.3 miles northeast of the Montgomery County line (SN 011-2513); bridge replacement on IL 16 over Sangamon Creek, at the west city limits of Ohlman (SN 068-0509); bridge replacement on IL 16 over a ditch and South Fork of the Sangamon River, 2.4 miles east of Elm Street in Nokomis (SN 068-0508).
|
215-72G52
|
Executed
|
08/04/2023
|
|
|
4
|
6
|
Cass
|
|
5.8 miles of resurfacing and paved shoulders on US 67 / IL 100 from 0.2 miles west of IL 125 to 0.1 miles south of IL 125 and on IL 125 from US 67 / IL 100 to 0.5 miles east of South Bluff Springs Road.
|
216-72M53
|
Executed
|
08/02/2023
|
1 / 1 |
|
4
|
6
|
Macoupin
|
|
Painting of SN 059-0009 carrying IL 4 over UP Railroad, 0.9 miles north of Staunton.
|
217-74702
|
Rejected
|
06/28/2023
|
1 / 1 |
1 |
4
|
7
|
Macon
|
|
Bridge work, pavement patching, HMA and concrete surface removal, HMA resurfacing, detector loops, inlet adjustments, curb and gutter repairs, ADA ramps, and pavement markings on US 36 from IL 48 to Church Street in Decatur.
|
218-74A85
|
Withdrawn
|
05/26/2023
|
2 / 2 |
|
4
|
7
|
Crawford
|
|
Culvert removal and precast concrete culvert placement at 5 entrance locations on TR 183A (East 1000th Avenue) in Palestine.
|
219-78926
|
Executed
|
07/26/2023
|
|
|
5
|
9
|
Williamson
|
|
Resurfacing and safety shoulders on Cambria Road north of Blairsville roundabout to 149; resurfacing of mainline and shoulders on Herrin Road east of the Blairsville roundabout to Division Street; resurfacing of mainline and shoulders on Division Street for approximately 1 mile to the state maintenance sign.
|
220-78959
|
Executed
|
07/26/2023
|
3 / 3 |
|
5
|
9
|
Alexander
|
|
Pavement approach and joint repairs on SN 002-0022 carrying I-57 over the Mississippi River.
|
221-46615
|
Executed
|
07/28/2023
|
|
|
3
|
4
|
Various
|
|
D4 HT Pavement Marker RPR 23-23 on various routes in various counties throughout District 4.
|
222-61H30
|
Rejected
|
07/17/2023
|
|
1 |
1
|
1
|
Cook
|
|
Sidewalk replacement, ADA ramps, pedestrian traffic signals, lighting, and landscaping along Cicero Avenue from 143rd Street to the Calumet Sag Channel in Crestwood.
|
223-61H85
|
Executed
|
08/04/2023
|
3 / 3 |
2 |
1
|
1
|
Kane
|
|
Pavement reconstruction, traffic signals, and street lighting on Indian Trail Road from Mitchell Road to Church Road in Aurora.
|
224-61J09
|
Executed
|
08/04/2023
|
2 / 2 |
1 |
1
|
1
|
Cook
|
|
HMA resurfacing with storm sewers, Curb and gutter, lighting, landscaping, and pavement markings on Rodenburg Road from Irving park Road to Central Avenue in Schaumburg.
|
225-61J35
|
Rejected
|
07/17/2023
|
2 / 2 |
1 |
1
|
1
|
Kane
|
|
HMA Pavement widening and resurfacing with sidewalks, ADA ramps, curb and gutter, storm sewer, pavement markings and signing at the intersecton of Prairie Street and Wilson Street in Batavia.
|
226-64B13
|
Executed
|
07/14/2023
|
61 / 61 |
4 |
2
|
2
|
Winnebago
|
|
Reconstruction of the I-39/US 20 Interchange.
|
227-66N21
|
Withdrawn
|
06/23/2023
|
|
|
2
|
3
|
Various
|
|
Repairing and maintaining traffic signals, flashing beacons, and roadway lighting in various counties in District 3.
|
228-74B37
|
Withdrawn
|
06/15/2023
|
|
|
4
|
7
|
Wabash
|
|
Washing the bridge deck on SN 093-0021 carrying IL 15 over the Wabash River in Mt. Carmel.
|
229-74C30
|
Executed
|
07/25/2023
|
4 / 4 |
|
4
|
7
|
Various
|
|
Guardrail repair at specific locations and on an on-call basis throughout District 7.
|
230-76J97
|
Withdrawn
|
05/31/2023
|
|
|
5
|
8
|
Washington
|
|
0.29 miles; Bridge replacement over Lunte Creek, 3.6 miles west of IL 127.
|
231-76L18
|
Executed
|
08/04/2023
|
1 / 1 |
|
5
|
8
|
Greene
|
|
9.9 miles of resurfacing and ADA improvements on IL 267 from the Jersey County line to SN 031-0044, 0.4 miles south of Short Road.
|
232-76P65
|
Executed
|
08/01/2023
|
|
|
5
|
8
|
St. Clair
|
|
1.5 miles of resurfacing and ADA improvements on US 50 from 0.1 miles west of Schantz Road to Anne Avenue in O-Fallon.
|
233-91617
|
Executed
|
08/01/2023
|
1 / 1 |
|
3
|
5
|
Vermilion
|
|
Replace existing structure with a single-span PPC deck beam bridge with aggregate roadways, lane widening, aggregate shoulders, and pipe culverts on TR 13 over Fountain Creek.
|
234-93671
|
Rejected
|
07/28/2023
|
14 / 14 |
1 |
4
|
6
|
Sangamon
|
|
Construction of two structures; one to carry Iron Bridge Road over the Union Pacific Railroad, the other to carry the Union Pacific Railroad over Woodside Road. Project includes a pedestrian truss bridge over Woodside Road, reconstruction of the signalized intersection of Iron Bridge Road at Woodside Road, and the relocation of the Interurban Trail.
|
235-95901
|
Executed
|
08/04/2023
|
|
|
4
|
7
|
Lawrence
|
|
Replace existing structure with a thirteen-span PPC IL36N beam bridge with HMA approaches on Wabash Cannonball Road over the Wabash River overflow in St. Francisville.
|
236-97800
|
Executed
|
08/15/2023
|
1 / 1 |
|
5
|
8
|
Jersey
|
|
Full depth pavement reconstruction, storm sewer, combination curb and gutter, sidewalk, and pavement markings on Hollow Avenue from Hickory Street to Westlake Drive in Jerseyville.
|
237-97803
|
Rejected
|
07/17/2023
|
|
|
5
|
8
|
St. Clair
|
|
Resurfacing Market Place from east of Commerce Drive to west of Lanaghan Drive in Fairview.
|
238-74477
|
Executed
|
08/04/2023
|
|
|
4
|
7
|
Macon
|
|
2.7 miles of patching, resurfacing, sidewalk, curb and gutter replacement and new signals on IL 121 in Decatur.
|
239-78524
|
Executed
|
08/04/2023
|
1 / 1 |
1 |
5
|
9
|
Johnson
|
|
Lane addition and shared use path on IL 146 from US 45 to the intersection with the eastbound I-24 ramps and construction of a roundabout at the intersection of IL 146 and Red Bud Lane in Vienna.
|
240-46621
|
Executed
|
07/28/2023
|
|
|
1
|
1
|
Lake, Will
|
|
Application of water borne, lead free, white and yellow paint pavement marking lines of 4, 6 and 8 inches at various locations. The work will be on various State-maintained highways in Lake and Will Counties.
|
241-46622
|
Executed
|
08/01/2023
|
|
|
1
|
1
|
DuPage, McHenry
|
|
Application of water borne, lead free, white and yellow paint pavement marking lines of 4, 6 and 8 inches at various locations. The work will be on various State-maintained highways in McHenry and DuPage Counties.
|
242-46625
|
Executed
|
07/25/2023
|
|
|
1
|
1
|
Cook
|
|
This work shall consist of removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and placing new new raised pavement marker castings within the limits shown. Located in various routes throughout North Cook County.
|
243-62T53
|
Executed
|
07/25/2023
|
|
1 |
1
|
1
|
Cook, DuPage
|
|
Installation of new fiber optic cable, network switches, PTZ cameras, at 77 signalized intersections. This project located in Cook and DuPage Counties.
|
244-72136
|
Executed
|
07/25/2023
|
1 / 1 |
|
4
|
6
|
Scott
|
|
Bridge deck microsilica overlay on 4 structures on I-72 east of the Illinois River (SN 086-0040, 086-0041, 086-0042 and 086-0043). , Bridge deck microsilica overlay on 4 structures on I-72 east of the Illinois River (SN 086-0040, 086-0041, 086-0042 and 086-0043).
|
245-72A75
|
Executed
|
08/04/2023
|
|
1 |
4
|
6
|
Sangamon
|
|
5.1 miles of overlay on I-55 from 0.5 miles north of I-72 (Clearlake Avenue) to 0.5 miles north of Sangamon Avenue and 1.2 miles of resurfacing on IL 54 (Sangamon Avenue) from 0.3 miles west of I-55 to 0.1 miles east of Colt Road in Springfield. , 5.1 miles of overlay on I-55 from 0.5 miles north of I-72 (Clearlake Avenue) to 0.5 miles north of Sangamon Avenue and 1.2 miles of resurfacing on IL 54 (Sangamon Avenue) from 0.3 miles west of I-55 to 0.1 miles east of Colt Road in Springfield.
|
246-74C18
|
Executed
|
07/28/2023
|
|
1 |
4
|
7
|
Various
|
|
Repairing, replacing, servicing and maintaining various electrical systems throughout District 7. , Repairing, replacing, servicing and maintaining various electrical systems throughout District 7.
|
01A-TR014
|
Executed
|
03/05/2024
|
|
1 |
2
|
2
|
Carroll
|
|
Rehabilitate Runway 13/31 Pavement
|
02A-SC072
|
Deleted
|
05/09/2023
|
|
|
5
|
8
|
|
|
Terminal Apron Expansion (Construction ONLY)
|
03A-WI060
|
Rejected
|
07/07/2023
|
|
|
5
|
9
|
Williamson
|
|
Extend Fixed Base Operator Access Road
|
04A-MA034
|
Rejected
|
11/30/2023
|
|
1 |
3
|
4
|
Marshall
|
|
Rehabilitate Runway 13/31
|
05A-BO006
|
Executed
|
10/10/2023
|
|
1 |
1
|
1
|
Will
|
|
Rehabilitate Aircraft Parking Apron Pavements, Phase 3 and 4
|
06A-DK064
|
Executed
|
11/27/2023
|
9 / 9 |
1 |
2
|
3
|
DeKalb
|
|
Rehabilitate Runway 9/27
|
07A-JO026
|
Executed
|
12/26/2023
|
|
1 |
1
|
1
|
Will
|
|
Removal and Replacement of the existing airport rotating beacon and tower
|
08A-UN062
|
Executed
|
04/09/2024
|
|
1 |
3
|
5
|
Champaign
|
|
Midfield Intersection Reconfiguration
|
09A-WA079
|
Rejected
|
10/02/2023
|
2 / 2 |
2 |
1
|
1
|
Lake
|
|
Rehabilitate East Aircraft Parking Apron
|
10A-VA022
|
Active
|
04/29/2023
|
|
|
4
|
7
|
Fayette
|
|
Reconstruct Aircraft T-hangar Access Pavements
|
11A-SA036
|
Executed
|
10/10/2023
|
|
1 |
5
|
8
|
Marion
|
|
Rehabilitate Bituminous Taxiways
|
12A-SC071
|
Rejected
|
06/30/2023
|
|
2 |
5
|
8
|
St. Clair
|
Voluntary
|
Terminal Apron Expansion - Project 1
|