Region | District | DBE % | VBP % | Federal Project # |
---|---|---|---|---|
2 | 3 | 0.00 | 0.00 | HSIPWA9K(538) |
County(s) | Key Route(s) | Marked Route(s) | Section(s) | State Job #(s) | PPS #(s) |
---|---|---|---|---|---|
|
|
|
|
|
|
Contract Specifics |
---|
15 Working Days |
No More Contract Specifics |
Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
---|---|---|---|---|---|---|---|
20100210 | UNIT | TREE REMOVAL (OVER 15 UNITS DIAMETER) | Base items | 30.000 | |||
67100100 | L SUM | MOBILIZATION | Base items | 1.000 | |||
70100460 | L SUM | TRAFFIC CONTROL AND PROTECTION, STANDARD 701306 | Base items | 1.000 | |||
80500300 | EACH | SERVICE INSTALLATION, TYPE C | Base items | 1.000 | |||
81028200 | FOOT | UNDERGROUND CONDUIT, GALVANIZED STEEL, 2" DIA. | Base items | 301.000 | |||
81028350 | FOOT | UNDERGROUND CONDUIT, PVC, 2" DIA. | Base items | 1,352.000 | |||
81100500 | FOOT | CONDUIT ATTACHED TO STRUCTURE, 1 1/2" DIA., GALVANIZED STEEL | Base items | 63.000 | |||
81400700 | EACH | HANDHOLE, PORTLAND CEMENT CONCRETE | Base items | 7.000 | |||
85800100 | EACH | FLASHER CONTROLLER | Base items | 1.000 | |||
87301215 | FOOT | ELECTRIC CABLE IN CONDUIT, SIGNAL NO. 14 2C | Base items | 2,049.000 | |||
87301805 | FOOT | ELECTRIC CABLE IN CONDUIT, SERVICE, NO. 6 2 C | Base items | 5.000 | |||
87301900 | FOOT | ELECTRIC CABLE IN CONDUIT, EQUIPMENT GROUNDING CONDUCTOR, NO. 6 1C | Base items | 2,049.000 | |||
88040030 | EACH | SIGNAL HEAD, POLYCARBONATE, LED, 1-FACE, 1-SECTION, POST MOUNTED | Base items | 4.000 | |||
X8302125 | EACH | WOOD POLE, 25 FT, CLASS 4 | Base items | 1.000 | |||
X8620200 | EACH | UNINTERRUPTABLE POWER SUPPLY (SPECIAL) | Base items | 1.000 | |||
Z0030850 | SQ FT | TEMPORARY INFORMATION SIGNING | Base items | 84.000 | |||
No More Pay Items |