Home > Notice of Letting > Contract Detail

April 26, 2024 Letting 12:00 PM
192-62L16

Bulletin Description

7.3 miles of Standard Overlay, Milled Rumble Strips and drainage improvements on IL 173 in the Villages of Hebron and Alden.
Region District DBE % VBP % Federal Project #
1 1 15.00 0.00 NHPPWNBU(352)
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • McHenry
  • FAP 303
  • IL 173
  • 2020-044-RS&SW
  • C-91-234-20
  • 1-79512-0000
  • 1-79512-0001
Contract Specifics
Project Labor Agreement
90 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (7 Submitted / 7 Answered ) Questions not accepted as of April 16, 2024 04:30 PM.

  • Per plan notes on page 10, the department is directing the excavated topsoil to be stockpiled and re-used for respread. Since the topsoil falls within the non-special waste limits, per article 669, any stockpiling of non-special waste material shall be done within the right-of-way per specific criteria. With the limited area available in the ditchline/ROW, where shall the material be assumed stockpiled for re-use?
    The project should be bid according to the Standard Specifications for Road and Bridge Construction, Highway Standards, and the plans and specifications available online. (04/18/2024)

  • Will a silt fence and filter bag be required when jetting and cleaning the box culvert for us to decant in?
    Work to be performed for Pipe / Box Culverts to be Cleaned is described in the corresponding Standard Specifications for Road and Bridge Construction Section 609 and should be bid accordingly. Foreign material removed from the culvert shall be disposed according to Article 202.03 (04/18/2024)

  • The box culverts are full of debris and the area around them are is full of debris also, will it be a separate pay item to remove the debris around the front of the culverts in order to clean them?
    Work to be performed for Pipe / Box Culverts to be Cleaned is described in the corresponding Standard Specifications for Road and Bridge Construction Section 609 and should be bid accordingly. (04/18/2024)

  • Are additional schedule/duration details available for the required Nicor adjustments noted in Stage 1?
    Nicor has estimated 30 working days needed for the relocation, 10 days for each section identified in the SOU (04/18/2024)

  • Is it the intent of IDOT to perform all of the resurfacing work first, and then complete all remaining impacted ditch work after the work restriction is over off of the new pavement or would the department plan to suspend the job in order to perform all of the ditch work first, followed by the mill/overlay work?
    Design suggested sequence of operation includes utility adjustments as indicated in the SOU, ditch grading and roadway resurfacing. Final sequence to be coordinated with the Resident Engineer (04/18/2024)

  • The special provisions note a work restriction for tree clearing/removal cannot be done between 4/1 - 10/31. Does Tree Limb removal & pruning for safety and equipment clearance also fall into that work restriction category?
    Tree Limb removal & pruning for safety and equipment clearance doesn’t fall into tree work restriction. Those can be removed at any time. (04/18/2024)

  • There are several box culverts on the prints, can you identify all the print page numbers that will have box culvert locations that will be cleaned?
    Please refer to the Drainage Cleaning Schedule included in the plans for the detailed locations and types of the pipe cleanings. (04/08/2024)

Authorized Bidders

  • 0280 Peter Baker & Son Co.
    1349 Rockland Road
    Lake Bluff, IL 60044
    Phone: (847) 362-3663 Fax: (847) 362-0707 Email: john@peterbaker.com
    $5,133,133.22 is within a reasonable approximation of the Estimate

  • 0103 Alliance Contractors, Inc.
    1166 Lake Avenue
    Woodstock, IL 60098
    Phone: (815) 338-5900 Fax: (815) 338-9109 Email: estimating@alliancecontractors.com

  • 0392 Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc.
    1205 Garland Rd.
    Wauconda, IL 60084
    Phone: (847) 526-5457 Fax: (847) 526-4204 Email: kberger@bergercontractors.com

  • 2341 Builders Paving, LLC
    4401 Roosevelt Road
    Hillside, IL 60162
    Phone: (847) 419-9000 Fax: (847) 419-9050 Email: ssalinas@builderspavingllc.com

  • 1305 Curran Contracting Company
    286 Memorial Court
    Crystal Lake, IL 60014
    Phone: (815) 455-5100 Fax: (815) 455-7894 Email: estimating@currancontracting.com
    $5,289,023.20

  • 4696 Payne & Dolan, Inc.
    28435 West IL Route 173
    Antioch, IL 60002
    Phone: (847) 838-3700 Fax: No Record Email: No Record
    $5,169,575.77

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
20100110 UNIT TREE REMOVAL (6 TO 15 UNITS DIAMETER) Base items 67.000
20100210 UNIT TREE REMOVAL (OVER 15 UNITS DIAMETER) Base items 438.400
20200100 CU YD EARTH EXCAVATION Base items 5,895.000
20800150 CU YD TRENCH BACKFILL Base items 37.000
21101505 CU YD TOPSOIL EXCAVATION AND PLACEMENT Base items 4,440.000
25000210 ACRE SEEDING, CLASS 2A Base items 8.500
25000400 POUND NITROGEN FERTILIZER NUTRIENT Base items 754.000
25000500 POUND PHOSPHORUS FERTILIZER NUTRIENT Base items 754.000
25000600 POUND POTASSIUM FERTILIZER NUTRIENT Base items 754.000
25100630 SQ YD EROSION CONTROL BLANKET Base items 34,889.000
25100635 SQ YD HEAVY DUTY EROSION CONTROL BLANKET Base items 4,629.000
28000250 POUND TEMPORARY EROSION CONTROL SEEDING Base items 835.000
28000305 FOOT TEMPORARY DITCH CHECKS Base items 2,300.000
28000400 FOOT PERIMETER EROSION BARRIER Base items 136.000
28000510 EACH INLET FILTERS Base items 9.000
35102000 SQ YD AGGREGATE BASE COURSE, TYPE B 8" Base items 1,155.000
40600290 POUND BITUMINOUS MATERIALS (TACK COAT) Base items 102,947.000
40600370 FOOT LONGITUDINAL JOINT SEALANT Base items 38,270.000
40600400 TON MIXTURE FOR CRACKS, JOINTS, AND FLANGEWAYS Base items 229.000
40600982 SQ YD HOT-MIX ASPHALT SURFACE REMOVAL - BUTT JOINT Base items 485.000
40603200 TON POLYMERIZED HOT-MIX ASPHALT BINDER COURSE, IL-4.75, N50 Base items 6,292.000
40604062 TON HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "D", N70 Base items 14,947.000
42001300 SQ YD PROTECTIVE COAT Base items 58.000
44000159 SQ YD HOT-MIX ASPHALT SURFACE REMOVAL, 2 1/2" Base items 152,514.000
44000200 SQ YD DRIVEWAY PAVEMENT REMOVAL Base items 1,051.000
44201749 SQ YD CLASS D PATCHES, TYPE I, 9 INCH Base items 500.000
44201753 SQ YD CLASS D PATCHES, TYPE II, 9 INCH Base items 4,800.000
44201757 SQ YD CLASS D PATCHES, TYPE III, 9 INCH Base items 3,200.000
48101500 SQ YD AGGREGATE SHOULDERS, TYPE B 6" Base items 14.000
48102100 TON AGGREGATE WEDGE SHOULDER, TYPE B Base items 1,728.000
50105220 FOOT PIPE CULVERT REMOVAL Base items 1,162.000
54213450 EACH END SECTIONS 15" Base items 58.000
54213453 EACH END SECTIONS 18" Base items 6.000
542D0220 FOOT PIPE CULVERTS, CLASS D, TYPE 1 15" Base items 1,257.000
542D0223 FOOT PIPE CULVERTS, CLASS D, TYPE 1 18" Base items 145.000
550A0070 FOOT STORM SEWERS, CLASS A, TYPE 1 15" Base items 225.000
550A0120 FOOT STORM SEWERS, CLASS A, TYPE 1 24" Base items 127.000
55101200 FOOT STORM SEWER REMOVAL 24" Base items 100.000
60200805 EACH CATCH BASINS, TYPE A, 4'-DIAMETER, TYPE 8 GRATE Base items 2.000
60207605 EACH CATCH BASINS, TYPE C, TYPE 8 GRATE Base items 2.000
60406000 EACH FRAMES AND LIDS, TYPE 1, OPEN LID Base items 2.000
60406100 EACH FRAMES AND LIDS, TYPE 1, CLOSED LID Base items 10.000
60905305 FOOT BOX CULVERTS TO BE CLEANED Base items 186.000
60920012 FOOT PIPE CULVERTS TO BE CLEANED 12" Base items 153.000
60920015 FOOT PIPE CULVERTS TO BE CLEANED 15" Base items 93.000
64200108 FOOT SHOULDER RUMBLE STRIPS, 8 INCH Base items 60,700.000
66900200 CU YD NON-SPECIAL WASTE DISPOSAL Base items 2,404.000
66900530 EACH SOIL DISPOSAL ANALYSIS Base items 11.000
66901001 L SUM REGULATED SUBSTANCES PRE-CONSTRUCTION PLAN Base items 1.000
66901003 L SUM REGULATED SUBSTANCES FINAL CONSTRUCTION REPORT Base items 1.000
66901006 CAL DA REGULATED SUBSTANCES MONITORING Base items 7.000
67100100 L SUM MOBILIZATION Base items 1.000
70100450 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701201 Base items 1.000
70100460 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701306 Base items 1.000
70100600 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701336 Base items 1.000
70102620 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701501 Base items 1.000
70102635 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701701 Base items 1.000
70102640 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701801 Base items 1.000
70300100 FOOT SHORT TERM PAVEMENT MARKING Base items 10,862.000
70300150 SQ FT SHORT TERM PAVEMENT MARKING REMOVAL Base items 10,646.000
70300211 SQ FT TEMPORARY PAVEMENT MARKING LETTERS AND SYMBOLS - PAINT Base items 117.000
70300221 FOOT TEMPORARY PAVEMENT MARKING - LINE 4"- PAINT Base items 76,560.000
70300241 FOOT TEMPORARY PAVEMENT MARKING - LINE 6"- PAINT Base items 1,200.000
70300261 FOOT TEMPORARY PAVEMENT MARKING - LINE 12"- PAINT Base items 975.000
70300281 FOOT TEMPORARY PAVEMENT MARKING - LINE 24"- PAINT Base items 186.000
70307120 FOOT TEMPORARY PAVEMENT MARKING - LINE 4" - TYPE IV TAPE Base items 36,646.000
72400500 EACH RELOCATE SIGN PANEL ASSEMBLY - TYPE A Base items 20.000
72400600 EACH RELOCATE SIGN PANEL ASSEMBLY - TYPE B Base items 4.000
72800100 FOOT TELESCOPING STEEL SIGN SUPPORT Base items 341.000
78000100 SQ FT THERMOPLASTIC PAVEMENT MARKING - LETTERS AND SYMBOLS Base items 117.000
78000200 FOOT THERMOPLASTIC PAVEMENT MARKING - LINE 4" Base items 76,560.000
78000400 FOOT THERMOPLASTIC PAVEMENT MARKING - LINE 6" Base items 1,200.000
78000600 FOOT THERMOPLASTIC PAVEMENT MARKING - LINE 12" Base items 975.000
78000650 FOOT THERMOPLASTIC PAVEMENT MARKING - LINE 24" Base items 186.000
78100100 EACH RAISED REFLECTIVE PAVEMENT MARKER Base items 2,105.000
78300200 EACH RAISED REFLECTIVE PAVEMENT MARKER REMOVAL Base items 1,270.000
78300202 SQ FT PAVEMENT MARKING REMOVAL - WATER BLASTING Base items 27,584.000
X0326898 FOOT CENTER LINE - RUMBLE STRIP - 16" Base items 30,350.000
X2010100 EACH TREE LIMB REMOVAL (4 TO 10 INCHES DIAMETER) Base items 3.000
X2020110 UNIT GRADING AND SHAPING SHOULDERS Base items 766.000
X2100002 UNIT PRUNING FOR SAFETY AND EQUIPMENT CLEARANCE Base items 4.960
X4400503 FOOT COMBINATION CURB AND GUTTER REMOVAL AND REPLACEMENT GREATER THAN 10 FEET Base items 253.000
X4421817 SQ YD CLASS D PATCHES, TYPE III, 7 INCH (SPECIAL) Base items 40.000
X5537800 FOOT STORM SEWERS TO BE CLEANED 12" Base items 116.000
X6030310 EACH FRAMES AND LIDS TO BE ADJUSTED (SPECIAL) Base items 15.000
X6700407 CAL MO ENGINEER'S FIELD OFFICE, TYPE A (D1) Base items 12.000
X7800815 FOOT HOT SPRAY THERMOPLASTIC PAVEMENT MARKING LINE - 4 INCH Base items 51,100.000
Z0004530 SQ YD HOT-MIX ASPHALT DRIVEWAY PAVEMENT, 8" Base items 252.000
Z0004538 SQ YD HOT-MIX ASPHALT DRIVEWAY PAVEMENT, 10" Base items 799.000
Z0018500 EACH DRAINAGE STRUCTURES TO BE CLEANED Base items 10.000
Z0030850 SQ FT TEMPORARY INFORMATION SIGNING Base items 104.000
Z0064800 UNIT SELECTIVE CLEARING Base items 5.000
Z0076600 HOUR TRAINEES Base items 500.000 $0.80
Z0076604 HOUR TRAINEES TRAINING PROGRAM GRADUATE Base items 500.000 $15.00
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.