| Region | District | DBE % | VBP % | Federal Project # |
|---|---|---|---|---|
| 3 | 4 | 0.00 | 0.00 | N/A |
| County(s) | Key Route(s) | Marked Route(s) | Section(s) | State Job #(s) | PPS #(s) |
|---|---|---|---|---|---|
|
|
|
|
|
|
| Contract Specifics |
|---|
| The completion date will be 10 calendar days after the Contractor begins work, or twenty calendar days after execution of the contract, whichever is earlier, unless a delayed start is granted by the Engineer. After the completion date, an additional 5 working days will be allowed to complete pavement markings. |
| No More Contract Specifics |
| Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
|---|---|---|---|---|---|---|---|
| 40600295 | POUND | POLYMERIZED BITUMINOUS MATERIALS (TACK COAT) | Base items | 1,928.000 | |||
| 40600825 | TON | POLYMERIZED LEVELING BINDER (MACHINE METHOD), N50 | Base items | 77.000 | |||
| 40600982 | SQ YD | HOT-MIX ASPHALT SURFACE REMOVAL - BUTT JOINT | Base items | 55.000 | |||
| 40603535 | TON | POLYMERIZED HOT-MIX ASPHALT SURFACE COURSE, MIX "D", N50 | Base items | 77.000 | |||
| 44000161 | SQ YD | HOT-MIX ASPHALT SURFACE REMOVAL, 3" | Base items | 1,284.000 | |||
| 44200956 | SQ YD | CLASS B PATCHES, TYPE II, 9 INCH | Base items | 107.000 | |||
| 44201007 | SQ YD | CLASS B PATCHES, TYPE II, 13 INCH | Base items | 22.000 | |||
| 44201298 | EACH | DOWEL BARS 1 1/4" | Base items | 120.000 | |||
| 44201299 | EACH | DOWEL BARS 1 1/2" | Base items | 36.000 | |||
| 44213200 | FOOT | SAW CUTS | Base items | 714.000 | |||
| 48203100 | TON | HOT-MIX ASPHALT SHOULDERS | Base items | 72.000 | |||
| 67100100 | L SUM | MOBILIZATION | Base items | 1.000 | |||
| 70107025 | CAL DA | CHANGEABLE MESSAGE SIGN | Base items | 34.000 | |||
| 70300100 | FOOT | SHORT TERM PAVEMENT MARKING | Base items | 24.000 | |||
| 70300150 | SQ FT | SHORT TERM PAVEMENT MARKING REMOVAL | Base items | 8.000 | |||
| 78009004 | FOOT | MODIFIED URETHANE PAVEMENT MARKING - LINE 4" | Base items | 1,334.000 | |||
| 78009008 | FOOT | MODIFIED URETHANE PAVEMENT MARKING - LINE 8" | Base items | 355.000 | |||
| X7010216 | L SUM | TRAFFIC CONTROL AND PROTECTION, (SPECIAL) | Base items | 1.000 | |||
| Z0034105 | TON | MATERIAL TRANSFER DEVICE | Base items | 226.000 | |||
| No More Pay Items | |||||||