001-46669
|
Active
|
09/23/2025
|
|
|
4
|
6
|
Various
|
|
Removing and replacing damaged raised reflective pavement and markers and/or lenses throughout District 6.
|
01X-74435
|
Active
|
09/23/2025
|
|
|
4
|
7
|
Coles
|
|
Reconstructing the I-57 and IL 16 interchange located east of Mattoon from a cloverleaf to a raindrop diamond configuration.
|
002-46944
|
Active
|
09/23/2025
|
|
|
2
|
2
|
Whiteside
|
|
Bridge deck replacement and other brige repairs to structure SN 098-3751 in Whiteside County.
|
003-60R94
|
Active
|
09/23/2025
|
|
|
1
|
1
|
Cook
|
|
(3366.37-Ft) Intersection Reconstruction of IL-171 at 95th Street, reconfigure the existing "wye" intersection into a "tee" intersection, in Unincorporated Willow Springs, Illinois in. Cook County.
|
004-62321
|
Active
|
09/23/2025
|
|
|
1
|
1
|
Cook
|
|
(1,375-Ft) Standard Overlay, ADA Improvements Project with HMA surface and binder course, thermoplastic pavement markings, curb ramps located on Kimball Avenue from Diversey Avenue to Wellington Avenue located in the City of Chicago Cook County.
|
005-62P93
|
Active
|
09/23/2025
|
|
|
1
|
1
|
Cook
|
|
ADA Improvements: curb ramps for sidewalks (ADA) including combination curb and gutter removal and replacement, sidewalk removal and replacement, installation of detectable warning surfaces, drainage structure adjustments, minor traffic signal improvements (accessible pedestrian signals), thermoplastic pavement markings work. Location: Various Routes, Various Locations within Norwood Park and Leyden Townships (Villages of Norridge, Park Ridge, River Grove and Elmwood Park).
|
006-62R51
|
Active
|
09/23/2025
|
|
|
1
|
1
|
Will
|
|
(3,400-Ft) Intersection Improvement (channelization, pavement widening, resurfacing),traffic signal Installation at railroad crossing, traffic signal modernization, Interconnect, minor lighting improvements, drainage Improvements (including new storm sewer at Monee Maintenance Yard), Location: IL 50 (Cicero Avenue) at Dralle Road, at Governors Hwy and at Monee Maintenance Yard, located withing the Villages of University Park and Monee.
|
007-62R63
|
Active
|
09/23/2025
|
|
|
1
|
1
|
Cook
|
|
(2,891-Ft) Bridge Replacement Project. lighting, traffic signals and ADA improvements for structure (SN 016-0834) for I-94 (Edens Expressway) at Devon Avenue (Overhead) in the City of Chicago and the Village of Lincolnwood within Cook County.
|
008-62R76
|
Active
|
09/23/2025
|
|
|
1
|
1
|
Will
|
|
(290-Ft) Bridge Deck Overlay, (SN 099-0210) over I-55. The project consists of reconstruction of the expansion joints with strip seals, hydro scarification (3/4-), deck and approach slab repairs, latex concrete overlay (2¼-) with diamond grinding and longitudinal grooving, application of a protective coat, and substructure concrete repair. Roadway improvements include HMA on each side of the bridge. I-55 at Caton Farm Road (3 miles north of US 52) in the Village of Plainfield.
|
009-62U41
|
Active
|
09/23/2025
|
|
|
1
|
1
|
Cook
|
|
(481-Ft) Bridge Replacement Project, bridge approach slab replacement for Structure Number (016-2068), lighting, traffic signal modernization, ADA improvement, resurfacing, I-290 at Keeler Avenue.
|
010-62Y00
|
Active
|
09/23/2025
|
|
|
1
|
1
|
Will
|
|
The work consists of building demolition for eleven (11) residential and/or commercial parcels and outbuildings. Each parcel removal will include removing any structure above and below the ground, including the main building frames, attached and detached buildings, facilities, and filling of basements, removal of fences, sidewalks and driveways, utilities, and trees within the parcels' limits. Interim grading and seeding. The project located in the City of Joliet, in the vicinity of FAI Route 80 (Interstate 80) and Des Plaines River.
|
011-62Y05
|
Active
|
09/23/2025
|
|
|
1
|
1
|
McHenry
|
|
(1050-Ft) Bridge Deck Overlay (SN 056-0037) consists of replacing the expansion joints at both abutments, updating the guardrail, removing tree debris from the channel. Located on FAP Route 336, IL 31 (Richmond Road) over Nippersink Creek in The City of Richmond in McHenry County, IL.
|
012-62Y14
|
Active
|
09/23/2025
|
|
|
1
|
1
|
Cook
|
|
(296-Ft) Bridge joint repair and replacement, and bridge deck latex overlay project (SN 016-2545) consist of I-beam repair, joint sealing, HMA surface removal, butt joints, HMA surface course, guardrail removal, traffic barrier terminal installation, pavement markings, temporary concrete barrier, maintenance of traffic with temporary pavement markings, temporary traffic signals. This project is in the City of Chicago Heights, in Cook County, IL.
|
013-62Y30
|
Active
|
09/23/2025
|
|
|
1
|
1
|
Cook
|
|
(190-Ft) Bridge Deck Overlay, Bridge Joint Replacement consists of scarify and overlay bridge deck, bridge deck repairs, repair piers and abutments, repair parapets and sidewalk, joint replacement, and graffiti removal on the bridge of US 14 (Peterson Ave) over North Shore Channel. This project is in the City of Chicago in Cook County.
|
014-62Y33
|
Active
|
09/23/2025
|
|
|
1
|
1
|
Various
|
|
Project consist of the installing new signs, removal, relocation and repair of existing signs. Location of the project is in various counties in District 1.
|
015-62Y36
|
Active
|
09/23/2025
|
|
|
1
|
1
|
Various
|
|
The intent of this contract is to provide prompt repair to the high-tension cable barrier median system. This work includes removing and replacing damaged high tension cable barrier system components. This work is located on various State maintained routes in Various Counties.
|
016-64L71
|
Active
|
09/23/2025
|
|
|
2
|
2
|
Henry
|
|
Culvert replacement on IL 82 Over a Drainage Ditch 0.3 mile north of roadway 1700N.
|
017-64R26
|
Active
|
09/23/2025
|
|
|
2
|
2
|
Jo Daviess
|
|
Bridge deck patching on SN 043-0043, carrying US 20/IL 84 over Galena River and ICG RR in Galena.
|
018-64S71
|
Active
|
09/23/2025
|
|
|
2
|
2
|
Carroll
|
|
10.3 miles of milling, HMA overlay, shoulders, and patching on IL 84 from 0.2 mile north of Doty Rd south of Savanna to the Whiteside County Line.
|
019-64T05
|
Active
|
09/23/2025
|
|
|
2
|
2
|
Ogle
|
|
Bridge repairs and joint replacement on SN 071-0082, carrying IL 64 over Elkhorn Creek Tributary, 0.4 mile east of US 52.
|
020-64T96
|
Active
|
09/23/2025
|
|
|
2
|
2
|
Lee
|
|
Bridge repairs and joint replacement on SN 052-0068, carrying IL 251 over Bureau Creek, 0.80 miles north of Lee County line.
|
021-64U18
|
Active
|
09/23/2025
|
|
|
2
|
2
|
Henry, Whiteside
|
|
11.4 miles of patching, cold milling, and standard overlay on IL 78 from 0.2 mile north of IL 92 in Henry County to north of west 8th St in Prophetstown, Whiteside County; and IL 92 from IL 78 to Bureau County Line in Henry County.
|
022-64U21
|
Active
|
09/23/2025
|
|
|
2
|
2
|
Lee
|
|
8 Miles Cold-In Place Eldena Road to US 30.
|
023-64U80
|
Active
|
09/23/2025
|
|
|
2
|
2
|
Henry
|
|
9 miles of intermittent resurfacing from IL 81 to culvert #1083 .25 miles South of I-80 ramps.
|
024-64U82
|
Active
|
09/23/2025
|
|
|
2
|
2
|
Henry
|
|
9 miles of intermittent resurfacing along Atkinson Rd. from IL 92 to Atkinson and on I-80 ramps south of Atkinson.
|
025-64U87
|
Active
|
09/23/2025
|
|
|
2
|
2
|
Henry
|
|
16.6 miles of agg. shoulder repair from Woodhull to Galva along IL 17/ US 34, and IL 91 to Henry Co. line.
|
026-64U98
|
Active
|
09/23/2025
|
|
|
2
|
2
|
Winnebago
|
|
Furnishing the structural steel and bearings for the bridge on FAP Route 525 over the Kishwaukee River in Cherry Valley Township, in Winnebago, IL.
|
027-64V05
|
Active
|
09/23/2025
|
|
|
2
|
2
|
Rock Island
|
|
Bridge washing of SN 081-0011 carrying I-80 over the Mississippi River in Rock Island County.
|
028-64V06
|
Active
|
09/23/2025
|
|
|
2
|
2
|
Rock Island
|
|
Bridge washing of SN 081-0106 carrying I-280 over the Mississippi River in Rock Island County.
|
029-64V07
|
Active
|
09/23/2025
|
|
|
2
|
2
|
Carroll, Rock Island, Whiteside
|
|
Bridge washing of 3 structures over the Mississippi River in Carroll, Rock Island, and Whiteside Counties.
|
030-66R42
|
Active
|
09/23/2025
|
|
|
2
|
3
|
Kankakee
|
|
Traffic Signal Mast Arm Replacement at the intersections of US 45/US 52 and River Road and at US 45/ US 52 and South Tec Drive.
|
031-66R58
|
Active
|
09/23/2025
|
|
|
2
|
3
|
Livingston
|
|
Removing existing dual CMP culverts at three locations and replacement with a precast concrete box culvert, ditch cleaning, pavement removal and replacement, landscaping and other related construction work on IL Route 116 beginning approximately 138 feet west of N. 1450 Rd and ending approximately 170 feet east of 1304 W. Reynolds St. in Pontiac.
|
032-66R83
|
Active
|
09/23/2025
|
|
|
2
|
3
|
LaSalle
|
|
Milling and resurfacing, patching, pavement striping, pavment markers, and other related construction work on FAU_Route 6081 north of I-80 in Peru beginning at Il Route 251 and ending at Airport Rd; also on Charles St adjacent to east 3rd Rd in Lasalle County.
|
033-66R85
|
Active
|
09/23/2025
|
|
|
2
|
3
|
LaSalle
|
|
Filling existing shoulder inlets, paved shoulder removal and replacement with PCC shoulders and concrete curbs, pipe drain removal, riprap installation Class A Patching (Special) and other related construction work on FAI 39 north and south of SNs 050-0167 and 050-0168 over the Chicago and Northwestern Railroad.
|
034-68B60
|
Active
|
09/23/2025
|
|
|
3
|
4
|
Warren
|
|
Rehabilitation and resurfacing of the existing pavement including vertical adjustments, curve adjustments, shoulder widening, guardrail replacement, culvert replacements and extensions, addition of turn lanes, and all other related collateral work necessary to complete the project located on US 67 (FAP 310) from south of 270th St to south of 220th St_in Monmouth. Nearly 6 mi.
|
035-68F45
|
Active
|
09/23/2025
|
|
|
3
|
4
|
Woodford
|
|
Class D patching, milling and resurfacing, ADA improvements, curb and gutter removal and replacement, drainage improvements, the addition of a turn-lane, and other related collateral work on IL 117 from 600' south of Grandview Circle to Mill St in Eureka. 1.87 miles.
|
036-70D72
|
Active
|
09/23/2025
|
|
|
3
|
5
|
McLean
|
|
Culvert replacement at ditch 0.4 mile south of US 136 in Heyworth.
|
037-70E65
|
Active
|
09/23/2025
|
|
|
3
|
5
|
Piatt
|
|
Bridge deck overlay IL-32 over the Sangamon River 4.3 miles south of Cisco (SN 074-3171).
|
038-70F19
|
Active
|
09/23/2025
|
|
|
3
|
5
|
McLean
|
|
Mill, patch and resurface FAP 693 (ILL 9) from Hinshaw Avenue to Center Street in Bloomington, IL._Approximately 1.291 miles.
|
039-70F93
|
Active
|
09/23/2025
|
|
|
3
|
5
|
McLean
|
|
Bridge deck overlay at Mackinaw River 2 miles southwest of Lexington and at Turkey Creek 1.5 miles southwest of Lexington on I-55.
|
040-70H59
|
Active
|
09/23/2025
|
|
|
3
|
5
|
Champaign
|
|
Bridge Painting of 7 Structures on FAI 74 / (I-74) in Champaign County.
|
041-72307
|
Active
|
09/23/2025
|
|
|
4
|
6
|
Pike
|
|
9.2 miles of partial depth pavement patching, resurfacing, HMA shoulders, concrete gutter replacement and guardrail updates on IL 107 from the Brown County line to north of Franklin Street in Griggsville.
|
042-72383
|
Active
|
09/23/2025
|
|
|
4
|
6
|
Logan
|
|
5 miles of Cape seal on the mainline and fog seal on the shoulders of IL 121 from west of IL 54, south of Mt Pulaski, to 0.2 miles west of CH 6 (2200th Avenue), west of Latham.
|
043-72420
|
Active
|
09/23/2025
|
|
|
4
|
6
|
Macoupin
|
|
|
044-72433
|
Active
|
09/23/2025
|
|
|
4
|
6
|
Sangamon
|
|
2.7 miles of resurfacing on Andrew Road from 0.1 miles east of IL 29 to west of IL 124, west of Sherman.
|
045-72469
|
Active
|
09/23/2025
|
|
|
4
|
6
|
Christian
|
|
8.4 miles of microsurfacing on Mt. Auburn Road from south of Arch Street in Mt. Auburn to south of CH 21 (2100N Road) in Taylorville.
|
046-72508
|
Active
|
09/23/2025
|
|
|
4
|
6
|
Sangamon
|
|
Tree removal and vegetation removal along I-55 from 11th Street to Stevenson Drive in Springfield.
|
047-72523
|
Active
|
09/23/2025
|
|
|
4
|
6
|
Cass, Schuyler
|
|
1.8 miles of tree removal on US 67 / IL 100 near the Illinois River Bridge in Beardstown.
|
048-72653
|
Active
|
09/23/2025
|
|
|
4
|
6
|
Logan
|
|
Painting three bridges on I-55 in northern Logan County. (SN 054-060, 054-0061, and 054-0062)
|
049-72688
|
Active
|
09/23/2025
|
|
|
4
|
6
|
Sangamon
|
|
Tree clearing and ditch grading along the IDOT access road near the Lincolnshire Subdivision, northwest of I-72 and Chatham Road in Springfield.
|
050-72978
|
Active
|
09/23/2025
|
|
|
4
|
6
|
Sangamon
|
|
Bridge deck overlay on SN 084-0192 carrying IL 104 over Sugar Creek, 1.2 miles east of Auburn.
|
051-72A25
|
Active
|
09/23/2025
|
|
|
4
|
6
|
Pike, Scott
|
|
Painting portions of four bridges on I-72. (SN 075-0083, 075-0112, 086-0037 and 086-0038)
|
052-72A62
|
Active
|
09/23/2025
|
|
|
4
|
6
|
Sangamon
|
|
Bridge removal on I-55 / I-72, 0.1 miles south of Stevenson Drive.
|
053-72D12
|
Active
|
09/23/2025
|
|
|
4
|
6
|
Pike, Scott
|
|
1.4 miles of tree removal for the new Illinois River Bridge in Florence.
|
054-72F57
|
Active
|
09/23/2025
|
|
|
4
|
6
|
Menard
|
|
Expansion joint removal and deck/approach patching on SN 065-0018 carrying IL 123 over Indian Creek, 2.5 miles east of IL 97.
|
055-72G63
|
Active
|
09/23/2025
|
|
|
4
|
6
|
Macoupin
|
|
5.3 miles of resurfacing on IL 111 from south of Sherman Street in Palmyra to south of Cheshire Lane, north of Hettick.
|
056-72G90
|
Active
|
09/24/2025
|
|
|
4
|
6
|
Christian
|
|
1.8 miles of resurfacing, patching, ADA curb ramps, storm sewer, pipe culverts and lighting on IL 29 in Pana.
|
057-74168
|
Active
|
09/23/2025
|
|
|
4
|
7
|
Macon
|
|
Bridge replacement on IL 105 over Long Creek, 0.5 miles east of Oakley Road. (SN 058-0044)
|
058-74433
|
Deleted
|
10/02/2025
|
|
|
4
|
7
|
Clark
|
|
Replacement of SN 012-0014 carrying IL 1 over the CSX Railroad, 0.5 miles north of US 40.
|
059-74D31
|
Active
|
09/25/2025
|
|
|
4
|
7
|
Lawrence
|
|
Tree removal and tree installation along US 50 from 320E to 750E.
|
060-74595
|
Active
|
09/23/2025
|
|
|
4
|
7
|
Cumberland
|
|
Bridge replacement on US 40 over the Embarras River, 0.5 miles east of Cumberland Road, west of Greenup.
|
061-74650
|
Active
|
09/23/2025
|
|
|
4
|
7
|
Coles
|
|
Superstructure replacement and bridge widening of 2 structures on I-57 over IC Railroad and TR 86 at Jones Switch. (SN 015-0003 and 015-0004)
|
062-74705
|
Deleted
|
10/02/2025
|
|
|
4
|
7
|
Macon
|
|
Replacement of 2 structures carrying I-72 over IL 121 and the IC Railroad, northwest of Decatur. (SN 058-0074 and 058-0075)
|
063-74B78
|
Active
|
09/23/2025
|
|
|
4
|
7
|
Wayne
|
|
Bridge deck overlay, bridge deck repairs and approach pavement on SN 096-0010 carrying IL 15 over the Little Wabash River, 0.3 miles east of CR 2500 East.
|
064-76A46
|
Active
|
09/23/2025
|
|
|
5
|
8
|
Madison
|
|
Intersection improvements with signals and bridge replacement on IL 162/IL 157 in Glen Carbon.
|
065-76R78
|
Active
|
09/23/2025
|
|
|
5
|
8
|
St. Clair
|
|
Modernization of eight traffic signals along the IL 159 corridor in Fairview Heights.
|
066-76T66
|
Active
|
09/23/2025
|
|
|
5
|
8
|
Greene
|
|
Structural, mechanical and electrical repairs to the Joe Page Bridge in Hardin. (SN 031-0001)
|
067-76U47
|
Active
|
09/23/2025
|
|
|
5
|
8
|
Various
|
|
Bridge deck sealing on various bridges throughout various counties of District 6. (Calhoun, Greene and Jersey)
|
068-76U48
|
Active
|
09/23/2025
|
|
|
5
|
8
|
Various
|
|
Bridge deck sealing on various bridges throughout various counties of District 6. (Bond, Clinton, Marion and Washington)
|
069-76U50
|
Active
|
09/23/2025
|
|
|
5
|
8
|
Monroe, Randolph
|
|
Bridge deck sealing on various bridges throughout Monroe and Randolph Counties in District 6.
|
070-76U64
|
Active
|
09/23/2025
|
|
|
5
|
8
|
Various
|
|
Litter removal - IL 100 from Norman-s Landing to US 67; US 67 from IL 100 to IL 143; I-270 from the Mississippi River to IL 3; I-70 from the Mississippi Riv River to I-55/64; I-55/64 from the Mississippi River to I-70; I-255 from the Mississippi River to IL 3.
|
071-78209
|
Active
|
09/23/2025
|
|
|
5
|
9
|
Williamson
|
|
Replacement of SN 100-0031 carrying IL 166 over Sugar Creek at the east corporate limits of Creal Springs.
|
072-78813
|
Active
|
09/23/2025
|
|
|
5
|
9
|
Perry
|
|
1.6 miles of milling, resurfacing, shoulder work, culvert replacement and patching on IL 14 from US 51 in DuQuoin to Old Route 14.
|
073-78878
|
Deleted
|
10/02/2025
|
|
|
5
|
9
|
Jefferson
|
|
Replacing SN 041-0089 and 041-0090 carrying I-64 over Casey Fork and UP Railroad, 0.2 miles east of IL 37.
|
074-78937
|
Withdrawn
|
10/03/2025
|
|
|
5
|
9
|
Jackson
|
|
Replacement of SN 039-0052 carrying US 51 over CN, IC Railroad, approximately 2.6 miles north of Desoto.
|
075-78994
|
Active
|
09/23/2025
|
|
|
5
|
9
|
Franklin
|
|
Adjustment of a sanitary sewer forced main and the repair of two eroded downstream channels at I-57 Northbound Rend Lake Rest Area.
|
076-78A79
|
Active
|
09/23/2025
|
|
|
5
|
9
|
White
|
|
0.6 miles of pavement, shoulder and median replacement on IL 1 at the I-64 interchange.
|
077-78B23
|
Active
|
09/23/2025
|
|
|
5
|
9
|
Franklin
|
|
Replacement of SN 028-7049 on IL 14, 1 mile east of Benton.
|
078-78B42
|
Active
|
09/23/2025
|
|
|
5
|
9
|
Union
|
|
Installation of culvert liners at various locations along I-57 in District 9 (SN 091-7066, 091-7071, 091-7072, 091-7073 and 091-7077).
|
079-78B51
|
Active
|
09/23/2025
|
|
|
5
|
9
|
Gallatin
|
|
1.6 miles of resurfacing on Old Shawneetown Road / Washington Street from IL 13 to Main Street in Old Shawneetown and 0.2 miles of resurfacing on Shawneetown Road from IL 13 to Washington Street in Old Shawneetown.
|
080-78B53
|
Active
|
09/23/2025
|
|
|
5
|
9
|
Perry
|
|
6.8 miles of resurfacing and ADA ramp improvements on US 51 from 0.2 miles north of IL 154 to Raven Road.
|
081-78B54
|
Active
|
09/24/2025
|
|
|
5
|
9
|
Jackson
|
|
Resurfacing Sweets Drive from Reed Station Road to 0.5 miles west of Reed Station Road in Carbondale.
|
082-78B58
|
Active
|
09/23/2025
|
|
|
5
|
9
|
Williamson
|
|
1.9 miles of patching and resurfacing on IL 148 from 0.8 miles south of the Franklin County line to 17th Street, north of Herrin.
|
083-78B63
|
Active
|
09/23/2025
|
|
|
5
|
9
|
Union
|
|
0.6 miles of HMA removal, pavement overlay, patching and shoulder work on Old US 51 from IL 146 to US 51.
|
084-78B64
|
Active
|
09/23/2025
|
|
|
5
|
9
|
Various
|
|
Bridge deck concrete sealing on various bridges in Alexander, Johnson, Massac, Pulaski and Union Counties.
|
085-78B74
|
Active
|
09/23/2025
|
|
|
5
|
9
|
Williamson
|
|
Patching on IL 166 from IL 13 to Tune Road east of Marion.
|
086-78B82
|
Active
|
09/23/2025
|
|
|
5
|
9
|
Various
|
|
Painting structures on various routes in various counties: 3 in Johnson County, 7 in Union County and 2 in Williamson County.
|
087-80B14
|
Active
|
09/23/2025
|
|
|
1
|
1
|
Will
|
|
(1.19-Mile) This project-s scope is designed overlay. It consists of resurfacing the existing HMA pavement with HMA surface and binder course, thermoplastic pavement markings located along US 6 (Channahon Rd) from Terry Drive of IL 7 (Larkin Ave) in the City of Joliet in Will County.
|
088-80B18
|
Active
|
09/23/2025
|
|
|
1
|
1
|
Cook
|
|
(767.78-Ft) Designed Overlay Project consists of hot-mix asphalt surface removal, resurfacing with polymerized hot-mix asphalt surface course and polymerized hot-mix asphalt binder course, placement of thermoplastic and preformed plastic pavement markings, pavement patching, combination concrete curb and gutter removal and replacement. The project is located within the City of Elgin in Hanover Townships in Cook County.
|
089-80B19
|
Active
|
09/23/2025
|
|
|
1
|
1
|
Cook
|
|
(3,512-Ft) Standard Overlay and ADA curb ramp improvement project consists of asphalt surface removal, placement of hot mix surface course, placement of hot mix binder course, pedestrian ramp improvements, pavement patching and pavement markings. This project located on IL-1 (Halsted St) from South of Ridge Road to Strieff Lane in the Villages of Homewood and Glenwood within Cook County.
|
090-80B29
|
Active
|
09/23/2025
|
|
|
1
|
1
|
Lake
|
|
(0.46-mile) Designed Overlay consisting of hot-mix asphalt surface removal, depth patches (Class D), curb and gutter spot repairs (removal and replacement) hot-mix asphalt resurfacing (cold milling and inlay), new thermoplastic pavement markings. Located on US 45 (Lake Street) from north of Tempel Drive to Ramp to IL 137 within the Village of Libertyville.
|
091-80B50
|
Active
|
09/23/2025
|
|
|
1
|
1
|
Lake
|
|
(1.08-Mile) Standard Overlay and ADA Improvements: curb and gutter spot repairs (remove and replace), sidewalk removal and replacement for curb ramps for sidewalks (ADA), hot-mix asphalt (HMA) surface removal and replacement (cold milling and inlay), full-depth patches (Class D), drainage structures adjustments and cleaning, new thermoplastic pavement markings raised reflective pavement markers, accessible pedestrian signals (APS) improvements and detector loops. Location: US 45 (Lake Street), from IL 176 (Maple Avenue) to Woodlawn Drive within the Village of Mundelein.
|
092-80B53
|
Active
|
09/23/2025
|
|
|
1
|
1
|
Cook
|
|
This improvement consists of a full bridge painting and cleaning for the BNSF Bridges (SN 016-0020) and (SN 016-0021) over FAI 55 (Stevenson Expressway) in the City of Chicago and Cook County.
|
093-80B69
|
Active
|
09/23/2025
|
|
|
1
|
1
|
Cook
|
|
The project consists of Full Arterial Cleaning Cycle, Supplemental Sweeping including pickup, removal and satisfactory disposal of limbs, sticks, leaves, stones, dirt, weeds, debris, deceased animal carcasses, refuse, litter on various State maintained arterial routes located within the northern half of Cook County.
|
094-80B70
|
Active
|
09/23/2025
|
|
|
1
|
1
|
DuPage
|
|
The project consists of Arterial Cleaning, Supplemental Sweeping shall consist of the pickup, removal and satisfactory disposal of limbs, sticks, leaves, sand stones, dirt, weeds, debris, deceased animal carcasses, refuse, litter and any other rubbish which has accumulated on the highway areas located on various State maintained arterial routes within DuPage County.
|
095-80B71
|
Active
|
09/23/2025
|
|
|
1
|
1
|
Cook
|
|
This project consists of Arterial Cleaning, Supplemental Sweeping shall consist of the pickup, removal and satisfactory disposal of limbs, sticks, leaves, sand stones, dirt, weeds, debris, deceased animal carcasses, refuse, litter and any other rubbish which has accumulated on the highway areas located on various State maintained arterial routes located within southern half of Cook County.
|
096-80B72
|
Active
|
09/23/2025
|
|
|
1
|
1
|
Will
|
|
This project consists of Arterial Cleaning, Supplemental Sweeping shall consist of the pickup, removal and satisfactory disposal of limbs, sticks, leaves, sand stones, dirt, weeds, debris, deceased animal carcasses, refuse, litter and any other rubbish which has accumulated on the highway areas located on various State maintained arterial routes located within the county of Will.
|
097-80B73
|
Active
|
09/23/2025
|
|
|
1
|
1
|
Cook
|
|
The project consists of GRAFFITI REMOVAL and shall consist of removing graffiti from the surfaces on State DOT right of way located on the inbound and outbound mainlines and ramps of the Kennedy (I-90/94), Dan Ryan (I-90/94), Bishop Ford (I-94), the Stevenson (I-55), and I-57 Expressways in Cook County.
|
098-61J94
|
Active
|
09/25/2025
|
|
|
1
|
1
|
Cook
|
|
Construct a shared-use path adjacent to Meacham Road, from IL 72 to American Lane, and adjacent to Golf Road from Meacham Road to Roosevelt Boulevard in Schaumburg.
|
099-61L19
|
Active
|
09/25/2025
|
|
|
1
|
1
|
Lake
|
|
Construction of a single-span PPC IL-beam bridge with intgral abutments carrying Greenwood Avenue over the Union Pacific Railroad in Waukegan. Additional work includes MSE retaining walls, HMA approach roadways, guardrail, and lighting.
|
100-61L43
|
Active
|
09/25/2025
|
|
|
1
|
1
|
Cook
|
|
HMA resurfacing on Woodfield Road from Plum Grove Road to Meacham Road in Schaumburg. Includes; HMA full depth patching, curb and gutter, sidewalks, shared use path, traffic signal modifications, and lighting.
|
101-61L56
|
Active
|
09/25/2025
|
|
|
1
|
1
|
Kane
|
|
Resurfacing Molitor Road from Elizebeth Lane to Felton Road, Diehl Road from Felton Road to Eola Road, Molitor Road from Diehl Road to Eola Road in Aurora.
|
102-61L57
|
Active
|
09/25/2025
|
|
|
1
|
1
|
DuPage
|
|
Resurfacing Stonebridge Boulevard from Sheffer Road to Indian head Road, and from Sheffer Road to Eola Road in Aurora.
|
103-61L75
|
Active
|
09/25/2025
|
|
|
1
|
1
|
Cook
|
|
Resurfacing 5th Avenue from Harrison Street to Quincy Street in Maywood.
|
104-61L76
|
Active
|
09/25/2025
|
|
|
1
|
1
|
Cook
|
|
Resurfacing and pedestrian safety improvements at the intersection of 9th Ave. at Van Buren Street, and at Quiney Street in Maywood.
|
105-61L77
|
Active
|
09/25/2025
|
|
|
1
|
1
|
Cook
|
|
Construct PCC Sidewalks along Center Avenue from Maple Avenue to Laurel Avenue. Includes: ADA Ramps, curb and gutter, landscaping, pavement markings and driveways.
|
106-61L78
|
Active
|
09/25/2025
|
|
|
1
|
1
|
DuPage
|
|
Resurfacing Rober Palmer Drive from North York Street to South York Street in Elmhurst.
|
107-61L79
|
Active
|
09/25/2025
|
|
|
1
|
1
|
DuPage
|
|
HMA resurfacing on Lambert Road from the South Village limits to IL 38 in Glen Ellyn. Includes; pavement patching, curb and gutter, sidewalks, ADA ramps, and q traffic signal maintenance.
|
108-61L80
|
Active
|
09/25/2025
|
|
|
1
|
1
|
DuPage
|
|
Resurfacing Riford Road from St. Harles Road to Crescent Boulevard in Glen Ellyn.
|
109-61L81
|
Active
|
09/25/2025
|
|
|
1
|
1
|
Will
|
|
Resurfacing Remington Road from Weber Road to Claar Boulevard in Romeoville.
|
110-61L82
|
Active
|
09/25/2025
|
|
|
1
|
1
|
Cook
|
|
Construction of a three-span cast-in-place RC slab bridge to carry 21st Street over Addison Creek in Broadview. Includes; full depth HMA pavement, sidewalk, curb and gutter, storm sewer, and lighting.
|
111-61L83
|
Active
|
09/25/2025
|
|
|
1
|
1
|
Lake
|
|
HMA resurfacing on Oak Spring Road from Appley Avenue to St. Mary's Road in Libertyville. Includes; pavement pathcing, ADA ramps, and signage.
|
112-61L88
|
Active
|
09/25/2025
|
|
|
1
|
1
|
McHenry
|
|
Construct a four-span RC slabl bridge to carry Allendale Road over Nippersink C Creek. Includes HMA pavement, and guardrail.
|
113-61L89
|
Active
|
09/25/2025
|
|
|
1
|
1
|
Cook
|
|
HMA resurfacing on Maple Avenue from Brookfield Avenue to 31st Street in Brookfield. Includes pavement patching, curb and gutter, sidewalk, driveways, ADA ramps, curb bump-outs, and flashing beacons.
|
114-61L90
|
Active
|
09/25/2025
|
|
|
1
|
1
|
Cook
|
|
Resurfacing on Jackson Boulevard from Des Plaines Avenue to Harlem Avenue in Forest Park.
|
115-61L92
|
Active
|
09/25/2025
|
|
|
1
|
1
|
Cook
|
|
Rehabilitation of Devon Avenue from Lincoln Avenue to McCormick Boulevard in Lincolnwood. Includes; HMA resurfacing, curb and gutter, sidewalks, lighting, parkway ebhancements and water main.
|
116-61L94
|
Active
|
09/25/2025
|
|
|
1
|
1
|
McHenry
|
|
Resurfacing on Raffel Road from Ware Road to IL 120 in Woodstock.
|
117-61L95
|
Active
|
09/25/2025
|
|
|
1
|
1
|
Kane
|
|
Resurfacing various routes and locations in Aurora.
|
118-61L97
|
Active
|
09/25/2025
|
|
|
1
|
1
|
Kane
|
|
HMA resurfacing on Spruce and E. Main Street from Gilbert Street to Kenyon Road in South Elgin. Includes; curb and gutter, drainage, parkway restoration, patching, replacment of pedestrian push buttons and detector loops.
|
119-61L98
|
Active
|
09/25/2025
|
|
|
1
|
1
|
Cook
|
|
Reconstruction and HMA resurfacing of shoenbeck Road from US 12 to Camp McDonald Road in Mount Prospect. Includes; sidewalks, ADA ramps, pedestrian signals, driveways, storm sewers, and curb and gutter.
|
120-85779
|
Active
|
09/25/2025
|
|
|
2
|
2
|
Whiteside
|
|
Replace the bridge carrying East 11th Street over the Illinois-Mississippi Feeder Canal and re-align the canal's parallel path, in Rock Falls.
|
121-85783
|
Active
|
09/25/2025
|
|
|
2
|
2
|
Henry
|
|
Construction of PCC Sidewalk along Lake Street in Kewanee. Includes: storm sewer, PCC entrances, HMA pavement, and seeding.
|
122-85785
|
Active
|
09/25/2025
|
|
|
2
|
2
|
Rock Island
|
|
Construction of a PCC shared-use path along 19th Street and 27th Street from Avenue of the Cities to 36th Avenue in Moline. Includes; curb and gutter, storm sewer, and traffic signal improvements.
|
123-85786
|
Active
|
09/25/2025
|
|
|
2
|
2
|
Whiteside
|
|
Replace the bridge carrying Genesee Court over Rock Creek, east of Lister Road at the south edge of Morrison.
|
124-87884
|
Active
|
09/25/2025
|
|
|
2
|
3
|
Livingston
|
|
Sidewalk construction at various locations in Dwight.
|
125-87889
|
Active
|
09/25/2025
|
|
|
2
|
3
|
DeKalb
|
|
Construct a three-span PPC deck beam bridge to carry Pratt Road over Somonauk Creek in Sandwich.
|
126-87890
|
Active
|
09/25/2025
|
|
|
2
|
3
|
Ford
|
|
Replace the bridge carrying Clarence Road over Sugar Creek, 0.01 mile south of IL 9
|
127-87891
|
Active
|
09/25/2025
|
|
|
2
|
3
|
Ford
|
|
Replace the bridge carrying Gallahue Road over an un-named stream, 0.1 mile northeast of N 1200 E Road.
|
128-89832
|
Active
|
09/25/2025
|
|
|
3
|
4
|
Tazewell
|
|
Guardrail replacement on various routes in Tazewell, Peoria and Woodford Counties. Includes, curb and gutter, and pedestrian railing.
|
129-89872
|
Active
|
09/25/2025
|
|
|
3
|
4
|
Peoria
|
|
Intersection improvements at Northmoor Road and University Street in Peoria. Includes; full-depth HMA, traffic signals, lighting, and storm sewer.
|
130-93826
|
Active
|
09/25/2025
|
|
|
4
|
6
|
Logan
|
|
Reconstruction, widening and resurfacing Fifth Street Road from I-55 to Lincoln Parkway in Lincoln.
|
131-93839
|
Active
|
09/25/2025
|
|
|
4
|
6
|
Sangamon
|
|
Construction of left turn lanes at the intersections of Carpenter Street and 5th and 6th Streets in Springfield. Includes; HMA resurfacing, widening, traffic signals, sidewalks, ADA ramps, and storm sewer.
|
132-93843
|
Active
|
09/25/2025
|
|
|
4
|
6
|
Menard
|
|
Widening and HMA resurfacing of Kent Street to Ingram Street west of Athens. Includes; aggregate shoulders, and pipe culverts.
|
133-93844
|
Active
|
09/25/2025
|
|
|
4
|
6
|
Macoupin
|
|
Sidewalk replacement at various locations in Virden.
|
134-93846
|
Active
|
09/25/2025
|
|
|
4
|
6
|
Logan
|
|
Replace PCC deck beams on a three-span structure carrying CH 24 over Prairie Creek, 5 miles South of San Jose.
|
135-93847
|
Active
|
09/25/2025
|
|
|
4
|
6
|
Pike
|
|
HMA Resurfacing on N. Monroe Street, E. Adams Street, and Madison Street in Pittsfield. Includes; watermain, sidewalk, ADA ramps, storm sewer, and Lighting.
|
136-97880
|
Active
|
09/25/2025
|
|
|
5
|
8
|
Monroe
|
|
Construction of an HMA multi-use path and pedestrian bridge from GMandO Heritage Trail to Rueck road in Columbia. Includes; concrete curb, driveway, sidewalks, box culvert extension, and storm sewer.
|
137-80B11
|
Active
|
09/25/2025
|
|
|
1
|
1
|
Will
|
|
(6,160-Ft) Standard Overlay, New Shoulders, and ADA Improvements include: Hot- mix asphalt (HMA) surface removal (cold milling), full-depth patches (Class D), resurfacing (inlay) with HMA binder and surface course, longitudinal joint sealing, replacement of curb and gutter, sidewalk removal and replacement for curb ramps for sidewalks (ADA), replacement of existing aggregate shoulders with HMA, drainage structures adjustments and cleaning, new thermoplastic pavement markings and raised reflective pavement markers. Location: IL 50 (Governors Hwy), from Beecher Rd to Tucker Rd / Wilmington Rd within the Village of Peotone.
|
138-72C57
|
Active
|
09/29/2025
|
|
|
4
|
6
|
Christian
|
|
6.5 miles of resurfacing on Mount Auburn Road from CH 21 (2100 Road) to north of the Taylorville City limits. Also includes bridge repairs on SN 011-0029 located at Paper Mill Branch, 3.2 miles north of IL 29.
|
139-61J54
|
Active
|
09/29/2025
|
|
|
1
|
1
|
DuPage
|
|
Extension of the west branch of DuPage River Trail from Gary's Mill Road to an existing trail within the West DuPage Woods Forest Preserve.
|
140-61K01
|
Active
|
09/29/2025
|
|
|
1
|
1
|
DuPage
|
|
Sidewalk construction, traffic signals and street lights on York Street from WB I-290 ramps/Crestview Avenue to lake Street in Elmhurst.
|
141-61L99
|
Active
|
09/29/2025
|
|
|
1
|
1
|
Will
|
|
Decorative lighting, landscaping and parkway restoration on IL 50 from Bruce Street Road to Steger Drive in University Park.
|
142-87843
|
Active
|
09/29/2025
|
|
|
2
|
3
|
DeKalb
|
|
Construction of HMA multi-use trail from Old Mill Park to Pleasant Street in Sycamore. Includes a prefabricated pedestrian bridge with boardwalk and concrete approach pavement, storm sewer, and signage.
|
143-97872
|
Active
|
09/29/2025
|
|
|
5
|
8
|
St. Clair
|
|
Pavement widening and reconstruction of Frank Scott Parkway East from Green Mount Road to Cross Street in Shiloh.
|
144-97873
|
Active
|
09/29/2025
|
|
|
5
|
8
|
St. Clair
|
|
Pavement widening on North Green Mount Road from north of Lebanon Avenue to south of Frank Scott Parkway.
|
145-97876
|
Active
|
09/29/2025
|
|
|
5
|
8
|
Madison
|
|
Intersection resurfacing and sidewalk replacement on Clay Street between Seminary Street and Morrison Avenue in Collinsville.
|
146-46943
|
Active
|
10/01/2025
|
|
|
1
|
1
|
Lake
|
|
This project consists of bridge replacement (Ex SN 049-0185, Pr SN 049-0400) and other misc repairs at Illinois Beach State Park in Lake County, IL.
|
147-61L73
|
Active
|
09/30/2025
|
|
|
1
|
1
|
Will
|
|
Extension of Old Renwick Road Trial from the DuPage River to West Renwick Road.
|
148-61L21
|
Active
|
10/02/2025
|
|
|
1
|
1
|
Cook
|
|
Remove and replace traffic signals and pedestrian accommodations along Desplaines River Road and Balmoral Avenue in Rosemont.
|
01A-LO034
|
Active
|
09/30/2025
|
|
|
4
|
6
|
Logan
|
|
Replace Airport Perimeter Fencing, Phase 1
|
02A-KE021
|
Active
|
09/30/2025
|
|
|
2
|
2
|
Henry
|
|
Rehabilitate Taxiway A
|
03A-FR048
|
Active
|
09/30/2025
|
|
|
2
|
2
|
Stephenson
|
|
Replace Runway 6/24 Precision Approach Path Indicator (PAPI) System
|
04A-LK016
|
Active
|
09/30/2025
|
|
|
1
|
1
|
McHenry
|
|
Replace Automated Weather Observation System (AWOS)
|
05A-LI040
|
Active
|
09/30/2025
|
|
|
4
|
6
|
Montgomery
|
|
Replace Airport Lighting Vault
|
06A-AU075
|
Active
|
09/30/2025
|
|
|
1
|
1
|
Kane
|
|
Replace Airfield Signage, Wind Cones, Runway 15 and 27 REILs, and Airport Rotating Beacon; Construct Runway Guard Lights at Runway 15/33
|
07A-BE005
|
Active
|
09/30/2025
|
|
|
4
|
6
|
Cass
|
|
Install Medium Intensity Runway Lights, Medium Intensity Taxiway Lights, and Vault Work
|