20101400
|
POUND
|
NITROGEN FERTILIZER NUTRIENT
|
Base items
|
4.000
|
|
20101600
|
POUND
|
POTASSIUM FERTILIZER NUTRIENT
|
Base items
|
4.000
|
|
20200100
|
CU YD
|
EARTH EXCAVATION
|
Base items
|
2,413.000
|
|
20201200
|
CU YD
|
REMOVAL AND DISPOSAL OF UNSUITABLE MATERIAL
|
Base items
|
1,206.000
|
|
21001000
|
SQ YD
|
GEOTECHNICAL FABRIC FOR GROUND STABILIZATION
|
Base items
|
3,620.000
|
|
21101615
|
SQ YD
|
TOPSOIL FURNISH AND PLACE, 4"
|
Base items
|
259.000
|
|
25200110
|
SQ YD
|
SODDING, SALT TOLERANT
|
Base items
|
259.000
|
|
28000510
|
EACH
|
INLET FILTERS
|
Base items
|
7.000
|
|
30300001
|
CU YD
|
AGGREGATE SUBGRADE IMPROVEMENT
|
Base items
|
1,206.000
|
|
31101400
|
SQ YD
|
SUBBASE GRANULAR MATERIAL, TYPE B 6"
|
Base items
|
14,477.000
|
|
40600275
|
POUND
|
BITUMINOUS MATERIALS (PRIME COAT)
|
Base items
|
32,452.000
|
|
40600290
|
POUND
|
BITUMINOUS MATERIALS (TACK COAT)
|
Base items
|
5,139.000
|
|
40603085
|
TON
|
HOT-MIX ASPHALT BINDER COURSE, IL-19.0, N70
|
Base items
|
2,506.000
|
|
40604062
|
TON
|
HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "D", N70
|
Base items
|
1,496.000
|
|
42000060
|
SQ YD
|
WELDED WIRE REINFORCEMENT
|
Base items
|
506.000
|
|
42000300
|
SQ YD
|
PORTLAND CEMENT CONCRETE PAVEMENT 8"
|
Base items
|
506.000
|
|
42001300
|
SQ YD
|
PROTECTIVE COAT
|
Base items
|
517.000
|
|
42400200
|
SQ FT
|
PORTLAND CEMENT CONCRETE SIDEWALK 5 INCH
|
Base items
|
100.000
|
|
44000100
|
SQ YD
|
PAVEMENT REMOVAL
|
Base items
|
14,984.000
|
|
44000155
|
SQ YD
|
HOT-MIX ASPHALT SURFACE REMOVAL, 1 1/2"
|
Base items
|
1,579.000
|
|
44000158
|
SQ YD
|
HOT-MIX ASPHALT SURFACE REMOVAL, 2 1/4"
|
Base items
|
1,755.000
|
|
44000600
|
SQ FT
|
SIDEWALK REMOVAL
|
Base items
|
100.000
|
|
60250200
|
EACH
|
CATCH BASINS TO BE ADJUSTED
|
Base items
|
1.000
|
|
60252800
|
EACH
|
CATCH BASINS TO BE RECONSTRUCTED
|
Base items
|
1.000
|
|
60300305
|
EACH
|
FRAMES AND LIDS TO BE ADJUSTED
|
Base items
|
7.000
|
|
66900200
|
CU YD
|
NON-SPECIAL WASTE DISPOSAL
|
Base items
|
1,206.000
|
|
66900530
|
EACH
|
SOIL DISPOSAL ANALYSIS
|
Base items
|
4.000
|
|
66901001
|
L SUM
|
REGULATED SUBSTANCES PRE-CONSTRUCTION PLAN
|
Base items
|
1.000
|
|
66901003
|
L SUM
|
REGULATED SUBSTANCES FINAL CONSTRUCTION REPORT
|
Base items
|
1.000
|
|
66901005
|
SQ YD
|
ENGINEERED BARRIER
|
Base items
|
590.000
|
|
66901006
|
CAL DA
|
REGULATED SUBSTANCES MONITORING
|
Base items
|
8.000
|
|
67100100
|
L SUM
|
MOBILIZATION
|
Base items
|
1.000
|
|
78000200
|
FOOT
|
THERMOPLASTIC PAVEMENT MARKING - LINE 4"
|
Base items
|
2,218.000
|
|
X4400501
|
FOOT
|
COMBINATION CURB AND GUTTER REMOVAL AND REPLACEMENT LESS THAN OR EQUAL TO 10 FEET
|
Base items
|
50.000
|
|
X4400503
|
FOOT
|
COMBINATION CURB AND GUTTER REMOVAL AND REPLACEMENT GREATER THAN 10 FEET
|
Base items
|
50.000
|
|
X5537800
|
FOOT
|
STORM SEWERS TO BE CLEANED 12"
|
Base items
|
100.000
|
|
X6030205
|
EACH
|
FRAMES AND GRATES TO BE ADJUSTED (SPECIAL)
|
Base items
|
1.000
|
|
X6700407
|
CAL MO
|
ENGINEER'S FIELD OFFICE, TYPE A (D1)
|
Base items
|
6.000
|
|
Z0013798
|
L SUM
|
CONSTRUCTION LAYOUT
|
Base items
|
1.000
|
|
Z0018500
|
EACH
|
DRAINAGE STRUCTURES TO BE CLEANED
|
Base items
|
7.000
|
|