001-60R77
|
Executed
|
09/08/2023
|
3 / 3 |
1 |
1
|
1
|
Cook
|
|
(260.2-Ft) Bridge deck overlay, bridge painting, and bridge repair of 1-94 at 111TH ST (overhead) in the city of Chicago, Cook County.
|
01X-72K47
|
Active
|
06/22/2023
|
1 / 1 |
|
4
|
6
|
Cass, Schuyler
|
|
Bridge replacement on US 67 over the Illinois River in Beardstown.
|
002-61H88
|
Executed
|
10/03/2023
|
|
|
1
|
1
|
Cook
|
|
Resurfacing Ridge Road from Torrence Avenue to State Line Road in Lansing.
|
003-61J40
|
Executed
|
09/12/2023
|
|
|
1
|
1
|
DuPage
|
|
HMA Resurfacing with Utility and structure adjustments, curb and gutter, sidewalk improvements, sodding, aggregate shoulders, and pavement markings on Crestwood Boulevard, from Park Right-of-Way to the east corporate limits of Glen Ellyn.
|
004-61J42
|
Executed
|
09/15/2023
|
|
|
1
|
1
|
Cook
|
|
Install push button actuated flashing pedestrian beacons, sidewalk improvements , signage, and pavement markings at Midblock Crossing on Wolf Road in Burr Ridge.
|
005-61J52
|
Executed
|
09/15/2023
|
|
|
1
|
1
|
DuPage
|
|
Construction of a Shared-Use path along Wildwood Avenue and Monterey Avenue to provide connection between the Great Western Trail, the Illinois Prarie Path and Salt Creek Greenway Trail in Villa Park.
|
006-61J64
|
Executed
|
09/12/2023
|
|
|
1
|
1
|
Lake
|
|
HMA Resurfacing with Curb and Gutter, Sidewalk Repair, Drainage Adjustments, and Parkway Restoration algon Glen Flora Avenue from McAree Road to Lewis Avenue, and on Sheridan Road from Greenwood Avenue to Flora Avenue in Waukegan.
|
007-61J66
|
Withdrawn
|
08/04/2023
|
2 / 2 |
|
1
|
1
|
DuPage
|
|
Construction of a Shared-Use Path on 22nd Street from Finley Road to Meyers Road in Lombard.
|
008-61J67
|
Rejected
|
08/24/2023
|
14 / 14 |
1 |
1
|
1
|
Cook
|
|
construcion of a prefabricated steel truss pedestrian bridge over IL 59. Includes an elevated boardwalk and lighting in Streamwood.
|
009-62N36
|
Executed
|
09/15/2023
|
6 / 6 |
1 |
1
|
1
|
Cook
|
|
(9.5-Mile) Smart overlay project on I-57 from Will County Line /Steger Rd. to US 6 / 159th St. located within the Cities of Markham, Oak Forest, County Club Hills and Villages of Matteson and Richton Park in Cook County.
|
010-62P00
|
Executed
|
09/08/2023
|
2 / 2 |
1 |
1
|
1
|
Cook
|
|
(1000-Ft) The proposed improvement consists of bridge superstructure replacement of the structure on 1-57 at Parnell Avenue in the City of Chicago, Cook County.
|
011-62P03
|
Executed
|
09/08/2023
|
|
|
1
|
1
|
DuPage
|
|
(900-Ft) The proposed improvement consists of culvert repair of IL 83 (Kingery Hwy) over drainage ditch, 0.6 miles south of 91st Street in the Village of Burr Ridge in DuPage County.
|
012-62P42
|
Executed
|
09/08/2023
|
|
|
1
|
1
|
Kane
|
|
This project consists of ADA Improvements at Various locations throughout Kane and McHenry counties.
|
013-62R18
|
Executed
|
09/12/2023
|
|
1 |
1
|
1
|
Lake
|
|
(3,068-Ft) Intersection improvement with traffic signal modernization, dual left-turn lanes, pedestrian signals, drainage System, ADA improvements at the intersection IL 120 at O'Plaine Road in the City of Waukegan and Village of Gurnee, Lake County.
|
014-62R59
|
Executed
|
09/05/2023
|
1 / 1 |
|
1
|
1
|
Cook
|
|
Location 1 is located along the I-90 WB to IL 53 NB ramp. Location 2 is located along the I-290 NB to I-90 EB, ramp with scope of work of high-friction surface treatment (HFST). Location 3 is located along I-290 EB near I-88 with scope of work of diamond grooving. This project is located in the City of Rolling Meadows and the Village of Hillside in Cook County with a net length of 4,377 feet.
|
015-62T01
|
Executed
|
09/12/2023
|
1 / 1 |
1 |
1
|
1
|
McHenry
|
|
(457-Ft) Bridge rehabilitation project and scope of work includes deck scarification, latex concrete overlay, joint replacement and approach slab and shoulders repair on IL Route 47 over Nippersink Creek in the City of Woodstock in McHenry County.
|
016-62T05
|
Executed
|
09/12/2023
|
|
|
1
|
1
|
Cook
|
|
(105.5-Ft) Bridge Preservation Project: bridge repair, joint replace/ repair and deck overlay on bridge carrying US 45 (Des Plaines River Rd) over McDonald Creek (North of Enclave Dr). Located in Unincorporated Wheeling Township in Cook County.
|
017-62T35
|
Executed
|
09/08/2023
|
|
1 |
1
|
1
|
Will
|
|
(2.6-mile) SMART Overlay project located on IL 113 (Coal City Rd.) from I-55 to IL 53, located in the Cities of Braidwood and Wilmington in Will County.
|
018-62T39
|
Executed
|
09/26/2023
|
|
1 |
1
|
1
|
Cook
|
|
(188-Ft) Bridge deck overlay, joint replacement/ repair of bridge carrying IL 72 (Higgins Road) over Willow Creek, in the City of Des Plaines and the Village Rosemont in Cook County.
|
019-62T73
|
Executed
|
09/05/2023
|
|
|
1
|
1
|
Cook
|
|
(3,100-Ft) SMART Overlay and ADA improvements, located in the City of Oak Forest, Cook County.
|
020-62T81
|
Executed
|
09/08/2023
|
|
|
1
|
1
|
Lake
|
|
(2.17-Mile) Crack and Joint Sealing project is located on IL. 137, (Greenwood Ave.) It Begins at Genesse St and proceeds NE to Joe Favero Dr through the City of Waukegan, Lake County.
|
021-62T93
|
Executed
|
09/08/2023
|
|
|
1
|
1
|
Cook
|
|
(2818-Ft) This improvement consists of Smart overlay resurfacing on Western Ave from 87th St. to 91st St. in the Village of Evergreen and City of Chicago in Cook County.
|
022-62U08
|
Executed
|
09/05/2023
|
3 / 3 |
1 |
1
|
1
|
Cook
|
|
(1.96 mile) SMART Overlay, ADA and drainage improvement on US 30 (Lincoln Highway) from Hilltop Ave. to Lowe Ave. within the City of Chicago Heights in Cook County.
|
023-62U47
|
Executed
|
09/08/2023
|
|
1 |
1
|
1
|
Cook, Kane
|
|
Trombone Mast Arm replacement in various locations in District 1.
|
024-62U70
|
Active
|
06/22/2023
|
4 / 4 |
|
1
|
1
|
Various
|
|
This contract consists of nighttime sweeping along various expressways in District 1.
|
025-62U93
|
Executed
|
10/27/2023
|
|
|
1
|
1
|
Various
|
|
The work to be completed under this contract consists of repairing high tension cable median barrier systems throughout District 1 on a work order basis.
|
026-62U94
|
Executed
|
09/08/2023
|
|
|
1
|
1
|
Various
|
|
This improvement consists of the repair and installation of fence along various expressway and arterial highways in various counties throughout District One.
|
027-64K08
|
Executed
|
09/05/2023
|
|
|
2
|
2
|
Whiteside
|
|
Reconstruction of IL 78 from 0.1 mile S. of US 30 to 0.1 mile S. of Academic Drive in Morrison.
|
028-66M89
|
Executed
|
09/05/2023
|
2 / 2 |
1 |
2
|
3
|
Iroquois
|
|
This job is located on FAP 317 (US 24) from 0.1 mile east of IL 45 to IL 49 in Crescent City, for a length of 5.87 miles. The work consists of HMA milling and resurfacing, culvert replacement, ditch cleaning, pavement marking, and raised reflectors.
|
029-66N27
|
Executed
|
09/12/2023
|
|
|
2
|
3
|
Iroquois, Kankakee
|
|
This project consists of the installation of a flashing red beacon at each of the stop controlled approaches to the intersection of US 45/52 and W 8000S Rd. It also includes the installation of a flashing yellow beacon at each of the advanced intersection warning signs adjacent to US 45/52.
|
030-66N29
|
Executed
|
09/05/2023
|
|
|
2
|
3
|
Various
|
|
This project consists of the installation, maintenance, and pickup/removal of smart traffic monitoring systems or real-time traffic control systems. The work will be completed on a work order basis for repairs and maintenance activities.
|
031-66N37
|
Executed
|
09/15/2023
|
3 / 3 |
2 |
2
|
3
|
LaSalle
|
|
This project is located at Structure No. 050-2540 carrying IL Route 170 over a stream approximately 3.8 miles north of Ransom. This project consists of the removal and replacement of 6 foot of the structrure slab and sidewalls, guardrail replacement, striping, pavement patching and other related work.
|
032-66N49
|
Executed
|
09/05/2023
|
|
|
2
|
3
|
Livingston
|
|
This project is located on US 24 Beginning at the Intersection of N. 2000 E. Rd and ending at the curb and gutter just east of Tenth Street in Fairbury. This work consists of Class B pavement patching.
|
033-66N51
|
Executed
|
09/05/2023
|
|
|
2
|
3
|
Grundy, Livingston
|
|
This project is located on Interstate Route 55 beginning at M.M. 2.15 (Beginning of concrete section) to M.M. 218.81(Livingston/Grundy County Line) to M.M. 222 end of concrete section in Grundy County. This work consists of Class A pavement Patching, striping and other related work.
|
034-66N55
|
Executed
|
09/08/2023
|
|
|
2
|
3
|
Kankakee
|
|
This project is located on IL Route 17 beginning at the east abutment of SN 046-0027 (+/-1200 feet east of Livingston/Kankakee County Line and ending at S. 2000 W. Rd (Herscher Rd). This work consists of milling and resurfacing a 2 foot wide path along the centerline of roadway and micro-surfacing 4' wide path along the centerline, pavement striping and raised reflective pavement markers.
|
035-68698
|
Executed
|
09/08/2023
|
2 / 2 |
1 |
3
|
4
|
Stark
|
|
Replacement of the structure carrying IL 17/ IL 91 over the Spoon River SN 088-0002 (existing; SN 088-0030 (proposed)Ù, 0.6 miles West of Wyoming in Stark County. The project is 2887 feet (0.55 mile) in length. The project also includes roadway profile adjustments, regrading of sideslopes, and construction of the stream barbs.
|
036-68H72
|
Executed
|
09/08/2023
|
|
|
3
|
4
|
Peoria
|
|
Partial depth HMA patching and longitudinal joint repair.
|
037-70860
|
Executed
|
09/08/2023
|
2 / 2 |
1 |
3
|
5
|
Vermilion
|
|
0.078 Miles of Bridge Replacement and Bridge Deck Overlay at Griffin St. and Stony Creek.
|
038-70G83
|
Executed
|
09/12/2023
|
|
|
3
|
5
|
McLean
|
|
30.7 mi of patching on I-55 0.3 mi SW of Airport Rd to N of Turkey Creek W of Lexington; I-55 0.2 mi S of Six Points Rd to up RR; I-74 Veterans Parkway to 1 mi S of Chestnut St SW of Leroy; I-74 Carlock to I-55 N of Bloomington; I-74 at Carlock weigh station ramps.
|
039-70G84
|
Executed
|
09/08/2023
|
|
|
3
|
5
|
McLean
|
|
1.34 mi of longitudinal joint repair W of Colton Ave to Empire Crossing in Bloomington.
|
040-72711
|
Executed
|
09/08/2023
|
|
|
4
|
6
|
Pike
|
|
Deck patching and expansion joint repairs on SN 075-0047 and SN 075-0048 carrying IL 96 over KCS Railroad and 6 Mile Bay Diversion, southeast of Pleasant Hill.
|
041-72712
|
Executed
|
09/08/2023
|
|
|
4
|
6
|
Pike
|
|
Deck patching and expansion joint repair on SN 075-0155 carrying IL 106 over I-72 at the IL 106 and I-72 interchange, 1.2 miles east of the Missouri state line.
|
042-72713
|
Executed
|
09/05/2023
|
|
|
4
|
6
|
Pike
|
|
Patching on I-72, IL 110 from the Mississippi River to the Sny Slough.
|
043-72714
|
Executed
|
09/05/2023
|
|
|
4
|
6
|
Morgan
|
|
Patching on I-72 from the Scott County line to US 67.
|
044-72B88
|
Withdrawn
|
08/02/2023
|
2 / 2 |
1 |
4
|
6
|
Mason
|
|
1.9 miles of resurfacing, pavement replacement, ADA improvements, drainage improvements, culvert replacements, parking lot improvements, tree removal and storm sewer reconstruction on IL 10, in Mason City, from 0.1 miles east of IL IL 29 to west of Price Street, east of Mason City.
|
045-72F26
|
Withdrawn
|
07/27/2023
|
6 / 6 |
2 |
4
|
6
|
Adams
|
|
Culvert replacement on IL 96 over a ditch, 1 mile north of Kochs Lane, north of Qunicy.
|
046-72H76
|
Executed
|
09/12/2023
|
1 / 1 |
|
4
|
6
|
Cass
|
|
Pipe culvert removal and replacement on IL 125, 0.5 miles west of Newmansville Road.
|
047-62U86
|
Active
|
06/26/2023
|
2 / 2 |
1 |
1
|
1
|
Various
|
|
Upgrading existing pedestrian push buttons to APS push buttons at various D1 ADA compliant intersections.
|
048-72N39
|
Executed
|
09/08/2023
|
|
|
4
|
6
|
Adams
|
|
Installing riprap at SN 001-0008 carrying IL 96 over Rock Creek, 2 miles south of IL 61.
|
049-74B37
|
Withdrawn
|
07/27/2023
|
|
|
4
|
7
|
Wabash
|
|
Washing the bridge deck on SN 093-0021 carrying IL 15 over the Wabash River in Mt. Carmel.
|
050-74B50
|
Rejected
|
08/24/2023
|
|
|
4
|
7
|
Macon
|
|
7.9 miles of longitudinal joint repair on I-72 from US 36 to US 51.
|
051-76L29
|
Executed
|
09/08/2023
|
1 / 1 |
|
5
|
8
|
Marion
|
|
2.7 miles of patching, ultra-thin bonded wearing course and ADA improvements IL 161 from Beech Street to Pleasant Avenue in Centralia.
|
052-76P67
|
Executed
|
09/15/2023
|
|
1 |
5
|
8
|
Madison, St. Clair
|
|
Installation of 2 dynamic message signs on butterfly trusses and fiber optic on northbound I-255 at mile marker 7.6 and southbound I-255 at mile marker 27.1.
|
053-76R47
|
Executed
|
09/12/2023
|
|
|
5
|
8
|
Madison
|
|
Median removal and replacement on US 67 (Landmark Boulevard), near the intersection of Broadway Street, in Alton.
|
054-76R65
|
Executed
|
09/12/2023
|
4 / 4 |
1 |
5
|
8
|
Randolph
|
|
Bridge deck overlay and bridge deck repairs on SN 079-0032 carrying IL 155 over a stream east of Bluff Road in Prairie Du Rocher.
|
055-76R82
|
Executed
|
09/05/2023
|
|
|
5
|
8
|
Greene
|
|
0.09 miles of pavement patching on US 67 from Palm Street to Clay Street in Roodhouse.
|
056-76R98
|
Executed
|
09/08/2023
|
|
|
5
|
8
|
Various
|
|
Weed spraying for Johnson Grass along various interstates throughout District 8.
|
057-76T09
|
Executed
|
09/08/2023
|
|
|
5
|
8
|
Madison
|
|
9.6 miles of patching and resurfacing on IL 4 from 0.37 miles south of I-55 to IL 143.
|
058-78814
|
Rejected
|
08/24/2023
|
10 / 10 |
2 |
5
|
9
|
Franklin
|
|
Conversion of I-57 and IL 149 ramp terminals into roundabouts, pavement pavement reconstruction and bridge modifications in West Frankfort.
|
059-78944
|
Executed
|
09/08/2023
|
|
|
5
|
9
|
Franklin
|
|
0.78 miles of resurfacing on IL 149 from Orient Road to Ken Gray Boulevard in West Frankfort.
|
060-78971
|
Executed
|
09/08/2023
|
3 / 3 |
1 |
5
|
9
|
Hardin
|
|
Joint reconstruction, HMA widening, bridge deck, approach slab and structure repair, epoxy crack injection and waterproofing with HMA overlay on SN 035-0004 carrying IL 34 over Rose Creek, south of Herod and north of Karbers Ridge Road.
|
061-78A01
|
Executed
|
09/12/2023
|
|
|
5
|
9
|
Various
|
|
Repairing or replacing damaged guardrail, barrier terminals, impact attenuators, cable median barrier and fence on a work order basis throughout District 9.
|
062-78A11
|
Executed
|
09/08/2023
|
1 / 1 |
|
5
|
9
|
Jackson
|
|
Installation of median crossovers for the eastbound lanes of IL 13 at SN 039-0075 carrying IL 13 over the Big Muddy River, east of Murphysboro.
|
063-85744
|
Executed
|
09/12/2023
|
6 / 6 |
|
2
|
2
|
Rock Island
|
|
PCC Shared-Use path on 19th Street from Avenue of the Cities to 18th Avenue, and reduction of lanes on 19th street from 7th Avenue to River Drive in Moline.
|
064-87828
|
Executed
|
09/05/2023
|
|
|
2
|
3
|
Iroquois
|
|
Resurfacing CH 47 from Ford County line to IL 54.
|
065-89804
|
Executed
|
09/05/2023
|
9 / 9 |
1 |
3
|
4
|
Tazewell
|
|
Resurfacing and intersection improvements on Court Street from Stadium Drive to Hilltop Drive in Pekin.
|
066-93806
|
Executed
|
09/08/2023
|
2 / 2 |
|
4
|
6
|
Mason
|
|
Installation of Plate Beam Guardrail and Traffic Terminals at various locations along CH 5.
|
067-72300
|
Executed
|
09/08/2023
|
|
|
4
|
6
|
Various
|
|
On-call repair of guardrail and cable median barrier at locations throughout District 6.
|
068-87841
|
Executed
|
09/05/2023
|
1 / 1 |
|
2
|
3
|
DeKalb
|
|
Streetscape improvements along US 30 from South Shabbona Road to Illini Road in Shabbona
|
069-89767
|
Withdrawn
|
08/03/2023
|
8 / 8 |
1 |
3
|
4
|
Peoria
|
|
Conversion of Jefferson Avenue and Adams Street to Two-Way Traffic, from Walnumt Street to Fayette Street in Peoria.
|
070-89829
|
Rejected
|
08/24/2023
|
1 / 1 |
1 |
3
|
4
|
McDonough
|
|
Removal of existing pavement and construction of PCC pavement with curb and gutter, sidewalks, ADA ramps, storm sewer, step replacement and retaining walls from Charles Street to Johnson Street in the City of Macomb.
|
071-89849
|
Executed
|
09/15/2023
|
14 / 11 |
1 |
3
|
4
|
Tazewell
|
|
Re-align and reconstruct Nofsinger Road at the intersection of US 24 in the City of Washington.
|
072-95927
|
Executed
|
09/08/2023
|
1 / 1 |
|
4
|
7
|
Clark
|
|
Curb and Gutter, Sidewalks, ADA Ramps, Storm Sewers, and Street Lights, at various locations in Marshall.
|
073-97805
|
Executed
|
09/15/2023
|
|
1 |
5
|
8
|
Bond
|
|
Sidewalk Construction along various routes in Greenville.
|
074-97810
|
Executed
|
09/08/2023
|
|
1 |
5
|
8
|
Monroe
|
|
HMA Resurfacing with PCC Base Course widening, storm sewers, curb and gutter, and ADA Ramps on Ghent Road from south of Palmer Road to Christina Court in Columbia
|
075-97811
|
Executed
|
09/08/2023
|
|
|
5
|
8
|
Madison
|
|
Construction of a Shared-Use Path along Erwin Plegge Boulevard, from Old Bethalto Road to Ashbrook Street in Bethalto.
|
076-99704
|
Executed
|
09/08/2023
|
|
1 |
5
|
9
|
Williamson
|
Voluntary
|
Pedestrian safety enhancements, lighting, landscaping, and resurfacing around the town square and along portions of Main street in Marion.
|
077-99706
|
Executed
|
09/12/2023
|
1 / 1 |
1 |
5
|
9
|
Gallatin
|
|
Replace the bridge carrying Shawnee - New Haven Road over South Fork Cypress Creek, 3 miles north of IL 13
|
078-46606
|
Deleted
|
06/28/2023
|
|
|
1
|
1
|
Various
|
|
This work shall consists of raised reflective pavement marker removal and replacement and replacement of raised reflective pavement marker reflectors in various counties in District 1.
|
079-62T78
|
Executed
|
09/15/2023
|
|
|
1
|
1
|
Kane
|
|
(2.14-Mile) Crack and Joint Sealing. Location: FAP 341 (IL 72) from 0.1- mile West of Richmond Road to 0.1-mile West of IL 31 in the Villages of Sleepy Hollow and West Dundee in Kane County.
|
080-62U18
|
Executed
|
09/15/2023
|
|
1 |
1
|
1
|
Cook
|
|
This improvement consists of a full bridge painting of span 2 of the structure (016-1110) carrying 1-90/94 over 15th to 16th Streets in the City of Chicago in Cook County.
|
081-66N15
|
Executed
|
09/12/2023
|
|
|
2
|
3
|
Kankakee
|
|
This project is located at the intersection of IL-17 and IL-1 in Kankakee County, to replace two traffic signal mast arms in northbound and southbound traffic.
|
082-66N21
|
Active
|
06/27/2023
|
1 / 1 |
|
2
|
3
|
Various
|
|
Repairing and maintaining traffic signals, flashing beacons, and roadway lighting in various counties in District 3.
|
083-76M86
|
Rejected
|
08/24/2023
|
1 / 1 |
|
5
|
8
|
St. Clair
|
|
Lighting on I-55/70/64 from the Mississippi River to east of the I-64 (Tri-Level) Interchange.
|
084-76R27
|
Executed
|
09/08/2023
|
1 / 1 |
1 |
5
|
8
|
Madison
|
|
Lighting upgrades on I-55 at IL 140.
|
085-78964
|
Executed
|
09/08/2023
|
2 / 2 |
|
5
|
9
|
Alexander
|
|
Navigation lighting upgrade on SN 002-0005 on US 60/62 over the Mississippi River in Cairo.
|
01A-WI059
|
Executed
|
02/16/2024
|
|
|
5
|
9
|
Williamson
|
Voluntary
|