Home > Notice of Letting > Contract Detail

April 26, 2024 Letting 12:00 PM
158-78A62

Bulletin Description

9.8 miles of patching on I-57 from 2.5 miles south of IL 154 to Atchison Creek, south of Bonnie.
Region District DBE % VBP % Federal Project #
5 9 4.00 0.00 N/A
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Franklin
  • Jefferson
  • FAI 57
  • I-57
  • D9 PATCH 2024-1
  • C-99-087-24
  • 0-02178-9014
  • 9-01047-0000
Contract Specifics
20 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (1 Submitted / 1 Answered ) Questions not accepted as of April 16, 2024 04:30 PM.

  • Is it the intent of the Department to perform this contract work at night? The contract does include NIGHT WORK ZONE LIGHT as a pay item, but the TRAFFIC CONTROL PLAN on page 4 of the proposal does not outline nighttime hours of work, or any penalties associated with not having the workers and equipment out of the work zone by the peak hours.
    An addendum will be issued to address this question. Please continue to monitor the website for an update. (04/15/2024)

Authorized Bidders

  • 5550 E. T. Simonds Construction Company
    1500 N Oakland Ave
    PO Box 2107
    Carbondale, IL 62902
    PO Box 2107
    Carbondale, IL 62902
    Phone: (618) 457-8191 Fax: (618) 549-0131 Email: jjones@etsimonds.com
    $1,659,506.36 is not within a reasonable approximation of the Estimate

  • 5306 Samron Midwest Contracting, Inc.
    PO Box 1555
    Murphysboro, IL 62966
    Phone: (618) 687-5500 Fax: (618) 684-9341 Email: info@samron.com
    $1,909,303.81

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
40600290 POUND BITUMINOUS MATERIALS (TACK COAT) Base items 12,817.000
40604174 TON POLYMERIZED HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "E", N90 Base items 3,252.000
44000157 SQ YD HOT-MIX ASPHALT SURFACE REMOVAL, 2" Base items 28,516.000
67100100 L SUM MOBILIZATION Base items 1.000
70100420 EACH TRAFFIC CONTROL AND PROTECTION, STANDARD 701411 Base items 10.000
70100800 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701401 Base items 1.000
70107025 CAL DA CHANGEABLE MESSAGE SIGN Base items 28.000
70200100 L SUM NIGHTTIME WORK ZONE LIGHTING Base items 1.000
70300100 FOOT SHORT TERM PAVEMENT MARKING Base items 30,249.000
70300150 SQ FT SHORT TERM PAVEMENT MARKING REMOVAL Base items 10,083.000
70300221 FOOT TEMPORARY PAVEMENT MARKING - LINE 4"- PAINT Base items 50,649.000
78000200 FOOT THERMOPLASTIC PAVEMENT MARKING - LINE 4" Base items 50,649.000
78100100 EACH RAISED REFLECTIVE PAVEMENT MARKER Base items 651.000
78300200 EACH RAISED REFLECTIVE PAVEMENT MARKER REMOVAL Base items 651.000
78300201 SQ FT PAVEMENT MARKING REMOVAL - GRINDING Base items 33,820.000
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.