001-62W89
|
Active
|
08/08/2025
|
|
|
1
|
1
|
Various
|
|
This project involves the partial modernization of thirty-six (36) intersection to include Accessible Pedestrian Pushbuttons (APS) and/or Leading Pedestrian Interval (LPI) timing updates. Thirty-six (36) intersections located in the following District 1 counties: Cook, McHenry, Lake, Kane, and Dupage.
|
01X-68C55
|
Active
|
07/31/2025
|
|
|
3
|
4
|
Tazewell
|
|
Bridge replacement carrying IL 8/IL 116 (Cedar St. Ext.) over TZPR RR and over IL 29. This includes reconstruction of the IL 8/IL 116 interchange with IL 29/US 24 (S. Main St.) in East Peoria in Tazewell County.
|
002-61K52
|
Active
|
07/30/2025
|
|
|
1
|
1
|
Lake
|
|
Construction of an open-spandrel arch bridge with cast-in-place concrete deck and bituminous overlay on Lake Road over an unamed ravine in Lake Forest.
|
003-61L19
|
Active
|
07/30/2025
|
|
|
1
|
1
|
Lake
|
|
Construction of a single-span PPC IL-beam bridge with intgral abutments carrying Greenwood Avenue over the Union Pacific Railroad in Waukegan. Additional work includes MSE retaining walls, HMA approach roadways, guardrail, and lighting.
|
004-61L35
|
Active
|
07/30/2025
|
|
|
1
|
1
|
Cook
|
|
Construct an HMA Multi-Use Path, sidewalk replacement and traffic signal modifications along Lake Street from Church Street to Gary Avenue in Hanover Park.
|
005-61L68
|
Active
|
07/30/2025
|
|
|
1
|
1
|
Cook
|
|
Resurfacing, sidewalk replacement, curb and gutter, and accessible pedestrian signals on Pratt Avenue, from Lincolnwood Drive to McCormick Boulevard in Lincolnwood.
|
006-61L70
|
Active
|
07/30/2025
|
|
|
1
|
1
|
Cook
|
|
Sidewalk construction on Prairie Avenue from Hillside Avenue to South Street, and South Street from Summit Street to Prairie Avenue in Barrington.
|
007-61L71
|
Active
|
07/30/2025
|
|
|
1
|
1
|
Cook
|
|
HMA resurfacing on Dee Road from Devon Avenue to the Union Pacific Railroad in Park Ridge.
|
008-61L72
|
Active
|
07/30/2025
|
|
|
1
|
1
|
Cook
|
|
HMA Resurfacing of State Street from 127th Street to Cass Street in Lemont. Includes; ADA Ramps, curb and gutter, and drainage adjustments.
|
009-61L73
|
Active
|
07/30/2025
|
|
|
1
|
1
|
Will
|
|
Extension of Old Renwick Road Trail includes aggregate base, HMA surface, culverts, and signage. Project begins west of Petit Court along the DuPage River and ends at the intersection of Renwick Road and River Road.
|
010-61L74
|
Active
|
07/30/2025
|
|
|
1
|
1
|
Kane
|
|
Construction of PCC Sidewalk along various routes in Hampshire. Includes; HMA an PCC Driveways and pavement markings.
|
011-62B64
|
Active
|
07/30/2025
|
|
|
1
|
1
|
Cook
|
|
(1,354-Ft) Intersection and ADA Improvements include pavement widening, HMA resurfacing, patching, traffic signal modernization, drainage improvements, pavement markings and landscaping. Located at Joliet Rd and Brainard Ave. in the City of Countryside in Cook County.
|
012-62F86
|
Active
|
07/30/2025
|
|
|
1
|
1
|
Cook
|
|
(3,542-Mile) This improvement consists of pavement patching, hot-mix asphalt surface removal, resurfacing with binder and surface course, sidewalk ramps improvements, curb and gutter replacement, thermoplastic pavement marking, raised reflective pavement markers, accessible pedestrian signals. Located in the Villages of Arlington Heights, Buffalo Grove, and Wheeling in Cook County.
|
013-62J29
|
Active
|
07/30/2025
|
|
|
1
|
1
|
Lake
|
|
(3.27-Mile) The improvement consists of tree removal along IL Route 22, from east of Quentin Road to west of IL Route 83. The project is located within the Villages of Hawthorn Woods, Kildeer and Long Grove and within Lake County.
|
014-62K78
|
Active
|
07/30/2025
|
|
|
1
|
1
|
Kane
|
|
(2.54-Mile) Designed Overlay, New Shoulders, and ADA Improvements: The proposed consists of cold milling existing (HMA) surface, full-depth patches (Class D), resurfacing (inlay) with HMA binder and surface course, longitudinal joint sealing, replacement of curb and gutter, sidewalk removal and replacement for for sidewalks (ADA), replacement of existing aggregate shoulders with HMA, drainage structures adjustments and cleaning, pavement markings and raised reflective Location: IL 25 (Saint Charles Street), from Bluff City Boulevard to 0.4 Miles North of Stearns Road within the City of Elgin.
|
015-62L15
|
Active
|
07/30/2025
|
|
|
1
|
1
|
Cook
|
|
(2.23-Mile) Designed Overlay and ADA Improvements consisting of asphalt surface removal, pavement patching, hot-mix asphalt resurfacing, detector loop replacement, concrete curb and gutter replacement, curb ramps for sidewalks (ADA) improvements and new thermoplastic pavement marking on Lincoln Avenue from 138th Street to IL 83 (Sibley Boulevard) within the Village of Dolton, in in Cook County.
|
016-62T23
|
Active
|
07/30/2025
|
|
|
1
|
1
|
McHenry
|
|
The project scope of work consists of advanced tree removal, selective clearing as well as all incidental and collateral work necessary to complete the project shown on the plans. This project is in the City of Crystal Lake, City of McHenry, Village of Prairie Grove, and Nunda Township in McHenry County.
|
017-62U11
|
Active
|
07/30/2025
|
|
|
1
|
1
|
Cook, Will
|
|
Drainage Improvements. Work includes ditch regrading, culvert replacement and other drainage improvements. Locations: US 30 between 84th Avenue and 82nd Avenue in Will County; US 52 at Draves Road and Offner Road in Will County; Intersection of 115th Street and Homan Avenue in Cook County; Intersection of Taft Avenue and Elm Avenue in Cook County; Along Palatine Road, West of Roselle Road in Cook County.
|
018-62W62
|
Active
|
07/30/2025
|
|
|
1
|
1
|
Cook, DuPage, Will
|
|
This work includes replacement of existing span wire mounted traffic signals with new mast arm mounted traffic signals, installation of LED signal heads, traffic signal posts and mast arms, installation of accessible pedestrian signals. Installations are various locations in District 1.
|
019-62X00
|
Active
|
07/30/2025
|
|
|
1
|
1
|
Lake
|
|
The scope of work consists of advance tree removal as well as all incidental and collateral work necessary to complete the project. This project is in the City of Highland in Lake County.
|
020-62X01
|
Active
|
07/30/2025
|
|
|
1
|
1
|
Will
|
|
(7.04-Mile) Designed Overlay and Shoulder Reconstruction includes (HMA) removal earth excavation, pavement patching, resurfacing with HMA asphalt, full depth HMA shoulder, pavement markings, raised reflective markers, curb and gutter removal and replacement. Project located on US 45/52 (96th Ave / LaGrange Road) from North of Monee Manhattan Road to Wilmington Peotone Road in the Townships of Green Garden, Peotone and Wilton Center in Will County.
|
021-62X58
|
Active
|
07/30/2025
|
|
|
1
|
1
|
Cook
|
|
(4,646-Ft) The resurfacing project consists of resurfacing the existing HMA pavement with HMA surface course, HMA binder course, thermoplastic pavement markings located FAU 2916 (State Street) from Sauk Trail to Steger Road in the Villages of South Chicago Heights and Steger in Cook County. Also included is a box culvert (SN 016-1413), cleaning project consists of debris removal. The Torrence Avenue over a ditch in the Village of Sauk Village in Cook County.
|
022-62X84
|
Active
|
07/30/2025
|
|
|
1
|
1
|
Cook
|
|
(2.28-Mile) Standard Overlay (1st HMA overlay of bare PCC pavement), ADA Improvements. Work includes curb and gutter removal and replacement, curb ramps for sidewalk (ADA), pedestrian signals (APS), pavement patching, PCC milling, resurfacing with hot-mix asphalt, drainage structure adjustment and cleaning, pavement markings, raised reflective markers, detector loops. Location: Pershing Road, from US 34 Ogden Avenue to West of Central Avenue within the municipalities of Berwyn, Cicero, Lyons and Stickney.
|
023-62X87
|
Active
|
07/30/2025
|
|
|
1
|
1
|
Cook
|
|
(3,089-Ft) Standard Overlay consists of asphalt surface removal, pavement patching, resurfacing with hot-mix asphalt binder and surface course, concrete curb and gutter removal and replacement, pedestrian curb ramps (ADA) improvements, raised reflective pavement markers, thermoplastic pavement marking. Located along Dolton Avenue from 142nd Street to I-94 (Bishop Ford Freeway) in the Village of Dolton.
|
024-62Y06
|
Active
|
07/30/2025
|
|
|
1
|
1
|
Various
|
|
The project consists of removing trees, as well as all incidental and collateral work necessary to complete the project. This project is in several locations throughout District One within Cook, Kane, Kendall, Lake McHenry and Will Counties.
|
025-62Y12
|
Active
|
07/30/2025
|
|
|
1
|
1
|
Cook
|
|
(269-Ft) Bridge Preservation Project: deck overlay, joint replacement/ repair. Work includes hydroscarification, deck repairs, latex modified concrete overlay diamond grinding, structural repair of concrete, joint replacement with strip seals, relief joints cleaning, approach slab repair, concrete sealer, HMA butt joints, curb and gutter replacement, sidewalk replacement and collateral and incidental work. Location: Bridge carrying Foster Avenue over the North Shore Channel, just East of North Albany Avenue within the City of Chicago.
|
026-62Y13
|
Active
|
07/30/2025
|
|
|
1
|
1
|
Cook
|
|
(304-Ft) Bridge Deck Overlay, Bridge Joint Replacement / Repair consists of staged construction to complete partial and full depth deck slab repair and latex overlay of existing bridge. The scope also includes sidewalk and curb and gutter removal and replacement. (Existing Structure No. 016-2672). This project is on IL 19 (Irving Park Road) at Des Plaines River in Schiller Park, IL. in Cook County.
|
027-62Y32
|
Active
|
07/30/2025
|
|
|
1
|
1
|
Various
|
|
This project consists of new guardrail and repair of damaged guardrail and traffic barrier terminals, includes removing damaged guardrail components and replacing all removed guardrail components. This work is located on various State maintained arterial and expressway routes and at other district-wide locations within the counties of Cook, DuPage, Kane, Lake, McHenry and Will.
|
028-64L27
|
Deleted
|
08/13/2025
|
|
|
2
|
2
|
Stephenson
|
|
Reconstruction of the intersection of US Route 20 and Illinois Route 73 including grade changes, replacing across road culverts, adding turn lanes, and installing traffic signals. The project includes Jointed PCC Pavement and Tied-Shoulders, 9", Hot-Mix Asphalt (HMA) surface removal and replacement 2-3/4", HMA Shoulders, 8", PCC and HMA Driveway Pavement, Pipe and Box Culverts pavement markings, tree removal, pavement removal, temporary pavement, intersection lighting, highway signage, earthwork, erosion control, permanent landscaping, fence, and all other items to complete the project.
|
029-64P02
|
Active
|
08/01/2025
|
|
|
2
|
2
|
Ogle
|
|
Pedestrian button upgrades, sidewalk ADA improvements on IL 2: Market St to Lincoln St and IL 72: IL 2 to Diamond St. 3,480 gross feet.
|
030-64P76
|
Active
|
07/30/2025
|
|
|
2
|
2
|
Henry
|
|
2.34 miles of cold milling, pavement patching, HMA resurfacing, and inlet erosion repair on IL 81 from 1st St. in Cambridge to 0.2 mile east of IL 82(N).
|
031-64U45
|
Active
|
07/30/2025
|
|
|
2
|
2
|
Stephenson, Winnebago
|
|
Installation of stop ahead/stop signs, advance flashing beacons, and pavement markings on IL 75 at Rock City Rd.; and Springfield Ave. at Safford Rd. in Stephenson and Winnebago Counties.
|
032-64U54
|
Active
|
07/31/2025
|
|
|
2
|
2
|
Rock Island
|
|
Tree removal along I-74 from 0.9 miles south of 23rd Ave. in Moline to 0.5 miles south of IL 5 and along IL 5 from west of 16th St. to 0.2 miles west of 38th St. (approximately 2.0 miles total).
|
033-66295
|
Active
|
08/01/2025
|
|
|
2
|
3
|
Grundy
|
|
Railroad Separation Structure Replacement at WCL Railroad over I-80 (SN 032-9906) and Bridge Repair at Wabena Rd. over I-80 (SN 032-0065 in Kendall and Grundy Counties.
|
034-66R59
|
Active
|
07/30/2025
|
|
|
2
|
3
|
LaSalle
|
|
Scour mitigation by placing stone dumped riprap at both ends of the culvert and other related construction items at SN 050-2006 carrying IL 18 over Eagle Creek approximately 1.7 miles west of IL Route 23 near Streator.
|
035-66R60
|
Active
|
07/30/2025
|
|
|
2
|
3
|
Bureau
|
|
Shoulder removal and replacement, concrete removal, remove and replace expansion bearings, expansion joint replacement at SN 006-0116 carrying Backbone Rd. over I-80, 1.8 miles west of IL Route 26 near Princeton.
|
036-66R62
|
Active
|
07/30/2025
|
|
|
2
|
3
|
Livingston
|
|
Deck slab repairs (patching on the bridge deck and approach slabs) included in this work is structural concrete repairs to piers and debris removal on SN 053-0150 carrying IL Route 17 over the east branch of the Mazon River approximately 6.1 miles east of IL Route 47 in Livingston County.
|
037-66R70
|
Active
|
07/30/2025
|
|
|
2
|
3
|
Livingston
|
|
Scour mitigation by placing stone dumped riprap and other related construction items at SN 053-0011 carrying OR 66 over Wolf Creek approximately 5.15 miles northeast of IL Route 23 near Pontiac.
|
038-46668
|
Active
|
08/14/2025
|
|
|
4
|
7
|
Various
|
|
Repairing various types of pavement markings at various locations throughout District 7.
|
039-68J20
|
Active
|
07/30/2025
|
|
|
3
|
4
|
Various
|
|
Culvert lining of various sizes at various locations.
|
040-68K24
|
Active
|
07/30/2025
|
|
|
3
|
4
|
Peoria
|
|
Upgrade HPS to LED luminaries along Interstate 74 (I-74) on existing light towers, light poles, and inside tunnels from Sterling Ave. in Peoria to Illinois River in Peoria County.
|
041-68K25
|
Active
|
07/31/2025
|
|
|
3
|
4
|
Peoria, Tazewell
|
|
Installation of LED luminaries along I-74 on existing light towers, light poles, and inside tunnels from Knoxville Interchange in Peoria to Washington St. Interchange in East Peoria in Peoria and Tazewell Counties.
|
042-70C33
|
Active
|
07/30/2025
|
|
|
3
|
5
|
McLean
|
|
0.88 miles of drainage improvements at the intersection of and along US 136 and IL 54, 2.0 miles SW of Bellflower.
|
043-70D66
|
Active
|
07/30/2025
|
|
|
3
|
5
|
Vermilion
|
|
Staged removaland replacement of dual structures (SN's 092-001 and 092-002) on I-74 at Stony Creek.
|
044-70F21
|
Active
|
08/04/2025
|
|
|
3
|
5
|
McLean
|
|
3P Policy, Designed Overlay, ADA improvements, curb and gutter, and traffic signal replacement on IL 9 from west of Towanda Ave to Carnahan Dr east of Bloomington; and on Hershey Rd from Lamon Dr to Castleton Dr in Bloomington. Gross length of 2.189 mi.
|
045-70H51
|
Active
|
07/30/2025
|
|
|
3
|
5
|
McLean
|
|
Replacing light towers and poles with aluminum poles and LED lighting on US 51 from I-74 to Filbert Rd.
|
046-72286
|
Active
|
07/30/2025
|
|
|
4
|
6
|
Pike
|
|
Bridge deck overlay and bridge deck painting on various structures on I-72: (SN 075-0090 and 0091) over McCraney Creek 1.8 miles east of the IL 96/Hull Interchange, (SN 075-0124 and 0125) over tributary to McCraney Creek 2.1 miles east of the IL 96/Hull interchange, (SN 075-0092) TR 52 (205th Street) overhead 2.2 miles east of the IL 96/Hull Interchange and (SN 075-0094 and 0095) over TR 62 (213th Street) 3.3 miles east of the IL 96/Hull Interchange.
|
047-72324
|
Active
|
07/30/2025
|
|
|
4
|
6
|
Scott
|
|
Bridge deck overlay on SN 086-0029 carrying CH 14 (800E Hoots Road) over I-72, 0.9 miles east of Plum Creek.
|
048-72416
|
Active
|
07/30/2025
|
|
|
4
|
6
|
Sangamon
|
|
7.5 miles of crack and joint sealing on I-55 from north of the Glenarm interchange to 0.2 miles north of Southwind Road.
|
049-72974
|
Active
|
07/30/2025
|
|
|
4
|
6
|
Logan
|
|
Installing helical ground anchors at SN 054-7102 carrying I-55 over a drainage ditch 0.4 miles north of IL 10 near Lincoln.
|
050-72976
|
Active
|
07/30/2025
|
|
|
4
|
6
|
Cass
|
|
Filed tile removal and replacement on IL 125 east of Philadelphia.
|
051-72977
|
Active
|
07/30/2025
|
|
|
4
|
6
|
Logan
|
|
Installation of highway lighting on I-55 at the Elkhart interchange.
|
052-72G90
|
Deleted
|
08/07/2025
|
|
|
4
|
6
|
Christian
|
|
1.8 miles of resurfacing, patching, ADA curb ramps, storm sewer, pipe culverts and lighting on IL 29 in Pana.
|
052-72C80
|
Deleted
|
08/04/2025
|
|
|
4
|
6
|
Macoupin
|
|
Culvert replacement on IL 4 over a ditch north of West North Street in Girard. (SN 059-7007)
|
053-72E33
|
Deleted
|
08/07/2025
|
|
|
4
|
6
|
Macoupin
|
|
Tree removal, excavation, patching, pavement replacement, PCC widening, concrete curb and gutter, HMA overlay, pipe culverts and storm sewers on IL 108 in Carlinville approximately 0.2 miles west of Hurricane Creek to east of Taylor Street and 2 miles to 2.3 miles east of IL 111.
|
055-72M33
|
Active
|
07/30/2025
|
|
|
4
|
6
|
Pike
|
|
Bridge deck overlay on I-72 at Bay Creek, 0.9 miles west of CH 3 at the New Salem interchange.
|
056-74164
|
Active
|
08/01/2025
|
|
|
4
|
7
|
Lawrence
|
|
Complete structure replacement of SN 051-0004 carrying IL 1 over the Embarras River Overflow approximately 1 mile north of US 50.
|
057-74433
|
Deleted
|
08/04/2025
|
|
|
4
|
7
|
Clark
|
|
Replacement of SN 012-0014 carrying IL 1 over the CSX Railroad, 0.5 miles north of US 40.
|
058-74597
|
Active
|
07/30/2025
|
|
|
4
|
7
|
Cumberland
|
|
Bridge replacement on I-57 over Eastern Illinois Railroad, 0.3 miles south of the Neoga interchange, and over US 45 at the Neoga interchange. (SN 018-0001, 018-0002, 018-0003, 018-0004)
|
059-74608
|
Active
|
07/30/2025
|
|
|
4
|
7
|
Effingham
|
|
0.3 miles of resurfacing and ADA improvements on Dietrich Blacktop from IL 33 to Church Street in Dietrich.
|
060-74654
|
Active
|
08/04/2025
|
|
|
4
|
7
|
Clay
|
|
Bridge superstructure replacement on SN 013-0037 carrying Old US 50 over Raccoon Creek, 2.5 miles west of the US 45 North Junction.
|
061-74A04
|
Active
|
07/30/2025
|
|
|
4
|
7
|
Effingham
|
|
Structure removal and replacement, paved shoulder removal, pavement removal, pipe underdrains, PCC pavement, PCC shoulders, HMA base course, guardrail and median crossovers on I-57 at Green Creek, 1.5 miles south of the Shelby County line. (SN 025-0003)
|
062-74D09
|
Active
|
07/30/2025
|
|
|
4
|
7
|
Wayne
|
|
Expansion joint replacement, bridge deck patching, scarification, bridge deck overlay and HMA surface course to tie into the existing pavement on IL 15 over Skillet Fork and Skillet Fork Overflow approximately 0.5 and 0.2 miles southwest of CR 635E near Wayne City.
|
063-74D11
|
Active
|
07/30/2025
|
|
|
4
|
7
|
Clark
|
|
Bridge deck overlay, bridge joint repair/replacement, bridge deck repairs and striping on I-70 at Crooked Creek, 1.8 miles west of US 40.
|
064-74D31
|
Active
|
07/30/2025
|
|
|
4
|
7
|
Lawrence
|
|
Tree removal and tree installation along US 50 from 320E to 750E.
|
065-74D57
|
Active
|
07/30/2025
|
|
|
4
|
7
|
Effingham
|
|
Installation of a median crossover on I-70 approximately 0.4 miles west of the IL 128 interchange.
|
066-76A46
|
Active
|
08/01/2025
|
|
|
5
|
8
|
Madison
|
|
Intersection improvements with signals and bridge replacement on IL 162/IL 157 in Glen Carbon.
|
067-76F84
|
Active
|
07/30/2025
|
|
|
5
|
8
|
Madison
|
|
Intersection reconstruction on IL 3 at Delmar Avenue and at Pierce Lane, both in Godfrey.
|
068-76R08
|
Active
|
07/30/2025
|
|
|
5
|
8
|
Clinton
|
|
1.3 miles of resurfacing and ADA improvements on Old US 50, 0.6 miles east of Pipeline Road to 13th Street in Carlyle.
|
069-76T17
|
Active
|
07/30/2025
|
|
|
5
|
8
|
St. Clair
|
|
Bridge replacement, pavement reconstruction, ADA and APS improvements, new intersection and traffic signal installation, upgrading drainage system and signage upgrades on IL 203 from 0.1 miles north of IL 3 Connector to 0.1 miles south of IL 3 Connector in Madison.
|
070-76U51
|
Active
|
07/30/2025
|
|
|
5
|
8
|
Various
|
|
Call-out bridge deck patching at various locations throughout District 8 on access-controlled roadways.
|
071-78789
|
Active
|
07/30/2025
|
|
|
5
|
9
|
Gallatin, White
|
|
Shoulder widening, culvert replacement and culvert extensions on US 45 / IL 141 from south of TR400N to 0.1 miles south of IL 141. Project also includes pavement removal and replacement at the intersection of US 45 and IL 141.
|
072-78793
|
Active
|
07/30/2025
|
|
|
5
|
9
|
Pulaski
|
|
Removal and replacement of the existing single span bridge (SN 077-0023) carrying IL 169 over Kitchel Slough, west of Karnak.
|
073-78A79
|
Active
|
07/30/2025
|
|
|
5
|
9
|
White
|
|
0.6 miles of pavement, shoulder and median replacement on IL 1 at the I-64 interchange.
|
074-78B70
|
Active
|
07/30/2025
|
|
|
5
|
9
|
Jefferson
|
|
1.2 miles of pavement patching on I-64 ramps at Exit 89.
|
075-85764
|
Active
|
07/30/2025
|
|
|
2
|
2
|
Winnebago
|
|
construct a three-span steel plate girder bridge to carry Prairie Hill Road over the Rock River, 1.75 miles southwest of South Beloit. Includes; HMA approach, pavement patching, guardrails, and HMA shoulders.
|
076-85782
|
Active
|
07/30/2025
|
|
|
2
|
2
|
Rock Island
|
|
Sidewalk replacement on 10th Street from 12th Avenue to 16th Avenue, on 10th Street from 16th Avenue to 17th Avenue, and on 16th Avenue from 10th Street to 11th street in Moline.
|
077-87846
|
Active
|
07/30/2025
|
|
|
2
|
3
|
Kendall
|
|
Convert the intersecton of Wolf's Crossing Road and Douglas Road to a roundabout. Includes; full depth HMA paving, drainage improvements, detention pond grading, culverts, multi-use path and sidewalks.
|
078-93826
|
Active
|
07/30/2025
|
|
|
4
|
6
|
Logan
|
|
Reconstruction, widening, and resurfacing Fifth Street Road from I-55 to Lincoln Parkway in Lincoln.
|
079-93841
|
Active
|
07/30/2025
|
|
|
4
|
6
|
Christian
|
|
Reconstruction of West Main Cross Street from Silver Street to Clay Street in Taylorville. Includes; HMA pavement, PCC driveways, ADA Ram and storm sewer.
|
080-95980
|
Active
|
07/30/2025
|
|
|
4
|
7
|
Moultrie
|
|
Remove and replace sidewalks, curb and driveway pavements, and install flashing beacons for pedestrian crossing on IL 121 from Jefferson Street to Church Street in Bethany.
|
081-95983
|
Active
|
07/30/2025
|
|
|
4
|
7
|
Moultrie
|
|
Construction of three pipe culverts, earth embankment and approaches on Joe Pound Road from 0.4 mile east of 1300 E Road to 0.6 mile east of 1300 E Road.
|
082-95984
|
Active
|
07/30/2025
|
|
|
4
|
7
|
Wayne
|
|
Construct a single-span steel plate girder bridge with concrete deck to carry 250 N Road over Little Pond Creek, 4.5 miles south of Golden Gate.
|
083-95988
|
Active
|
07/30/2025
|
|
|
4
|
7
|
Clay
|
|
Sidewalk construction and sidewalk replacement along Shadwell Street to Floyd Henson Jr. High School in Flora.
|
084-97874
|
Active
|
07/30/2025
|
|
|
5
|
8
|
Madison
|
|
Reconstruction of C Street from West 7th Street to 1st Street, and the reconstruction of West 7th Street from C Street to D Street within America's Central Post District.
|
085-99745
|
Active
|
07/31/2025
|
|
|
5
|
9
|
Massac
|
|
Construct a 12'x 6' precast box culvert to carry Country Club Road over an unnamed creek one mile northwest of Metropolis. Includes PCC pavement and Guardrail.
|
086-99749
|
Active
|
07/30/2025
|
|
|
5
|
9
|
Perry
|
|
Intersection reconstruction and replace the bridge carrying Greens Mark Road over Six Mile Creek, one mile west of US 51.
|
087-68J62
|
Active
|
08/08/2025
|
|
|
3
|
4
|
Peoria
|
|
Resurfacing of IL 8 from East Kickapoo Creek to Main St in Peoria. 1.68 miles.
|
088-68K26
|
Active
|
08/08/2025
|
|
|
3
|
4
|
Various
|
|
Installation of traffic signal controllers, cabinets, battery backup system, and CCTV cameras along various routes in District 4.
|
089-61K93
|
Active
|
08/11/2025
|
|
|
1
|
1
|
Cook
|
|
Reconstruction of Tonne road from Lanmeier Road to Clearmont Drive in Elk Grove Village.
|
090-61L21
|
Active
|
08/11/2025
|
|
|
1
|
1
|
Cook
|
|
Remove and replace traffic signals and pedestrian accommodations along Desplaines River Road and Balmoral Avenue in Rosemont.
|
091-61L28
|
Active
|
08/11/2025
|
|
|
1
|
1
|
Kane
|
|
Construction of additonal through lanes on each side of Randall Road at the intersection of IL 72, widening to 3 NB and SB lanes. Includes HMA multi- use patch, curb and gutter, drainage improvements, traffic signal modifications, and lighting.
|
092-61L69
|
Active
|
08/11/2025
|
|
|
1
|
1
|
DuPage
|
|
Construct a prefabicated pedestrian truss bridge to carry Cricket Trail extension over IL 83 in Elmhurst.
|
093-87871
|
Active
|
08/11/2025
|
|
|
2
|
3
|
LaSalle
|
|
Sidewalk construction at various locations in Oglesby.
|
094-97833
|
Active
|
08/11/2025
|
|
|
5
|
8
|
Madison
|
|
Reconstruction of Summit Avenue with a shared-use path from Notting Hill Court to Dooner Drive in Collinsville.
|
095-97868
|
Active
|
08/11/2025
|
|
|
5
|
8
|
Madison
|
|
Contruction of a new sidewalk and shared-use path from Pontoon Road to Raes Creek Drive in Granite City.
|
096-97869
|
Active
|
08/11/2025
|
|
|
5
|
8
|
Madison
|
|
Resurfacing on Madison Avenue from 14th Street to 3rd Street in Madison.
|
097-62R22
|
Active
|
08/11/2025
|
|
|
1
|
1
|
Will
|
|
(3,775-Ft) Realignment and Reconstruction of the mainline and interchange pavement and related roadway elements, including ramp and cross-road reconstruction, existing bridge removal, storm sewer, drainage structures, detention ponds, earth excavation and grading, retaining and noise walls, barrier and moment slab construction, bridge rehabilitation and replacement, roadway lighting, traffic signals, ITS implementation, erosion and sediment control, landscaping, traffic control and protection, detour routing, pavement marking and signing, building removals. The project extends from West of Wheeler Avenue to the Des Plaines River bridge in the City of Joliet of Will County.
|
01A-AU074
|
Active
|
08/12/2025
|
|
|
1
|
1
|
Kane
|
|
Rehabilitate Airfield Lighting Vault and Replace Vault Generator
|
02A-DI035
|
Active
|
08/12/2025
|
|
|
2
|
2
|
Lee
|
|
Rehabilitate Runway 12/30
|
03A-FL037
|
Active
|
08/12/2025
|
|
|
4
|
7
|
|
|
Replace Medium Intensity Runway Lights on Runway 3/21
|
04A-KA055
|
Active
|
08/12/2025
|
|
|
2
|
3
|
Kankakee
|
|
Rehabilitate Apron R-1 and Various T-Hangar Pavements
|