Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
---|---|---|---|---|---|---|---|
20100110 | UNIT | TREE REMOVAL (6 TO 15 UNITS DIAMETER) | Base items | 12.000 | |||
20100210 | UNIT | TREE REMOVAL (OVER 15 UNITS DIAMETER) | Base items | 108.000 | |||
20200100 | CU YD | EARTH EXCAVATION | Base items | 75.000 | |||
28000400 | FOOT | PERIMETER EROSION BARRIER | Base items | 1,500.000 | |||
35100100 | TON | AGGREGATE BASE COURSE, TYPE A | Base items | 34.000 | |||
42300200 | SQ YD | PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT, 6 INCH | Base items | 36.000 | |||
42400100 | SQ FT | PORTLAND CEMENT CONCRETE SIDEWALK 4 INCH | Base items | 9,692.000 | |||
42400300 | SQ FT | PORTLAND CEMENT CONCRETE SIDEWALK 6 INCH | Base items | 734.000 | |||
42400800 | SQ FT | DETECTABLE WARNINGS | Base items | 320.000 | |||
44000200 | SQ YD | DRIVEWAY PAVEMENT REMOVAL | Base items | 88.000 | |||
44000500 | FOOT | COMBINATION CURB AND GUTTER REMOVAL | Base items | 279.000 | |||
44000600 | SQ FT | SIDEWALK REMOVAL | Base items | 7,981.000 | |||
56500300 | EACH | DOMESTIC METER VAULTS TO BE ADJUSTED | Base items | 5.000 | |||
60600605 | FOOT | CONCRETE CURB, TYPE B | Base items | 258.000 | |||
60605100 | FOOT | COMBINATION CONCRETE CURB AND GUTTER, TYPE B-6.24 (ABUTTING EXISTING PAVEMENT) | Base items | 196.000 | |||
67100100 | L SUM | MOBILIZATION | Base items | 1.000 | |||
K0026830 | EACH | SHRUB REMOVAL | Base items | 3.000 | |||
X2500900 | ACRE | SEEDING, CLASS 1 (SPECIAL) | Base items | 0.750 | |||
X7010216 | L SUM | TRAFFIC CONTROL AND PROTECTION, (SPECIAL) | Base items | 1.000 | |||
XX008958 | L SUM | EARTH EXCAVATION SOIL MANAGEMENT | Base items | 1.000 | |||