Bulletin Description

(1,560-Ft) Bridge structural repairs, bridge deck overlay removal and replacement, joint replacement, and bridge drainage repairs, for the Ohio St. Bascule Bridge over the North Branch Chicago River, and the west and east approach bridges, in the City of Chicago, Cook County, IL.
Region District DBE % VBP % Federal Project #
1 1 10.00 0.00 HIBR4849(127)
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Cook
  • FAP 383
  • OHIO STREET
  • 2020-143-BR&BJR
  • C-91-249-20
  • 1-79999-0000
Contract Specifics
A voluntary pre-bid meeting will be held on Tuesday, April 9, 2024 at 09:00 AM in the under the Ohio Street east approach Bridge, SN 016-1053, on Kingsbury Street. Location Notes - Gather at the meeting location at 9 AM. The site visit begins promptly at 9:30 AM and ends at 11:30. Meeting Description - The purpose of this meeting is to view the areas to be repaired on the Ohio Street Bascule Bridge over the North Branch of the Chicago River.  Any Contractor arriving after the 9:30 AM start time will not be allowed to participate in the site visit.  No project information will be transmitted, and no questions will be answered during the site visit.
Project Labor Agreement
Completion Date: October 31, 2025 Plus 10 Working Days
Previously advertised on June 16, 2023 (Item 168).
No More Contract Specifics

Ask Subscribe Questions and Answers (19 Submitted / 19 Answered ) Questions not accepted as of April 16, 2024 04:30 PM.

  • For SN: 016-0202, can a breakdown of the quantities for STRUCTURAL STEEL REMOVAL, STRUCTURAL STEEL REPAIR, AND FURN & ERECT STEEL be provided? Perhaps a bill of materials for sheets SB-17 to SB-26.
    The project should be bid according to the Standard Specifications for Road and Bridge Construction, Highway Standards, and the plans and specifications available online. (04/18/2024)

  • Addendum A just issued a revised plan sheet (sheet 4 of 201), in which pay item 66901006 is now listed with a unit of "CAL MO". The pay item report has that pay item as CAL DAY. Please advise if this pay item is to be calendar day or month?
    Pay item 66901006 is correct and is paid for as CAL DAY. The Item should be bid as it is listed in the Schedule of Prices on eBids. (04/17/2024)

  • Plan sheets for 016-0202, call for a BRIDGE DECK THIN POLYMER OVERLAY 1/4" pay item. However, the contract pay item calls for 3/8" thick. Please confirm the thickness of Thin Polymer Overlay to be placed at.
    The pay item listed in the Schedule of Prices and on the SOQ sheets, BRIDGE DECK THIN POLYMER OVERLAY 3/8" is correct and should be utilized. (04/17/2024)

  • In the General Notes it states that all holes shall be subpunched or subdrilled 11/16" dia. (then reamed) for 3/4" bolts and 13/16" dia. (then reamed) for 7/8" bolts. This is typically not done on projects, and it will require the contractor to perform an inordinate amount of reaming. Can standard holes 13/16" be put in the new steel for 3/4" bolts and 15/16" holes for 7/8" bolts?
    Where new steel is proposed to line up with holes in existing steel, General Note applies. (04/17/2024)

  • For the bottom chord removal and replacement for Floorbeam 0-0 and 12-12 on the bascule bridge, does this work require a full detour (dead load only)? If so, can an extended detour (over the time called for in the specs.) be given?
    The full detour shall be per the contract specification “keeping the expressway open to traffic (D1)”. Any extended hour requests shall be per the Detour note on plan sheet 18. (04/17/2024)

  • On Sheet 121 and 122, the drawings show to remove and replace the bottom chord angle for Floorbeam 0-0 and 12-12 trusses. Is a temporary strut or any shoring required in order to perform this removal and replacement? If so, can detail be provided?
    It is the Contractor's responsibility to determine means and methods of performing repairs. (04/17/2024)

  • What is the impact attenuator width that should be used and what type of transition? Can we mount the transition directly on the pier median or will there be a concrete build out to be able to bolt the transition to?
    The Impact Attenuators (Fully Redirective, Narrow), Test Level 3 shall be on the IDOT materials approved list and shall be installed per manufacturer’s recommendations for this type of application. The attenuator shall be similar in dimensions to the existing attenuator being removed. No concrete buildout is proposed. (04/17/2024)

  • Please confirm the thickness of the THIN POLYMER OVERLAY REMOVAL. Is the intent to remove the existing polymer to the top of the steel grid?
    Removal of existing polymer should be to the top of the steel grid. See note on page 107 (DECK PLAN) “Existing 3" Concrete Filled Steel Roadway Grid with ¼” Overlay. (04/15/2024)

  • Please consider moving this project to the June 2024 Letting. There are various large projects bidding throughout the Chicagoland Area that do not time out well with this April Letting date.
    The Department will accept bids for this contract as planned on the April 26, 2024 Letting. (04/15/2024)

  • Are there any soil borings available? Specifically where the Temporary Soil Retention System is located.
    No new soil borings were taken for this project. (04/11/2024)

  • Will the parking lots under the East and West Approach Spans be closed during construction to allow access to the work to the substructure?
    These areas will not be fully closed at all times. The Contractor shall coordinate with the Engineer and the occupants for work to be performed in and/or above the parking areas (04/11/2024)

  • On SN 016-0202, on the fixed deck spans, is the intent to do the concrete removal and concrete superstructure placement first, then do the 3/4" scarification and 2 3/4" Latex Overlay.
    Yes, that is the Department's intent. (04/08/2024)

  • Please confirm that for SN 016-0202, the CLEANING AND PAINTING STEEL BRIDGE pay item is only for the steel listed on general note 11 on sheet SB-02, and not the entire steel structure.
    For SN 016-0202, the CLEANING AND PAINTING STEEL BRIDGE pay item is only for the steel listed on general note 11 on sheet SB-02, and not the entire steel structure. (04/08/2024)

  • The bridge balancing specification indicates that new counterweight blocks are to be provided. Can details be provided about the size/shape of the counterweight blocks, and an estimated quantity of blocks needed?
    The project should be bid according to the Standard Specifications for Road and Bridge Construction, Highway Standards, and the plans and specifications published online. (04/08/2024)

  • The Bridge Balancing specification indicates that the Contractor is to take "operational responsibility of the bascule bridge throughout the project duration." Does this mean that the Contractor is responsible for all bridge lift operations 24/7 during construction? If so, how often does the bridge open?
    The project should be bid according to the Standard Specifications for Road and Bridge Construction, Highway Standards, and the plans and specifications published online. (04/08/2024)

  • Is the completion date 10-31-2024 or 10-31-2025 there is conflicting dates.
    The Completion Date in the Special Provisions is the correct Date. The Department is working on correcting the Bulletin. (04/05/2024)

  • Are the restrictions on the 2 detour the same as system full ramp closures. Will there are no extended hours?
    The full detour shall be the same as the ramp closures per the contract specification “keeping the expressway open to traffic (D1)”. Any extended hour requests shall be per the Detour note on plan sheet 18. (04/05/2024)

  • Plan general notes indicate a railroad flagger must be present during contractor working operations? Is this only when within the railroad ROW? Who is responsible for payment of the Railroad Flagger?
    An addendum will be issued to address this. (04/05/2024)

  • Can a site visit be scheduled to allow us to see the portions of the bascule that are to be repaired?
    The Department is currently working on coordinating a pre-bid site visit and will publish the details when they are finalized. (04/04/2024)

Authorized Bidders

  • 3505 Lorig Construction Company
    250 East Touhy Avenue
    Des Plaines, IL 60018
    Phone: (847) 298-0360 Fax: (847) 298-2689 Email: estimating@lorigconstruction.com
    $15,385,970.85 is within a reasonable approximation of the Estimate

  • 0204 Areatha Construction Co., Inc.
    410 E. North Avenue
    Streamwood, IL 60107
    Phone: (630) 830-9853 Fax: (630) 830-9856 Email: areathaconstco@sbcglobal.net

  • 1552 Dunnet Bay Construction Company
    115 N. Brandon Drive
    Glendale Heights, IL 60139
    Phone: (630) 539-1200 Fax: (630) 539-4171 Email: estimating@dunnetbay.net

  • 4657 F. H. Paschen, S.N. Nielsen & Associates LLC
    5515 N. East River Road
    Chicago, IL 60656
    Phone: (773) 444-3474 Fax: (773) 693-0064 Email: jvickers@fhpaschen.com

  • 2166 Granite Construction Company
    585 West Beach Street
    Watsonville, CA 95076
    2215 Sanders Road
    Suite 400
    Northbrook, IL 60062
    Phone: (847) 919-8200 Fax: (847) 272-5930 Email: gmcivilestimating@gcinc.com

  • 2779 ICC Group Inc.
    39W866 Fabyan Parkway
    Elburn, IL 60119
    Phone: (630) 232-7280 Fax: (630) 232-7281 Email: estimating@icceo.com
    $19,150,000.00

Non Bidders

  • 1604 Era-Valdivia Contractors, Inc.
    (Pending Authorization)
    11909 S. Avenue O
    Chicago, IL 60617
    Phone: (773) 721-9350 Fax: (773) 721-8027 Email: estimating@eravaldivia.com

  • 4677 Path Construction Company, Inc.
    (Pending Authorization)
    125 E. Algonquin Road
    Arlington Heights, IL 60005
    Phone: (847) 997-9147 Fax: (847) 398-7101 Email: PSowa@pathcc.com

Pay Item # UOM Description Type Quantity Unit Price
42000080 SQ YD PAVEMENT CONNECTOR (PCC) FOR BRIDGE APPROACH SLAB Base items 46.000
50102400 CU YD CONCRETE REMOVAL Base items 221.800
50157300 SQ YD PROTECTIVE SHIELD Base items 14,919.000
50200100 CU YD STRUCTURE EXCAVATION Base items 82.000
50300225 CU YD CONCRETE STRUCTURES Base items 63.400
50300255 CU YD CONCRETE SUPERSTRUCTURE Base items 198.400
50300300 SQ YD PROTECTIVE COAT Base items 14,498.000
50301350 CU YD CONCRETE SUPERSTRUCTURE (APPROACH SLAB) Base items 153.600
50500405 POUND FURNISHING AND ERECTING STRUCTURAL STEEL Base items 175,120.000
50800205 POUND REINFORCEMENT BARS, EPOXY COATED Base items 94,470.000
50800515 EACH BAR SPLICERS Base items 2,244.000
50901760 FOOT PIPE HANDRAIL Base items 79.000
52000110 FOOT PREFORMED JOINT STRIP SEAL Base items 662.500
52100400 EACH STEEL BEARING ASSEMBLY Base items 2.000
52200020 SQ FT TEMPORARY SOIL RETENTION SYSTEM Base items 78.000
58600101 CU YD GRANULAR BACKFILL FOR STRUCTURES Base items 82.000
58700300 SQ FT CONCRETE SEALER Base items 3,828.000
59000200 FOOT EPOXY CRACK INJECTION Base items 21.000
59100100 SQ YD GEOCOMPOSITE WALL DRAIN Base items 61.000
59200101 EACH BRIDGE WASHING NO. 1 Base items 1.000
64300260 EACH IMPACT ATTENUATORS (FULLY REDIRECTIVE, NARROW), TEST LEVEL 3 Base items 1.000
66900200 CU YD NON-SPECIAL WASTE DISPOSAL Base items 85.000
66900530 EACH SOIL DISPOSAL ANALYSIS Base items 1.000
66901001 L SUM REGULATED SUBSTANCES PRE-CONSTRUCTION PLAN Base items 1.000
66901003 L SUM REGULATED SUBSTANCES FINAL CONSTRUCTION REPORT Base items 1.000
66901006 CAL DA REGULATED SUBSTANCES MONITORING Base items 6.000
67000400 CAL MO ENGINEER'S FIELD OFFICE, TYPE A Base items 12.000
67100100 L SUM MOBILIZATION Base items 1.000
70107025 CAL DA CHANGEABLE MESSAGE SIGN Base items 484.000
70200100 L SUM NIGHTTIME WORK ZONE LIGHTING Base items 1.000
70300150 SQ FT SHORT TERM PAVEMENT MARKING REMOVAL Base items 38,977.000
70307120 FOOT TEMPORARY PAVEMENT MARKING - LINE 4" - TYPE IV TAPE Base items 36,833.000
70307125 FOOT TEMPORARY PAVEMENT MARKING - LINE 5" - TYPE IV TAPE Base items 2,067.000
70307160 FOOT TEMPORARY PAVEMENT MARKING - LINE 12"- TYPE IV TAPE Base items 77.000
70400100 FOOT TEMPORARY CONCRETE BARRIER Base items 7,113.000
70400200 FOOT RELOCATE TEMPORARY CONCRETE BARRIER Base items 10,788.000
70600260 EACH IMPACT ATTENUATORS, TEMPORARY (FULLY REDIRECTIVE, NARROW), TEST LEVEL 3 Base items 4.000
70600332 EACH IMPACT ATTENUATORS, RELOCATE (FULLY REDIRECTIVE, NARROW), TEST LEVEL 3 Base items 4.000
78004640 FOOT PREFORMED PLASTIC PAVEMENT MARKING, TYPE D - STANDARD - LINE 8" Base items 2,775.000
78009000 SQ FT MODIFIED URETHANE PAVEMENT MARKING - LETTERS AND SYMBOLS Base items 146.000
78009004 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 4" Base items 15,818.000
78009005 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 5" Base items 844.000
78009006 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 6" Base items 628.000
78009008 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 8" Base items 1,356.000
78009012 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 12" Base items 406.000
78009024 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 24" Base items 42.000
78011045 FOOT GROOVING FOR RECESSED PAVEMENT MARKING 9" Base items 2,775.000
78100100 EACH RAISED REFLECTIVE PAVEMENT MARKER Base items 245.000
78200011 EACH BARRIER WALL REFLECTORS, TYPE C Base items 1,219.000
78300200 EACH RAISED REFLECTIVE PAVEMENT MARKER REMOVAL Base items 116.000
78300202 SQ FT PAVEMENT MARKING REMOVAL - WATER BLASTING Base items 12,605.000
81100220 FOOT CONDUIT ATTACHED TO STRUCTURE, 3/4" DIA., PVC COATED GALVANIZED STEEL Base items 470.000
81100300 FOOT CONDUIT ATTACHED TO STRUCTURE, 1" DIA., GALVANIZED STEEL Base items 1,620.000
81100605 FOOT CONDUIT ATTACHED TO STRUCTURE, 2" DIA., PVC COATED GALVANIZED STEEL Base items 500.000
81300220 EACH JUNCTION BOX, STAINLESS STEEL, ATTACHED TO STRUCTURE, 6" X 6" X 4" Base items 34.000
81300550 EACH JUNCTION BOX, STAINLESS STEEL, ATTACHED TO STRUCTURE, 12" X 12" X 6" Base items 2.000
81702100 FOOT ELECTRIC CABLE IN CONDUIT, 600V (XLP-TYPE USE) 1/C NO. 12 Base items 1,600.000
81702101 FOOT ELECTRIC CABLE IN CONDUIT, 600V (XLP-TYPE USE) 1/C NO. 14 Base items 2,258.000
81702110 FOOT ELECTRIC CABLE IN CONDUIT, 600V (XLP-TYPE USE) 1/C NO. 10 Base items 4,860.000
81702140 FOOT ELECTRIC CABLE IN CONDUIT, 600V (XLP-TYPE USE) 1/C NO. 4 Base items 300.000
82110007 EACH LUMINAIRE, LED, ROADWAY, OUTPUT DESIGNATION G Base items 30.000
88600100 FOOT DETECTOR LOOP, TYPE I Base items 50.000
X0322215 EACH CLEANING BRIDGE SCUPPERS AND DOWNSPOUTS Base items 54.000
X0322701 EACH SERVICE INSTALLATION, 100 AMP Base items 1.000
X0324900 EACH SERVICE CONNECTION TO CECO LINE Base items 1.000
X0327407 SQ FT CORRUGATED FIBERGLASS SIDING PANELS Base items 3,654.000
X0327777 SQ FT STAIR AND GRATING SYSTEM Base items 1,490.000
X0328025 FOOT TIMBER FENDER REPLACEMENT Base items 40.000
X0328027 EACH SECURITY GATE Base items 1.000
X0328028 EACH ROOF HATCH Base items 1.000
X0328029 EACH FIXED LOUVER Base items 1.000
X0328030 EACH FORMED METAL WALL PANELS Base items 1.000
X0900033 L SUM BRIDGE BALANCING Base items 1.000
X1000001 SQ YD THIN POLYMER OVERLAY REMOVAL Base items 2,110.000
X1400013 FOOT REMOVAL OF CABLE IN CONDUIT Base items 1,600.000
X1400023 FOOT CONDUIT, FLEXIBLE, LIQUID TIGHT, METALLIC, 2" DIAMETER Base items 6.000
X1400280 EACH OPTIMIZE TRAFFIC SIGNAL SYSTEM (SPECIAL) Base items 30.000
X1400341 EACH REMOVAL OF LUMINAIRE, SALVAGE Base items 30.000
X2080255 FOOT TRENCH AND BACKFILL WITH SCREENINGS Base items 100.000
X4005553 EACH HOLES DRILLED Base items 16.000
X5030250 SQ YD BRIDGE DECK GROOVING (LONGITUDINAL) Base items 9,680.000
X5230146 FOOT BRIDGE DRAINAGE SYSTEM REPAIR Base items 14.000
X6430120 EACH REMOVE IMPACT ATTENUATORS, NO SALVAGE Base items 1.000
X7010216 L SUM TRAFFIC CONTROL AND PROTECTION, (SPECIAL) Base items 1.000
X7011015 L SUM TRAFFIC CONTROL AND PROTECTION (EXPRESSWAYS) Base items 1.000
X7013820 CAL DA TRAFFIC CONTROL SURVEILLANCE, EXPRESSWAYS Base items 484.000
X7830050 EACH RAISED REFLECTIVE PAVEMENT MARKER, REFLECTOR REMOVAL Base items 335.000
X7830052 EACH RAISED REFLECTIVE PAVEMENT MARKER, REFLECTOR REPLACEMENT Base items 219.000
X8100002 FOOT GALVANIZED STEEL CONDUIT, PUSHED, 2 Base items 100.000
X8130125 EACH REMOVE EXISTING JUNCTION BOX Base items 17.000
X8140102 EACH GROUND EXISTING HANDHOLE Base items 1.000
X8140105 EACH HANDHOLE (SPECIAL) Base items 1.000
X8220002 EACH NAVIGATIONAL LUMINAIRE, LED, CHANNEL CENTER, SUSPENDED MOUNT Base items 8.000
X8220006 EACH NAVIGATIONAL LUMINAIRE, LED, CHANNEL MARGIN, BASE MOUNT Base items 6.000
X8250516 EACH CONTROLLER, UNDERPASS LIGHTING, CONSTANT POWER, 1-PHASE, 120/240V, 60A Base items 1.000
X8400104 L SUM MAINTENANCE OF STREET LIGHTING SYSTEM (CITY OF CHICAGO) Base items 1.000
X8420105 EACH REMOVAL OF WATERWAY OBSTRUCTION WARNING LUMINAIRE Base items 13.000
X8430100 FOOT REMOVE EXISTING CONDUIT ATTACHED TO STRUCTURE Base items 970.000
X8950060 EACH REMOVE EXISTING CONTROLLER Base items 1.000
Z0001899 EACH JACK AND REMOVE EXISTING BEARINGS Base items 2.000
Z0001903 POUND STRUCTURAL STEEL REMOVAL Base items 173,600.000
Z0001905 POUND STRUCTURAL STEEL REPAIR Base items 27,630.000
Z0004552 SQ YD APPROACH SLAB REMOVAL Base items 407.000
Z0006016 SQ YD BRIDGE DECK LATEX CONCRETE OVERLAY, 2 3/4 INCHES Base items 10,966.000
Z0007101 L SUM CONTAINMENT AND DISPOSAL OF LEAD PAINT CLEANING RESIDUES NO. 1 Base items 1.000
Z0010400 SQ FT CLEANING BRIDGE SEATS Base items 219.000
Z0010501 L SUM CLEANING AND PAINTING STEEL BRIDGE NO. 1 Base items 1.000
Z0012130 SQ YD BRIDGE DECK SCARIFICATION 3/4" Base items 10,966.000
Z0012193 SQ YD BRIDGE DECK THIN POLYMER OVERLAY 3/8" Base items 2,110.000
Z0012754 SQ FT STRUCTURAL REPAIR OF CONCRETE (DEPTH EQUAL TO OR LESS THAN 5 INCHES) Base items 4,558.000
Z0012755 SQ FT STRUCTURAL REPAIR OF CONCRETE (DEPTH GREATER THAN 5 INCHES) Base items 9.000
Z0013798 L SUM CONSTRUCTION LAYOUT Base items 1.000
Z0015500 L SUM DEBRIS REMOVAL Base items 1.000
Z0016001 SQ YD DECK SLAB REPAIR (FULL DEPTH, TYPE I) Base items 3.000
Z0016200 SQ YD DECK SLAB REPAIR (PARTIAL) Base items 4.000
Z0018000 EACH DRAINAGE SCUPPERS (SPECIAL) Base items 2.000
Z0029090 SQ YD DIAMOND GRINDING (BRIDGE SECTION) Base items 9,910.000
Z0032470 FOOT JOINT SEALER Base items 182.000
Z0033020 EACH LUMINAIRE SAFETY CABLE ASSEMBLY Base items 30.000
Z0033028 CAL MO MAINTENANCE OF LIGHTING SYSTEM Base items 12.000
Z0041895 CU FT POLYMER CONCRETE Base items 2.000
Z0048665 L SUM RAILROAD PROTECTIVE LIABILITY INSURANCE Base items 1.000
Z0049798 L SUM REMOVAL AND DISPOSAL OF FRIABLE ASBESTOS, SPECIAL Base items 1.000
Z0049900 L SUM REMOVAL AND DISPOSAL OF NON-FRIABLE ASBESTOS, SPECIAL Base items 1.000
Z0073200 EACH TEMPORARY SHORING AND CRIBBING Base items 32.000
Z0076600 HOUR TRAINEES Base items 1,000.000 $0.80
Z0076604 HOUR TRAINEES TRAINING PROGRAM GRADUATE Base items 1,000.000 $15.00