Home > Notice of Letting > Contract Detail

November 08, 2024 Letting 12:00 PM
100-78A88

Bulletin Description

Mowing and application of herbicide to eliminate invasive species and interseeding at the Sugar Camp Creek Wetland Mitigation Site.
Region District DBE % VBP % Federal Project #
5 9 0.00 0.00 N/A
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Franklin
  • FAP 853
  • IL 14
  • D9 WETLAND MAINTENANCE 2024-1
  • C-99-117-24
  • 9-00957-2500
Contract Specifics
Completion Date: December 31, 2027 Plus 15 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (2 Submitted / 2 Answered ) Questions not accepted as of October 29, 2024 04:30 PM.

  • If phragmites areas are to be removed from the mowing program due to excessive water during the mowing window is the contractor to bill based on actual areas / acres mowed?
    The contractor should bid according to the Standard Specifications for Road and Bridge Construction, Highway Standards, and the plans and specifications available online. (10/29/2024)

  • There are roughly 17.8 acres over approximately 60 separate areas of phragmites scheduled to be mowed between Dec 16 to March 1st in this wetland which will possibly be too wet for any ground mounted machine mowing. Is it expected that all areas are to be mowed during this period even if: 1) they are inaccessible by machine? or 2) even foot?
    The contractor should bid according to the Standard Specifications for Road and Bridge Construction, Highway Standards, and the plans and specifications available online. (10/29/2024)

Authorized Bidders

  • 3752 Mayer Landscaping, Inc.
    3620 High Prairie School Road
    Belleville, IL 62220
    Phone: No Record Fax: No Record Email: No Record
    $555,882.50 is not within a reasonable approximation of the Estimate

  • 0463 Big Creek Excavating, Inc.
    18110 Co. Rd.300E
    Dahlgren, IL 62828
    Phone: (618) 736-2822 Fax: (618) 736-2824 Email: sandra@bigcreekexcavating.com

  • 0737 CSD Environmental Services, Inc.
    2220 Yale Blvd
    Springfield, IL 62703
    Phone: (217) 522-4085 Fax: (217) 522-4087 Email: frank@csdenviro.com

  • 2262 Guinzy Construction,Inc.
    160 West Main St.
    Ashley, IL 62808
    P.O. Box 360
    Ashley, IL 62808
    Phone: (618) 485-2293 Fax: (618) 485-2552 Email: gcil@frontiernet.net
    $698,968.39

  • 5417 Semper Fi Yard Service, Inc. d/b/a Semper Fi Land Service, Inc.
    1275 Golfview st
    Aurora, IL 60506
    Phone: (630) 518-8484 Fax: (630) 882-9973 Email: robert@semperfi.land

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
25000750 ACRE MOWING Base items 69.500
67100100 L SUM MOBILIZATION Base items 1.000
K0012950 ACRE HERBICIDE SPRAYING Base items 23.400
K0029632 GALLON WEED CONTROL, NON-SELECTIVE AND NON-RESIDUAL Base items 63.600
X2503318 ACRE INTERSEEDING, CLASS 4B (MODIFIED) Base items 69.500
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.