September 19, 2025 Letting 12:00 PM
01A-AU074

Plans and Special Provisions are not available at this time

Bulletin Description

Rehabilitate Airfield Lighting Vault and Replace Vault Generator
Region District DBE % VBP % Federal Project #
1 1 Pending Pending 317SBGPTBD
County(s) IL Project # Airport Sponsor City
  • Kane
ARR 4915 Aurora Municipal City of Aurora Sugar Grove
Contract Specifics
The time limit to award this item has been changed from 45 days to 90 days after the scheduled letting.
61 Calendar Days
Previously advertised on November 08, 2024 (Item 05A).

WARNING:  FAA Buy American Preference provisions apply to this contract.  Failure to submit a “Certification of Compliance with FAA Buy American Preference – Construction Projects” form in accordance with the bidding procedures set forth in the proposal document (Appendix A4 BUY AMERICAN PREFERENCE) will result in the bid being declared non-responsive.

No More Contract Specifics

Ask Subscribe Questions and Answers (0 Submitted / 0 Answered ) Questions not accepted as of September 09, 2025 04:30 PM.

Authorized Bidders

  • No authorized bidders

Non Bidders

  • No requests received
This list of pay items is subject to change until the Plans and Special Provisions have been published.
Pay Item # UOM Description Type Quantity Unit Price
AR109210 L SUM VAULT MODIFICATIONS Base items 1.000
AR109311 EACH 7.5 KW REGULATOR, STYLE 1 Base items 2.000
AR109331 EACH 15 KW REGULATOR, STYLE 1 Base items 1.000
AR109341 EACH 20 KW REGULATOR, STYLE 1 Base items 1.000
AR109361 EACH 30 KW REGULATOR, STYLE 1 Base items 4.000
AR109362 EACH 30 KW REGULATOR, STYLE 2 Base items 4.000
AR109810 EACH GENERATOR Base items 1.000
AR109903 EACH REMOVE REGULATOR Base items 16.000
AR109908 L SUM REMOVE GENERATOR Base items 1.000
AR150510 L SUM ENGINEER'S FIELD OFFICE Base items 1.000
AR150520 L SUM MOBILIZATION Base items 1.000
AR800192 L SUM INSTALL ALCMS L-890 Base items 1.000