Home > Notice of Letting > Contract Detail

September 19, 2025 Letting 12:00 PM
062-74D09

Plans and Special Provisions are not available at this time

Bulletin Description

Expansion joint replacement, bridge deck patching, scarification, bridge deck overlay and HMA surface course to tie into the existing pavement on IL 15 over Skillet Fork and Skillet Fork Overflow approximately 0.5 and 0.2 miles southwest of CR 635E near Wayne City.
Region District DBE % VBP % Federal Project #
4 7 Pending Pending NHPP33WJ(728)
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Wayne
  • FAP 821
  • IL 15
  • D7 BRIDGE REPAIRS 2026-4
  • C-97-081-24
  • 7-52945-0000
Contract Specifics
80 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (0 Submitted / 0 Answered ) Questions not accepted as of September 09, 2025 04:30 PM.

Authorized Bidders

  • No authorized bidders

Non Bidders

  • No requests received
This list of pay items is subject to change until the Plans and Special Provisions have been published.
Pay Item # UOM Description Type Quantity Unit Price
28100807 TON STONE DUMPED RIPRAP, CLASS A4 Base items 21.000
35600716 SQ YD HOT-MIX ASPHALT BASE COURSE WIDENING, 10" Base items 1,048.000
40600290 POUND BITUMINOUS MATERIALS (TACK COAT) Base items 360.000
40600982 SQ YD HOT-MIX ASPHALT SURFACE REMOVAL - BUTT JOINT Base items 529.000
40600990 SQ YD TEMPORARY RAMP Base items 102.000
40604052 TON HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "C", N70 Base items 117.000
44004250 SQ YD PAVED SHOULDER REMOVAL Base items 684.000
48102100 TON AGGREGATE WEDGE SHOULDER, TYPE B Base items 120.000
50102400 CU YD CONCRETE REMOVAL Base items 20.000
50104650 SQ YD SLOPE WALL REMOVAL Base items 21.000
50300255 CU YD CONCRETE SUPERSTRUCTURE Base items 21.700
50300300 SQ YD PROTECTIVE COAT Base items 1,231.000
50800205 POUND REINFORCEMENT BARS, EPOXY COATED Base items 3,100.000
50800515 EACH BAR SPLICERS Base items 48.000
52000110 FOOT PREFORMED JOINT STRIP SEAL Base items 152.000
67000400 CAL MO ENGINEER'S FIELD OFFICE, TYPE A Base items 5.000
67100100 L SUM MOBILIZATION Base items 1.000
70100450 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701201 Base items 1.000
70106500 EACH TEMPORARY BRIDGE TRAFFIC SIGNALS Base items 1.000
70107005 FOOT PAVEMENT MARKING BLACKOUT TAPE, 5" Base items 2,641.000
70107025 CAL DA CHANGEABLE MESSAGE SIGN Base items 28.000
70300100 FOOT SHORT TERM PAVEMENT MARKING Base items 200.000
70300150 SQ FT SHORT TERM PAVEMENT MARKING REMOVAL Base items 1,167.000
70300221 FOOT TEMPORARY PAVEMENT MARKING - LINE 4"- PAINT Base items 3,131.000
70400100 FOOT TEMPORARY CONCRETE BARRIER Base items 898.000
70400200 FOOT RELOCATE TEMPORARY CONCRETE BARRIER Base items 771.000
70600250 EACH IMPACT ATTENUATORS, TEMPORARY (NON- REDIRECTIVE), TEST LEVEL 3 Base items 4.000
70600260 EACH IMPACT ATTENUATORS, TEMPORARY (FULLY REDIRECTIVE, NARROW), TEST LEVEL 3 Base items 4.000
70600332 EACH IMPACT ATTENUATORS, RELOCATE (FULLY REDIRECTIVE, NARROW), TEST LEVEL 3 Base items 4.000
70600350 EACH IMPACT ATTENUATORS, RELOCATE (NON- REDIRECTIVE), TEST LEVEL 3 Base items 4.000
78001110 FOOT PAINT PAVEMENT MARKING - LINE 4" Base items 3,131.000
78300200 EACH RAISED REFLECTIVE PAVEMENT MARKER REMOVAL Base items 8.000
X5030250 SQ YD BRIDGE DECK GROOVING (LONGITUDINAL) Base items 798.000
X6026200 EACH INLETS TO BE ADJUSTED (SPECIAL) Base items 4.000
X7010202 EACH TRAFFIC CONTROL AND PROTECTION, STANDARD 701321 (SPECIAL) Base items 1.000
Z0012111 SQ YD BRIDGE DECK FLY ASH OR GGBF SLAG CONCRETE OVERLAY, 2 1/2" Base items 1,175.000
Z0012130 SQ YD BRIDGE DECK SCARIFICATION 3/4" Base items 1,175.000
Z0016001 SQ YD DECK SLAB REPAIR (FULL DEPTH, TYPE I) Base items 4.000
Z0016002 SQ YD DECK SLAB REPAIR (FULL DEPTH, TYPE II) Base items 2.000
Z0029090 SQ YD DIAMOND GRINDING (BRIDGE SECTION) Base items 1,089.000
No More Pay Items