001-46651
|
Active
|
09/19/2024
|
|
|
4
|
7
|
Various
|
|
Removal and replacement of damaged raised reflective pavement marker reflectors and castings as needed throughout various counties of District 7.
|
002-46654
|
Active
|
09/19/2024
|
|
|
4
|
7
|
Various
|
|
Repairing various widths and types of pavement markings through District 7.
|
003-60R50
|
Active
|
09/19/2024
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
5,158-Ft. (0.98 miles), This project includes intersection improvements, ADA improvements, pavement widening and resurfacing, drainage improvements, traffic signal work, lighting, street scape improvements, and sidewalk and shared-use path construction, at the intersection with US 12/20/45 (La Grange Road), City of Countryside, Cook County, IL.
|
004-60T22
|
Active
|
09/19/2024
|
1 / 1 |
1 |
1
|
1
|
DuPage
|
|
(2,439 Ft) Channelization, Traffic Signal Installation: Median improvement, new HMA shoulders, HMA resurfacing, pavement widening, pavement patching, grading and shaping ditches, curb ramps (ADA) improvements, pavement markings, installation of new traffic signal and APS. FAP 870: IL 53 (Columbine Ave), from Bryant Avenue to Surrey Drive in the Villages of Lombard and Glen Ellyn in DuPage County.
|
005-62B66
|
Active
|
09/19/2024
|
40 / 40 |
1 |
1
|
1
|
Lake
|
Voluntary
|
The project consists of decommissioning of existing Pump Station 37 located in the IL 176 over US 41 bridge abutment (SN 049-0131), and construction of the new pump station in the northeast quadrant of the US 41 and IL 176 intersection with a new outfall pipe to the Skokie River.
|
006-62G18
|
Active
|
09/19/2024
|
3 / 3 |
2 |
1
|
1
|
Cook
|
|
(3.11-Mile) Standard Overlay, ADA improvements, traffic signal modernization, shoulder widening, roadway pavement marking. The project is in the cities of Des Plaines and Park Ridge, Cook County.
|
007-62G63
|
Active
|
09/19/2024
|
2 / 2 |
|
1
|
1
|
DuPage
|
|
(6.63-Mile) Standard and Designed Overlay, ADA Improvements, Patching, Signal Modifications, Landscape Medians. Project is located on IL-38 (Roosevelt Rd) from East of Technology Blvd to Pierce Ave. in the Cities of West Chicago, Wheaton and the Village of Winfield in Cook County.
|
008-62P92
|
Active
|
09/19/2024
|
|
1 |
1
|
1
|
Cook
|
|
This project consists of curb ramps (ADA) improvements consists of sidewalk removal, combination concrete curb and gutter removal and replacement, concrete sidewalk and detectable warnings, drainage structure adjustments, pavement markings on Various Routes, at Various Locations in North Cook County in the Villages of Elk Grove, Mount Prospect, Wheeling, Arlington Heights, and the City of Prospect Heights in Cook County.
|
009-62P94
|
Active
|
09/19/2024
|
2 / 1 |
1 |
1
|
1
|
Cook
|
|
This is an ADA curb ramp installation project consists of sidewalk removal, combination concrete curb and gutter removal and replacement, concrete sidewalk and detectable warnings, accessible pedestrian signals and roadway signs, drainage structure adjustments, pavement markings. Located along various State routes in the City of Evanston and the Villages of Glencoe, Kenilworth, and Wilmette in Cook County.
|
010-62P98
|
Active
|
09/19/2024
|
1 / 1 |
2 |
1
|
1
|
Cook
|
|
ADA Improvements: Removal and replacement of sidewalk, curb and gutter, minor traffic signal (APS) improvements. Located in southeast Leyden Township within the City of Northlake and the Villages of Franklin Park, Melrose Park and Schiller Park.
|
011-62R00
|
Active
|
09/19/2024
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
The project consists of hot-mix asphalt surface removal and resurfacing, pavement patching, concrete curb and gutter removal and replacement, ADA pedestrian ramp improvements, detector loop replacement and pavement marking. Improvements at various locations on IL 58 (Golf Rd.), Rand Rd., US 12 / 45 (Lee St. / Graceland Ave. / Mannheim Rd.) and Touhy Ave. in the city of Des Plaines.
|
012-62R21
|
Active
|
09/19/2024
|
|
1 |
1
|
1
|
Will
|
|
The proposed scope of work consists of the building demolition at various locations. Each building removal will include removing any structure above and below the ground, including the main building frames, attached and detached buildings, and facilities. It will also include the removal of fences, sidewalks and driveways, utilities, and trees within the parcels- limits. The project is in the City of Joliet in Will County.
|
013-62T04
|
Withdrawn
|
11/07/2024
|
|
1 |
1
|
1
|
Will
|
|
The proposed improvement consists of bridge deck overlay, reconstruction of abutment deck joint, approach slab repairs and substructure repairs of the bridge located on La Grange Road/US 45 at Hickory Creek in Will County. Gross length: 4854 Ft (0.919 Mi), Net length: 1327 Ft (0.252 Mi).
|
014-62T10
|
Active
|
09/19/2024
|
1 / 1 |
|
1
|
1
|
DuPage
|
|
(5.78-Mile) SMART Overlay and ADA Improvements: HMA surface removal and replacement, Class D patches, detector loops replacement, pavement markings, sidewalk and curb removal and replacement, drainage structures adjustments, minor traffic signal (APS) improvements. Located along IL 59 (Neltnor Boulevard ) from South of Heritage Woods Drive to North of Batavia Road within the City of West Chicago and the Village of Warrenville.
|
015-62T17
|
Withdrawn
|
11/07/2024
|
3 / 3 |
1 |
1
|
1
|
DuPage
|
|
(760-Ft) Bridge Deck Overlay, Bridge Joint Replacement / Repair at IL 38 (Roosevelt Rd) at IL 53. This project is located in the Village of Glen Ellyn in DuPage County.
|
016-62T30
|
Withdrawn
|
11/07/2024
|
1 / 1 |
1 |
1
|
1
|
DuPage
|
|
(307-Ft) Bridge preservation project: Deck overlay, Joints replacement/repair. Located on IL 53 / Rohlwing Road, at Canadian National (CN) Railroad (approximately 0.1-miles South of Fullerton Avenue) in the Village of Addison.
|
017-62W03
|
Active
|
09/19/2024
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
Parking Improvement, work includes existing HMA removal, installation of aggregate base, installation of new HMA surface course and minor collateral and incidental work. Location: Located at the District Bridge Maintenance Yard (1101 Biesterfield Rd), Elk Grove Village, in Cook County.
|
018-62W05
|
Active
|
09/19/2024
|
1 / 1 |
1 |
1
|
1
|
Kane
|
|
This is a maintenance yard improvement project for the IDOT Sign Shop Yard. The project includes pavement removal, placement of subbase material, HMA HMA binder course, HMA surface course, portland cement concrete, thermoplastic pavement markings, drainage structure repairs, and other incidental. The project is located at 595 S. Street, Elgin in Kane County.
|
019-62W30
|
Active
|
09/19/2024
|
12 / 11 |
2 |
1
|
1
|
Cook
|
|
Improvements on this project include full superstructure replacement with galvanized steel beams and semi-integral abutment conversions of Structure No. (SN) 016-1018 carrying Euclid Avenue over IL 53. This project begins at a point on the centerline of FAU 1292 (Euclid Avenue) east of Hicks Road and extends west of Rohlwing Road.
|
020-62X00
|
Withdrawn
|
11/01/2024
|
2 / 2 |
1 |
1
|
1
|
Lake
|
|
The proposed project scope of work consists of advanced tree removal as well as all incidental and collateral work necessary to complete the project as shown on the plans. This project is in the City of Highland Park in Lake County.
|
021-62X03
|
Active
|
09/19/2024
|
|
1 |
1
|
1
|
Cook
|
|
Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any other rubbish. This work is located on I-190; I-90/94 expressways from W. of US 12/45 Mannheim Road to Congress Parkway in Cook County.
|
022-62X04
|
Active
|
09/19/2024
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any other rubbish. This work is located on I-290/IL 110 (Eisenhower) expressway from Austin Blvd. to Wells Street in Cook County.
|
023-62X05
|
Active
|
09/19/2024
|
|
1 |
1
|
1
|
Cook
|
|
Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any other rubbish. This work is located on I-90/94 (Dan Ryan Expwy) expressway from Congress Pkwy to I-57 / I-94 (Bishop Ford Expwy) in Cook County.
|
024-62X06
|
Active
|
09/19/2024
|
|
1 |
1
|
1
|
Cook
|
|
Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any other rubbish. This work is located on I-55 - Stevenson expressway from Lake Shore Dr. to IL 43 (Harlem Ave) in Cook County.
|
025-62X08
|
Active
|
09/19/2024
|
4 / 4 |
1 |
1
|
1
|
Kane
|
|
Demolition and removal of two single-family residences, and site clean-up at a commercial property. All three locations are in Sugar Grove.
|
026-62X13
|
Active
|
09/19/2024
|
|
1 |
1
|
1
|
Kane
|
|
(214-Ft) Retaining wall repair. Work includes replacement of cast-in-place segment, replacement of curb and gutter, sidewalk, adjustment of drainage parkway/ landscaped areas restoration. Located on IL 25, North of IL 64 (at 404 North 5th Avenue) within the City of St. Charles, in Kane County.
|
027-62X14
|
Active
|
09/19/2024
|
1 / 1 |
1 |
1
|
1
|
McHenry
|
|
The proposed project scope of work consists of advanced tree removal, selective clearing, as well as all incidental and collateral work necessary to complete the project as shown on the plans. This project is in the City of Crystal Lake, City of McHenry, Village of Prairie Grove and Nunda Township in McHenry County.
|
028-62X19
|
Active
|
09/19/2024
|
|
1 |
1
|
1
|
Cook
|
|
This improvement consists of Bridge Painting of the structures (Foster Ave over North Branch Chicago River SN: 016-0249, Foster Ave over North Branch Chicago River SN: 016-0250, Foster Ave over North Shore Channel SN: 016-0251, and Pulaski Rd over North Branch Chicago River SN: 016-2612) all structures are located at City of Chicago. The project length is 0.1 miles.
|
029-62X23
|
Active
|
09/19/2024
|
|
1 |
1
|
1
|
Various
|
|
The work to be completed under this contract consists of installing signs at new locations and repairing existing damaged signs on a work order basis throughout District 1.
|
030-64C24
|
Withdrawn
|
10/18/2024
|
1 / 1 |
|
2
|
2
|
Winnebago
|
|
Reconstruction of I-39 from 0.3 miles north of Mulford Rd to 0.2 miles north of Harrison Avenue.This includes the removal of 6 bridges, installation of 6 new bridges, installation of Cherry Valley Path Tunnel, removal and replacement of the Madigan Creek Culvert, installation of noisewalls along Ramp AD and I-39, and removal and replacement of an existing noisewall along Ramp DB. 2.087 miles.
|
031-64N05
|
Withdrawn
|
11/07/2024
|
2 / 2 |
|
2
|
2
|
Henry
|
|
5.795 miles of pavement patching, HMA resurfacing, HMA surface removal, the removal and replacement of concrete bridge decks for SNs 037-0023 and 037-0024 over Cleveland Road, deck replacements and deck repairs for SN-s 037-0021 and 037-0022 over the Rock River, deck repairs for SN-s 037-0027 and 037-0028 over the Iowa Interstate Railroad, and other necessary work to complete the proposed improvements along I-80 from the Rock River to US 6.
|
032-64P06
|
Active
|
09/19/2024
|
10 / 10 |
2 |
2
|
2
|
Winnebago
|
|
Removal and replacement of SN 101-0100 carrying Springfield Ave over the North Forth of Kent Creek lacated 0.5 mile south of IL 70. 2,011'
|
033-64R26
|
Active
|
09/19/2024
|
2 / 2 |
|
2
|
2
|
Jo Daviess
|
|
632' of bridge deck patching on SN 043-0043, carrying US 20/IL 84 over Galena River and ICG RR in Galena.
|
034-64T36
|
Active
|
09/19/2024
|
|
|
2
|
2
|
Carroll, Rock Island, Whiteside
|
|
Bridge washing of 3 structures over the Mississippi River in various counties.
|
035-64T37
|
Active
|
09/19/2024
|
|
|
2
|
2
|
Rock Island
|
|
Bridge washing of SN 081-0011 carrying I-80 over the Mississippi River in Rock Island County.
|
036-64T38
|
Active
|
09/19/2024
|
|
|
2
|
2
|
Rock Island
|
|
Bridge washing of SN 081-0106 carrying I-280 over the Mississippi River in Rock Island County.
|
037-64U04
|
Active
|
09/19/2024
|
|
|
2
|
2
|
Whiteside
|
|
Tree removal over BN RR 0.5 mi S of US 30.
|
038-64U05
|
Active
|
09/19/2024
|
1 / 1 |
|
2
|
2
|
Jo Daviess
|
|
4.07 miles of tree removal on US 20 from 0.2 miles west of Logemann Rd to Rush St in Stockton.
|
039-64U06
|
Active
|
09/19/2024
|
|
|
2
|
2
|
Stephenson
|
|
10,607' of tree removal in advance of the reconstruction of US Route 20 and IL Route 73 south of Lena.
|
040-66L79
|
Active
|
09/19/2024
|
1 / 0 |
1 |
2
|
3
|
Livingston
|
|
Bridge replacement of SN 053-0062 on IL 116 over Scattering Point Creek east of Flanagan. 600'
|
041-66P32
|
Active
|
09/19/2024
|
3 / 3 |
|
2
|
3
|
Iroquois
|
|
Bridge repairs to SN 038-0187 carrying US 24 over a tributary of Prairie Creek 3.74 miles west of I-57.
|
042-66P35
|
Active
|
09/19/2024
|
|
|
2
|
3
|
DeKalb
|
|
Slope wall removal and replacement, erosion repairs to SN 019-0005 carrying IL 23 over Chicago, Central and Pacific Railroad.
|
043-66P61
|
Active
|
09/19/2024
|
|
|
2
|
3
|
Bureau
|
|
Removing deteriorated wingwalls and partial barrel removal, clearing and grubbing adjacent slopes and installation of gabion baskets and slope mattress at SN 006-2543_carrying IL 29 over a stream 0.8 miles west of the US 6 and IL 89 intersection.
|
044-68801
|
Active
|
09/19/2024
|
2 / 2 |
|
3
|
4
|
Mercer
|
|
Bridge replacement on US 67 over North Henderson Creek, south of Viola, in Mercer County. 1,525'
|
045-68989
|
Active
|
09/19/2024
|
2 / 2 |
|
3
|
4
|
Henderson
|
|
Bridge removal and replacement on Carman Rd over Dugout Creek in Lomax, in Henderson County. 470'
|
046-68J34
|
Active
|
09/19/2024
|
1 / 1 |
|
3
|
4
|
Various
|
|
Cleaning and painting the structural steel of six bridges in District 4.
|
047-68J49
|
Active
|
09/19/2024
|
1 / 1 |
1 |
3
|
4
|
Various
|
|
Cleaning and painting the structural steel of six_bridges in District 4.
|
048-70629
|
Active
|
09/19/2024
|
4 / 4 |
|
3
|
5
|
Piatt
|
|
270' bridge replacement at White Heath Rd (overhead) 4.3 mi west of the Champaign County Line.
|
049-70D76
|
Withdrawn
|
11/07/2024
|
2 / 2 |
|
3
|
5
|
Champaign
|
|
287' bridge repairs and bridge deck overlay at Saline Branch 0.8 mi west of US 45 and US 45 N of Urbana. SN's 010-0022 and 010-0023.
|
050-70E63
|
Withdrawn
|
11/07/2024
|
2 / 2 |
1 |
3
|
5
|
Vermilion
|
|
Bridge deck overlay and other repairs to SN 092-0177. About 875'.
|
051-70G13
|
Active
|
09/19/2024
|
|
|
3
|
5
|
Douglas, Vermilion
|
|
Bridge Painting of 13 Structure locations on various routes in Douglas and Vermilion Counties.
|
052-70H01
|
Withdrawn
|
11/07/2024
|
1 / 1 |
|
3
|
5
|
Douglas
|
|
113.2' bridge repairs and overlay at Scattering Fork River 1.5 mi south of US 36.
|
053-72122
|
Withdrawn
|
11/07/2024
|
1 / 1 |
|
4
|
6
|
Sangamon
|
|
1.7 miles of reconstruction, milling and resurfacing, ADA improvements and accessible pedestrian traffic signals on Dirksen Parkway in Springfield, from 0.1 miles south of Peoria Road to north of Northfield Drive.
|
054-72426
|
Withdrawn
|
11/07/2024
|
2 / 2 |
|
4
|
6
|
Christian
|
|
Intersection reconstruction on US 51 at Leafland Street (CH 6) in Assumption.
|
055-72516
|
Active
|
09/19/2024
|
|
|
4
|
6
|
Logan
|
|
Patching on I-55 from the Sangamon County line to the McLean County line.
|
056-72648
|
Active
|
09/19/2024
|
|
|
4
|
6
|
Logan
|
|
Bridge painting on SN 054-0038 carrying CH 10 over I-55 at the Elkhart Interchange, and on SN 054-0063 and 054-0064 carrying I-55 over the Kickapoo Creek north of Lawndale.
|
057-72649
|
Active
|
09/19/2024
|
|
|
4
|
6
|
Pike
|
|
Bridge painting on SN 075-0080 carrying US 54 over The Sny, 0.9 miles south of IL 96.
|
058-72715
|
Deleted
|
10/01/2024
|
|
|
4
|
6
|
Sangamon
|
|
Substructure repairs on SN 084-0073 and 084-0178 carrying Dirksen Parkway over NSRR and ICRR in Springfield.
|
059-72729
|
Deleted
|
10/01/2024
|
|
|
4
|
6
|
Sangamon
|
|
Bridge painting on SN 084-0127 and 084-0128 carrying I-72 over NSRR, 1.2 miles east of Wabash Avenue in Springfield.
|
060-72732
|
Deleted
|
10/01/2024
|
|
|
4
|
6
|
Morgan
|
|
Deck patching on 4 bridges carrying US 67 over IL 104 ramps and NSRR northwest of Jacksonville. (SN 069-0073, 0074, 0075, 0076)
|
061-72745
|
Active
|
09/19/2024
|
|
|
4
|
6
|
Morgan
|
|
Bridge patching and joint repairs on SN 069-0024 carrying IL 267 over TR 182A and KCS Railroad and on SN 069-0025 carrying IL 267 over KCS Railroad, south of Old US 67.
|
062-72913
|
Deleted
|
10/01/2024
|
|
|
4
|
6
|
Morgan
|
|
Riprap installation for erosion control at SN 069-0019 carrying IL 104 over the NSRR, 0.5 miles south of IL 78 in Jacksonville.
|
063-72A59
|
Active
|
09/19/2024
|
2 / 2 |
1 |
4
|
6
|
Montgomery
|
|
Deck replacement and widening of SN 068-0035 carrying Virden Avenue over I-55, 1.6 miles south of the Sangamon County line, and 068-0036 carrying North 33rd Avenue over I-55, 3 miles south of the Sangamon County line.
|
064-72M81
|
Withdrawn
|
11/07/2024
|
1 / 1 |
|
4
|
6
|
Sangamon
|
|
Pavement patching, resurfacing, HMA shoulders, aggregate shoulders, grading and shaping ditches, rumble strips, and bridge repairs to SN 084-0111 on I-55 from 0.7 miles south of IL 104 to 0.5 miles north of Horse Farm Road/Old Route 66 at the Glenarm Interchange and on Horse Farm Road/Old Route 66 from 0.4 miles west to 1 mile east of I-55.
|
065-74164
|
Withdrawn
|
10/11/2024
|
|
|
4
|
7
|
Lawrence
|
|
Structure replacement of 051-0004 carrying IL 1 over the Embarras River Overflow, approximately 1 mile north of US 50 and SN 051-0005 carrying IL 1 over the Embarras River Overflow, approximately 0.5 miles north of US 50.
|
066-74B41
|
Withdrawn
|
11/07/2024
|
|
|
4
|
7
|
Cumberland
|
|
0.08 mile of bridge deck overlay, bridge joint replace/repair, bridge approach roadway, and bridge deck repairs at Cottonwood Creek, 0.1 mile east of CR 1125E (overhead).
|
067-74D00
|
Active
|
09/19/2024
|
|
|
4
|
7
|
Various
|
|
Installation of truck parking information management systems (TPIMS) by installing conduit, camera poles, high-definition CCTV cameras and CAT 5 ethernet cable at various rest areas: I-72 at the Pride of the Prairie rest areas in Macon County, I-57 at the Green Creek rest areas in Effingham County, I-70 at the National Trail rest areas in Effingham County and I-70 at the Cumberland Road rest area in Clark County.
|
068-74D01
|
Withdrawn
|
11/06/2024
|
|
|
4
|
7
|
Fayette
|
|
Bridge painting at 4 locations in Fayette County.
|
069-74D02
|
Active
|
09/19/2024
|
|
|
4
|
7
|
Various
|
|
Bridge painting at nine locations in Fayette and Effingham Counties.
|
070-74D24
|
Active
|
09/19/2024
|
1 / 1 |
|
4
|
7
|
Various
|
|
Line existing corrugated metal pipes under slope walls of eight overhead bridges along I-57 with polyethylene solid wall smooth interior pipe at various locations in various counties.
|
071-74D25
|
Active
|
09/19/2024
|
1 / 1 |
|
4
|
7
|
Various
|
|
Line existing corrugated metal pipes under slope walls of eight overhead bridges along I-70 with polyethylene solid wall smooth interior pipe at various locations in various counties.
|
072-74D26
|
Active
|
09/19/2024
|
1 / 1 |
|
4
|
7
|
Clark
|
|
Culvert liner installation at various locations on I-70.
|
073-76F84
|
Withdrawn
|
10/10/2024
|
|
|
5
|
8
|
Madison
|
|
Intersection reconstruction on IL 3 at Delmar Lane and at Pierce Lane, both in Godfrey.
|
074-76K02
|
Deleted
|
10/03/2024
|
|
|
5
|
8
|
St. Clair
|
|
Bridge repair, approach roadway and painting on SN 082-0017 carrying I-55/70 over the CSX, KCS, NS, and TRRA Railroads and two private access roads, just east of the I-55/64/70 Tri-Level Interchange near the City of East St. Louis.
|
075-76M49
|
Active
|
09/19/2024
|
1 / 1 |
|
5
|
8
|
St. Clair
|
|
Culvert replacement on Old US 50 at West Tributary East Branch of Silver Creek, east of Summerfield Road in Summerfiled (SN 082-2516).
|
076-76N47
|
Active
|
09/19/2024
|
2 / 2 |
|
5
|
8
|
Clinton
|
|
Turn lane widening, resurfacing and culvert replacement and extensions on IL 160 at Wesclin Road, approximately 1.75 miles north of New Baden.
|
077-76P16
|
Deleted
|
10/03/2024
|
|
|
5
|
8
|
Jersey
|
|
Widening and resurfacing of IL 16 at the Otterville Road/Grafton Lane intersect intersection to provide a dedicated left turn lanes and improved turning radii.
|
078-76R77
|
Active
|
09/19/2024
|
|
|
5
|
8
|
Various
|
|
Bridge deck patching on various structures in various counties of District 8.
|
079-76T56
|
Active
|
09/19/2024
|
|
|
5
|
8
|
St. Clair
|
|
Sign maintenance on I-55/I-64/US 40 from the Mississippi River to east of the I-64 (Tri-Level) Interchange.
|
080-76T75
|
Active
|
09/19/2024
|
|
|
5
|
8
|
Marion
|
|
1 mile of ultra-thin bonded wearing course on US 50 from 0.1 miles east of Selmaville Road to 0.2 miles east of Baldridge Lane and from 0.1 miles west of Weymeyer Avenue to 0.1 miles west of Lackey Street in Salem.
|
081-76T82
|
Active
|
09/19/2024
|
|
|
5
|
8
|
Bond
|
|
Replacement of approach slabs on SN 003-0009 and 003-0010 carrying I-70 over Beaver Creek, 0.2 miles west of IL 127 in Greenville.
|
082-76U07
|
Withdrawn
|
11/07/2024
|
1 / 1 |
1 |
5
|
8
|
Madison
|
|
Bridge joint replacement/repairs and bridge deck overlay on SN 060-0014 and 060-0015 carrying I-55/70 over Beltline Road.
|
083-76U12
|
Active
|
09/19/2024
|
|
|
5
|
8
|
Various
|
|
15.6 miles of litter removal IL 100 from Hoffman Gardens to US 67; US 67 from IL 100 to IL 143; I-270 from Mississippi River to IL 3; I-70 from Mississippi I-70 from Mississippi River to I-55/I-64; I55/64 from Mississippi River to I-70; I-255 from Mississippi River to IL 3.
|
084-76U19
|
Active
|
09/19/2024
|
|
|
5
|
8
|
Madison
|
|
8.25 miles of patching on IL 3 from the McKinley Bridge to 0.3 miles north of I-270.
|
085-76U21
|
Active
|
09/19/2024
|
|
|
5
|
8
|
St. Clair
|
|
4.8 miles of pavement patching on Bond Avenue from 8th Street in East St. Louis to IL 163 in Cahokia Heights.
|
086-76U22
|
Active
|
09/19/2024
|
|
|
5
|
8
|
Monroe, St. Clair
|
|
7.5 miles of pavement patching on I-255/IL 3/US 50 from the Mississippi River to IL 157 in Cahokia Heights.
|
087-78633
|
Withdrawn
|
11/07/2024
|
1 / 1 |
|
5
|
9
|
Williamson
|
|
7.8 miles of resurfacing, HMA shoulders, aggregate shoulders, earthwork, culvert replacement, tree removal, guardrail updates, addition of a right turn lane, and construction of a roundabout on IL 37, south of Marion, from Wildcat Road to IL 148.
|
088-78906
|
Active
|
09/19/2024
|
|
|
5
|
9
|
Williamson
|
|
Modification of a signalized intersection to a roundabout at IL 148 and Old IL 13 in the City of Marion.
|
089-78949
|
Active
|
09/19/2024
|
1 / 1 |
1 |
5
|
9
|
Perry
|
|
Removal and replacement of SN 073-7048 carrying IL 154 over an unnamed creek, 1.5 miles east of IL 150.
|
090-78A16
|
Active
|
09/19/2024
|
|
|
5
|
9
|
Jackson
|
|
Offset left turn lanes and signal modifications to flashing yellow arrows on IL 13 at Williams Street, just east of Murphysboro.
|
091-78A27
|
Withdrawn
|
11/07/2024
|
|
|
5
|
9
|
Perry
|
|
Joint reconstruction with strip seals, base course widening, bridge deck, approach slab and structure repair, deck scarification, microsilica concrete overlay and approach HMA mill and fill on SN 073-0025 carrying IL 127 over Swanwick Creek and SN 073-0026 carrying IL 127 over Swanwick Creek Overflow north of Pinckneyville.
|
092-78A40
|
Active
|
09/19/2024
|
|
|
5
|
9
|
Jefferson
|
|
Resurfacing and ADA sidewalks upgrades on CH 39 (Dix Irving Road) from the I-57 ramps to IL 37 in Dix.
|
093-78A65
|
Withdrawn
|
11/07/2024
|
2 / 2 |
1 |
5
|
9
|
Williamson
|
|
7.8 miles of standard overlay on Crab Orchard Road from the IL 13 West Connector to the IL 13 East Connector.
|
094-78A67
|
Withdrawn
|
11/07/2024
|
1 / 1 |
|
5
|
9
|
Gallatin
|
|
8.8 miles of HMA surface removal, HMA resurfacing, aggregate wedge shoulders, pavement patching and guardrail improvements on IL 13 from IL 1 to the Old Shawneetown Bridge.
|
095-78A70
|
Withdrawn
|
11/07/2024
|
|
|
5
|
9
|
Johnson
|
|
1.1 miles of pavement patching, HMA surface removal and HMA resurfacing on IL 37 from the Williamson County line to 0.2 miles south of I-24.
|
096-78A71
|
Withdrawn
|
11/07/2024
|
|
|
5
|
9
|
Union
|
|
6 miles of overlay on IL 146 from 0.5 miles west of I-57 to the Johnson County line.
|
097-78A73
|
Active
|
09/19/2024
|
|
|
5
|
9
|
Various
|
|
Bridge deck concrete sealing of various structures throughout District 9.
|
098-78A77
|
Active
|
09/19/2024
|
|
|
5
|
9
|
Pulaski
|
|
Repairs on SN 077-0005 and 077-0006 carrying I-57/US 51 over the Cache River, 3.8 miles south of the Union County line.
|
099-78A82
|
Withdrawn
|
11/07/2024
|
|
|
5
|
9
|
Perry
|
|
3 miles of resurfacing on IL 150 from IL 4 to Reeses Hill Road in Culter.
|
100-78A88
|
Active
|
09/19/2024
|
2 / 2 |
|
5
|
9
|
Franklin
|
|
Mowing and application of herbicide to eliminate invasive species and interseeding at the Sugar Camp Creek Wetland Mitigation Site.
|
101-61H32
|
Active
|
09/27/2024
|
1 / 1 |
|
1
|
1
|
Will
|
|
Replace the bridge carrying TR 181 over Jackson Creek, 0.4 mile east of US 52.
|
102-61J87
|
Active
|
09/27/2024
|
46 / 39 |
1 |
1
|
1
|
Lake
|
|
Construction of a grade separation structure to carry the CN/WCL Railroad over US 14; Pavement reconstruction of US 14, construction of a pump station, relocation of the Flint Creek Tributary, box culvert construction, retaining and noise walls, watermain, sanitary sewer, traffic signals and roadway lighting between IL 59 and Valencia Avenue in Barrington.
|
103-61J90
|
Active
|
09/27/2024
|
2 / 2 |
1 |
1
|
1
|
Cook
|
|
Pavement widening, resurfacing and traffic signal improvements on Irving Park Road at Old River Road in Schiller Park.
|
104-61K21
|
Active
|
09/27/2024
|
4 / 4 |
2 |
1
|
1
|
Cook
|
|
Replace existing culverts with two three-side precast concrete structures with HMA resurfacing, patching, curb and gutter, sidewalks, ADA improvements, and storm sewers on Wellington Avenue and Leicester Road over Lake Cosman in Elk Grove Village.
|
105-61K48
|
Active
|
09/27/2024
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
Full Depth HMA pavement with aggregate subgrade improvement, median construction, driveways, curb and gutter, sidewalks, ADA Ramps, drainage improvements, and traffic signal installation on 187th Streeyt from Science Road to Pleasant Drive in Glenwood.
|
106-61K54
|
Active
|
09/27/2024
|
2 / 1 |
|
1
|
1
|
Cook
|
|
Constrution of a shared-use path from the north side of Irvign Park Road to Lawrence Avenue in the City of Chicago and Schiller Park.
|
107-61K56
|
Active
|
09/27/2024
|
|
|
1
|
1
|
Cook
|
|
Resurface Burlington Avenue from Central Avenue to Wolf Rd. in Western Springs.
|
108-61K58
|
Active
|
09/27/2024
|
|
|
1
|
1
|
Cook
|
|
Sidewalk construction on McDermott Drive from Wolf Road to the end of St. Charles road and on Morris Avenue from McDermott Dr. to St. Charles Rd. in Berkeley.
|
109-61K59
|
Active
|
09/27/2024
|
|
|
1
|
1
|
Cook
|
|
Sidewalk construction at various locations in Berkeley.
|
110-61K64
|
Active
|
09/27/2024
|
|
|
1
|
1
|
Kane
|
|
HMA resurfacing, concrete curb and gutter, storm sewer, and erosion control on Indian Trail from Highland Avenue to IL 31 in Aurora.
|
111-61K65
|
Active
|
09/27/2024
|
1 / 1 |
|
1
|
1
|
DuPage
|
|
Resurface Liberty Street from Eola Road to Commons Drive in Aurora.
|
112-61K66
|
Active
|
09/27/2024
|
|
|
1
|
1
|
Kane
|
|
Resurface Ashland Avenue from IL 25 to Union Street in Aurora.
|
113-61K67
|
Active
|
09/27/2024
|
|
|
1
|
1
|
Kane
|
|
Resurface Prairie Street from the west city limits to Randall Road in Aurora.
|
114-61K69
|
Active
|
09/27/2024
|
|
|
1
|
1
|
Cook
|
|
HMA resurfacing, patching, curb and gutter, sidewalks, ADA improvements, pavement striping, parkway restoration, on 46th Street from Harlem Avenue to Oak Park Avenue in Forest View.
|
115-61K73
|
Active
|
09/27/2024
|
1 / 0 |
|
1
|
1
|
Kane
|
|
HMA resurfacing, patching, pavement markings, sidewalks, ADA improvements, at various locations in Elgin.
|
116-61K74
|
Active
|
09/27/2024
|
16 / 14 |
1 |
1
|
1
|
Lake
|
|
HMA reconstruction of Hazel Avenue from Wilmot Road to Waukegan Road in Deerfield. Includes curb and gutter, PCC Sidewalk, ADA improvements, bridge deck sealing and landscaping.
|
117-61K75
|
Active
|
09/27/2024
|
|
|
1
|
1
|
DuPage
|
|
Resurface Schick Road from the west corporate limits to County Farm Road in Hanover Park.
|
118-61K76
|
Active
|
09/27/2024
|
4 / 2 |
|
1
|
1
|
McHenry
|
|
Replace the bridge carrying Flat Iron Road over Mokeler Creek, 0.4 mile south of IL 173.
|
119-61K80
|
Active
|
09/27/2024
|
2 / 2 |
|
1
|
1
|
McHenry
|
|
Construct a single-span PPC IL-Beam structure with concrete deck to carry White Oaks Road over West Branch of Piscasaw Creek. Includes full-depth HMA resurfacing, pavement markings and storm sewer.
|
120-61K83
|
Active
|
09/27/2024
|
5 / 5 |
2 |
1
|
1
|
Cook
|
|
Reconstruct Salem Drive from Schaumburg road to Weathersfield Way in Schaumburg.
|
121-68D84
|
Active
|
09/27/2024
|
14 / 10 |
2 |
3
|
4
|
Peoria
|
|
Bridge replacements to SN 072-0259 (EB) and SN 072-0258 (WB) carrying Interstate 74 (I-74) over County Highway 69 (CH 69) in Peoria County.
|
122-70991
|
Withdrawn
|
10/31/2024
|
|
|
3
|
5
|
Champaign
|
|
3.038 miles of standard overlay with ADA improvements and traffic signal modernization from Springfield Ave in Champaign to Curtis Rd in Savoy.
|
123-85743
|
Active
|
09/27/2024
|
4 / 4 |
1 |
2
|
2
|
Whiteside
|
|
Pavement reconstruction, construction of a shared-use path, retaining wall and pedestrian truss superstructure on East 2nd Street from IL 40 Broadway Ave. and on Broadway to IL 2 in Sterling.
|
124-85766
|
Active
|
09/27/2024
|
3 / 3 |
|
2
|
2
|
Jo Daviess
|
|
Cold-in-Place recycling and resurfacing on Scout Camp Road from Stagecoach Trail to 0.2 mile east of Townsend Road.
|
125-87868
|
Active
|
09/27/2024
|
|
1 |
2
|
3
|
Kendall
|
|
Replace the bridge carrying Minkler Road over Morgan Creek, 1.7 miles south of IL 71 in Oswego.
|
126-87869
|
Active
|
09/27/2024
|
|
|
2
|
3
|
Kendall
|
|
HMA Resurfacing, pavement patching, PCC sidewalk, curb and gutter, drainage improvements, pavement markings, and signage on East Van Emmon Street from IL 47 to the Yorkville City Limit.
|
127-87870
|
Active
|
09/27/2024
|
|
|
2
|
3
|
Grundy
|
|
Sidewalk improvements along Mitchell, Main, and Railroad Streets in Braceville.
|
128-91599
|
Active
|
09/27/2024
|
2 / 2 |
|
3
|
5
|
McLean
|
|
HMA Resurfacing, Traffic Signal Improvements, Curb and Gutter, Storm Sewer, Sidewalks, Multi-Use Path, ADA Ramps, and Watermains on Hamilton Road from Commerce Parkway to US 150 in Bloomington.
|
129-91630
|
Active
|
09/27/2024
|
|
|
3
|
5
|
Edgar
|
|
Replace PCC Sidewalk at Carolyn Wenz Elementary School, Paris Mayo Middle School, and Allen Memorial Field in Paris. Work includes Concrete Curb replacement, HMA removal, ADA Improvements, drainage improvements and seeding.
|
130-93671
|
Withdrawn
|
11/07/2024
|
7 / 7 |
|
4
|
6
|
Sangamon
|
|
Construction of two structures: Iron Bridge Road over the Union Pacific Railroad, and the Union Pacific Railroad over Woodside Road. Work includes; pedestrian truss bridge over Woodside Road, reconstruction of the signalized intersection of Iron Bridge and Woodside, and the relocation of the Interurban Trail.
|
131-95966
|
Active
|
09/27/2024
|
1 / 0 |
|
4
|
7
|
Wabash
|
|
Replace the bridge carrying E 440 Road over a tributary to Bonpas Creek, 2 miles northeast of Cowling.
|
132-97372
|
Active
|
09/27/2024
|
1 / 1 |
|
5
|
8
|
St. Clair
|
|
Roadway extension of Frank Scott Parkway East from Cross Street to IL 158.
|
133-97793
|
Active
|
09/27/2024
|
1 / 1 |
1 |
5
|
8
|
Madison
|
|
Reconstruction of the IL 159/Glen Carbon Road Intersection in Glen Carbon to establish northbound and eastbound right turn lanes.
|
134-97840
|
Withdrawn
|
10/24/2024
|
|
|
5
|
8
|
Madison
|
|
HMA resurfacing, Pavement Patching, sidewalks, curb and gutter, and pavement markings on Wood River Avenue from Ferguson Avenue to the north city limits of Wood River.
|
135-97845
|
Active
|
09/27/2024
|
|
|
5
|
8
|
Madison
|
|
Resurface Milton Road from Worden Avenue to Edgewood Avenue in Alton.
|
136-97846
|
Active
|
09/27/2024
|
2 / 2 |
1 |
5
|
8
|
Madison
|
|
Replace bridge superstructure (PPC Deck Beams with composite deck) on Center Grove Road over the Nickel Plate Trail in Edwardsville. Work includes; concrete pier repair, PCC Pavement patching, guardrail replacement and pavement markings.
|
137-99736
|
Active
|
10/01/2024
|
1 / 1 |
|
5
|
9
|
Williamson
|
|
Guardrail replacement, pavement markings and signage, and LED Stop Signs at the intersection of Creal Springs Road and Borton Street in Creal Springs.
|
138-64P26
|
Active
|
09/27/2024
|
1 / 1 |
1 |
2
|
2
|
Jo Daviess
|
|
1.5 miles of Reconstruction/HSIP Safety Funds_on US 20 (EB): 0.1 mile West to Frentress Lake Road and 0.2 mile West_to 0.6 mile East of Barge Terminal Rd and US 20 (WB): 0.4 mile to 0.1 mile East of Barge Terminal Rd.
|
139-78798
|
Withdrawn
|
11/07/2024
|
4 / 4 |
|
5
|
9
|
Williamson
|
|
8 miles of earthwork, HMA pavement, HMA resurfacing, drainage and guardrail in order to add a lane in each direction of I-57 from Westminster Drive in Marion to just south of the I-24 interchange.
|
140-87872
|
Active
|
09/27/2024
|
|
|
2
|
3
|
Grundy
|
|
Resurface Ashton Road from US 6 to north of Locust Road in the City of Morris.
|
141-89816
|
Active
|
10/01/2024
|
6 / 6 |
2 |
3
|
4
|
Peoria
|
|
Pavement reconstruction, and the construction of a multi-use path on Maxwell Road from Middle Road to south of Fauber Road.
|
142-62W38
|
Active
|
09/27/2024
|
39 / 37 |
1 |
1
|
1
|
Cook
|
|
(6.41-Mile) Bridge Rehabilitation and Roadway Improvement along IL 53 in Cook County.
|
143-62W00
|
Withdrawn
|
10/10/2024
|
|
|
1
|
1
|
Lake
|
|
Parking Lot improvement project for IDOT, District 1 Gurnee Maintenance Yard. Work consists of full depth removal of existing HMA pavement and replacement, PCC pavement replacement/ patching, drainage improvements. Location of work: Gurnee Maintenance Yard (3516 W Washington St) within the Village of Gurnee, in Lake County. , Parking Lot improvement project for IDOT, District 1 Gurnee Maintenance Yard. Work consists of full depth removal of existing HMA pavement and replacement, PCC pavement replacement/ patching, drainage improvements. Location of Work: Gurnee Maintenance Yard (3516 W Washington St) within the Village of Gurnee, in Lake County.
|
144-62W28
|
Active
|
10/03/2024
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
This improvement consists of the graffiti cleaning on I-290 between Mannheim (US 45) and Wells Street.
|
145-76T43
|
Active
|
10/04/2024
|
|
|
5
|
8
|
Greene
|
|
Electrical repairs at the Joe Page Bridge in Hardin.
|
01A-MA035
|
Active
|
09/24/2024
|
1 / 1 |
1 |
3
|
4
|
Marshall
|
|
Install Runway End Identifier Lights on Runway 13 End
|
02A-CO072
|
Active
|
09/24/2024
|
1 / 1 |
|
4
|
7
|
Coles
|
|
Reconstruct West Aircraft T-hangar Area Pavements
|
03A-JO028
|
Active
|
09/24/2024
|
|
1 |
1
|
1
|
Will
|
|
Airfield Marking and Maintenance
|
04A-BN020
|
Active
|
09/24/2024
|
2 / 2 |
2 |
5
|
9
|
Franklin
|
|
Replace Runway and Taxiway Lights, Windcone, and REILS
|
05A-AU074
|
Active
|
09/24/2024
|
3 / 3 |
1 |
1
|
1
|
Kane
|
|
Rehabilitate Airfield Lighting Vault and Replace Vault Generator
|
06A-UN064
|
Active
|
09/24/2024
|
1 / 1 |
|
3
|
5
|
Champaign
|
|
Rehabilitate Airport Entrance Road and Employee Automobile Parking Lot
|
07A-UN065
|
Active
|
09/24/2024
|
|
1 |
3
|
5
|
Champaign
|
|
Rehabilitate General Aviation Aprons
|