| Region | District | DBE % | VBP % | Federal Project # |
|---|---|---|---|---|
| 4 | 7 | 6.00 | 0.00 | 317SBGPTBD |
| County(s) | IL Project # | Airport | Sponsor | City |
|---|---|---|---|---|
|
FOA 5137 | Flora | Flora Airport Authority | Flora |
| Contract Specifics |
|---|
| The time limit to award this item has been changed from 45 days to 90 days after the scheduled letting. |
| 47 Calendar Days |
|
WARNING: FAA Buy American Preference provisions apply to this contract. Failure to submit a “Certification of Compliance with FAA Buy American Preference – Construction Projects” form in accordance with the bidding procedures set forth in the proposal document (Appendix A4 BUY AMERICAN PREFERENCE) will result in the bid being declared non-responsive. |
| No More Contract Specifics |
| Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
|---|---|---|---|---|---|---|---|
| AR108108 | FOOT | 1/C #8 5 KV UG CABLE | Base items | 13,440.000 | |||
| AR109410 | L SUM | VAULT WIRING | Base items | 1.000 | |||
| AR110012 | FOOT | 2" DIRECTIONAL BORE | Base items | 360.000 | |||
| AR110202 | FOOT | 2" PVC DUCT, DIRECT BURY | Base items | 10,440.000 | |||
| AR125445 | EACH | TAXI GUIDANCE SIGN, 5 CHARACTER | Base items | 2.000 | |||
| AR125462 | EACH | TAXI GUIDANCE SIGN, UNLIT | Base items | 2.000 | |||
| AR125511 | EACH | MIRL, BASE MOUNTED-LED | Base items | 48.000 | |||
| AR125565 | EACH | SPLICE CAN | Base items | 4.000 | |||
| AR150510 | L SUM | ENGINEER'S FIELD OFFICE | Base items | 1.000 | |||
| AR150520 | L SUM | MOBILIZATION | Base items | 1.000 | |||
| AR150530 | L SUM | TRAFFIC MAINTENANCE | Base items | 1.000 | |||
| AR800476 | L SUM | REMOVE AIRFIELD LIGHTING | Base items | 1.000 | |||
| AR800564 | L SUM | CABLE & CCR TESTING & CALIBRATION | Base items | 1.000 | |||
| No More Pay Items | |||||||