Resurfacing East Grand Avenue from Hurricane Road to IL 148.
Region District DBE % VBP % Federal Project #
5 9 0.00 0.00 3V29(827)
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Williamson
  • FAS 2907
  • EAST GRAND AVENUE
  • 18-00155-00-RS
  • C-99-017-19
  • 9-10616-0000
  • 9-10616-0010
Contract Specifics
20 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (4 Submitted / 4 Answered ) Questions not accepted as of November 07, 2023 04:30 PM.

  • Please provide as-built drawings to help determine how the existing shoulders an roadway are constructed.
    No as-built drawings are available for this roadway. (11/01/2023)

  • Spl Provision page 3 notes "This work as well as the additional installations shown in the plans will be paid for at the contract unit price per Foot for VERTICAL ADJUSTMENT OF GUARDRAIL What is meant by 'additional installations shown in the plans'??? IF there is Incidental work besides vertical adjustment of guardrail, please identify what it is. INCIDENTAL items need to be identified and quantified so all can bid the same way.
    The plans have no additional work called out regarding the vertical adjustment of guardrail. Therefore, no incidental items pertaining to this pay item. (10/31/2023)

  • If the existing guardrail is vertically adjusted to meet guardrail height requirements per highway standards in the plans, the existing block-outs and existing post lengths will not meet these Standards and the rail splices will not fall between posts as shown in provided Standards. Should these be Remove and Replace SPBGR Type A?
    The intention is for the existing guardrail to remain in place with only a height adjustment to meet guardrail height requirements per highway standard 630001-12. (10/24/2023)

  • The Proposal says Vertical Adjust Guardrail shall be according to section 631 of Standard Specifications. There are no specifications for vertical adjust. Is it intended for all existing material to remain in place with only height adjustment?
    See VERTICAL ADJUSTMENT OF GUARDRAIL special provision located on page 3. "This work shall consist of vertical adjustment of existing guardrail according to section 631 of the Standard Specifications and the following: The guardrail will be vertically adjusted to meet guardrail height requirements specified within provided highway standards. This work as well as the additional installations shown in the plans will be paid for at the contract unit price per Foot for VERTICAL ADJUSTMENT OF GUARDRAIL." (10/24/2023)

Authorized Bidders

  • 5306 Samron Midwest Contracting, Inc.
    PO Box 1555
    Murphysboro, IL 62966
    Phone: (618) 687-5500 Fax: (618) 684-9341 Email: info@samron.com
    $402,402.00

  • 5550 E. T. Simonds Construction Company
    1500 N Oakland Ave
    PO Box 2107
    Carbondale, IL 62902
    PO Box 2107
    Carbondale, IL 62902
    Phone: (618) 457-8191 Fax: (618) 549-0131 Email: jjones@etsimonds.com
    $409,679.31

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
40200800 TON AGGREGATE SURFACE COURSE, TYPE B Base items 200.000
40600370 FOOT LONGITUDINAL JOINT SEALANT Base items 8,000.000
40600982 SQ YD HOT-MIX ASPHALT SURFACE REMOVAL - BUTT JOINT Base items 1,006.000
40600990 SQ YD TEMPORARY RAMP Base items 30.000
40604052 TON HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "C", N70 Base items 2,600.000
44000151 SQ YD HOT-MIX ASPHALT SURFACE REMOVAL, 1/2" Base items 21,800.000
63100167 EACH TRAFFIC BARRIER TERMINAL, TYPE 1 (SPECIAL) TANGENT Base items 4.000
63200310 FOOT GUARDRAIL REMOVAL Base items 200.000
67100100 L SUM MOBILIZATION Base items 1.000
70300100 FOOT SHORT TERM PAVEMENT MARKING Base items 1,420.000
70300150 SQ FT SHORT TERM PAVEMENT MARKING REMOVAL Base items 240.000
72501000 EACH TERMINAL MARKER - DIRECT APPLIED Base items 4.000
78001110 FOOT PAINT PAVEMENT MARKING - LINE 4" Base items 28,507.000
78001150 FOOT PAINT PAVEMENT MARKING - LINE 12" Base items 95.000
78001180 FOOT PAINT PAVEMENT MARKING - LINE 24" Base items 62.000
78100100 EACH RAISED REFLECTIVE PAVEMENT MARKER Base items 100.000
78300200 EACH RAISED REFLECTIVE PAVEMENT MARKER REMOVAL Base items 6.000
88600100 FOOT DETECTOR LOOP, TYPE I Base items 275.000
X4060101 POUND TRACKLESS TACK Base items 9,300.000
X6330900 FOOT VERTICAL ADJUSTMENT OF GUARDRAIL Base items 1,075.000
X7010216 L SUM TRAFFIC CONTROL AND PROTECTION, (SPECIAL) Base items 1.000
No More Pay Items