001-60R80
|
Executed
|
07/10/2019
|
|
|
1
|
1
|
Cook
|
|
Bridge deck and approach overlay, repairs and reconstruction of deck joints on structures carrying Sheridan Road over ravines in the Village of Glencoe and City of Highland Park. (SN 016-0616, 0617, 0618, 0619)
|
002-62B75
|
Executed
|
07/11/2019
|
1 / 1 |
1 |
1
|
1
|
Lake
|
|
Intersection reconstruction at IL 131 and Kenosha Road in the Village of Beach Park.
|
003-62C06
|
Executed
|
07/18/2019
|
4 / 4 |
1 |
1
|
1
|
McHenry
|
|
Intersection improvement, roadway realignment and traffic signal installation where IL 176 intersects with Mt. Thabor Road and Haligus Road in Crystal Lake.
|
004-62D39
|
Executed
|
07/11/2019
|
|
|
1
|
1
|
McHenry
|
|
Replace culvert, roadway reconstruction and resurfacing on IL 120 in Greenwood Township.
|
005-62G29
|
Deleted
|
04/18/2019
|
|
|
1
|
1
|
McHenry
|
|
1.8 miles of resurfacing and pedestrian ramps on IL 47 from State Line Road to IL 173 in the Village of Hebron.
|
006-62G30
|
Executed
|
07/17/2019
|
|
1 |
1
|
1
|
Lake
|
|
3.1 miles of resurfacing on IL 22 from N. Quentin Road to IL 83 in the Villages of Kildeer and Long Grove.
|
007-62G59
|
Deleted
|
04/22/2019
|
|
|
1
|
1
|
DuPage
|
|
1.5 miles of resurfacing and ADA improvements on IL 52 from St. Charles Road to Sidney Avenue in the Villages of Addison and Lombard.
|
008-62G69
|
Deleted
|
04/22/2019
|
|
|
1
|
1
|
Cook
|
|
0.4 mile resurfacing, pedestrian ramps and signals on IL 58 from Lincoln Street to IL 43 in the Villages of Morton Grove and glenview.
|
009-62G70
|
Deleted
|
04/22/2019
|
|
|
1
|
1
|
Cook
|
|
0.8 miles of resurfacing and pedestrian ramps on Central Avenue from just south of 53rd Street to just north of 47th Street in the City of Chicago.
|
010-62G83
|
Executed
|
07/15/2019
|
|
|
1
|
1
|
Lake
|
|
1.9 miles of resurfacing, shoulders, milled rumble strips, ADA ramps and pedestrian traffic signals at 2 locations in Gurnee, Livertyville, Waukegan and Park City: 1) IL 120 from east of I-94 to IL 43; 2)IL 21 at Red Top Drive.
|
011-62H09
|
Executed
|
07/09/2019
|
6 / 5 |
1 |
1
|
1
|
Cook, DuPage, Kane
|
|
Guardrail end section replacement at various locations in Cook, DuPage and Kane Counties.
|
012-62H10
|
Executed
|
07/16/2019
|
2 / 1 |
1 |
1
|
1
|
Lake, McHenry
|
|
Guardrail improvements at varous locations in McHenry and Lake Counties.
|
013-62H11
|
Executed
|
07/09/2019
|
5 / 5 |
1 |
1
|
1
|
Cook, Will
|
|
Guardrail end section replacement at various locations in Cook and Will Counties.
|
014-62H18
|
Executed
|
07/17/2019
|
|
1 |
1
|
1
|
Lake
|
|
Culvert wing wall replacement on IL 120 just west of IL 83 in Grayslake.
|
015-62H37
|
Executed
|
07/15/2019
|
|
|
1
|
1
|
DuPage
|
|
Wing Wall and culvert repairs at the structure carrying IL 59 in Warrenville. Includes grading and shaping of the ditch on the south side of US 20, E of Garden Avenue in Roselle.
|
016-62H46
|
Executed
|
07/09/2019
|
|
1 |
1
|
1
|
Various
|
|
Trombone mast arm replacement at various locations in District 1.
|
017-62H56
|
Deleted
|
04/22/2019
|
|
|
1
|
1
|
Cook
|
|
0.9 mile of resurfacing and pedestrian ramp improvements on Touhy Avenue from US 41 to Lawndale Avenue in the villages of Lincolnwood and Skokie.
|
018-62H83
|
Deleted
|
04/22/2019
|
|
|
1
|
1
|
McHenry
|
|
1.2 miles of resurfacing and pedestrian ramps on IL 31 from James R. Rakow Road to north of US 14 (Northwest Highway) in the City of Crystal Lake.
|
019-62H88
|
Executed
|
07/15/2019
|
|
|
1
|
1
|
Lake
|
|
Demolition and site clean-up of three single-family residences on IL 22 between Quentin Road and west of IL 83 in Long Grove and Kildeer.
|
020-62H92
|
Deleted
|
04/22/2019
|
|
|
1
|
1
|
Lake
|
|
1.8 miles of resurfcing on US 45 (Lake Street) from Woodlawn Drive to IL 83 in the Village of Mundelein.
|
021-62H93
|
Deleted
|
04/18/2019
|
|
|
1
|
1
|
Will
|
|
6835.2 feet resurfacing improvements along IL 50 from Cicero Avenue to Manhattan-Monee Road in Monee Township.
|
022-62H98
|
Deleted
|
04/22/2019
|
|
|
1
|
1
|
Kane
|
|
6336 feet of resurfacing and pedestrian ramps on IL 31 from Webster St/Aucutt Rd to Rathbone Ave in Aurora and Montgomery.
|
023-62J01
|
Executed
|
07/18/2019
|
|
|
1
|
1
|
DuPage
|
|
Demolition of a single-family residence at 22W432 IL 53 in Glen Ellyn.
|
024-62J03
|
Deleted
|
04/22/2019
|
|
|
1
|
1
|
Lake
|
|
5171 feet resurfacing and pedestrian ramp improvements on IL 43 from McGaw Rd/Pulaski Rd to US 41 in Park City and Waukegan.
|
025-62J07
|
Executed
|
07/15/2019
|
|
|
1
|
1
|
Cook
|
|
Intermittent resurfacing project on various state maintained arterial routes in various cities.
|
026-62J08
|
Executed
|
07/15/2019
|
|
|
1
|
1
|
Will
|
|
Intermittent pavement resurfacing project located on various state maintained arterial routes.
|
027-62J09
|
Executed
|
07/08/2019
|
1 / 0 |
|
1
|
1
|
Cook, DuPage
|
|
Intermittent resurfacing project on various expressway routes.
|
028-62J18
|
Deleted
|
05/03/2019
|
|
|
1
|
1
|
Cook
|
|
Substructure repairs of bridges carrying Chicago Avenue over I-90/94 (SN 016-2046), Milwaukee Ave (SN 016-1094) and Halsted Street (SN 016-2118) over the Ohio Feeder in Chicago.
|
029-62J22
|
Executed
|
07/15/2019
|
1 / 1 |
1 |
1
|
1
|
Kane
|
|
Repairing the Hankes Road Bridge over IL 56.
|
030-72G87
|
Executed
|
07/09/2019
|
1 / 1 |
|
4
|
6
|
Sangamon
|
|
2.9 miles of resurfacing, HMA shoulders and guardrail on 1) Old US 36 from 7th Street to west of Camp Butler Road, 2) Camp Butler Road from 0.1 mile west of Camp Butler Road to Old US 36, 3) 7th Street from south of Lincoln Street to Old US 36 in Riverton.
|
031-72L13
|
Executed
|
07/15/2019
|
|
1 |
4
|
6
|
Logan, Mason
|
|
4.2 miles of resurfacing on IL 10 from the east city limits of Mason City to the Logan County line.
|
032-74703
|
Executed
|
07/08/2019
|
|
|
4
|
7
|
Edwards
|
|
7.6 miles of patching, resurfacing, safety shoulders and other repairs to 3 structures on IL 130 from IL 1 in Garyville to the Northfolk Southern Railroad Bridge south of Albion. (SN 024-0005, 7011 and 7013)
|
033-74754
|
Executed
|
07/08/2019
|
|
1 |
4
|
7
|
Jasper
|
|
12.2 miles of resurfacing on IL 49 from the Cumberland County line to Main Street in Willow Hill.
|
034-74867
|
Executed
|
07/15/2019
|
|
|
4
|
7
|
Clay
|
|
12.2 miles of cape seal on Zion Lane from south of Bible Grove Road to just north of the railroad tracks in Clay City.
|
035-74895
|
Executed
|
07/09/2019
|
2 / 2 |
|
4
|
7
|
Various
|
|
Replace obsolete guardrail and terminals at various locations.
|
036-74901
|
Executed
|
07/11/2019
|
|
|
4
|
7
|
Clay
|
|
Traffic signal modernization on US 45 and North State Road in Flora.
|
037-74911
|
Executed
|
07/23/2019
|
|
|
4
|
7
|
Wayne
|
|
Beam end repairs on SN 096-0010 carrying IL 15 over Little Wabash River 4.5 miles west of the Edwards County line.
|
038-76L69
|
Executed
|
07/15/2019
|
1 / 1 |
|
5
|
8
|
Madison
|
|
6.5 miles of micro-surfacing on I-55/70 from 0.5 mile west of Black Lane to 0.4 mile east of IL 159;
|
039-76M21
|
Executed
|
07/08/2019
|
2 / 2 |
2 |
5
|
8
|
Greene
|
|
Deck replacement on SN 031-0015 carrying IL 267 over Apple Creek, 8.6 miles north of Greenfield.
|
040-78162
|
Executed
|
07/03/2019
|
|
|
5
|
9
|
White
|
|
removal and replacement of SN 097-0036 carrying IL 141 over a tributary to Cane Creek, 0.25 mile east of IL 1.
|
041-78520
|
Deleted
|
04/30/2019
|
|
|
5
|
9
|
Jefferson
|
|
4.4 miles of safety shields, crown and superelevation correction, earthwork, drainage improvements and resurfacing on IL 37 from just south of Casey Fork to Campground Road just north of Bonnie.
|
042-78623
|
Executed
|
07/03/2019
|
|
|
5
|
9
|
Massac
|
|
Bridge repairs including joint reconstruction, deck repair, overlay removal and replacement, bearing removal and replacement, and substructure repairs on SN 064-0016. 0037, and 0038, at the I-24 Big Bay Road Interchange.
|
043-78698
|
Executed
|
07/03/2019
|
|
|
5
|
9
|
Franklin
|
|
1.9 miles of patching, milling and resurfacing at 2 locations: 1) IL 14 from Court Street to Glen Street in West City, 2)IL 14/37 from Bond Street to the Square in Benton.
|
044-78706
|
Executed
|
07/03/2019
|
|
|
5
|
9
|
Franklin
|
|
5.4 miles of milling, resurfacing and ADA Sidewalk improvements on IL 149 from Ziegler to West Frankfort.
|
045-78711
|
Executed
|
07/11/2019
|
|
|
5
|
9
|
Johnson, Union
|
|
Cleaning and painting portions of SN 044-0011, 0025, 0027, and 091-0064.
|
046-78727
|
Executed
|
07/10/2019
|
|
|
5
|
9
|
Jefferson
|
|
1.3 miles of patching and resurfacing on IL 15 from just east of 44th Street to just west of 25th Street in Mt. Vernon.
|
047-46526
|
Rejected
|
07/01/2019
|
|
|
5
|
8
|
Madison
|
|
Pump station improvements at 2 locations: 1) I-255 at Grey's Farm/Sparks Lane in Collinsville; 2) I-270/Fun and Sun at West Chain of Rocks in Mitchell.
|
048-46529
|
Executed
|
07/11/2019
|
|
1 |
4
|
7
|
Effingham, Lawrence, Macon
|
|
New automatic transfer switch and miscellaneous improvements to 3 pump stations: 1) Westport Pump House along IL 33 in Lawrence County; 2) Effingham Pump House at US 40 and US 45 in Effingham County; 3) Decatur Pump House on Garfield Avenue east of IL 121 in Macon County.
|
049-61F76
|
Executed
|
08/19/2019
|
1 / 1 |
|
1
|
1
|
Will
|
|
Construction of a multi-use path adjacent to University Parkway from Steger- Monee Road to Western Avenue in the Village of University Park.
|
050-61F78
|
Executed
|
07/18/2019
|
|
|
1
|
1
|
McHenry
|
|
Sidewalk and lighting improvements on Pearl Street from Illinois Route 31 to Riverside Drive in the City of McHenry.
|
051-61F80
|
Executed
|
07/18/2019
|
2 / 2 |
1 |
1
|
1
|
McHenry
|
|
Resurfacing Curran Road from Illinois Route 120 to Ojibwa Lane in the City of McHenry.
|
052-61F83
|
Executed
|
07/08/2019
|
|
|
1
|
1
|
DuPage
|
|
Work consists of bridge deck scarification, bridge deck latex concrete overlay and bridge deck grooving on the structure carrying 83rd Street over I-355 between Wharf Dr. and Woodward Avenue in the village of Woodridge.
|
053-61F84
|
Executed
|
07/15/2019
|
|
|
1
|
1
|
Cook
|
|
Construction of a pedestrian path adjacent to Roselle Road from Algonquin Road to Shire Circle in the Village of Palatine.
|
054-62H33
|
Executed
|
07/08/2019
|
|
|
1
|
1
|
Various
|
|
DRAINAGE IMPROVEMENTS ON VARIOUS STATE MAINTAINED ROUTES IN COOK, DUPAGE, AND LAKE COUNTIES.
|
055-62H89
|
Executed
|
07/15/2019
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
259 FT OF BRIDGE DECK SEALING, NEOPRENE EXPANSION JOINT REMOVAL, INSTALLING PREFORMED JOINT SEALS, CLEANING BRIDGE DRAINAGE SYSTEM, AND DECK SLAB REPAIRS ON STEVENSON EXPRESSWAY AT PULASKI RD.
|
056-62J15
|
Executed
|
07/08/2019
|
|
|
1
|
1
|
Cook, DuPage
|
|
INTRMITTENT RESURFACING PROJECT ON VARIOUS ROUTES IN VARIOUS CITIES.
|
057-64N51
|
Executed
|
07/15/2019
|
|
|
2
|
2
|
Carroll
|
|
2,500 FT APPLICATION OF A THIN POLYMER OVERLAY ON THE DECK OF SN 008--0052 IN SAVANNA.
|
058-64N61
|
Executed
|
07/15/2019
|
|
|
2
|
2
|
Whiteside
|
|
EXPANSION JOINT REPLACEMENT, DECK PATCHING. AND MICROSILICA OVERLAY ON SN 098-0052.
|
059-66A03
|
Executed
|
07/11/2019
|
|
|
2
|
3
|
Ford
|
|
3.9 MILES OF MILLING AND RESURFACING 2.5 INCHES ON IL 165 MAINLINE FROM THE MCLEAN CO LINE TO IL 47 IN SIBLEY, IL.
|
060-66A81
|
Deleted
|
04/25/2019
|
|
|
2
|
3
|
Ford
|
|
6 MILES OF MILLING AND RESURFACING ON US 24 FROM THE LIVINGSTON COUNTY LINE TO THE IROQUOIS COUNTY LINE. , 6 miles of milling and resurfacing of US 24 from Livingston county line to the Iroquois county line.
|
061-66D59
|
Deleted
|
05/03/2019
|
|
|
2
|
3
|
Kankakee, Livingston
|
|
1.954 MILES OF 3P MILLING AND RESURFACING ON IL 17 FROM WEST OF REDDICK TO 0.3 MILES WEST OF TR 48. INCLUDING CENTERLINE AND SHOULDER RUMBLE STRIPS. , 1.954 miles of 3P milling and resurfacing W of Reddick to 0.3 mile W of TR 48. It also includes centerline and shoulder rumble strips.
|
062-66E21
|
Executed
|
07/08/2019
|
1 / 1 |
1 |
2
|
3
|
Bureau
|
|
4.34 MILES OF 3P MILLING AND RESURFACING 2.25" OF MAINLINE FROM 0.2 MILES N OF COUNTY ROAD 1500N ON US 6 TO ST MARY AND FROM US 6 TO W ILLINOIS ST. IT INCLUDES PAVEMENT MARKINGS AND REPLACING EXISTING DETECTOR LOOPS.
|
063-66H03
|
Executed
|
07/15/2019
|
3 / 3 |
|
2
|
3
|
DeKalb
|
|
2.72 MILES OF 3P RESURFACING WORK WITH PAVEMENT PATCHING AND ADA RAMP IMPROVEMENTS FROM STATE ST. IN GENOA TO THE JUNCTION WITH IL 23 (N).
|
064-66J12
|
Executed
|
07/15/2019
|
1 / 1 |
|
2
|
3
|
DeKalb
|
|
2.51 MILES OF SHOULDER WIDENING AND RUMBLE STRIP INSTALLATION ON IL72 FROM E OF IRENE RD TO JUST W OF MALTA RD.
|
065-66J23
|
Executed
|
07/17/2019
|
1 / 1 |
|
2
|
3
|
DeKalb
|
|
1.596 MILES OF RESURFACING AND ADA IMPROVEMENTS FROM LITTLE ROCK CREEK TO 0.3 MILES E OF REES ST. IN HINCKLEY.
|
066-66J56
|
Executed
|
07/18/2019
|
|
|
2
|
3
|
Kendall
|
|
2.39 MILES OF 3P MILLING AND RESURFACING OF 2.25" FOR MAINLINE PAVEMENT AND SHOULDER FROM S OF GALENA RD TO S KENNEDY DR IN YORKVILLE.
|
067-66J74
|
Executed
|
07/08/2019
|
|
1 |
2
|
3
|
LaSalle
|
|
MEDIAN CROSSOVER and SHOULDER RECONSTRUCTION 0.5 MILES W OF SN 050-0228/0228 TO 0.5 MILES E OF SN 050-0220/0221 IN LASALLE.
|
068-66J87
|
Executed
|
07/18/2019
|
|
|
2
|
3
|
Bureau
|
|
10.5 MILES OF ROUTING AND SEALING TRANSVERSE AND PRIMARY LONGITUDINAL CRACKS GREATER THAN 0.25" WIDE AS WELL AS CLEANING AND SEALING SECONDARY CRACKS GREATER THAN 0.25" WIDE ON IL 26 FROM I-80 TO THE SOUTH OF RAILROAD AVE IN PRINCETON. MICROSURFACING THE CENTERLINE FROM 0.1 MILES N OF 2600N RD TO I-80.
|
069-66J89
|
Executed
|
07/23/2019
|
|
|
2
|
3
|
DeKalb
|
|
7.011 MILES OF ROUTING AND SEALING TRANSVERSE AND PRIMARY LONGITUDINAL CRACKS GREATER THAN 0.25" WIDE AS WELL AS CLEANING AND SEALING SECONDARY CRACKS GREATER THAN 0.25" WIDE ON US 30 FROM 0.2 MILES E OF HICKORY ST IN WATERMAN TO LITTLE ROCK CREEK, AND FROM 0.3 MILES E OF REES ST. IN HINCKLEY TO THE KANE CO LINE.
|
070-66K09
|
Executed
|
07/15/2019
|
|
|
2
|
3
|
Livingston
|
|
2.337 MILES OF 2' WIDE CENTERLINE MILLING AND RESURFACING FROM 2NS ST. IN STRAWN TO THE FORD COUNTY LINE.
|
071-66K10
|
Executed
|
07/18/2019
|
|
1 |
2
|
3
|
Grundy, LaSalle
|
|
BRIDGE WASHING AT VARIOUS STRUCTURES OVER THE ILLINOIS RIVER.
|
072-66K11
|
Executed
|
07/08/2019
|
|
|
2
|
3
|
Grundy
|
|
6 MILES OF CLASS A PAVEMENT PATCHING 16" ON PORTLAND CEMENT CONCRETE (PCC) PAVEMENT, PCC SHOULDER REPAIR AND INTERMITTNT PAVEMENT STRIPPING ON I-80 FROM 0.4 MILES N OF SENECA TO 0.4 MILES WOF IL 47 IN MORRIS.
|
073-66K12
|
Executed
|
07/11/2019
|
|
|
2
|
3
|
Livingston
|
|
REMOVING AND REPLACING HIGH MAST LIGHT TOWERS AT THE I-55 AND IL 17 EXCHANGE.
|
074-66K13
|
Executed
|
08/01/2019
|
|
|
2
|
3
|
DeKalb
|
|
CLEANING AND PAINTING ALL STRUCTURAL STEEL COMPONENTS OF SN 019-0026 CARRYING IL 72 OVER THE SOUTH BRANCH OF THE KISHWAUKEE RIVER.
|
075-66K16
|
Executed
|
07/01/2019
|
2 / 1 |
2 |
2
|
3
|
LaSalle
|
|
RAISING BRIDGE APPROACH SLAB SN 05-0211 (50' OF THE NORTH APPROACH) ON I-39 NORTHBOUND WITH EXPANDING POLYURETHANE HIGH DENSITY FOAM.
|
076-66K24
|
Executed
|
07/11/2019
|
|
|
2
|
3
|
Iroquois
|
|
4.5 MILES OF INTERMITTENT MILLING AND RESURFACING 2" AT VARIOUS LOCATIONS FROM MILE POST 265 TO MILE POST 280. THE PROJECT ALSO INCLUDES PAVEMENT MARKING, SHOULDER REPAIRS (2" WIDE, 6" DEEP RESURFACING), AND SETTING UP TRAFFIC CONTROL.
|
077-66K26
|
Executed
|
08/01/2019
|
|
|
2
|
3
|
Kankakee
|
|
CLEANING AND PAINTING ALL STRUCTURAL STEEL COMPONENTS OF SN 046-0052 CARRYING US 45/52 AND I-57 INTERCHANGE SOUTH OF KANKAKEE.
|
078-68D45
|
Executed
|
07/16/2019
|
|
|
3
|
4
|
Fulton
|
|
2400' OF SLOPE AND TOE REPAIR ALONG THE EAST SIDE OF IL 78/IL 97 N OF DICKSON MOUNDS RD. THE PROJECT ALSO INCLUDES THE RECONSTRUCTION OF THE SHOULDER AND INSTALLATION OF GUARDRAIL.
|
079-68D99
|
Executed
|
07/15/2019
|
|
|
3
|
4
|
Peoria, Tazewell
|
|
TEMPORARY SIGNUNG FOR I-74 CLOSURE AND DETOUR ROUTES FOR THE MURRAY BAKER BRIDGE REHABILITATION PROJECT.
|
080-68E26
|
Executed
|
07/18/2019
|
|
|
3
|
4
|
Henderson
|
|
BRIDGE JOINT REPAIR AND BRIDGE REPAIR TO SN 036-0039 CARRYING IL RTE 164 OVER HENDERSON CREEK.
|
081-68E73
|
Executed
|
07/10/2019
|
|
|
3
|
4
|
Tazewell
|
|
Resurfacing ramp from Washington St to IL Rte 40 in East Peoria.
|
082-68E83
|
Executed
|
07/11/2019
|
|
|
3
|
4
|
Woodford
|
|
REMOVAL OF EXISTING HIGH MAST LIGHTING SYSTEM AND INSTALLATION OF NEW LIGHT POLES, FOUNDATION, LUMINAIRES, ELECTRICAL CABLE, LIGHTING CONTROLLER, AND SERVICE INSTALLATION AT THE INTERCHANGE OF I-39 AND US 24 IN EL PASO.
|
083-68E87
|
Executed
|
07/08/2019
|
|
|
3
|
4
|
Peoria
|
|
PATCHING ON IL 6 AND I-474 FROM IL 40 (KNOXVILLE AVE) TO STRUCTURE OVER IL 8 IN PEORIA.
|
084-68E91
|
Rejected
|
06/26/2019
|
|
|
3
|
4
|
Peoria
|
|
INSTALLATION OF CENTRAL TRAFFIC SIGNAL SYSTEM SOFTWARE, TRAFFIC SIGNAL CONTROLLERS, AND TRAFFIC SIGNAL CABINETS AT VARIOUS INTERSECTIONS LOCATED WITH- IN PEORIA.
|
085-68E95
|
Executed
|
07/15/2019
|
|
|
3
|
4
|
Marshall, Woodford
|
|
22 MILES OF CLASS A PAVEMENT PATCHING ON INTERSTATE 39 FROM 0.25 MILES N OF US RTE 24 TO 2.1 MILES S OF IL RTE 17.
|
086-68E96
|
Withdrawn
|
06/12/2019
|
|
|
3
|
4
|
Peoria
|
|
2.5 MILES OF PATCHING AND JOINT REPAIR ON IL 40 (KNOXVILLE AVE) FROM RAVINSWOOD RD TO BETHANY WAY IN PEORIA.
|
087-68F02
|
Executed
|
07/10/2019
|
|
|
3
|
4
|
Peoria
|
|
MILL AND OVERLAY SN 072-0012 AND 072-0133 CARRYING ADAMS ST OVER BNSF AND UP RAILROADS AT THE WESTERN CITY LIMITS OF PEORIA.
|
088-68F03
|
Executed
|
07/08/2019
|
|
|
3
|
4
|
Henry, Knox
|
|
REMOVAL OF EXISTING HPS LUMINAIRES AND INSTALLATION OF LED LUMINAIRES ON EXISTING LIGHT POLES ALONG I-74 AT VARIOUS LOCATIONS.
|
089-70B53
|
Deleted
|
05/09/2019
|
|
|
3
|
5
|
Champaign
|
|
1.553 MILES OF SAFETY IMPROVEMENTS ON US 150 FROM WRIGHT ST. TO CUNNINGHAM AVE IN URBANA. IMPROVEMENTS INCLUDE TRAFFIC SIGNAL MODERNIZATION, LED STREET LIGHTING, ADA COMPLAINT SIDEWALKS AND PEDESTRIAN RAMPS, CURB AND GUTTER REPLACEMENT, MILLING AND RESURFACING, GUADRAIL REPLACEMENT, AND PAVEMENT MARKINGS. , 1.533 miles of safety improvements on US 150/University Ave. from Wright St. to Cunningham Ave. in Urbana.
|
090-70C02
|
Executed
|
07/10/2019
|
1 / 1 |
|
3
|
5
|
Edgar
|
|
BRIDGE DECK REPAIRS ON 3 (SN 023-0001, SN 023-0002, SN 023-0003) STRUCTURES CARRYING US 150.
|
091-70D18
|
Executed
|
07/11/2019
|
|
|
3
|
5
|
Edgar
|
|
STORM SEWER REMOVAL AND PATCHING IDOT DISTRICT 5 PARKING LOT.
|
092-70D33
|
Executed
|
07/08/2019
|
|
|
3
|
5
|
Edgar, Vermilion
|
|
IL 119: 7.609 MILES OF A1 SURFACE TREATMENT FROM 2.8 MILES WEST OF ALVIN TO INDIANA STATE LINE; US 36: 7.572 MILESOF A1 SURFACE TREATMENT FROM IL 1 AT CHRISMAN TO INDIANA STATE LINE.
|
093-70D43
|
Executed
|
07/23/2019
|
|
|
3
|
5
|
Various
|
|
CRACK AND JOINT SEALING ON VARIOUS RTES IN CHAMPAIGN, PIATT, AND MCLEAN COUNTIES.
|
094-70D47
|
Executed
|
07/10/2019
|
|
1 |
3
|
5
|
McLean
|
|
BRIDGE DECK REPAIRS OVER NS RR IN BLOOMINGTON.
|
095-70D79
|
Executed
|
07/15/2019
|
|
|
3
|
5
|
McLean
|
|
TREE REMOVAL, SELECTIVE CLEARING, and SEEDING AT FUNKS GROVE REST AREA.
|
096-70D88
|
Executed
|
07/10/2019
|
|
|
3
|
5
|
Various
|
|
50.1 MILES OF POLLINATOR HABITAT SIGNS ALONG US 150 FROM URBANA TO DANVILLE and ALONG I-72 FROM MACON CO LINE TO CHAMPAIGN.
|
097-70D90
|
Executed
|
07/11/2019
|
|
|
3
|
5
|
Champaign, Douglas
|
|
SELECTIVE CLEARING, 1.0 MILE N OF TUSCOLA TO 1.5 MILES S OF CHAMPAIGN COUNTY LINE, AT CURTIS RD. INTERCHANGE, AND AT LINCOLN AVE INTERCHANGE.
|
098-70D93
|
Executed
|
07/11/2019
|
|
|
3
|
5
|
Various
|
|
DISTRICT-WIDE ON-CALL TREE REMOVAL.
|
099-70D94
|
Executed
|
07/11/2019
|
|
|
3
|
5
|
Various
|
|
ON-CALL LIGHTING REPAIRS IN THE DISTRICT WEST FIELD AREA CONSISTING OF DEWITT, MCLEAN, and PIATT COUNTIES.
|
100-70D95
|
Executed
|
07/11/2019
|
|
|
3
|
5
|
Various
|
|
ON-CALL LIGHTING REPAIRS IN THE DISTRICT EAST FIELD AREA CONSISTING OF CHAMPAIGN, VERMILION, DOUGLAS, AND EDGAR COUNTIES.
|
101-70D98
|
Executed
|
07/10/2019
|
1 / 1 |
|
3
|
5
|
Champaign
|
|
4.458 MILES OF MICRO-SURFACING 2 PASS AND RESURFACING (SMART) ON I-74 FROM PROSPECT AVE. IN CHAMPAIGN TO UNIVERSITY AVE. IN URBANA.
|
102-70E05
|
Executed
|
07/10/2019
|
7 / 7 |
|
3
|
5
|
DeWitt, McLean, Piatt
|
|
CONCRETE CONTAINMENT STRUCTURES FOR LIQUID BRINE AT TOWANDA, LEROY, CLINTON,AND MONTICELLO STORAGES.
|
103-72K88
|
Executed
|
07/09/2019
|
|
|
4
|
6
|
Adams, Pike
|
|
Insertion culvert liners at various locations on IL 57 and IL 96.
|
104-72L10
|
Withdrawn
|
06/12/2019
|
|
|
4
|
6
|
Pike
|
|
Drainage improvements and patching on IL 96 from west of Jackson Street to IL 106 in Kinderhook and IL 106 from IL 96 to 0.1 miles east of IL 96.
|
105-72L14
|
Executed
|
07/15/2019
|
|
|
4
|
6
|
Sangamon
|
|
Deck patching on SN 084-0180 carrying IL 97 over Spring Creek, 0.08 miles east of IL 4.
|
106-72L15
|
Executed
|
07/08/2019
|
|
|
4
|
6
|
Logan
|
|
Replacing expansion joints on SN 054-0039 carrying County Highway 13 over I-55 at the Broadwell.
|
107-72L16
|
Executed
|
07/09/2019
|
|
|
4
|
6
|
Adams
|
|
Replacing expansion joints on SN 001-0048 carrying Columbus Road over I-72 at Columbus Road, 1.3 miles north of IL 104.
|
108-72L17
|
Executed
|
07/08/2019
|
|
|
4
|
6
|
Adams
|
|
Removing concrete slope wall and replacing with riprap under SN 001-0008 carrying IL 96 over Rock Creek, 2 miles south of IL 61.
|
109-72L18
|
Executed
|
07/15/2019
|
|
|
4
|
6
|
Logan
|
|
Substructure repair on SN 054-0075 carrying Township Road over I-55 at the Hartsburg interchange.
|
110-72L19
|
Executed
|
07/09/2019
|
|
|
4
|
6
|
Pike
|
|
Deck patching on SN 075-0081 carrying IL 104 over McKee Creek at the east edge of Chambersburg.
|
111-72L20
|
Executed
|
07/23/2019
|
|
|
4
|
6
|
Sangamon
|
|
Patching on various routes in Sangamon County.
|
112-72L21
|
Executed
|
07/11/2019
|
|
|
4
|
6
|
Scott
|
|
Patching on I-72 in Scott County.
|
113-72L24
|
Executed
|
07/15/2019
|
|
|
4
|
6
|
Various
|
|
Installation of signage to designate pollinator habitat areas along various routes.
|
114-74913
|
Executed
|
07/11/2019
|
|
1 |
4
|
7
|
Various
|
|
Removal and replacement of light towers and light poles, rewiring light towers and poles, removal and replacement of wiring, removal and replacement of concrete foundations and LED reetrofits on various routes throughout District 7.
|
115-74914
|
Executed
|
07/11/2019
|
|
|
4
|
7
|
Effingham
|
|
Tree removal and seeding along 1-70 east of Effingham, from milepost 98 to milepost 105.
|
116-74919
|
Executed
|
07/11/2019
|
|
|
4
|
7
|
Moultrie
|
|
1.6 miles of patching on Bruce/Findlay Road.
|
117-76L80
|
Executed
|
07/11/2019
|
|
|
5
|
8
|
Various
|
|
Patching at various locations throughout District 8.
|
118-76L85
|
Executed
|
07/16/2019
|
|
|
5
|
8
|
St. Clair
|
|
Electrical repairs at the Bowman Pump Station on I-55/70.
|
119-76L87
|
Executed
|
07/10/2019
|
|
|
5
|
8
|
Various
|
|
Guardrail and cable rail repair at various locations thorughout District 8.
|
120-76M02
|
Executed
|
07/17/2019
|
|
|
5
|
8
|
St. Clair
|
|
0.7 miles of resurfacing and patching on IL 4/IL 15 from just east of 1st Street in Fayetteville to just east of Bee Hollow Road.
|
121-76M18
|
Executed
|
07/03/2019
|
|
|
5
|
8
|
Various
|
|
Maintenance and service of all ITS equipment at various location throughout District 8.
|
122-76M19
|
Executed
|
07/19/2019
|
|
|
5
|
8
|
Various
|
|
Setup, maintenance and pickup of traffic control devices at various locations throughout District 8.
|
123-76M20
|
Executed
|
07/03/2019
|
|
|
5
|
8
|
Various
|
|
Highway lighting and traffic signal repairs and maintenance at various locations throughout District 8.
|
124-76M23
|
Executed
|
07/15/2019
|
4 / 4 |
1 |
5
|
8
|
Madison
|
|
Guardrail and bridge repair on SN 060-0188 carrying IL 143 over Mooney Creek, 0.5 miles east of IL 157 in Edwardsville.
|
125-76M26
|
Executed
|
07/23/2019
|
|
|
5
|
8
|
Madison, St. Clair
|
|
Roadway and bridge deck patching along I-255 from 0.4 miles south of Mousette Lane to Collinsville Road.
|
126-76M27
|
Executed
|
07/15/2019
|
|
|
5
|
8
|
Various
|
|
Weed spraying on various routes throughout District 8.
|
127-76M29
|
Rejected
|
06/26/2019
|
|
|
5
|
8
|
Various
|
|
Tree removal at various locations throughout District 8.
|
128-76M32
|
Executed
|
07/03/2019
|
|
|
5
|
8
|
Randolph
|
|
3.2 miles of patching on IL 3/IL 150 from High Street in Chester to 0.2 miles south of Water Street.
|
129-87715
|
Executed
|
08/05/2019
|
|
|
2
|
3
|
Kankakee
|
|
Resurfacing CH 9 from IL Route 50 to IL Route 1.
|
130-89750
|
Executed
|
07/17/2019
|
|
|
3
|
4
|
Peoria
|
|
Replace the bridge carrying Streitmattes Road over a Branch of Spoon River, located 1.6 miles Southeast of Duncan.
|
131-91582
|
Executed
|
07/23/2019
|
|
|
3
|
5
|
Piatt
|
|
Resurfacing Bridge Street from I-72 to Market Street and resurfacing Marion Street from Market Street to Piatt Street in the City of Monticello.
|
132-91755
|
Rejected
|
06/26/2019
|
4 / 3 |
|
3
|
5
|
McLean
|
|
Contruction of a bikeway along Old US 66, 1.1 miles South of E 850 North Road to E 550 North Road.
|
133-93682
|
Executed
|
07/11/2019
|
1 / 0 |
|
4
|
6
|
Macoupin
|
|
Replace the bridge carrying Quarton Road over Otter Creek, located 5.5 miles West of Nilwood.
|
134-93724
|
Executed
|
08/01/2019
|
1 / 1 |
|
4
|
6
|
Adams
|
|
Roadway reconstruction on 18th Street from Chestnut Street to Maple Street in the City of Quincy.
|
135-93726
|
Executed
|
07/08/2019
|
|
1 |
4
|
6
|
Sangamon
|
|
Cold-in-place recylcing along Williamsville Road from McGrath Street to Wolf Creek Road and along Spaulding Orchard Road from Curran Road to IL Route 4.
|
136-93727
|
Executed
|
07/16/2019
|
|
|
4
|
6
|
Adams
|
|
Resurfacing and aggregate shoulders on CH 12 from 450 feet South of the intersection with North 1753rd lane southerly to the intersection with Liberty St. in Columbus.
|
137-97703
|
Executed
|
07/17/2019
|
1 / 1 |
|
5
|
8
|
Madison
|
|
Construction of a 18" reinforced concrete pavement, railroad track removal and replacement and HMA pavement, located on the East bank of the Chain of Rocks Canal, just North of Locks and Dam 27, within the property of America's Central Port District.
|
138-99620
|
Executed
|
07/09/2019
|
5 / 5 |
|
5
|
9
|
Williamson
|
|
Replace the bridge carrying Grassy Road over Little Wolf Creek, located 0.2 miles West of IL 148.
|
139-46497
|
Executed
|
07/19/2019
|
|
|
4
|
6
|
Various
|
|
PAVEMENT MARKING ON VARIOUS ROUTES THROUGHOUT DISTRICT 6
|
140-46518
|
Executed
|
07/16/2019
|
|
|
4
|
6
|
Various
|
|
REPAIRING OR REPLACING DAMAGED SIGN COMPONENTS, FURNISHING AND INSTALLING NEW SIGN SUPPORTS, REPAIRING OR REPLACING DAMAGED SIGN COMPONENTS, FURNISHING NEW OVERHEAD SIGN STRUCTURES AND REAPIRS TO OVERHEAD SIGN STRUCTURES AT VARIOUS LOCATIONS THROUGHOUT THE STATE.
|
141-46521
|
Executed
|
07/19/2019
|
|
1 |
5
|
9
|
Various
|
|
REMOVING REFLECTORS, PLACING NEW REFLECTORS, REMOVING DAMAGED RAISED REFLECTIVE PAVEMENT MARKER CASTINGS AND INSTALLING NEW CASTINGS ON VARIOUS ROUTES THROUGH- OUT DISTRICT 9.
|
142-46528
|
Rejected
|
07/01/2019
|
|
1 |
4
|
6
|
Logan
|
Voluntary
|
INSTALLATION OF NEW AUTOMATIC TRANSFER SWITCH AT THE STORM WATER PUMP STATION ON IL 121.
|
143-46916
|
Executed
|
07/08/2019
|
1 / 1 |
1 |
5
|
8
|
Clinton
|
|
RESURFACING OF PARK ROADS AND PARKING LOT. ADA SIDEWALK AND RAMP UPGRADES AND REPLACEMENT OF CULVERTS AT ELDON HAZLET STATE PARK.
|
144-72L23
|
Executed
|
07/23/2019
|
|
|
4
|
6
|
Macoupin
|
|
REPLACING EXPANSION JOINTS AND INSTALLING A MICROSILICA OVERLAY ON SN 059-0009 CARRYING IL 4 OVER THE UPRR, 2 MILES NORTH OF STAUNTON.
|
145-76K34
|
Executed
|
07/29/2019
|
5 / 5 |
|
5
|
8
|
Marion
|
|
5.7 MILES OF RESURFACING ON US 50 FROM LACKET STREET IN SALEM TO METCALF ROAD.
|
146-76M16
|
Deleted
|
05/02/2019
|
|
|
5
|
8
|
Madison
|
|
DECK WATERPROOFING, JOINT AND BEAM END REPAIRS ON SN 060-0226 CARRYING IL 140 OVER UPRR, 3.1 MILES WEST OF I-55 AND SN 060-0227 CARRYING IL 140 OVER NandWRR, 2.9 MILES WEST OF I-55.
|
147-78647
|
Rejected
|
06/26/2019
|
2 / 2 |
|
5
|
9
|
Jefferson
|
|
10 MILES OF HIGH TENSION GUARDRAIL IN THE MEDIAN, EARTHWORK AND WEED CONTROL MOW STRIP ON I-57 FROM THE JEFFERSON COUNTY LINE TO JUST SOUTH OF THE TRI-LEVEL
|
148-78695
|
Executed
|
07/15/2019
|
|
|
5
|
9
|
Jackson
|
|
INSTALLING CONDUIT, FIBER OPTIC CABLE, CONTROLLER AND NETWORK EQUIPMENT ON IL 13 FROM STRIEGEL ROAD TO REED STATION ROAD IN CARBONDALE.
|
149-78707
|
Executed
|
07/10/2019
|
|
|
5
|
9
|
Various
|
|
REPAIRING AND REPLACING DAMAGED GUARDRAIL, BARRIER TERMINALS, IMPACT ATTENUATORS, CABLE MEDIAN BARRIER AND FENCE ON A WORK ORDER BASIS THROUGHOUT DISTRICT 9.
|
150-78712
|
Executed
|
07/17/2019
|
|
|
5
|
9
|
Jefferson
|
|
11 MILES OF PATCHING AND RESURFACING ON I-64 EASTBOUND FROM MILEPOST 62 (WASHINGTON COUNTY LINE) TO MILEPOST 73.
|
151-78713
|
Executed
|
07/03/2019
|
|
|
5
|
9
|
Jackson
|
|
1.5 MILES OF PATCHING AND PAVEMENT MARKINGS ON EASTBOUND IL 13 FROM UNIVERSITY AVENUE TO MCKINNEY AVENUE IN CARBONDALE.
|
152-78729
|
Executed
|
07/25/2019
|
2 / 2 |
1 |
5
|
9
|
Jefferson
|
|
3.6 MILES OF HMA SURFACE REMOVAL, INLAYING WITH HMA SURFACE AND BINDER COURSE, PAVEMENT PATCHING, HMA SHOULDERS, STRIPING AND REFLECTIVE PAVEMENT MARKERS ON IL 142 FROM IL 37 TO JUST PAST I-64.
|
153-74880
|
Rejected
|
06/26/2019
|
|
|
4
|
7
|
Various
|
|
District-wide repair/replace steel plate beam guardrail damaged by vehicles.
|
154-74896
|
Executed
|
07/01/2019
|
|
|
4
|
7
|
Wayne
|
|
Removal and replacement of the bridge deck and parapet wall over the damaged beam, and removal and replacement of the damaged PCC I-beam on SN 096-0031 on I-64 approximately 3.5 miles east of IL 242.
|
155-46507
|
Executed
|
07/19/2019
|
|
|
1
|
1
|
Lake, Will
|
|
Apply water borne, lead free, white and yellow paint pavement marking lines, 4, 6, and 8 inches in width in Lake and Will counties.
|
156-46508
|
Executed
|
07/23/2019
|
|
|
1
|
1
|
Various
|
|
Apply water borne, lead free, white and yellow paint pavement marking lines, 4, 6, 8, 12 and 24 inches in width throughout District One.
|
157-46509
|
Executed
|
07/19/2019
|
|
|
1
|
1
|
Cook
|
|
Remove and replace reflectors and pavement marker castings within limits shown.
|
158-46511
|
Executed
|
08/19/2019
|
|
|
2
|
3
|
Various
|
|
REPLACING REFLECTORIZED GUARDRAIL MARKERS, TERMINAL MARKERS, AND PLACING LINEAR DELINEATOR PANELS WITHIN THE LIMITS OF THE CONTRACT.
|
159-46512
|
Executed
|
07/08/2019
|
|
|
2
|
3
|
Various
|
|
REMOVING REFLECTORS, PLACING NEW REFLECTORS, REMOVING DAMAGED RAISED RFLECTIVE PAVEMENT MARKER CASTINGS AND REPLACING WITH NEW WITHIN THE LIMITS SHOWN.
|
160-46513
|
Executed
|
07/19/2019
|
|
|
2
|
3
|
Various
|
|
REMOVING AND REPLACING REFLCTORS, AND RAISED REFLECTIVE PAVEMENT MARKER CASTINGS WITHIN THE LIMITS SHOWN.
|
161-46515
|
Executed
|
07/19/2019
|
|
|
3
|
5
|
Vermilion
|
|
38.57 MILES OF GROOVING AND PAVEMENT STRIPING.
|
162-46516
|
Executed
|
07/08/2019
|
|
|
3
|
4
|
Various
|
|
Remove and replace raised reflective pavement markers within limits shown.
|
163-46517
|
Executed
|
07/15/2019
|
|
|
3
|
4
|
Various
|
|
REMOVAL OF EXISTING PAVEMENT MARKINGS AND REPLACING WITH EPOXY AND MODIFIED URETHANE PAVEMENT MARKING LINES WITHIN THE LIMITS SPECIFIED ON EACH WORK ORDER.
|
164-46519
|
Executed
|
07/10/2019
|
|
|
2
|
2
|
Various
|
|
REMOVING EXISTING GUARDRAIL DELINEATORS AND INSTALLING NEW GUARDRAIL DELINEATORS WITHIN THE LIMITS SPECIFIED ON EACH INDIVIDUAL WORK ORDER.
|
165-46520
|
Executed
|
07/15/2019
|
|
|
2
|
2
|
Various
|
|
PLACING VARIOUS WIDTHS OF MODIFIED URETHANE AND THERMOPLASTIC PAVEMENT MARKING LINES, LETTERS, AND SYMBOLS WITHIN THE LIMITS SPECIFIED ON EACH WORK ORDER.
|
166-46902
|
Withdrawn
|
06/03/2019
|
1 / 0 |
|
2
|
3
|
Grundy
|
|
Remove and replace three span structures SN 032-7004 and SN 032-7099 carrying Price street over the IandM Canal, seal and stripe parking lots, and other associatd work at the William G. Stratton State Park in Morris.
|
167-46917
|
Executed
|
07/11/2019
|
|
|
2
|
3
|
Bureau
|
|
2 miles of resurfacing park roads and parking lots with A-2 Oil and Chip at Mautino State Fish and Wildlife Area. Project includes some roadway widening, culvert replacement and drainage improvements.
|
168-62C08
|
Executed
|
07/18/2019
|
|
1 |
1
|
1
|
Cook
|
|
Intersection widening, traffic signal modernization and resurfacing at Kedzie Avenue and 119th Street in Merrionette.
|
169-62F19
|
Executed
|
07/23/2019
|
|
1 |
1
|
1
|
DuPage
|
|
Channelization and traffic sigal modernization at IL 59 and Army Trail Road.
|
170-62H78
|
Active
|
05/01/2019
|
|
|
1
|
1
|
Various
|
|
Concrete bridge deck sealing upon the entire top surface of the deck, top of sidewalks and inside and top of parapets at various locations throughout District 1.
|
171-62H94
|
Executed
|
07/09/2019
|
|
|
1
|
1
|
Cook, DuPage
|
|
Expressway sweeping on I-55 (Stevenson Expressway) from I-355 to I-90/94 and on I-94, US 41 from US 14 (Dempster Street) to IL 68 (Dundee Road).
|
172-64K76
|
Executed
|
07/23/2019
|
|
|
2
|
2
|
Henry, Rock Island
|
|
Remove and replace 3 overhead dynamic message signs, structure components, and supports at various locations.
|
173-64N20
|
Executed
|
07/08/2019
|
|
|
2
|
2
|
Rock Island
|
|
Pavement patching on IL 5 and IL 5/IL 92 from Colona Road/Avenue of the Cities to the I-80/I-88 interchange.
|
174-64N28
|
Executed
|
07/11/2019
|
|
|
2
|
2
|
Lee
|
|
Expansion joint replacement, deck patching, and concrete overlay on SN 052-0060 carrying US 52 over the Green River South Edge of Amboy.
|
175-66J51
|
Executed
|
07/11/2019
|
|
|
2
|
3
|
Various
|
|
One year contract to repair damaged high tension cable median barrier, guardrail, attenuators, etc., caused by motorists along various routes.
|
176-66J81
|
Executed
|
08/19/2019
|
|
|
2
|
3
|
Iroquois
|
|
Weed spraying and seeding for prairie grass at various areas along IL 1 near Milford.
|
177-66J83
|
Executed
|
07/19/2019
|
|
|
2
|
3
|
Kankakee
|
|
Centerline and longitudinal joint crack sealing on various routes and centerline joint microsurfacing on FAP 330 from Will County line to Manteno- Deselm Road.
|
178-66J84
|
Executed
|
07/15/2019
|
|
1 |
2
|
3
|
LaSalle
|
|
8.5 miles of intermittent Class A Patching, longitudinal partial depth patching on mainline pavement, and intermittent pavement striping and crack sealing on I-39 from Marshall co Line to 0.4 miles north of CH 54 west of Tonica.
|
179-66J85
|
Executed
|
07/08/2019
|
1 / 1 |
1 |
2
|
3
|
LaSalle
|
|
6.5 miles of intermittent Class A Patching, longitudinal partial depth patching on mainline pavement, and intermittent pavement striping and crack sealing on I-39 from US 34 to 0.3 mile south of Lee County line.
|
180-66J88
|
Executed
|
07/23/2019
|
|
|
2
|
3
|
LaSalle, Livingston
|
|
12.4 miles of routing and sealing on IL 23 from just north of Oakley Avenue to Grove Street in Streator, and on IL 23 from 1 mile south of the LaSalle County Line to 9th Street in Cornell.
|
181-66J97
|
Executed
|
07/08/2019
|
|
|
2
|
3
|
LaSalle
|
|
Class B pavement patching on US 6 and IL 251 mainline and I-39 ramps at the US 6 and IL 251 interchange.
|
182-66J98
|
Executed
|
07/15/2019
|
|
|
2
|
3
|
DeKalb
|
|
Class B pavement patching on IL 64 from Peace Road in Sycamore to the Kane County line.
|
183-66J99
|
Executed
|
07/15/2019
|
|
|
2
|
3
|
DeKalb
|
|
Class B pavement patching on IL 38 from Peace Road to Somonauk Road in Cortland.
|
184-66K01
|
Executed
|
07/15/2019
|
|
|
2
|
3
|
LaSalle
|
|
Class B pavement patching on US 34 from the IL 23 north intersection to the IL 23 south intersection.
|
185-66K02
|
Executed
|
07/08/2019
|
|
|
2
|
3
|
Ford
|
|
Class B pavement patching on IL 54 from the Champaign County line to Church Street in Gibson City.
|
186-66K03
|
Executed
|
07/08/2019
|
|
|
2
|
3
|
Ford
|
|
Class B pavement patching on IL 54 from Church Street in Gibson City to East Main Street in Melvin.
|
187-66K04
|
Executed
|
07/08/2019
|
|
|
2
|
3
|
Ford
|
|
Class B pavement patching on IL 54 from East Main Street in Melvin to the Iroquois County line.
|
188-66K06
|
Executed
|
07/08/2019
|
1 / 1 |
1 |
2
|
3
|
Iroquois
|
|
Class B pavement patching on IL 1 from US 52 to the Vermilion County line.
|
189-66K07
|
Executed
|
07/15/2019
|
|
|
2
|
3
|
Iroquois
|
|
Class A and Class B patching on IL 24 from 2800E Road to the Indiana State line.
|
190-66K23
|
Executed
|
07/11/2019
|
|
|
2
|
3
|
Kankakee, Will
|
|
Radii widening at the intersection of IL 1 and E 1200N Road at the Kankakee/Will County Line. Includes new foreslopes and ditches and 0.75 mile centerline milling and resurfacing to add rumble strips.
|
191-68E53
|
Withdrawn
|
06/13/2019
|
4 / 4 |
1 |
3
|
4
|
Peoria, Tazewell
|
|
CONSTRUCTION, REPLACEMENT OR REPAIR OF SIDEWALKS AND/OR CROSSWALKS ALONG IL29 FROM HANCOCK ST. TO WAYNE ST. IN PEORIA, IL 8 FROM CHERRY LANE TO MEADOWVIEW LANE IN SUNNYLAND, IL 8 AT LEGION RD AND BUS 24 AT BONDURANT ST IN WASHINGTON.
|
192-68E71
|
Executed
|
07/15/2019
|
1 / 1 |
|
3
|
4
|
Peoria, Tazewell
|
|
DETOUR ROUTE PREPARATION, INCLUDING TEMPORARY PAVEMENT AND MISCELLANEOUS ELECTRICAL WORK, ALONG IL RTE 40 IN PEORIA AND EAST PEORIA FOR MURRAY BAKER REHABILITATION PROJECT.
|
193-68E84
|
Executed
|
07/15/2019
|
|
2 |
3
|
4
|
Mason
|
|
Apply concrete healer sealer to SN 063-0002 carrying US 136/IL 78/IL 97 over the Illinois River in Havana. (MBPM Project)
|
194-68E89
|
Executed
|
07/10/2019
|
|
|
3
|
4
|
Tazewell
|
|
PARTIAL DEPTH PATCHING ON IL 8/BUS 24 FROM LEGION RD. TO EAST CITY LIMITS IN WASHINGTON.
|
195-70D56
|
Executed
|
07/11/2019
|
|
|
3
|
5
|
Champaign, Vermilion
|
|
10.9 miles of milling and resurfacing on IL 49 from Homer SCL to the Vermilion/Edgar county line. Project includes new shoulders, milled rumble strips, bridge deck overlay and culvert replacement.
|
196-72L05
|
Executed
|
07/10/2019
|
|
|
4
|
6
|
Sangamon
|
|
Installation of video detection cameras at various intersectins on Dirksen Parkway in Springfield.
|
197-74694
|
Deleted
|
05/07/2019
|
|
|
4
|
7
|
Coles
|
|
3.9 miles of resurfacing, ADA improvements, and traffic signals on IL 16 from 0.2 mile west of Douglas Drive to 0.4 mile east of Madison Street in Charleston.
|
198-76J82
|
Executed
|
07/16/2019
|
|
|
5
|
8
|
Jersey
|
|
ADA improvements on US 67 from Oak Street to County Road in Jerseyville.
|
199-76M31
|
Executed
|
07/29/2019
|
|
|
5
|
8
|
Madison
|
|
14.9 miles of patching on IL 4 from I-55 to US 40.
|
200-78635
|
Executed
|
07/10/2019
|
2 / 2 |
1 |
5
|
9
|
Jackson
|
|
Box culvert replacement (SN 039-7061) carrying US 51 over an unnamed creek, adjacent to the Elkville Resevoir, 0.9 mile south of Hallidayboro Road, south of Elkville.
|
201-78708
|
Executed
|
07/15/2019
|
|
|
5
|
9
|
Various
|
|
Electrical repair and/or replacement on various routes in District 9.
|
202-78728
|
Executed
|
07/01/2019
|
|
|
5
|
9
|
Franklin, Jefferson
|
|
Patching and resurfacing on I-57 from 1 mile north of the West Frankfort interchange (MP 66) to Bonnie (MP 87.4).
|
203-62J10
|
Executed
|
07/19/2019
|
|
|
1
|
1
|
Cook
|
|
Intermittent resurfacing on various state maintained arterial routes in Cook County
|
204-62J11
|
Executed
|
07/25/2019
|
|
|
1
|
1
|
Cook, Kane, McHenry
|
|
Intermittent resurfacing on various routes in McHenry, Kane and Cook counties.
|
205-62J12
|
Executed
|
07/18/2019
|
|
|
1
|
1
|
Cook, Will
|
|
Intermittent resurfacing on various state maintained expressway routes in Cook and Will counties.
|
206-62J13
|
Executed
|
07/25/2019
|
|
|
1
|
1
|
DuPage, Kane
|
|
Intermittent resurfacing on various state maintained arterial routes in Dupage and Kane counties.
|
207-62J14
|
Executed
|
07/25/2019
|
1 / 1 |
1 |
1
|
1
|
Lake, McHenry
|
|
Intermittent resurfacing on various routes in Lake and McHenry counties.
|
208-62J24
|
Executed
|
07/15/2019
|
5 / 5 |
|
1
|
1
|
Various
|
|
Impact attenuators and sand barrels on various expressways in District One.
|
209-46505
|
Executed
|
07/19/2019
|
|
|
1
|
1
|
DuPage, McHenry
|
|
Apply water borne, lead free, white and yellow paint pavement marking lines, 4, 6, and 8 inches in width in Dupage and McHenry counties.
|
210-46506
|
Executed
|
07/19/2019
|
|
|
1
|
1
|
Cook
|
|
Apply water borne, lead free, white and yellow paint pavement marking lines, 4, 6, and 8 inches in width in Cook County.
|
211-66428
|
Executed
|
08/06/2019
|
|
|
2
|
3
|
Kankakee
|
|
6.530 miles of 3P milling and resurfacing from IL 17 to the north city limits of St. Anne; and traffic signal improvements at the intersection of IL 17 and IL 1.
|
212-61E01
|
Executed
|
08/01/2019
|
2 / 2 |
|
1
|
1
|
Kane
|
|
Construction of a pedestrian tunnel under the UP Railroad to reconnect the Fox River Trail on the west side of the tracks to the Prairie Path on the east side of the tracks, in the Raymond Street Forest Preserve.
|
213-61F06
|
Executed
|
08/09/2019
|
|
|
1
|
1
|
Cook
|
|
PCC multi-use path construction with ADA ramp improvements on Shermer Road from West Lake Avenue to willow Road in the Village of Glenview.
|
214-61F37
|
Executed
|
07/25/2019
|
1 / 1 |
|
1
|
1
|
Cook
|
|
Roadway reconstruction, traffic signals, interconnection with railroad signals, curb and gutter, sidewalk and street lighting at the intersection of 95th Street and Museum Avenue in Oak Lawn.
|
215-85680
|
Executed
|
07/23/2019
|
3 / 3 |
1 |
2
|
2
|
Stephenson
|
|
Replace the bridge carrying School Street over Cedar Creek, located south of Hubbard Street in the Village of Winslow.
|
216-87691
|
Executed
|
07/23/2019
|
|
|
2
|
3
|
Iroquois
|
|
Replace the bridge carrying TR74 over Spring Creek, 1.5 miles southeast of Onarga.
|
217-93728
|
Executed
|
07/17/2019
|
1 / 1 |
1 |
4
|
6
|
Hancock
|
|
Remove and replace steel plate beam guardrail at various locatons throughout Hancock County.
|
218-93733
|
Rejected
|
06/26/2019
|
14 / 14 |
|
4
|
6
|
Sangamon
|
|
Replace the structures carrying the NS Railroad over 5th and 6th Streets, and the construction of new structures to carry the UP Railroad over 5th and 6th Streets in Springfield.
|
219-95840
|
Executed
|
07/19/2019
|
|
|
4
|
7
|
Shelby
|
|
Replace the bridge carryingh TR97A over Sand Creek, located 2.2 miles north of Windsor.
|
220-95844
|
Executed
|
07/25/2019
|
2 / 2 |
|
4
|
7
|
Wayne
|
|
Replace the bridge carrying FAS 2821 over a branch of the Elm River Drain, 3.5 miles southwest of Mt. Erie.
|
221-95852
|
Executed
|
07/29/2019
|
|
|
4
|
7
|
Macon
|
|
Replace the bridge carrying School Road over a ditch 4.4 miles northeast of Argenta.
|
222-97679
|
Executed
|
07/19/2019
|
4 / 4 |
|
5
|
8
|
Monroe
|
|
Streetscape improvements including resurfacing, decorative street lights and landscaping on Main Street from Whiteside Street to Legion Street and from Cherry Street to IL 3 in columbia.
|
223-93730
|
Executed
|
07/15/2019
|
2 / 2 |
1 |
4
|
6
|
Pike
|
|
Replace the bridge carrying CH 4 over Kiser Creek, 2.8 miles southwest of Barry.
|
224-97698
|
Executed
|
07/23/2019
|
3 / 3 |
2 |
5
|
8
|
Madison
|
|
Resurfacing on Eastport Plaza Drive from south of the east connection of Executive Drive to Lentes Court in the Collinsville.
|
225-97705
|
Executed
|
07/29/2019
|
3 / 3 |
1 |
5
|
8
|
Clinton
|
|
Resurfacing and guardrail replacement on CH 3 from US 50 to Gambill Road.
|
226-97706
|
Executed
|
07/23/2019
|
|
|
5
|
8
|
St. Clair
|
|
Resurfacing Felling Springs Road from Monsanto Avenue to Queeny Avenue in the Village of Sauget.
|
227-99621
|
Executed
|
07/15/2019
|
|
|
5
|
9
|
Jefferson
|
|
Resurfacing Riddle Lane from IL 15 East Dubois Road.
|
228-99622
|
Executed
|
07/18/2019
|
1 / 1 |
1 |
5
|
9
|
Franklin
|
|
Resurfacing and aggregate shoulders on Rend City Road from Rend Lake Dam Road to IL 14.
|
229-99624
|
Executed
|
07/18/2019
|
|
|
5
|
9
|
Williamson
|
|
Resurfacing Grassy Road from Spillway Road to West of Caney Branch Lane and resurfacing Spillway Road from Hayton Shcool Road to Grassy Road.
|
230-99629
|
Executed
|
07/18/2019
|
1 / 1 |
1 |
5
|
9
|
Alexander
|
|
Resurfacing Grapevine trail from 0.6 miles east of Moseby Road to Sexton Creek.
|
231-46514
|
Executed
|
07/08/2019
|
|
|
2
|
3
|
Various
|
|
Remove and replace reflectors, remove and replace damaged raised reflective pavement marker castings within limits shown.
|
232-66E67
|
Executed
|
08/05/2019
|
|
|
2
|
3
|
Kankakee
|
|
3.43 miles of 3R resurfacing, patching, and bridge repairs on I-57 from north of the Kankakee River bridge to south of the IL 50 interchange in Bourbonnais.
|
233-70D50
|
Rejected
|
06/26/2019
|
|
|
3
|
5
|
Edgar
|
|
New PCC shoulder with inlet and curb, and new pipe drains at US 150 east of Paris.
|
234-76J17
|
Executed
|
07/15/2019
|
|
|
5
|
8
|
Calhoun
|
|
Deck replacement on SN 007-0014 carrying IL 96 over an unnamed creek in Kampsville.
|
235-76K57
|
Executed
|
07/16/2019
|
1 / 1 |
|
5
|
8
|
Greene
|
|
Bridge deck replacement on SN 031-0016 carrying IL 267 over Lick Creek south of CH 9.
|
236-85674
|
Executed
|
07/23/2019
|
1 / 1 |
|
2
|
2
|
Stephenson
|
|
Construction of a shared-use path along the north side of the Pecatonia River in Freeport and along an abandoned railroad from Tutty's Crossing Trailhead at Stephenson Street (IL 75) to River Road, east of Freeport.
|
237-87697
|
Executed
|
08/02/2019
|
|
|
2
|
3
|
DeKalb
|
|
Pavement widening to add right turn lanes on Peace Road at Freed Road and Brickville Road.
|
238-89462
|
Executed
|
07/29/2019
|
|
1 |
3
|
4
|
Marshall
|
|
Resurfacing, aggregate and HMA shoulders, culvert extensions, guardrail and pavement markings on Yankee Lane from IL 17 to Peoria County line.
|
239-89715
|
Executed
|
07/08/2019
|
|
|
3
|
4
|
Fulton
|
|
Install ornamental lighting, sidewalks, curb and gutter, storm sewers, pavement milling, resurfacing and markings on IL 116/78 from Main Street to Lightfoot Road in Farmington.
|
240-89742
|
Executed
|
07/15/2019
|
|
|
3
|
4
|
Fulton
|
|
Processing modified soils, HMA resurfacing, aggregate shoulders, pipe culverts and pavement markings on CH 2 from Airport Road to the BSNF Railroad crossing.
|
241-95848
|
Executed
|
07/25/2019
|
|
|
4
|
7
|
Crawford
|
|
Replace the bridge carrying TR 54 over Dogwood Creek, 0.5 miles southeast of Oblong.
|
242-95850
|
Executed
|
07/10/2019
|
|
|
4
|
7
|
Clay
|
|
Replace the bridge carrying TR 179 (Quartz Lane) over Hurrican Creek, 3.0 miles south of Wendelin.
|
243-95853
|
Executed
|
07/09/2019
|
|
|
4
|
7
|
Crawford
|
|
Resurfacing and lime modified soil and aggregate base on various routes from the Jasper County line to North 700th Street in Annapolis.
|
244-97677
|
Executed
|
07/23/2019
|
4 / 4 |
|
5
|
8
|
St. Clair
|
|
Streetscape project consisting of ADA compliant sidewalks, curb and gutter, decorative street lighting and resurfacing on West Main Street from 12th Street to 6th Street, and 158 feet east of 'A' Street in Belleville.
|
245-97691
|
Executed
|
07/23/2019
|
2 / 2 |
1 |
5
|
8
|
Madison
|
|
Pavement reconstruction, patching, curb and gutter, ADA compliant sidewalks, storm sewer, and pavement markings on West clay Street from IL 162 to North Main Street in Troy.
|
246-97697
|
Executed
|
07/17/2019
|
1 / 0 |
|
5
|
8
|
Bond
|
|
Replace the bridge carrying TR 156 (dudleyville Road) over Beaver Creek, 2.75 miles south of Greenville.
|
247-97702
|
Executed
|
08/01/2019
|
|
|
5
|
8
|
Jersey
|
|
Replace the bridge carrying Ryan Road over a tributary of Macoupin Creek, 2.8 miles south of Kemper.
|
248-99626
|
Executed
|
07/23/2019
|
11 / 11 |
1 |
5
|
9
|
Jefferson
|
|
Replace the structure carrying Richview Road over Pierce Creek, 3 miles south-southeast of Boyd.
|
249-61E96
|
Executed
|
07/15/2019
|
|
|
1
|
1
|
DuPage
|
|
Construction of an HMA pedestrian path, sidewalks, storm sewer and the extension of a culvert on the west side of Chruch Road from Grove Avenue to IL Route 19 in the Village of Bensenville
|
250-66J68
|
Executed
|
07/08/2019
|
|
2 |
2
|
3
|
Iroquois, Livingston
|
|
Installing back up generators at 2 pump stations, and removal and replacement of all electrical, plumbing, HVAC, and mechanical equipment at the Reading pump station.
|
01A-DI029
|
Rejected
|
07/08/2019
|
|
1 |
2
|
2
|
Lee
|
|
Rehabilitate Electrical System for Runway 12/30 and Airfield Signs
|
02A-WA074
|
Deleted
|
05/09/2019
|
|
|
1
|
1
|
|
|
Rehabilitate Runway 5/23
|
03A-RC009
|
Executed
|
10/21/2019
|
|
1 |
2
|
2
|
Ogle
|
|
Rehabilitate Runway 7/25 and Runway Lighting
|