Region | District | DBE % | VBP % | Federal Project # |
---|---|---|---|---|
2 | 3 | 18.00 | 0.00 | N/A |
County(s) | IL Project # | Airport | Sponsor | City |
---|---|---|---|---|
|
IKK 4991 | Greater Kankakee | Kankakee Valley Airport Authority | Kankakee |
Contract Specifics |
---|
The time limit to award this item has been changed from 45 days to 90 days after the scheduled letting. |
50 Calendar Days |
No More Contract Specifics |
Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
---|---|---|---|---|---|---|---|
AR108158 | FOOT | 1/C #8 5 KV UG CABLE IN UD | Base items | 5,600.000 | |||
AR108960 | FOOT | REMOVE CABLE | Base items | 7,000.000 | |||
AR110502 | FOOT | 2-WAY CONCRETE ENCASED DUCT | Base items | 100.000 | |||
AR110504 | FOOT | 4-WAY CONCRETE ENCASED DUCT | Base items | 110.000 | |||
AR110551 | FOOT | EXTEND DUCT | Base items | 15.000 | |||
AR110610 | EACH | ELECTRICAL HANDHOLE | Base items | 3.000 | |||
AR110900 | FOOT | REMOVE DUCT | Base items | 120.000 | |||
AR125410 | EACH | MITL-STAKE MOUNTED | Base items | 57.000 | |||
AR125415 | EACH | MITL-BASE MOUNTED | Base items | 8.000 | |||
AR125443 | EACH | TAXI GUIDANCE SIGN, 3 CHARACTER | Base items | 3.000 | |||
AR125446 | EACH | TAXI GUIDANCE SIGN, 6 CHARACTER | Base items | 1.000 | |||
AR125565 | EACH | SPLICE CAN | Base items | 1.000 | |||
AR125901 | EACH | REMOVE STAKE MOUNTED LIGHT | Base items | 39.000 | |||
AR125902 | EACH | REMOVE BASE MOUNTED LIGHT | Base items | 4.000 | |||
AR125904 | EACH | REMOVE TAXI GUIDANCE SIGN | Base items | 3.000 | |||
AR125906 | EACH | REMOVE SPLICE CAN | Base items | 2.000 | |||
AR125962 | EACH | RELOCATE BASE MOUNTED LIGHT | Base items | 1.000 | |||
AR150510 | L SUM | ENGINEER'S FIELD OFFICE | Base items | 1.000 | |||
AR150520 | L SUM | MOBILIZATION | Base items | 1.000 | |||
AR152410 | CU YD | UNCLASSIFIED EXCAVATION | Base items | 7,850.000 | |||
AR152540 | SQ YD | SOIL STABILIZATION FABRIC | Base items | 3,575.000 | |||
AR156510 | FOOT | SILT FENCE | Base items | 1,550.000 | |||
AR156520 | EACH | INLET PROTECTION | Base items | 4.000 | |||
AR208515 | CU YD | POROUS GRANULAR EMBANKMENT | Base items | 1,400.000 | |||
AR209612 | SQ YD | CRUSHED AGG. BASE COURSE - 12" | Base items | 715.000 | |||
AR401610 | TON | BITUMINOUS SURFACE COURSE | Base items | 780.000 | |||
AR401900 | SQ YD | REMOVE BITUMINOUS PAVEMENT | Base items | 2,250.000 | |||
AR403610 | TON | BITUMINOUS BASE COURSE | Base items | 970.000 | |||
AR602510 | GALLON | BITUMINOUS PRIME COAT | Base items | 1,000.000 | |||
AR603510 | GALLON | BITUMINOUS TACK COAT | Base items | 700.000 | |||
AR620520 | SQ FT | PAVEMENT MARKING-WATERBORNE | Base items | 3,550.000 | |||
AR620525 | SQ FT | PAVEMENT MARKING-BLACK BORDER | Base items | 2,950.000 | |||
AR620900 | SQ FT | PAVEMENT MARKING REMOVAL | Base items | 4,950.000 | |||
AR701524 | FOOT | 24" RCP, CLASS IV | Base items | 540.000 | |||
AR701900 | FOOT | REMOVE PIPE | Base items | 566.000 | |||
AR705526 | FOOT | 6" PERFORATED UNDERDRAIN W/SOCK | Base items | 780.000 | |||
AR751540 | EACH | MANHOLE 4' | Base items | 2.000 | |||
AR751550 | EACH | MANHOLE 5' | Base items | 1.000 | |||
AR751560 | EACH | MANHOLE 6' | Base items | 1.000 | |||
AR751900 | EACH | REMOVE INLET | Base items | 1.000 | |||
AR800003 | FOOT | 2 - 1/C #8 5KV UG CABLE IN UD | Base items | 365.000 | |||
AR800026 | SQ YD | CRUSHED AGG. BASE COURSE - 15" | Base items | 2,700.000 | |||
AR901510 | ACRE | SEEDING | Base items | 4.600 | |||
AR908515 | ACRE | HEAVY-DUTY HYDRAULIC MULCH | Base items | 4.600 | |||
No More Pay Items |