September 22, 2023 Letting 12:00 PM
05A-UN063

Bulletin Description

New Runway 4 and 22 FAA PAPIs - Phase 2 Paving
Region District DBE % VBP % Federal Project #
3 5 3.00 0.00 3170016TBD
County(s) IL Project # Airport Sponsor City
  • Champaign
CMI 5112 University of Illinois-Willard University of Illinois Savoy
Contract Specifics
The time limit to award this item has been changed from 45 days to 90 days after the scheduled letting.
20 Calendar Days
WARNING: FAA Buy American Preference provisions apply to this contract. Failure to submit a "Certification of Compliance with FAA Buy American Preference-Construction Projects" form in accordance with the bidding procedures set forth in the proposal document (Appendix A4 BUY AMERICAN PREFERENCE) will result in the bid being declared non-responsive.
No More Contract Specifics

Ask Subscribe Questions and Answers (4 Submitted / 4 Answered ) Questions not accepted as of September 12, 2023 04:30 PM.

  • ITEM P-403 The AC Binder Grade is not specified. Is it understood that the common grade of PG 64-22 is required?
    PG 64-22 will be required per the Standard Specifications for Road and Bridge Construction. An addendum will be issued. (09/19/2023)

  • Page P-403-2 – Table 1 Air Voids are specified as 2-4 %. Should this be 4.0% as normally specified by Article 1030.05 of the Standard Specifications?
    Air Voids of 4.0% will be required per Article 1030.05 of the Standard Specifications for Road and Bridge Construction. An addendum will be issued. (09/19/2023)

  • Page P-403-2 – Table 1 The table indicates that the Max allowable RAP is “0%”. The IDOT Standard Specs refers to Asphalt Binder Replacement (ABR) and allows up to 30% ABR for an N30 Surface mixture using RAP and up to 45% ABR for a N30 Surface mixture when using FRAP. Will RAP and / or FRAP be allowed per the IDOT Standard Specs? RAP and / or FRAP is normal for IDOT mixtures. Mixes with “0% RAP” are not typical and most contractors will need to design specifically to meet this spec.
    Maximum RAP% will be as specified in Article 1031.06 of the Standard Specifications for Road and Bridge Construction. An addendum will be issued. (09/19/2023)

  • Please confirm that there are no PAPI's for this project as none are listed on the bid schedule
    “The PAPI units will be installed under a separate project. There are no PAPI units as part of this project.“ (09/07/2023)

Authorized Bidders

  • 4551 Open Road Paving Company LLC
    1414 W Anthony Drive
    Urbana, IL 61802
    Phone: (217) 356-7280 Fax: (217) 356-1539 Email: cuppinghouse@openroadpaving.com
    $252,982.00

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
AW150510 L SUM ENGINEER'S FIELD OFFICE Base items 1.000
AW150520 L SUM MOBILIZATION Base items 1.000
AW152410 CU YD UNCLASSIFIED EXCAVATION Base items 150.000
AW154706 SQ YD CRUSHED AGG BASE COURSE - 6" Base items 1,100.000
AW156513 SQ YD SEPARATION FABRIC Base items 1,100.000
AW602510 GALLON BITUMINOUS PRIME COAT Base items 300.000
AW603510 GALLON BITUMINOUS TACK COAT Base items 100.000
AW800226 TON BITUMINOUS SURFACE - IDOT IL 9.5 Base items 270.000
AW901510 ACRE SEEDING Base items 0.400
AW908510 ACRE MULCHING Base items 0.400
No More Pay Items