Home > Notice of Letting

April 26, 2024 Letting 12:00 PM
Notice of Letting
Volume 027, No. 012

The following fields allow you to filter the projects assigned to this letting.

 
Item-Contract Status Status Date Q&A Sub/Ans Addendums Region District Counties Pre-Bid Meeting Bulletin Description
001-61K00 Active 03/11/2024 1 / 1 1 1 1 DuPage Resurfacing Lombard Road from Army Trial Boulevard to Fullerton Avenue in the Village of Addison.
002-61K13 Active 03/11/2024 1 1 1 DuPage Sidewalk construction along Armitage Avenue from Ardmore Avenue to Ellsworth Avenue in Addison.
003-61K15 Active 03/11/2024 1 / 1 1 1 Kane Construct an HMA Shared-Use path with a prefabricated steel truss pedestrian bridge over Blackberry Creek. Includes drainage improvements and landscaping. Project is located between Bell Vue Lane and the Virgil Gilman Nature Trail in Sugar Grove.
004-61K29 Active 03/11/2024 1 1 1 Cook HMA Resurfacing, curb and gutter, driveways, sidewalks, pavement patching, pavement markings, restoring Parkways on 25th Avenue from Lawrence Avenue to Waveland Avenue in Schiller Park
005-61K30 Active 03/11/2024 1 1 Cook Extend a multi-use path from 84th Avenue to 179th Street in Tinley Park.
006-61K31 Active 03/11/2024 1 1 Cook Sidewalk construction on various routes within Alsip.
007-61K32 Active 03/11/2024 2 / 2 3 1 1 DuPage Pavement reconstruction with an HMA multi-use path, curb and gutter, HMA shoulders, sidewalks, ADA ramps, traffic signals, culvert extension, and storm sewer on Gary Avenue from Jewell Road to Harrison Avenue in Wheaton.
008-61K33 Active 03/11/2024 1 1 DuPage HMA Resurfacing, sidewalks, traffic signal modifications, and pavement markings on Main Street from Sherman Road to Franklin Street in Downers Grove.
009-61K36 Withdrawn 04/17/2024 1 1 Cook Sidewalk construction on 91st Street from 0.1 mile east of California Avenue to Western Avenue at the CSX Railroad in Evergreen Park.
010-61K39 Active 03/11/2024 1 1 1 Kane Resurface Baseline Road from US 30 to IL 31 in Montgomery.
011-61K41 Active 03/11/2024 1 / 0 1 1 Cook Construct a concrete paver parking lot, retention basin, drainage improvements, and other work on the Cal-Sag Trial at the Lake Katherine Nature Center in Palos Heights.
012-61K42 Active 03/11/2024 1 1 McHenry Traffic signal replacement on Virginia Road from Teckler Boulevard to James R. Rekow Road, and at the intersection of Pyott Road and James R. Rekow Road in Crystal Lake and Lake of the Hills.
013-62P34 Active 03/11/2024 2 1 1 Cook (6,564-Ft) Standard Overlay project located on Cumberland Avenue from Belle Plaine Avenue to I-90 within the Village of Park Ridge and the City of Chicago in Cook County.
014-62P69 Active 03/11/2024 1 / 1 2 1 1 Cook The proposed improvement consists of bridge deck overlay and joint repair of the structure located at Foster Avenue over North branch Chicago River in the of Chicago, Cook County. Gross and Net length: 2639 Ft (0.50 Mi), 1088 Ft (0.21 Mi)
015-62P76 Active 03/11/2024 6 / 6 2 1 1 Cook Replace wooden noise abatement walls along IL 53 from Dundee Road to Lake Cook Road with precast concrete walls on both east and west sides for a total length of 2.1 miles. Located within Platine, Arlington Heights and Palatine Township.
016-62R43 Active 03/11/2024 2 1 1 Cook (4,090-Ft) Standard Overlay, ADA Improvements. Project located on Kedzie Ave. from 71st St to 77th St within the City of Chicago in Cook County.
017-62R53 Active 03/11/2024 1 1 1 Cook This improvement consists of a standard overlay of the existing FAU 2691 (Wolf Road) from IL 58 (Golf Road) to North of Touhy Avenue in the City of DES Plaines in Cook County approximately 13,627 ft in length.
018-62R75 Active 03/11/2024 1 / 1 1 1 1 Cook (1,770-Ft) Improvement consists of bridge deck overlay and joint replacement of IL 83/Sibley Blvd located over UPRR (0.2-mile east of the State Street/Indiana Avenue). The project is in the Village of Dolton, Cook County.
019-62R91 Active 03/11/2024 5 / 3 3 1 1 DuPage Bridge Deck Overlay, Bridge Joint Replacement / Repair at US 20 (Lake Street) over IL 390 (Elgin O'Hare Expressway). This project is located in the Village of Hanover Park in DuPage County.
020-62T00 Active 03/11/2024 2 1 1 McHenry (200-Ft) Bridge Preservation project including bridge deck overlay, bridge joint replace/repair of SN 056-0052 carrying US 14 (Division Street) over Rush Creek, 0.1-miles North of IL 23 located within the City of Harvard in McHenry County.
021-62T33 Active 03/11/2024 1 1 1 Will This is a bridge preservation project of SN 099-0282; US 6 (Maple Road) over CN Railroad. Scope of work includes bridge deck scarification and overlay, joint repair, approach slab repair and sidewalk and guardrail replacement. The project is located within the City of Joliet in Will County.
022-62T42 Active 03/11/2024 1 1 1 Cook (5.626-Mile) Pavement patching, hot-mix asphalt surface removal, resurfacing with binder and surface course and sidewalk ramps improvements. Located in the Villages of Oak Brook, Westchester, Broadview, North Riverside, and Forest Park in Cook County.
023-62T69 Active 03/11/2024 1 1 1 Lake (4.65-Mile) SMART Resurfacing and ADA Ramp improvements from County Line Road to West of US 12 and includes road surface removal, HMA paving, sidewalk removal, installation of PCC sidewalk, detectable warnings, and placement of pavement markings. Improvements is in the Villages of Lake Zurich, North Barrington, Lake Barrington, and in Cuba and ELA Townships in Lake County.
024-62T85 Active 03/11/2024 1 1 1 Cook The proposed improvement consists of bridge deck overlay and joint repair of the structure located at the Dundee Road Bridge (SN 016-0940) on FAU 1273 (IL- 68 Dundee Road) 0.2 miles east of I-94 in Northfield Township and New Trier Township in Cook County.
025-62U84 Active 03/11/2024 1 / 1 2 1 1 Kane (4,485-Ft) Pavement rehabilitation and widening, drainage, intersection channelization, signing, lighting, traffic signals and safety improvements of US 20 from west of Nesler Road to east of Weld Road/Longcommon Parkway in the City of Elgin within Kane County.
026-62U87 Active 03/11/2024 2 / 2 2 1 1 Cook Scope of work includes pavement removal, Drainage Improvement, Concrete Barrier removal and construction of new Concrete Barrier, retaining wall repair, placement of subbase granular material, HMA asphalt pavement and thermoplastic pavement markings. Located at the IDOT Northbrook Maintenance yard at 1916 Techny Rd., Northbrook, IL.
027-62V18 Active 03/11/2024 1 / 1 2 1 1 Various This improvement consists of repairing damaged concrete barrier wall, bridge parapet, retaining walls and wooden sound wall in various Townships in various Counties throughout District 1.
028-62W01 Active 03/11/2024 3 / 3 2 1 1 Cook This is a parking lot improvement project for the District 1 Landscape Maintenance Yard. The Yard consists of 2 lots, adjacent to each other. Both lots are located at 1260 West Augusta Boulevard within the City of Chicago.
029-62W09 Active 03/11/2024 1 / 1 1 1 1 Cook, DuPage This project consists of debris cleaning and litter picking located on I-55 - Stevenson expressway from IL 43 (Harlem Ave) to I-355 in Cook and DuPage Co.
030-62W10 Active 03/11/2024 1 1 1 Will This work is located on I-55 expressway from I-355 to Reed Rd in Will County. It consists of debris cleaning and litter picking.
031-62W42 Active 03/11/2024 1 1 1 Will (231.5-Ft) This project includes overlay of Gougar Road Bridge over I-80 (SN 099-0 203) and replacement of permanent protective shield, in the Village of New Lenox within Will County.
032-62W46 Active 03/11/2024 1 1 1 Various The work to be completed under this contract consist of impact attenuators removal and replacement, sand modules replacement and any collateral work necessary to complete the improvement as shown on the plans and as described herein on a work order basis and per the Department-s request.
033-64L95 Active 03/11/2024 6 / 6 3 2 2 Winnebago Patching, milling, and resurfacing on IL 75 from 0.2 mile East of Moate Rd to 0.4 mile East of Meridian Rd.
034-64N90 Active 03/11/2024 1 2 2 Rock Island 5.98 mile, HMA resurfacing on IL 92 from 115th St West in Andalusia to 0.4 mile East of IL 92 (N).
035-64P27 Active 03/11/2024 1 / 1 1 2 2 Winnebago 0.55 miles of cold milling, patching, and HMA resurfacing from 0.4 miles East of Lyford Rd to 0.1 mile West of Winnebago County Line.
036-64P58 Active 03/11/2024 1 2 2 Ogle 1.08 miles of cold milling, pavement patching, hot-mix asphalt resurfacing from West of Illinois St to 1st St in Oregon.
037-64S27 Active 03/11/2024 1 / 1 2 2 2 Whiteside Deck repair, joint replacement, deck overlay and other miscellaneous repairs on the existing bridges carrying I-88 over Rock Creek, BNSF RR Barstow Sub., Henry Road and Deer Creek.
038-64S29 Withdrawn 04/02/2024 2 / 2 2 2 Lee Deck repair, joint replacement, deck overlay and other miscellaneous repairs on SN 052-0062 over UP RR at the the south edge of Dixon.
039-64S30 Active 03/11/2024 2 / 2 1 2 2 Lee Deck repair, joint replacement, deck overlay, and other miscellaneous repairs on SN 052-0061 over Coon Creek, 3.2 miles South of Amboy.
040-64S38 Active 03/11/2024 1 2 2 Ogle 0.15 mile milling and standard overlay; tollway ramp (EB) to Steward Rd south of Rochelle.
041-64S55 Active 03/11/2024 1 / 1 2 2 2 Jo Daviess 1.3 miles of patching through Elizabeth.
042-64S61 Active 03/11/2024 2 / 2 1 2 2 Stephenson Bridge deck repair on SN's 089-0058 and 089-0059, carrying US 20 over Silver Creek, 0.5 miles east of Springfield Rd.
043-64S68 Active 03/11/2024 1 2 2 Henry 3.39 miles of HMA resurfacing and pavement patching, IL 82 frokm IL 81 in Camridge to N 70th Ave.
044-64S90 Withdrawn 04/02/2024 2 2 Lee Partial cleaning and painting of structural steel on SN 052-0031 carrying US 30 over UPRR, 0.9 miles east of Whiteside County line.
045-64S95 Active 03/11/2024 1 2 2 Henry Pavement patching on I-74 from the I-74/I-80/I-280 interchange to IL 81.
046-64T03 Active 03/11/2024 1 2 2 Various Various routes on-call guardrail.
047-64T08 Active 03/11/2024 1 / 1 1 2 2 Various Maintain and service all Intelligent Transportation System equipment located in the Department's Districts 2 and 3 to ensure the safety of the motoring public.
048-64T14 Active 03/11/2024 1 2 2 Rock Island 7.26 miles of patching, milling, widening, and resurfacing along 104th St from US 150 south of Coal Valley to Mercer County Line north of Sherrard.
049-64T22 Active 03/11/2024 1 2 2 Rock Island 31.1 miles of aggregate shoulder improvement.
050-66C45 Active 03/11/2024 2 2 3 Iroquois Work beings at the Iroquois/Ford county line on IL 116 extending 8.22 miles, ending at the interchange limits of IL 116 and I 57. The project is a milling and resurfacing designed overlay of IL 116 including drainage improvements.
051-66M43 Active 03/11/2024 1 / 1 1 2 3 Iroquois Class B Patching beginning at the Intersection of IL Route 49 (in Cresent City) and ending at the west abutment of Structure No. 038-0179 east of IL Route 1 in Watseka.
052-66M98 Active 03/11/2024 1 2 3 Iroquois, Kankakee Work beings at 0.1 Mi N of Ambrose St in St Anne to 1.8 Mi S of Papineau Rd. 6.22 Miles of smart overlay with ADA and drainage repairs.
053-66N40 Active 03/11/2024 1 2 3 Livingston Micro surfacing Joint Repair, Located on FAI 55 in Livingston County, from McLean County Line to 1.7 miles South of IL 116.
054-66N44 Active 03/11/2024 1 / 1 2 2 3 Iroquois Milling and resurfacing the Illinois Department of Transportation Ashkum Maintenance facility.
055-66N50 Active 03/11/2024 1 2 3 Grundy IL 47 at the north abutment, southbound lanes of structure No. 032-0099; the work consists of raising existing concrete pavement adjacent to approach pavement.
056-66N53 Active 03/11/2024 1 / 1 1 2 3 Bureau Bridge repairs at Structure No. 006-0083 carrying FAS 1252 (IL 26/29) over Bureau Creek Overflow, 0.3 mi. northeast of IL 26 and IL 29 junction.
057-66N54 Active 03/11/2024 1 2 3 Iroquois Remove concrete slope wall, install stone riprap, filter fabric, stone bedding, replace expansion joint seal, and structural repair of concrete (pier) on SN 038-0174.
058-66N92 Active 03/11/2024 1 / 1 1 2 3 LaSalle Cleaning and painting all structural steel on Structure No. 050-0019 carrying IL 351 over the Lone Star Cement Railroad, 2.0 miles south of US Route 6 (Oglesby).
059-66N93 Active 03/11/2024 1 2 3 Bureau Cleaning and painting all structural steel on Structure No. 006-0083 carrying IL 29/26 over Big Bureau Creek Overflow, 0.3 mi. north of the south junction of IL 26 and Structure No. 006-0084 carrying IL 29 over over Big Bureau Creek, 0.3 mi. south of the south junction of IL 26.
060-66N96 Active 03/11/2024 1 2 3 Kankakee SN 046-0108, riprap replacement, controlled low-strength material, riprap removal, grout for use with riprap.
061-66N97 Active 03/11/2024 1 2 3 Iroquois Traffic Signal Mast Arm Replacement. This project is located in Iroquois County, at the west intersection of US-24 and IL-1 in Watseka.
062-68880 Active 03/11/2024 14 / 14 2 3 4 Peoria Bridge deck replacement and rehabilitation on SN 072-0114 and SN 072-0115 over Kickapoo Creek/BNSF RR.
063-68F84 Active 03/11/2024 1 3 4 Henderson Bridge preservation to SN 036-0036 including: bridge joint replacement, hydroscarification, and MSC overlay on the bridge deck and roadway aproaches, slope wall repair, plating a beam end and other related collateral work to complete the work.
064-68H22 Active 03/11/2024 1 3 4 Marshall NB and SN I-39 over TR 39, Sandy Creek and North Fork Sandy Creek in Marshall County.
065-68H27 Active 03/11/2024 1 3 4 Various D4 bridge deck sealing 2024 at various locations within District 4.
066-68H71 Active 03/11/2024 1 / 1 1 3 4 Tazewell D4 Bridge Joint Repair 2024 at SN's 090-0130, 090-0132, 090-0133, 090-0137, 090-0138 and 090-0139 in Tazewell County.
067-68H81 Active 03/11/2024 4 / 3 1 3 4 Tazewell Bridge deck patching on SN 090-0141 on Morton Ave (FAU 6729) over I-74 in Morton in Tazewell County.
068-68H83 Active 03/11/2024 2 / 2 1 3 4 Peoria Paving the invert of the culvert under IL Rt 6 between Knoxville Ave and Allen Rd.
069-68H84 Active 03/11/2024 1 / 1 1 3 4 Mercer Culvert wingwall and slope repairs along IL 17, 3.8 miles east of US 67 in Mercer County.
070-68H85 Active 03/11/2024 1 / 1 1 3 4 Peoria Culvert wing wall repair (remove and replace) along IL 78, north of IL 116 near Farmington in Peoria County.
071-68H86 Active 03/11/2024 1 3 4 Knox, Peoria Pavement and drainage under RR viaducts on IL 90 and IL 78 in Peoria and Knox Counties.
072-68H91 Active 03/11/2024 1 3 4 Various D4 District-wide pavement markings.
073-68I01 Active 03/11/2024 11 / 10 2 3 4 Woodford Rehabilitation to existing lagoon at the eastbound I-74 Mackinaw Dells Rest Area.
074-68I05 Active 03/11/2024 2 3 4 Tazewell Traffic signal mast arm replacement at IL 98 (Birchwood St.) and I-155 NB ramps in Morton.
075-68J05 Active 03/11/2024 2 3 4 Peoria Traffic signal mast arm replacement at IL 29/Cedar Hills Drive in Peoria County.
076-70254 Active 03/11/2024 6 / 6 3 3 5 Champaign 0.34 mi Bridge Replacement over I-57 west of Champaign.
077-70753 Active 03/11/2024 1 / 1 2 3 5 Champaign 165' culvert replacement at ditch 0.6 and 2.2 miles east of Gifford ECL.
078-70C24 Active 03/11/2024 6 / 6 3 3 5 Douglas Designed Overlay Resurfacing from Coles Co Line to 0.3 mi north of US 36.
079-70D26 Active 03/11/2024 1 3 5 Edgar Culvert replacement field entrance east of Hume Station 1185+00.
080-70E12 Active 03/11/2024 2 3 5 McLean 14.93 miles of SMART Overlay - Standard Overlay ADA Improvements.
081-70G75 Active 03/11/2024 1 3 5 McLean 7.544 miles of SMART resurfacing form West of Cooksville to East of Colfax.
082-70G81 Active 03/11/2024 1 3 5 Vermilion Bridge repair structure 092-0050 bearing replacement at piers.
083-70H06 Active 03/11/2024 1 3 5 Champaign, Piatt Piatt/Champaign Co Line to I-57 west of Champaign and Dewitt/Piatt Co Line to 1 mi east of 900E Rd west of Mansfield.
084-70H14 Active 03/11/2024 1 3 5 McLean Bridge painting of 6 structures on various routes in McLean County.
085-72189 Active 03/11/2024 2 / 2 1 4 6 Sangamon Bridge deck overlay, bridge joint repair/replacement, bridge deck painting and bridge repairs on SN 084-0109 and SN 084-0110 carrying I-55 over IL 104 at the Auburn interchange.
086-72219 Active 03/11/2024 1 4 6 Christian 1.2 miles of overlay and bridge deck overlay on IL 48 from 0.9 miles southwest of Old IL 48 (Spresser Street), southwest of Taylorville, to 0.4 miles southwest of the South Fork Sangamon River.
087-72223 Active 03/11/2024 1 4 6 Pike Bridge deck overlay, deck repairs, and joint replacement on SN 075-0036 carrying IL 96 over Hadley Creek, 0.7 miles south of the IL 106 Junction in Kinderhook.
088-72230 Active 03/11/2024 1 4 6 Macoupin 1.1 miles of patching, resurfacing, adding parking lanes and sidewalk ramp improvements on IL 4 from south of North Street in Girard to north of Cambridge Road, south of Girard.
089-72265 Active 03/11/2024 1 / 1 1 4 6 Macoupin 8.7 miles of cape seal and grinding on IL 108 and 111 from west of Carlinville to the northern IL 108 and111 intersection.
090-72282 Active 03/11/2024 1 4 6 Sangamon 5 miles of resurfacing, curb and gutter replacement, guardrail replacement and bridge deck preservation (over Richland Creek) on IL 97 from the Menard County line to IL 125. SN 084-0068
091-72304 Active 03/11/2024 1 4 6 Montgomery 7.6 miles of resurfacing including interchange ramps on I-55 from 0.4 miles south of CH 17 (Mine Avenue) at the Farmersville interchange to just south of the Sangamon County line. Also includes fog seal of shoulders and culvert repairs.
092-72498 Active 03/11/2024 1 4 6 Sangamon Resurfacing on Old US 66 from 0.1 miles south of New City Road to 0.19 miles east of Burttle Lane, east of I-55.
093-72620 Active 03/11/2024 2 / 2 1 4 6 Schuyler Painting portions of SN 085-0029 carrying IL 99 over Cedar Creek, 0.65 miles north of Camden.
094-72725 Active 03/11/2024 1 / 1 1 4 6 Montgomery Pipe culvert removal and replacement on Nokomis Blacktop, 0.08 miles east of E 15th Road.
095-72732 Deleted 03/19/2024 4 6 Morgan Deck patching on 4 bridges carrying US 67 over IL 104 ramps and NSRR northwest of Jacksonville. (SN 069-0073, 0074, 0075, 0076)
096-72735 Active 03/11/2024 1 4 6 Various Maintenance and repair of surveillance cameras, vehicle detectors, dynamic message signs, advanced traffic management systems, fiber optic communications, traffic signal interconnects, ethernet networks and peripheral equipment throughout District 6.
097-72E35 Active 03/11/2024 1 4 6 Various Maintenance and repair of traffic signals, flashing beacons and roadway lighting along various routes at various locations in the western half of District 6.
098-72E36 Active 03/11/2024 1 / 1 1 4 6 Various Maintenance and repair of traffic signals, flashing beacons and roadway lighting along various routes at various locations in the eastern half of District 6.
099-74443 Active 03/11/2024 2 / 2 3 4 7 Lawrence Replacement of SN 051-0009 carrying US 50 over Muddy Creek, 0.5 miles east of Summer Road.
100-74458 Active 03/11/2024 2 / 2 2 4 7 Fayette 5.8 miles of resurfacing and ADA improvements on US 51 in the Village of Ramsey.
101-74564 Deleted 03/21/2024 4 7 Coles Superstructure and substructure replacement of SN 015-0068 carrying 900N over Riley Creek, 0.3 miles west of Charleston.
102-74857 Active 03/11/2024 1 4 7 Wayne Bridge superstructure replacement on SN 096-0064 carrying IL 15 over Pond Creek, 0.4 miles west of 2095E, east of Fairfield.
103-74986 Active 03/11/2024 7 / 7 3 4 7 Coles 8 miles of patching, HMA surface removal, HMA resurfacing, aggregate shoulders and guardrail replacement on Lake Paradise Road from IL 16 to the Cumberland County line.
104-74A08 Active 03/11/2024 1 4 7 Lawrence, Richland 6.4 miles of resurfacing on US 50 from 4 miles west of the Lawrence County line to 0.2 miles east of IL 250.
105-74A85 Active 03/11/2024 1 4 7 Crawford Culvert removal and precast concrete culvert placement at 5 entrance locations on TR 183A (East 1000th Avenue) in Palestine.
106-74B18 Active 03/11/2024 1 / 1 2 4 7 Macon HMA resurfacing over bare concrete with geometric improvements on IL 48 from 0.5 miles north of US 51 to south of Bowman Road.
107-74B42 Active 03/11/2024 1 4 7 Effingham 5.5 miles of crack and joint sealing on US 40 from East Division Street in Altamont to 0.3 miles west of Lake Sara Road.
108-74B47 Active 03/11/2024 1 4 7 Clark Removal and replacement of PCC sidewalks and ADA ramps at the Cumberland Rest Area on I-70.
109-74C41 Active 03/11/2024 1 4 7 Coles 3.8 miles of patching, milling and resurfacing on IL 16 from just east of 36th Street in Mattoon to the Moultrie County line.
110-74C43 Active 03/11/2024 1 / 1 4 7 Effingham, Fayette 2.4 miles of cape seal on IL 128 from the Shelby County line to IL 33.
111-74C67 Active 03/11/2024 1 4 7 Wayne Bridge painting at various locations in Wayne County.
112-74C71 Active 03/18/2024 1 / 1 1 4 7 Crawford Partial width resurfacing on IL 33 from 0.7 miles west of 1300th Street to 0.1 miles west of 1300th Street in Robinson.
113-74C72 Active 03/11/2024 1 4 7 Wayne Patching at the intersection of US 45 and IL 15 in Fairfield.
114-74C73 Active 03/11/2024 1 4 7 Macon 3.6 miles of patching on IL 48, IL 121 from 0.5 miles north of I-72 to 0.3 miles south of Pershing Road in Decatur.
115-74C74 Active 03/11/2024 1 4 7 Macon Patching on IL 121 from Garfield Avenue to Locust Street and on IL 105 from 0.1 miles north of Cantrell to 0.1 miles south of Cantrell.
116-74C80 Active 03/11/2024 4 7 Coles, Effingham Parking lot improvements at the Effingham District Office and the Mattoon Yard.
117-74C82 Active 03/11/2024 1 4 7 Macon Remove and replace light poles, light pole foundations, wiring, electric service, and lighting controller at the Niantic Intechange on I-72, Exit 128.
118-74C86 Active 03/11/2024 1 / 1 1 4 7 Clark 2.9 miles of pothole patching and seal coat for bituminous surface treatment at 12 locations in Clark County.
119-74C88 Active 03/11/2024 1 4 7 Various Repairing, replacing, servicing, and maintaining the electrical systems throughout District 7.
120-76L34 Active 03/11/2024 1 5 8 Washington 8.5 miles of crack and joint sealing on I-64 from the Clinton County line to 1.1 miles west of Covington Road.
121-76M86 Active 03/11/2024 2 / 2 5 8 St. Clair Lighting on I-55/70/64 from the Mississippi River to east of the I-64 (Tri-Level) Interchange.
122-76P46 Withdrawn 04/26/2024 1 5 8 Madison Bridge repair on SN 060-0124, HMA overlay and joint repair on IL 111 over NW and CNW and MCT Bike Trail, 0.2 miles north of IL 162 in Pontoon Beach.
123-76R12 Active 03/11/2024 1 5 8 Madison Bridge deck sealing on US 67 at the Clark Bridge (SN 0606-0255) over the Mississippi River in Alton.
124-76R37 Active 03/11/2024 1 5 8 St. Clair 4.8 miles of fog seal on IL 156 from IL 159 to IL 13.
125-76R39 Active 03/11/2024 1 5 8 Madison 6.3 miles of crack and joint sealing on I-70 from 0.1 miles west of Prairie Road to the Bond County line.
126-76R59 Active 03/11/2024 5 8 Madison Milling and resurfacing of the District 8 office parking area (west, southwest parking area and loading docks).
127-76R94 Active 03/11/2024 2 / 2 2 5 8 St. Clair Replacing high mast, roadway and underpass luminaires along I-55/70/64 near East St. Louis.
128-76T20 Active 03/11/2024 1 5 8 St. Clair 0.5 miles of resurfacing on Boul Avenue from IL 161 to IL 159 in Swansea.
129-76T29 Active 03/11/2024 1 5 8 St. Clair 1 mile of patching and resurfacing on IL 111 from the CSX Railroad bridge to Collinsville Road.
130-76T32 Active 03/11/2024 2 / 2 2 5 8 Clinton 0.7 miles of patching and resurfacing on IL 161 from 0.3 miles west of Red Fox Road to 0.1 miles east of Church Steeple Road.
131-76T34 Active 03/11/2024 1 5 8 St. Clair Patching and resurfacing on Collinsville Road/9th Street/Fairmont Avenue from 0.1 miles west of Rose Lake Road in East St. Louis to east of Exchange Avenue.
132-76T40 Active 03/11/2024 2 / 2 1 5 8 Clinton Bridge painting on US 50 under Schumacher Road, 5 miles east of Trenton (SN 014-0050), and on IL 127 over Flat Branch Creek, 8.1 miles north of Carlyle (SN 014 0063).
133-76T41 Active 03/11/2024 3 / 3 1 5 8 St. Clair, Washington Bridge painting on the structure carrying I-64 westbound over NS Railroad, 0.3 miles east of IL 161 and on the structure carrying IL 127 over Locust Creek, 5.5 miles south of Nashville. (SN 082-0195 and SN 095-0065)
134-76T42 Active 03/11/2024 2 / 2 1 5 8 Greene Bridge painting on the structure carrying IL 267 over Apple Creek, 8.6 miles north of Greenfield and the structure carrying IL 267 over Lick Creek, 6.6 miles north of Greenfield. (SN 031-0015 and SN 031-0016)
135-76T45 Active 03/11/2024 1 5 8 Various Video detection system replacement at various locations in District 8.
136-76T46 Active 03/11/2024 1 5 8 Randolph Bridge repair on Little Mary-s Covered Bridge (SN 079-9000) on IL 150, 4 miles northeast of Chester.
137-76T51 Active 03/11/2024 1 / 1 5 8 St. Clair Demolition of buildings along Old IL 3 (South Main Street) near Imbs Station Road in Dupo.
138-76T53 Active 03/11/2024 1 5 8 Madison, St. Clair Traffic signal modernization at various locations: St. Clair Ave. and 37th/38th Street; Foley Drive/70th Street and W. Main Street; 74th Street and Foley Drive; IL 159 and IL 13/158; IL 15 and 74th Street; IL 161 and Frank Scott Parkway in Belleville; IL 3 and Pontoon Road in Granite City.
139-76T54 Active 03/11/2024 1 5 8 Jersey, Madison Bridge approach roadway on IL 255 and US 67 at various locations: IL 255 over Humbert Road (SN 060-0309), UP and KCS Railroad (SN 060-0311), and over IL 111/IL 267 (SN 060-0331); US 67 over IL 255 (SN 060-0332) and over Piasa Creek (SN 042-0027).
140-76T55 Active 03/11/2024 1 5 8 Various Lighting and traffic signal repair and maintenance at various locations throughout District 8.
141-76T59 Active 03/11/2024 1 / 1 1 5 8 Washington 8.1 miles of resurfacing on IL 15 from 0.1 miles east of Gardner Street in Nashville to the US 51 West Junction.
142-76T60 Active 03/11/2024 1 / 1 1 5 8 Randolph 8 miles of ultra-thin bonded wearing surface on IL 3 from 0.1 miles north of Roots Road to 0.1 miles south of Elmer and Edna Kipp Lane.
143-76T61 Active 03/11/2024 3 / 3 3 5 8 Washington 3.4 miles of resurfacing on IL 127 from Masonic Drive to Conservation Drive, south of Nashville.
144-76T64 Active 03/11/2024 1 / 1 5 8 St. Clair Pump replacement at the Bowman Pump Station in East St. Louis.
145-76T65 Active 03/11/2024 1 5 8 Madison 6.6 miles of overlay on IL 140 from 0.2 miles west of IL 159 to 0.1 miles west of Park Avenue.
146-78825 Active 03/11/2024 2 / 2 2 5 9 Jackson Slope stabilization and resurfacing on IL 127 approximately 0.5 miles south of Tomcat Hill Lane, south of Murphysboro.
147-78920 Active 03/11/2024 1 5 9 Gallatin Joint reconstruction with strip seals, base course widening, bridge deck, approach slab and structure repair, deck scarification and microsilica overlay on SN 030-0020 carrying IL 1 over Lawler Ditch and SN 030-0021 carrying IL 1 over Saline River southeast of Equality.
148-78999 Active 03/11/2024 1 5 9 Hamilton, White Removal and replacement of 2 box culverts: SN 097-7066 carrying US45 over an unnamed ditch, north of Norris City and SN 033-7020 carrying IL242 over an unnamed ditch, south of Belle Prairie City.
149-78A06 Active 03/11/2024 1 5 9 Williamson Microsilica deck overlay, joint replacement and bridge deck patching on SN 100-0037 carrying IL 148 over Middle Wolf Creek, 1 mile north of I-57.
150-78A08 Active 03/11/2024 1 / 1 2 5 9 Hamilton, Jefferson Bridge repairs of SN 041-0062 on IL 142 over I-64, 1.5 miles southeast of Mt. Vernon and bridge repairs of SN 033-0038 on IL 14 over Sullivan Creek, 1.5 miles northeast of Macedonia.
151-78A10 Active 03/11/2024 1 5 9 Jefferson Bridge deck overlay on SN 041-0099 carrying IL 142 over Rock Branch, 1.4 miles southeast of Belle Rive; and bridge deck overlay on SN 041-0048 carrying IL 142 over Rocky Branch Tributary, 1.4 miles southeast of Belle Rive.
152-78A19 Active 03/11/2024 1 5 9 Williamson 2.2 miles of resurfacing on IL 13 from Sinclair Street to IL 37.
153-78A21 Active 03/11/2024 2 / 2 3 5 9 Jackson, Perry 10.9 miles of HMA surface removal, resurfacing, HMA shoulders, patching, rumble strips and guardrail improvements on IL 4 from IL 150 to Keller Street, west of the Ava.
154-78A22 Active 03/11/2024 1 5 9 Pulaski Structural repair of concrete, pier cap encasement and replacement of seismic restrainer cables on piers 7-15 on SN 077-0002 carrying I-57 over Old US 51.
155-78A36 Active 03/11/2024 1 5 9 Jackson 0.94 miles of patching on IL 149 from Grimsby Road to 1 mile east of the truck climbing lane near Kinkaid Creek in Murphysboro.
156-78A60 Active 03/11/2024 1 5 9 Jackson Traffic signal detection at 2 intersection: 1) IL 13 at New Era; 2) IL 13 at Sycamore/Emerald.
157-78A61 Active 03/11/2024 1 5 9 Jefferson Patching of the ramps and parking lots at the eastbound and westbound Goshen Road Rest Areas on I-57.
158-78A62 Active 03/11/2024 1 / 1 2 5 9 Franklin, Jefferson 9.8 miles of patching on I-57 from 2.5 miles south of IL 154 to Atchison Creek, south of Bonnie.
159-85757 Active 03/11/2024 1 2 2 Lee HMA resurfacing with aggregate shoulders on Indian Road from the Bureau County Line to Van Petten Road, and on Van Petten Road from the Whiteside County Line to Indian Head Road.
160-85759 Active 03/11/2024 1 2 2 Whiteside Resuracing Hahnaman Road from Yorktown Road to Tampico Village Limits, and Yorktown Road from Hahnaman Road to Osage Road, and Yorktown Road to 0.2 mile east of Yorktown Road.
161-87791 Active 03/11/2024 1 / 1 1 2 3 Grundy Rehabilitate the bridge carrying CH 34V over the Mazon Ricer, 0.7 mile north of I-55, and replace the bridge carrying FAS 272 over an Unnamed Creek 3 miles southwest of Mazon.
162-87792 Active 03/11/2024 2 3 Grundy Replace 3 structures on Grand Ridge Road over Hog Run, Bills Run and Waupecan Creek, located between LaSalle Road anc Verona Road.
163-87815 Active 03/11/2024 2 3 Bureau Replace the bridge carrying TR 312 over the Tributary to Masters Creek, 4 miles west of LaMolle.
164-87820 Active 03/11/2024 2 3 Livingston Replace existng structure with a three-span RC slab bridge with HMA approach, aggregate and HMA shoulders, and guardrail improvements on CH 3 over Broughton Creek, one mile north of Campus.
165-87824 Active 03/11/2024 1 2 3 Bureau Resurface CH 8 from east city limits of Walnut to 2600 Avenue/CH 22, and from the Lee County line to IL 92.
166-87826 Active 03/11/2024 1 / 1 1 2 3 DeKalb HMA resurfacing and shoulders on Chicago Road from the Lee County line to Shabbona Road, on Rollo Road from Chicago Road to Suydam Road, and on Suydam Road from Rool Road to the LaSalle County Line.
167-87829 Active 03/11/2024 1 2 3 Kankakee Resurfacing CH 3 from the Iroquois County line to CH 37.
168-87831 Active 03/11/2024 2 / 2 1 2 3 Livingston HMA Resurfacing with Cold-In-Place Recycling, aggregate base course widening, and aggregate shoulders on CH 6 rom 20000N Road to CH 8.
169-87847 Active 03/11/2024 8 / 5 1 2 3 LaSalle Resurfacing CH 2 from the Somonauk South City Limits to US 52.
170-89827 Active 03/11/2024 1 3 4 Knox HMA resurfacing with ADA improvements, drainage improvements and pavement markings on West Carl Sandburg Drive from Henderson Street to Broad Street in Galesburg.
171-89831 Active 03/11/2024 1 / 1 3 4 Peoria Construct 4" wide HMA Shoulders with Rumble Strips and pavement markings on Smithville Road to Lancaster Road.
172-90392 Active 03/11/2024 1 3 5 Vermilion 2.94 miles designed overlay from Catlin/Indianola Rd to 0.3 mile west of US 150 in Westville.
173-93818 Active 03/11/2024 3 / 3 1 4 6 Morgan HMA resurfacing with Curb and Gutter, sidewalks, storm sewers, lighting, signage and streetscape improvements on West State Street from Church Street to Sandy Street in Jacksonville.
174-95931 Active 03/11/2024 4 7 Lawrence Replace existing structure with a Three-Span PPC Deck Beam Bridge with HMA Approach on Applegate Road over Eagle Branch, 4 miles southeast of Chauncey.
175-95934 Active 03/11/2024 2 / 2 1 4 7 Cumberland Replace existing structure with a single-span PPC deck beam bridge with HMA approach and guardrails on Cumberland Road over Embarras River Overflow, 0.5 miles west of Greenup.
176-95949 Active 03/11/2024 1 / 1 4 7 Richland Reconstruction of Calhoun Lane from IL 130 to east city limits of Calhoun.
177-95954 Active 03/11/2024 4 7 Lawrence Sidewalk constrution on Christy Avenue from North Railroad Street to Cedar Street, and Locust Street from May Street to Christy Avenue in Sumner.
178-95955 Active 03/11/2024 4 7 Shelby HMA resurfacing with pavement patching, aggregate wedge shoulders and driveway improvements on North Broadway Street from North 12th Street to North 9th Street in Shelbyville.
179-97823 Active 03/11/2024 5 8 Marion Replace existing structure with a three-span PPC deck beam structure on H-Pile supported abutments, individual concrete encased H-pile piers with approach roadways on Kline Road over Flat Creek, one mile northwest of Vernon.
180-97828 Active 03/11/2024 2 / 2 2 5 8 Bond HMA resurfacing with sidewalk ramps on Beaumont Avenue from North 3rd Street to IL 140 in Greenville.
181-99717 Active 03/11/2024 5 9 Jackson PCC shared-use path with drainage improvements, signage and ADA ramps along IL 13 from West Murphysboro Road to Wood Road in Carbondale.
182-62380 Active 03/15/2024 6 / 6 2 1 1 Will Location 1: FAU 354 (Richards Street) at Hickory Creek North of I-80 (SN 099- 0123) 1,835 Feet (0.35 Mile) project which includes reconstruction and widening of the bridge bridge superstructure, pavement reconstruction, noise barriers, drainage, signing, lighting, and traffic signals in the City of Joliet and Joliet Township in Will County. Location feet 2: FAI 80 (I-80) over Des Plaine River (099-0056 EB and 099-0057 WB) 782 feet (0.15 Mile) project which includes structural steel repairs in the City of Joliet and Joliet Township in Will Co.
183-62P50 Active 03/15/2024 2 / 2 2 1 1 Cook (4,470-Ft) Corridor improvement, traffic signal modernization/ replacement and ADA improvements project on IL Route 43 (Harlem Avenue) and includes the intersections of 78th St., 79th St., 83rd St., 84th St., 87th St., 88th St./ Southfield Shopping Center Dr., and 90th St. in the Village of Bridgeview in Cook County.
184-62R65 Active 03/15/2024 1 1 1 Cook The improvement consists of cleaning and painting existing steel on various structures located in Villages of Hodgkins and Summit in Cook County. Location 1 (SN: 016-0004, 0005, 0006, and 0007) in Village of Hodgkins, Location 2 (016-0012 and 0013) in Village of Summit, and Location 3 (SN: 016-0014 and 0015) Village of Summit.
185-62R69 Active 03/15/2024 1 1 1 Cook (2.07-Mile) SMART Overlay on 183rd Street from Oak Park Ave to IL 50 (Cicero Ave). This project is located in the City of Country Club Hills, the Village of Tinley Park and unincorporated Cook County.
186-62T45 Active 03/15/2024 1 1 1 Kane This is a bridge preservation project of (SN 045-2015); Galena Blvd. over Blackberry Creek. Scope of work includes bridge deck scarification and latex overlay, full depth deck patching, approach slab repair and drainage adjustments. The project is located within the City of Aurora in Kane County.
187-62U73 Active 03/15/2024 2 / 2 2 1 1 DuPage (2,000-Ft) Traffic Signal Modernization and Intersection Improvements located at IL 83 (Kingery Highway) and Bluff Rd. in the Downers Grove Township, DuPage County.
188-72122 Withdrawn 04/25/2024 3 4 6 Sangamon 1.7 miles of pavement reconstruction, milling and resurfacing, sidewalk ramp improvements and accessible pedestrian traffic signals on Dirksen Parkway from 0.1 miles south of Peoria Road to north of Northfield Drive in Springfield.
189-72715 Deleted 03/19/2024 4 6 Sangamon Substructure repairs on SN 084-0073 and 084-0178 carrying Dirksen Parkway over NSRR and ICRR in Springfield.
190-72M82 Active 03/15/2024 1 4 6 Sangamon 1 mile of standard overlay, concrete curb and gutter ADA improvements and traffic signal upgrades on Business 55 / 6th Street in Springfield from north of Myrtle Street to Stanford Avenue.
191-76L11 Withdrawn 04/16/2024 1 5 8 Marion 11.5 miles of resurfacing and ADA improvements on IL 37 from Cherry Street in Kinmundy to Madison Street in Salem.
192-62L16 Active 03/18/2024 7 / 7 2 1 1 McHenry 7.3 miles of Standard Overlay, Milled Rumble Strips and drainage improvements on IL 173 in the Villages of Hebron and Alden.
193-62L31 Active 03/18/2024 19 / 19 2 1 1 Cook Voluntary (1,560-Ft) Bridge structural repairs, bridge deck overlay removal and replacement, joint replacement, and bridge drainage repairs, for the Ohio St. Bascule Bridge over the North Branch Chicago River, and the west and east approach bridges, in the City of Chicago, Cook County, IL.
194-62M25 Active 03/18/2024 1 / 1 2 1 1 Lake, McHenry (8.47-Mile) Standard Overlay, Milled Rumble Strips, Drainage Improvements on IL 173 (Kenosha St) from Greenwood Rd to Madison Ave. This project is in the Villages of Richmond, Spring Grove and in Unincorporated Hebron, Richmond and Burton Townships in McHenry and Lake Counties.
195-62M37 Active 03/18/2024 2 1 1 DuPage (1014-Ft) The proposed improvement consists of bridge deck overlay and joint repair of the structure located at IL 83 (Kingery Highway) over I-88, Dupage County.
196-62P05 Active 03/18/2024 1 1 1 Cook The proposed improvement consists of bridge deck overlay and joint repair of the structure located at Forest Avenue over Des Plaines River in the Village of Riverside, Cook County.
197-62V97 Active 03/18/2024 1 1 1 DuPage This improvement is located at the IDOT Oakbrook Maintenance yard at 17W125 Butterfield Road, Villa Park, IL. Scope of work includes pavement removal, Catch Basins PCC reconstruction, placement of subbase granular material, HMA asphalt pavement, PCC pavement, and thermoplastic pavement marking.
198-72893 Active 03/18/2024 2 / 2 1 4 6 Sangamon Earthwork, drainage improvements, HMA shoulders, guardrail, high-tension cable median barrier, bridge deck repairs (SN 084-0018 and 084-0019), and bridge deck microsilica concrete overlay of SN 084-0019 on I-55 at the Sangamon River, 2.2 miles south of I-55 BUS at the Sherman Interchange.
199-76P58 Withdrawn 04/03/2024 5 8 Madison 2.2 miles of resurfacing and ADA improvements on Beltline Road from IL 157 to IL 159 in Collinsville.
200-46639 Active 03/18/2024 1 2 2 Various Removing existing guardrail delineators and installing new guardrail delineators within the limits specified on each individual work order.
201-46641 Active 03/18/2024 1 4 6 Various Removing and replacing damaged raised reflective pavement markers or lenses throughout District 6.
202-46642 Active 03/18/2024 1 / 1 1 2 2 Various Placing various widths of preformed plastic and modified urethane pavement marking lines, letters and symbols within the limits specified on each individual work order.
203-46645 Active 03/18/2024 1 2 2 Various Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and placing new raised reflective pavement marker castings within the limits shown on each individual work order.
204-61D34 Active 03/18/2024 5 / 5 2 1 1 Will Pavement widening and reconstrtution;includes resurfacing, traffic signals and lightings at the intersection of Bell Road and 143rd Street in Homer Glen.
205-61H34 Active 03/19/2024 15 / 14 2 1 1 Will New roadway construction to extend 143rd Street from IL 59 to IL 126. Includes; construction of a new bridge over the DuPage River, culvert exetensions, retaining walls, traffic signals and lighting in Plainfield.
206-61J08 Active 03/18/2024 1 / 1 1 1 Will Construct a single-lane eliptical roundabout at the intersection of Cedar Road and Haven Avenue in New Lenox. Includes full-depth HMA Pavement, curb and gutter, sidewalk, lighting, and landscaping.
207-61J14 Active 03/18/2024 6 / 6 2 1 1 DuPage Replace existing structure with a single-span PPC bulb t-beam superstructure with concrete deck, HMA pavement, retaining wall, HMA multi-use path, storm sewers, sidewalks, ADA improvements, Guardrail, curb and gutter, and signage on Warrenville Road over the East Branch of the DuPage River in Lisle.
208-61J93 Withdrawn 04/26/2024 16 / 16 2 1 1 McHenry Pavement reconstruction, construction of a multi-use patch, replace two bridges , curb and gutter, storm sewer, traffic signals, lighting and landscaping on Randall Road from Acman Road to Acorn Lane/Polaris Drive in Lake in the Hills and Crystal Lake.
209-61K34 Active 03/18/2024 1 1 1 Lake Pavement reconstruction on FAU 160 (Sprucewood Ln.) from Rolling Ridge Lane to Lake Shore Drive, continuing on Lake Shore from Sprucewood Lane to Beck Road in Lindenhurst.
210-61K35 Active 03/18/2024 1 1 1 McHenry Roadway widening, reconstruction, resurfacing and triffic signals at the intersectionof Three Oaks Road and Lutter Drive/Sands Road in Crystal Lake.
211-64S65 Active 03/18/2024 1 2 2 Whiteside Bridge repair, deck repair, joint replacement on SN 098-0033, carrying US 30 over Elkhorn Creek.
212-64T15 Active 03/18/2024 1 2 2 Ogle, Whiteside 8.8 miles of patching, milling, and resurfacing on Freeport Rd from West Sterling Rd to East Lynn Blvd in Sterling.
213-70B07 Active 03/18/2024 1 / 1 1 3 5 Vermilion 6.16 miles of designed overlay and culvert repair; Georgetown/Indianola Rd to south of Catlin.
214-72M79 Active 03/19/2024 3 / 3 2 4 6 Menard 1.9 miles of resurfacing and culvert improvements on IL 97 south of Petersburg, from 0.1 miles north of North Shore Drive to 0.3 miles north of Boy Scout Road.
215-87794 Active 03/18/2024 2 3 Iroquois Replace the bridge carrying CH 40 over a tributary to Possum Trot Ditch, 3.5 miles south of Sheldon.
216-89835 Active 03/18/2024 4 / 4 3 3 4 Peoria Reconstruct the intersecton of Pioneer Parkway and University Street in Peoria.
217-95947 Active 03/18/2024 4 7 Cumberland Sidewalk construction on various routes within Neoga.
218-95951 Active 03/18/2024 4 7 Moultrie Replace an existing culvert with a trip-cell cast-in-place box culvert to carry CH 10 over Jonathan Creek, .3 mile east of Cadwell.
219-95956 Active 03/18/2024 1 4 7 Wabash Resurfacing on Poor Farm Road from Friendsville Avenue to IL 1, north of Mount Carmel.
220-95957 Active 03/18/2024 3 / 3 1 4 7 Edwards HMA Resurfacing with aggregate shoulders and pavement markings on CH 3 from the West Corporate Limits of West Salem to the Wabash County Line.
221-97807 Active 03/18/2024 3 / 3 1 5 8 Madison Construct a PCC Shared Use Path adjacent to IL 157 with concrete curb and gutter, driveway, drainage structures, retaining walls, traffic signal modifications, pavement markings and signage from the MCT Nature Trail to Levis Road in Edwardsville.
222-60P75 Active 03/19/2024 13 / 13 1 1 1 DuPage (1.62-Mile) Proposed improvement includes widening and reconstruction of IL Route 56 (Butterfield Road) from West of I-355 to Arboretum Drive including Bridge repairs, multi-use path, traffic signals and lighting.
223-62P06 Active 03/19/2024 1 / 1 1 1 1 DuPage (1157-Ft) The proposed improvement consists of culvert repair of the structure located at I-55 at stream (0.9 Mi E. of Cass Ave) in Downers Grove Township, DuPage County.
224-62P12 Active 03/19/2024 3 / 3 2 1 1 Cook (2,500-FT) The proposed improvement consist of a bridge deck overlay and joint replacement of IL59/ Sutton Road located over I-90. The project is located in the Village of Hoffman Estates, Cook County.
225-62U81 Active 03/19/2024 1 1 1 Cook (1.14-Mile) This improvement consists of pavement patching, hot-mix asphalt surface removal, resurfacing with binder and surface course and sidewalk ramps improvements. Located in the Villages of Winnetka in Cook County.
226-62W06 Active 03/19/2024 1 / 1 1 1 1 Cook Parking lot improvement project consists of full depth removal of existing HMA pavement and replacement, PCC pavement replacement/patching, drainage, lighting relocation. Location of Work: IDOT District 1 Emergency Traffic Patrol (ETP) facility at 3501 South Normal Avenue within the City of Chicago in Cook County.
227-68H26 Active 03/19/2024 1 / 1 1 3 4 Various Crack and joint sealing on various routes in various counties in District Four.
228-62U70 Active 03/21/2024 1 1 Various This contract consists of nighttime sweeping along various expressways in District 1.
229-62W28 Active 03/21/2024 1 1 1 Cook The improvement consists of the litter picking and debris removal, graffiti cleaning, and posting security at graffiti cleaning locations.
230-66P20 Active 03/21/2024 1 / 1 2 2 3 Kankakee Repair and maintain traffic signal, flashing beacons, and roadway lighting in Kankakee County.
231-62T51 Active 03/21/2024 1 / 1 1 1 1 Cook This project consists of Traffic Signal Modernization and ADA Improvements of at the intersection of IL 1 (Halsted St.) and IL 83 (147th St.) in the city of Harvey in Cook County. Project length is 1,332 ft (0.25 mile)
232-62U75 Active 03/21/2024 1 1 Various The work to be completed under this contract consists of expressway daytime sweeping throughout District 1.
233-62W17 Active 03/21/2024 1 1 1 Cook The work to be completed under this contract consists of expressway daytime sweeping in Cook County.
234-74562 Deleted 03/22/2024 4 7
01A-DK065 Active 03/12/2024 5 / 5 1 2 3 DeKalb Replace Perimeter Fencing, Phase 1
02A-SC071 Active 03/12/2024 2 5 8 St. Clair Voluntary Terminal Apron Expansion - Project 1
03A-WI061 Active 03/12/2024 4 / 4 3 5 9 Williamson Voluntary Taxiway A and B Rehabilitation
04A-VE058 Active 03/12/2024 1 3 5 Vermilion Realign Taxiway A Phase 2: Taxiway A2 and the connecting Taxiway A to Runway 16/34
05A-FA009 Active 03/12/2024 1 4 7 Wayne Airfield Pavement Maintenance and Pavement Markings
06A-BN020 Active 03/21/2024 1 / 1 3 5 9 Franklin Replace Runway and Taxiway Lights, Windcone, and REILS
07A-WA080 Active 03/12/2024 2 / 2 1 1 1 Lake Rehabilitate Main Automobile Parking Lot
08A-MA034 Active 03/12/2024 1 3 4 Marshall Rehabilitate Runway 13/31
09A-WA076 Active 03/21/2024 1 / 1 1 1 1 Lake Construct Wildlife Fencing - Phase 5 (Northwest Area)
10A-HA031 Active 03/21/2024 1 5 9 Saline Remark Runway 6-24, Runway 14-32, Partial Parallel Taxiway and Taxiway Connectors
No More Data