| Region | District | DBE % | VBP % | Federal Project # |
|---|---|---|---|---|
| 4 | 6 | 0.00 | 0.00 | 317SBGPTBD |
| County(s) | IL Project # | Airport | Sponsor | City |
|---|---|---|---|---|
|
3LF 5221 | Litchfield Municipal | Litchfield Airport Authority | Litchfield |
| Contract Specifics |
|---|
| The time limit to award this item has been changed from 45 days to 90 days after the scheduled letting. |
| 76 Calendar Days |
|
WARNING: FAA Buy American Preference provisions apply to this contract. Failure to submit a “Certification of Compliance with FAA Buy American Preference – Construction Projects” form in accordance with the bidding procedures set forth in the proposal document (Appendix A4 BUY AMERICAN PREFERENCE) will result in the bid being declared non-responsive. |
| No More Contract Specifics |
| Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
|---|---|---|---|---|---|---|---|
| AR108108 | FOOT | 1/C #8 5 KV UG CABLE | Base items | 1,500.000 | |||
| AR109100 | L SUM | CONSTRUCT ELECTRICAL VAULT | Base items | 1.000 | |||
| AR109200 | L SUM | INSTALL ELECTRICAL EQUIPMENT | Base items | 1.000 | |||
| AR115610 | EACH | ELECTRICAL HANDHOLE | Base items | 2.000 | |||
| AR115710 | EACH | ELECTRICAL MANHOLE | Base items | 1.000 | |||
| AR150510 | L SUM | ENGINEER'S FIELD OFFICE | Base items | 1.000 | |||
| AR150520 | L SUM | MOBILIZATION | Base items | 1.000 | |||
| AR800541 | FOOT | 4-WAY, 2" PVC DUCT BANK, DIR. BUR. | Base items | 160.000 | |||
| AR800542 | FOOT | 6-WAY, 2" PVC DUCT BANK, DIR. BUR. | Base items | 45.000 | |||
| AR800564 | L SUM | CABLE & CCR TESTING & CALIBRATION | Base items | 1.000 | |||
| AS109901 | L SUM | REMOVE ELECTRICAL VAULT | Additive 1 | 1.000 | |||
| AS109924 | L SUM | REPLACE ELECTRIC SERVICES | Additive 1 | 1.000 | |||
| No More Pay Items | |||||||