Home > Notice of Letting > Contract Detail

November 17, 2023 Letting 12:00 PM
090-76N43

Bulletin Description

Intersection reconstruction and ADA upgrades on IL 3 at 20th Street in Granite City.
Region District DBE % VBP % Federal Project #
5 8 16.00 0.00 NHPP2N7X(264)
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Madison
  • FAP 2
  • IL 3
  • 103R-1
  • C-98-095-20
  • 8-00703-0000
Contract Specifics
Project Labor Agreement
Completion Date: September 15, 2024 Plus 10 Working Days
Previously advertised on April 28, 2023 (Item 150).
No More Contract Specifics

Ask Subscribe Questions and Answers (8 Submitted / 8 Answered ) Questions not accepted as of November 07, 2023 04:30 PM.

  • The lane rental specification is a little ambiguous. Does the lane rental charge cover all lanes? There could be potential of 16 lane rental per day. 8 lanes on IL Route 3 and 8 lane on 20th St. If this is the case, the total charge per day would be $160,000 per day. Would the incentive work the same way? Please advise.
    An addendum will be issued to address this question. Please continue to monitor the website for an update. (11/09/2023)

  • In the removal plans it shows trees in the median. Do you anticipate any tree removal on this project? We don't have a line item for it, but if there were tree removal to do or if they were incidental, we would need to get those out prior to April 1st.
    The project should be bid according to the Standard Specifications for Road and Bridge Construction, Highway Standards, and the plans and specifications available online. Any revisions or omissions of bid items will be handled in construction according to Section 109 of the Standard Specifications for Road and Bridge Construction. (11/08/2023)

  • Are there any restrictions on hours of operation? This project is adjacent to a residential area
    There are peak hour restrictions in the special provisions if they choose to do any work under a lane closure rather than a full closure. Lane closures also count towards their 30 calendar days for closure of the road. (11/07/2023)

  • There is not a line item for an electrical service installation. Should a new electrical service installation be included with line item 85704804?
    An addendum will be posted that addresses this question. Please continue to monitor the website for an update. (11/07/2023)

  • In the plans on the traffic control sheets, it does not show how IL 3 will be closed. There is a listed pay item for a single lane closure included in the pay item X7010216, however NB is 3 through lanes with 2 turn lanes, and SB is 2 though lanes with a turn lane. Can further details be provided on how this work is to be accomplished for an accurate bid?
    IL 3 will be closed using type III barricades NB & SB per the special provisions. The special provisions state the work is to be completed in 30 days and allows for complete closure and use of a detour, but also a single lane closure may be used within the 30 days if required. (10/30/2023)

  • The detour details shows where IL 3 NB will be closed, but not where IL 3 SB will be closed. Can a detail be provided as to where IL 3 SB will need to be closed at, as it appears that it will need to be closed at Rock Rd, but there is a sign at this location that states 1/2 MILE.
    IL 3 SB should be closed at Rock Road. There should be type III barricades blocking all lanes at this location. (10/30/2023)

  • The joint plan at the ends of the paving does not have transverse lines. Is the intent for these sections to be CRC? We do not see anything indicating CRC, but it looks like that could be the intent in those sections. We would appreciate clarification on what type of paving you would like to see at the ends of the project.
    There are three pay items, 42101020, 42101030, and X4211080 Wide Flange Beam Terminal Joint Complete of the different sizes depending on the width of the pavement at the location, which cover the pavement at the end and beginning of the project to tie into the existing CRC pavement. (10/30/2023)

  • The special provisions call out for the road closure to be between the dates of July 1, 2023 and September 15, 2023. Since this is being let in November please advise if these dates are to be followed for the 2024 season.
    The dates are for the following 2024 season. An addendum will be issued to correct this. Please continue to monitor the website for an update. (10/30/2023)

Authorized Bidders

  • 0338 Baxmeyer Construction, Inc.
    1034 Floraville Road
    Waterloo, IL 62298
    Phone: (618) 939-3000 Fax: (618) 939-4299 Email: estimator@baxmeyerconstruction.com
    $7,285,267.77

  • 1487 DMS Contracting, Inc.
    10243 Fuesser Road
    Mascoutah, IL 62258
    PO Box 122
    Mascoutah, IL 62258
    Phone: (618) 566-9114 Fax: (618) 566-3145 Email: estimating@dmscontracting.com

  • 2308 Hank's Excavating & Landscaping, Inc.
    5825 West State Route 161
    Belleville, IL 62223
    Phone: (618) 398-5556 Fax: (618) 398-2729 Email: No Record

  • 3108 Keller Construction, Inc.
    22 Illini Drive
    Glen Carbon, IL 62034
    Phone: (618) 656-0033 Fax: (618) 656-7134 Email: dan.walker@kellerconstruction.com
    $7,861,163.41

  • 3810 McCarthy Improvement Company
    5401 Victoria Avenue
    Davenport, IA 52807
    Phone: (563) 359-0321 Fax: (563) 344-3717 Email: estimating@mccarthyimprovement.com
    $8,841,112.00

  • 4135 Millstone Weber LLC
    601 Fountain Lakes Blvd.
    St. Charles, MO 63301
    Phone: (636) 949-0038 Fax: (636) 949-3129 Email: bids@millstoneweber.com
    $9,517,447.46

  • 5802 Stutz Excavating, Inc.
    3837 Fosterburg Road
    Alton, IL 62002
    Phone: (618) 259-2485 Fax: (618) 259-2465 Email: No Record

Non Bidders

  • 1034 Christ Bros. Asphalt, Inc.
    820 s fritz st.
    P.O. Box 158
    Lebanon, IL 62254
    Phone: (618) 537-6174 Fax: (618) 537-6199 Email: No Record

  • 3085 Keeley & Sons, Inc.
    6303 Collinsville Road
    East St. Louis, IL 62201
    Phone: (618) 271-7470 Fax: (618) 271-0830 Email: Brian.Lurk@keeleyandsons.com

  • 3163 Kinney Contractors, Inc.
    19342 E. Frontage Rd.
    Raymond, IL 62560
    Phone: (217) 229-3322 Fax: (217) 229-3609 Email: kinney@roadbuilder.net

  • 3157 The Kilian Corporation
    608 South Independence Street
    Mascoutah, IL 62258
    P.O. Box A
    Mascoutah, IL 62258
    Phone: (618) 566-2000 Fax: (618) 566-2314 Email: sharon.weier@kiliancorp.com

Pay Item # UOM Description Type Quantity Unit Price
20200100 CU YD EARTH EXCAVATION Base items 14,441.000
20800150 CU YD TRENCH BACKFILL Base items 114.000
25000210 ACRE SEEDING, CLASS 2A Base items 0.750
25000400 POUND NITROGEN FERTILIZER NUTRIENT Base items 68.000
25000500 POUND PHOSPHORUS FERTILIZER NUTRIENT Base items 68.000
25000600 POUND POTASSIUM FERTILIZER NUTRIENT Base items 68.000
25100115 ACRE MULCH, METHOD 2 Base items 0.750
31102100 SQ YD SUBBASE GRANULAR MATERIAL, TYPE C 4" Base items 4,042.000
31200500 SQ YD STABILIZED SUBBASE - HOT-MIX ASPHALT, 4" Base items 23,763.000
35101100 SQ YD AGGREGATE BASE COURSE, TYPE A 12" Base items 27,805.000
40201000 TON AGGREGATE FOR TEMPORARY ACCESS Base items 1,522.000
42000506 SQ YD PORTLAND CEMENT CONCRETE PAVEMENT 10 1/4" (JOINTED) Base items 20,711.000
42001300 SQ YD PROTECTIVE COAT Base items 43,772.000
42101020 EACH WIDE FLANGE BEAM TERMINAL JOINT COMPLETE 24' Base items 1.000
42101030 EACH WIDE FLANGE BEAM TERMINAL JOINT COMPLETE 36' Base items 2.000
42300200 SQ YD PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT, 6 INCH Base items 21.000
42400100 SQ FT PORTLAND CEMENT CONCRETE SIDEWALK 4 INCH Base items 3,167.000
42400800 SQ FT DETECTABLE WARNINGS Base items 170.000
44000100 SQ YD PAVEMENT REMOVAL Base items 20,861.000
44000200 SQ YD DRIVEWAY PAVEMENT REMOVAL Base items 17.000
44000500 FOOT COMBINATION CURB AND GUTTER REMOVAL Base items 5,744.000
44000600 SQ FT SIDEWALK REMOVAL Base items 2,976.000
44003100 SQ FT MEDIAN REMOVAL Base items 6,461.000
44004250 SQ YD PAVED SHOULDER REMOVAL Base items 4,028.000
48101200 TON AGGREGATE SHOULDERS, TYPE B Base items 897.000
48300505 SQ YD PORTLAND CEMENT CONCRETE SHOULDERS 10 1/4" Base items 4,364.000
48301000 SQ YD PROTECTIVE COAT Base items 4,364.000
550A0070 FOOT STORM SEWERS, CLASS A, TYPE 1 15" Base items 20.000
550A0360 FOOT STORM SEWERS, CLASS A, TYPE 2 15" Base items 159.000
55100700 FOOT STORM SEWER REMOVAL 15" Base items 76.000
60236800 EACH INLETS, TYPE A, TYPE 11 FRAME AND GRATE Base items 2.000
60240310 EACH INLETS, TYPE B, TYPE 11 FRAME AND GRATE Base items 2.000
60255500 EACH MANHOLES TO BE ADJUSTED Base items 4.000
60260100 EACH INLETS TO BE ADJUSTED Base items 9.000
60500060 EACH REMOVING INLETS Base items 3.000
60609200 FOOT COMBINATION CONCRETE CURB AND GUTTER, TYPE M-6.12 Base items 3,105.000
60610400 FOOT COMBINATION CONCRETE CURB AND GUTTER, TYPE M-6.24 Base items 1,418.000
60618300 SQ FT CONCRETE MEDIAN SURFACE, 4 INCH Base items 1,942.000
60622800 SQ FT CONCRETE MEDIAN, TYPE SM-6.12 Base items 5,567.000
66900200 CU YD NON-SPECIAL WASTE DISPOSAL Base items 1,055.000
66900530 EACH SOIL DISPOSAL ANALYSIS Base items 8.000
66901001 L SUM REGULATED SUBSTANCES PRE-CONSTRUCTION PLAN Base items 1.000
66901003 L SUM REGULATED SUBSTANCES FINAL CONSTRUCTION REPORT Base items 1.000
66901006 CAL DA REGULATED SUBSTANCES MONITORING Base items 11.000
67000400 CAL MO ENGINEER'S FIELD OFFICE, TYPE A Base items 6.000
67100100 L SUM MOBILIZATION Base items 1.000
70107025 CAL DA CHANGEABLE MESSAGE SIGN Base items 268.000
72000100 SQ FT SIGN PANEL - TYPE 1 Base items 103.000
72000200 SQ FT SIGN PANEL - TYPE 2 Base items 24.000
72400100 EACH REMOVE SIGN PANEL ASSEMBLY - TYPE A Base items 13.000
72400200 EACH REMOVE SIGN PANEL ASSEMBLY - TYPE B Base items 4.000
73000100 FOOT WOOD SIGN SUPPORT Base items 321.000
78009000 SQ FT MODIFIED URETHANE PAVEMENT MARKING - LETTERS AND SYMBOLS Base items 291.000
78009004 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 4" Base items 11,669.000
78009008 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 8" Base items 896.000
78009012 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 12" Base items 860.000
78009024 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 24" Base items 192.000
78100100 EACH RAISED REFLECTIVE PAVEMENT MARKER Base items 109.000
78200020 EACH CURB REFLECTORS Base items 165.000
80400100 EACH ELECTRIC SERVICE INSTALLATION Base items 1.000
81028320 FOOT UNDERGROUND CONDUIT, PVC, 1" DIA. Base items 38.000
81028330 FOOT UNDERGROUND CONDUIT, PVC, 1 1/4" DIA. Base items 22.000
81028340 FOOT UNDERGROUND CONDUIT, PVC, 1 1/2" DIA. Base items 313.000
81028350 FOOT UNDERGROUND CONDUIT, PVC, 2" DIA. Base items 334.000
81028360 FOOT UNDERGROUND CONDUIT, PVC, 2 1/2" DIA. Base items 76.000
81028370 FOOT UNDERGROUND CONDUIT, PVC, 3" DIA. Base items 95.000
81400700 EACH HANDHOLE, PORTLAND CEMENT CONCRETE Base items 9.000
81400720 EACH DOUBLE HANDHOLE, PORTLAND CEMENT CONCRETE Base items 1.000
85704804 EACH FULL-ACTUATED CONTROLLER, STANDARD SEQUENCE IV, 8 PHASES, IN TYPE IV CABINET Base items 1.000
87301215 FOOT ELECTRIC CABLE IN CONDUIT, SIGNAL NO. 14 2C Base items 949.500
87301225 FOOT ELECTRIC CABLE IN CONDUIT, SIGNAL NO. 14 3C Base items 975.500
87301245 FOOT ELECTRIC CABLE IN CONDUIT, SIGNAL NO. 14 5C Base items 2,376.500
87301255 FOOT ELECTRIC CABLE IN CONDUIT, SIGNAL NO. 14 7C Base items 1,449.000
87301305 FOOT ELECTRIC CABLE IN CONDUIT, LEAD-IN, NO. 14 1 PAIR Base items 925.000
87301805 FOOT ELECTRIC CABLE IN CONDUIT, SERVICE, NO. 6 2 C Base items 34.000
87301900 FOOT ELECTRIC CABLE IN CONDUIT, EQUIPMENT GROUNDING CONDUCTOR, NO. 6 1C Base items 34.000
87502700 EACH TRAFFIC SIGNAL POST, ALUMINUM 16 FT. Base items 4.000
87700290 EACH STEEL MAST ARM ASSEMBLY AND POLE, 50 FT. Base items 1.000
87700320 EACH STEEL MAST ARM ASSEMBLY AND POLE, 55 FT. Base items 1.000
87700410 EACH STEEL MAST ARM ASSEMBLY AND POLE, 65 FT. Base items 2.000
87800100 FOOT CONCRETE FOUNDATION, TYPE A Base items 15.000
87800200 FOOT CONCRETE FOUNDATION, TYPE D Base items 3.000
87800415 FOOT CONCRETE FOUNDATION, TYPE E 36-INCH DIAMETER Base items 44.000
87800420 FOOT CONCRETE FOUNDATION, TYPE E 42-INCH DIAMETER Base items 50.000
87900200 EACH DRILL EXISTING HANDHOLE Base items 1.000
88040070 EACH SIGNAL HEAD, POLYCARBONATE, LED, 1-FACE, 3-SECTION, BRACKET MOUNTED Base items 4.000
88040090 EACH SIGNAL HEAD, POLYCARBONATE, LED, 1-FACE, 3-SECTION, MAST ARM MOUNTED Base items 8.000
88040110 EACH SIGNAL HEAD, POLYCARBONATE, LED, 1-FACE, 4-SECTION, BRACKET MOUNTED Base items 2.000
88040120 EACH SIGNAL HEAD, POLYCARBONATE, LED, 1-FACE, 4-SECTION, MAST ARM MOUNTED Base items 2.000
88040150 EACH SIGNAL HEAD, POLYCARBONATE, LED, 1-FACE, 5-SECTION, BRACKET MOUNTED Base items 2.000
88040160 EACH SIGNAL HEAD, POLYCARBONATE, LED, 1-FACE, 5-SECTION, MAST ARM MOUNTED Base items 2.000
88102825 EACH PEDESTRIAN SIGNAL HEAD, POLYCARBONATE, LED, 1-FACE, BRACKET MOUNTED WITH COUNT DOWN TIMER Base items 6.000
88200100 EACH TRAFFIC SIGNAL BACKPLATE Base items 12.000
88600100 FOOT DETECTOR LOOP, TYPE I Base items 1,021.000
89502300 FOOT REMOVE ELECTRIC CABLE FROM CONDUIT Base items 1,490.000
89502350 FOOT REMOVE AND REINSTALL ELECTRIC CABLE FROM CONDUIT Base items 1,867.000
89502375 EACH REMOVE EXISTING TRAFFIC SIGNAL EQUIPMENT Base items 7.000
89502380 EACH REMOVE EXISTING HANDHOLE Base items 9.000
89502385 EACH REMOVE EXISTING CONCRETE FOUNDATION Base items 6.000
X4211080 EACH WIDE FLANGE BEAM TERMINAL JOINT COMPLETE (SPECIAL) Base items 1.000
X6660445 EACH RIGHT OF WAY AND PROPERTY CORNERS Base items 7.000
X7010216 L SUM TRAFFIC CONTROL AND PROTECTION, (SPECIAL) Base items 1.000
X7800100 SQ FT PAINT PAVEMENT MARKING - RAISED MEDIAN Base items 19.000
X7800200 FOOT PAINT PAVEMENT MARKING CURB Base items 1,310.000
X8760200 EACH ACCESSIBLE PEDESTRIAN SIGNALS Base items 6.000
X8760201 EACH PEDESTRIAN PUSH-BUTTON POST Base items 2.000
Z0013798 L SUM CONSTRUCTION LAYOUT Base items 1.000
Z0028415 SQ YD GEOTECHNICAL REINFORCEMENT Base items 27,805.000
Z0076600 HOUR TRAINEES Base items 2,000.000 $0.80
Z0076604 HOUR TRAINEES TRAINING PROGRAM GRADUATE Base items 2,000.000 $15.00
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.