Home > Notice of Letting > Contract Detail

January 17, 2025 Letting 12:00 PM
145-85758

Bulletin Description

Replace the existing timber/steel truss bridge with a single-span concrete I-beam bridge to carry Big Cut Road over the BNSF Railroad, 3 miles south of Mt. Carroll.
Region District DBE % VBP % Federal Project #
2 2 2.00 0.00 90WR(052)
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Carroll
  • TR 50
  • BIG CUT ROAD
  • 19-06126-00-BR
  • C-92-056-22
  • 2-10551-0000
Contract Specifics
80 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (6 Submitted / 6 Answered ) Questions not accepted as of January 07, 2025 04:30 PM.

  • Please provide a copy of the geotechnical report or slope stability analysis.
    A slope stability analysis was approved by the Department in accordance with Article 522.09(a) of the Standard Specifications. However, this analysis is not available at this time. (01/08/2025)

  • Regarding the MSE wall design, the typical sections show 3.5' of wall embedment, however the elevation views depict a fixed leveling pad elevation. The south abutment has over 15' of embedded wall, what is the required wall embedment? Sheet #10 dimensions the reinforced zone width at the abutment caps, but there's a special note that says "See supplier shop drawings for lengths". Please provide required soil reinforcement lengths or ratios for abutment sections and wing walls.
    An addendum will be issued.The leveling pad shall be at the fixed elevation shown on the plans to allow for a temporary slope with potential future railroad improvements. The MSE Wall Detail on Sheet 10 of 38 notes a 3’-6” minimum dimension from finished grade to top of leveling pad. The MSE wall designer will be responsible for the design of the reinforced soil mass limits as required for the wall design. An amended plan sheet has been provided to clarify the minimum required reinforced soil mass limits. (01/08/2025)

  • The Earthwork Schedule on plan sheet 5 states that "Earth Excavation quantities assume on-site excavation can be used within MSE Walls". Plan sheet 10 requires Select Backfill be used within the MSE Walls. If the earth excavation material does not meet the IDOT Standard Specification for Select Backfill or the MSE Wall design specifications for Select Backfill, will the contractor be compensated to supply material that meets that specification?
    Per Article 522.09 of the Standard Specifications for Road and Bridge Construction, the MECHANICALLY STABILIZED EARTH RETAINING WALL pay item shall include a soil reinforcing system and select fill. So, the contractor will not be compensated for any additional supply material required for the MSE wall. (01/08/2025)

  • Are there plans of the existing steel truss bridge that can be made available?
    No drawings for the existing bridge are available. (01/08/2025)

  • If the BNSF Railroad hires an Inspector/Coordinator at a cost of $1200 per day, as stated on contract special provision pages 25 & 45, will the contractor be reimbursed by the department for this expense?
    The Contractor will only be responsible for paying the Inspector/Coordinator cost for instances when the Contractor impacts railroad property apart from what is shown in the plans and specifications. This expense would not be reimbursed by the department. Otherwise, the Contractor will not be required to pay any Inspector/Coordinator cost. (01/07/2025)

  • Regarding the MSE wall design, per GEC-011, a strip overlap of .3H is all that is needed on back to back walls to achieve full resistance. Is a .3H acceptable to reduce the strip lengths at the wing walls?
    The strip overlap shall be in accordance with the design computations performed by the MSE wall designer. (01/07/2025)

Authorized Bidders

  • 5570 Sjostrom & Sons, Inc.
    1129 Harrison Ave.
    Rockford, IL 61104
    Phone: (815) 226-0330 Fax: (815) 226-8868 Email: heavyhighway@sjostromconstruction.com
    $3,005,217.30

  • 0593 Brandt Construction Co.
    700 4th Street West
    Milan, IL 61264
    Phone: (309) 787-4644 Fax: (309) 787-6344 Email: bids@brandtconstructionco.com
    $3,834,936.40

  • 1045 Civil Constructors, Inc. d/b/a/ Helm Civil
    2283 Bus Hwy 20 East
    Freeport, IL 61032
    PO Box 750
    Freeport, IL 61032
    Phone: (815) 235-2200 Fax: (815) 235-2219 Email: civilestimating@helmgroup.com
    $3,298,536.27

  • 3706 Martin & Company Excavating
    2456 E. Pleasant Grove Road
    Oregon, IL 61061
    P.O. Box 443
    Oregon, IL 61061
    Phone: (815) 732-2422 Fax: (815) 732-2092 Email: info@martincoinc.net
    $3,993,390.00

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
20201200 CU YD REMOVAL AND DISPOSAL OF UNSUITABLE MATERIAL Base items 60.000
25100630 SQ YD EROSION CONTROL BLANKET Base items 2,548.000
28000250 POUND TEMPORARY EROSION CONTROL SEEDING Base items 50.000
28000305 FOOT TEMPORARY DITCH CHECKS Base items 100.000
28000400 FOOT PERIMETER EROSION BARRIER Base items 200.000
28000500 EACH INLET AND PIPE PROTECTION Base items 2.000
30300001 CU YD AGGREGATE SUBGRADE IMPROVEMENT Base items 60.000
35101400 TON AGGREGATE BASE COURSE, TYPE B Base items 1,346.000
40200800 TON AGGREGATE SURFACE COURSE, TYPE B Base items 31.000
40600275 POUND BITUMINOUS MATERIALS (PRIME COAT) Base items 4,432.000
40600290 POUND BITUMINOUS MATERIALS (TACK COAT) Base items 444.000
40603080 TON HOT-MIX ASPHALT BINDER COURSE, IL-19.0, N50 Base items 284.000
40604050 TON HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "C", N50 Base items 171.000
42000070 SQ YD PAVEMENT CONNECTOR (HMA) FOR BRIDGE APPROACH SLAB Base items 119.000
50100100 EACH REMOVAL OF EXISTING STRUCTURES Base items 1.000
50105220 FOOT PIPE CULVERT REMOVAL Base items 80.000
50200100 CU YD STRUCTURE EXCAVATION Base items 12.000
50300225 CU YD CONCRETE STRUCTURES Base items 54.200
50300255 CU YD CONCRETE SUPERSTRUCTURE Base items 267.200
50300260 SQ YD BRIDGE DECK GROOVING Base items 654.000
50300300 SQ YD PROTECTIVE COAT Base items 896.000
50301350 CU YD CONCRETE SUPERSTRUCTURE (APPROACH SLAB) Base items 96.500
50401350 FOOT FURNISHING AND ERECTING PRECAST PRESTRESSED CONCRETE BEAMS, IL72 Base items 778.000
50800205 POUND REINFORCEMENT BARS, EPOXY COATED Base items 99,530.000
50901730 FOOT BRIDGE FENCE RAILING Base items 144.000
51100300 SQ YD SLOPE WALL 6 INCH Base items 18.000
51201710 FOOT FURNISHING STEEL PILES HP12X84 Base items 378.000
51202305 FOOT DRIVING PILES Base items 378.000
51203710 EACH TEST PILE STEEL HP12X84 Base items 2.000
51204650 EACH PILE SHOES Base items 14.000
51500100 EACH NAME PLATES Base items 1.000
52200500 SQ FT MECHANICALLY STABILIZED EARTH RETAINING WALL Base items 4,012.000
54213663 EACH PRECAST REINFORCED CONCRETE FLARED END SECTIONS 18" Base items 2.000
54262718 EACH METAL FLARED END SECTIONS 18" Base items 2.000
542A0223 FOOT PIPE CULVERTS, CLASS A, TYPE 1 18" Base items 40.000
542D0223 FOOT PIPE CULVERTS, CLASS D, TYPE 1 18" Base items 30.000
58600101 CU YD GRANULAR BACKFILL FOR STRUCTURES Base items 215.000
60608572 FOOT COMBINATION CONCRETE CURB AND GUTTER, TYPE M-4.18 Base items 60.000
63100070 EACH TRAFFIC BARRIER TERMINAL, TYPE 5 Base items 2.000
63100085 EACH TRAFFIC BARRIER TERMINAL, TYPE 6 Base items 2.000
63100167 EACH TRAFFIC BARRIER TERMINAL, TYPE 1 (SPECIAL) TANGENT Base items 4.000
67100100 L SUM MOBILIZATION Base items 1.000
72501000 EACH TERMINAL MARKER - DIRECT APPLIED Base items 4.000
78200005 EACH GUARDRAIL REFLECTORS, TYPE A Base items 14.000
X2020410 CU YD EARTH EXCAVATION (SPECIAL) Base items 1,258.000
X2501000 ACRE SEEDING, CLASS 2 (SPECIAL) Base items 0.500
X5030540 EACH FLOOR DRAINS (SPECIAL) Base items 4.000
X7010216 L SUM TRAFFIC CONTROL AND PROTECTION, (SPECIAL) Base items 1.000
XX004565 SQ YD GROUTED RIPRAP Base items 892.000
Z0013798 L SUM CONSTRUCTION LAYOUT Base items 1.000
Z0048665 L SUM RAILROAD PROTECTIVE LIABILITY INSURANCE Base items 1.000
Z0076600 HOUR TRAINEES Base items 1,000.000 $0.80
Z0076604 HOUR TRAINEES TRAINING PROGRAM GRADUATE Base items 1,000.000 $15.00
No More Pay Items