20100500
|
ACRE
|
TREE REMOVAL, ACRES
|
Base items
|
1.100
|
|
20200100
|
CU YD
|
EARTH EXCAVATION
|
Base items
|
5,806.000
|
|
20400800
|
CU YD
|
FURNISHED EXCAVATION
|
Base items
|
6,292.000
|
|
20700220
|
CU YD
|
POROUS GRANULAR EMBANKMENT
|
Base items
|
93.400
|
|
25000210
|
ACRE
|
SEEDING, CLASS 2A
|
Base items
|
0.800
|
|
25000310
|
ACRE
|
SEEDING, CLASS 4
|
Base items
|
1.100
|
|
25000400
|
POUND
|
NITROGEN FERTILIZER NUTRIENT
|
Base items
|
171.000
|
|
25000500
|
POUND
|
PHOSPHORUS FERTILIZER NUTRIENT
|
Base items
|
171.000
|
|
25000600
|
POUND
|
POTASSIUM FERTILIZER NUTRIENT
|
Base items
|
171.000
|
|
25000700
|
TON
|
AGRICULTURAL GROUND LIMESTONE
|
Base items
|
3.800
|
|
25100115
|
ACRE
|
MULCH, METHOD 2
|
Base items
|
1.900
|
|
28000250
|
POUND
|
TEMPORARY EROSION CONTROL SEEDING
|
Base items
|
193.000
|
|
28000400
|
FOOT
|
PERIMETER EROSION BARRIER
|
Base items
|
3,166.000
|
|
28000500
|
EACH
|
INLET AND PIPE PROTECTION
|
Base items
|
3.000
|
|
28100207
|
TON
|
STONE RIPRAP, CLASS A4
|
Base items
|
123.000
|
|
28200200
|
SQ YD
|
FILTER FABRIC
|
Base items
|
124.600
|
|
35101400
|
TON
|
AGGREGATE BASE COURSE, TYPE B
|
Base items
|
951.000
|
|
40200800
|
TON
|
AGGREGATE SURFACE COURSE, TYPE B
|
Base items
|
24.000
|
|
40600275
|
POUND
|
BITUMINOUS MATERIALS (PRIME COAT)
|
Base items
|
5,776.000
|
|
40600290
|
POUND
|
BITUMINOUS MATERIALS (TACK COAT)
|
Base items
|
947.000
|
|
40603080
|
TON
|
HOT-MIX ASPHALT BINDER COURSE, IL-19.0, N50
|
Base items
|
267.400
|
|
40604050
|
TON
|
HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "C", N50
|
Base items
|
175.600
|
|
42000070
|
SQ YD
|
PAVEMENT CONNECTOR (HMA) FOR BRIDGE APPROACH SLAB
|
Base items
|
78.000
|
|
42001300
|
SQ YD
|
PROTECTIVE COAT
|
Base items
|
740.200
|
|
48101200
|
TON
|
AGGREGATE SHOULDERS, TYPE B
|
Base items
|
196.000
|
|
50100100
|
EACH
|
REMOVAL OF EXISTING STRUCTURES
|
Base items
|
1.000
|
|
50104400
|
EACH
|
CONCRETE HEADWALL REMOVAL
|
Base items
|
1.000
|
|
50105220
|
FOOT
|
PIPE CULVERT REMOVAL
|
Base items
|
81.000
|
|
50200100
|
CU YD
|
STRUCTURE EXCAVATION
|
Base items
|
10.400
|
|
50300100
|
EACH
|
FLOOR DRAINS
|
Base items
|
12.000
|
|
50300225
|
CU YD
|
CONCRETE STRUCTURES
|
Base items
|
72.300
|
|
50300255
|
CU YD
|
CONCRETE SUPERSTRUCTURE
|
Base items
|
160.300
|
|
50300260
|
SQ YD
|
BRIDGE DECK GROOVING
|
Base items
|
591.100
|
|
50300280
|
CU YD
|
CONCRETE ENCASEMENT
|
Base items
|
35.700
|
|
50301350
|
CU YD
|
CONCRETE SUPERSTRUCTURE (APPROACH SLAB)
|
Base items
|
91.400
|
|
50500105
|
L SUM
|
FURNISHING AND ERECTING STRUCTURAL STEEL
|
Base items
|
1.000
|
|
50500505
|
EACH
|
STUD SHEAR CONNECTORS
|
Base items
|
2,124.000
|
|
50800205
|
POUND
|
REINFORCEMENT BARS, EPOXY COATED
|
Base items
|
81,352.000
|
|
51201400
|
FOOT
|
FURNISHING STEEL PILES HP10X42
|
Base items
|
164.000
|
|
51201600
|
FOOT
|
FURNISHING STEEL PILES HP12X53
|
Base items
|
168.000
|
|
51265001
|
CU FT
|
DRILLING AND SETTING PILES (IN SOIL)
|
Base items
|
728.000
|
|
51265002
|
CU FT
|
DRILLING AND SETTING PILES (IN ROCK)
|
Base items
|
202.000
|
|
51500100
|
EACH
|
NAME PLATES
|
Base items
|
1.000
|
|
52100520
|
EACH
|
ANCHOR BOLTS, 1"
|
Base items
|
32.000
|
|
54213471
|
EACH
|
END SECTIONS 36"
|
Base items
|
2.000
|
|
542C0241
|
FOOT
|
PIPE CULVERTS, CLASS C, TYPE 1 36"
|
Base items
|
64.000
|
|
59100100
|
SQ YD
|
GEOCOMPOSITE WALL DRAIN
|
Base items
|
40.000
|
|
60100060
|
EACH
|
CONCRETE HEADWALLS FOR PIPE DRAINS
|
Base items
|
2.000
|
|
60146304
|
FOOT
|
PIPE UNDERDRAINS FOR STRUCTURES 4"
|
Base items
|
98.000
|
|
63100080
|
EACH
|
TRAFFIC BARRIER TERMINAL, TYPE 5R
|
Base items
|
4.000
|
|
67100100
|
L SUM
|
MOBILIZATION
|
Base items
|
1.000
|
|
72501000
|
EACH
|
TERMINAL MARKER - DIRECT APPLIED
|
Base items
|
4.000
|
|
78001120
|
FOOT
|
PAINT PAVEMENT MARKING - LINE 5"
|
Base items
|
4,340.000
|
|
78200006
|
EACH
|
GUARDRAIL REFLECTORS, TYPE B
|
Base items
|
4.000
|
|
X5021507
|
L SUM
|
DEWATERING
|
Base items
|
1.000
|
|
X6310164
|
EACH
|
TRAFFIC BARRIER TERMINAL, TYPE 1
|
Base items
|
4.000
|
|
X7010216
|
L SUM
|
TRAFFIC CONTROL AND PROTECTION, (SPECIAL)
|
Base items
|
1.000
|
|
Z0013798
|
L SUM
|
CONSTRUCTION LAYOUT
|
Base items
|
1.000
|
|
Z0076600
|
HOUR
|
TRAINEES
|
Base items
|
1,500.000
|
$0.80
|
Z0076604
|
HOUR
|
TRAINEES TRAINING PROGRAM GRADUATE
|
Base items
|
1,500.000
|
$15.00
|