Region | District | DBE % | VBP % | Federal Project # |
---|---|---|---|---|
1 | 1 | 0.00 | 0.00 | X1QX(960) |
County(s) | Key Route(s) | Marked Route(s) | Section(s) | State Job #(s) | PPS #(s) |
---|---|---|---|---|---|
|
|
|
|
|
|
Contract Specifics |
---|
15 Working Days |
No More Contract Specifics |
Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
---|---|---|---|---|---|---|---|
20201200 | CU YD | REMOVAL AND DISPOSAL OF UNSUITABLE MATERIAL | Base items | 5.000 | |||
21101615 | SQ YD | TOPSOIL FURNISH AND PLACE, 4" | Base items | 29.000 | |||
25200110 | SQ YD | SODDING, SALT TOLERANT | Base items | 29.000 | |||
25200200 | UNIT | SUPPLEMENTAL WATERING | Base items | 1.000 | |||
35101600 | SQ YD | AGGREGATE BASE COURSE, TYPE B 4" | Base items | 46.000 | |||
40800029 | POUND | BITUMINOUS MATERIALS (TACK COAT) | Base items | 100.000 | |||
40800050 | TON | INCIDENTAL HOT-MIX ASPHALT SURFACING | Base items | 5.000 | |||
42400200 | SQ FT | PORTLAND CEMENT CONCRETE SIDEWALK 5 INCH | Base items | 410.000 | |||
42400800 | SQ FT | DETECTABLE WARNINGS | Base items | 60.000 | |||
44000100 | SQ YD | PAVEMENT REMOVAL | Base items | 7.000 | |||
44000600 | SQ FT | SIDEWALK REMOVAL | Base items | 350.000 | |||
66900200 | CU YD | NON-SPECIAL WASTE DISPOSAL | Base items | 5.000 | |||
66900530 | EACH | SOIL DISPOSAL ANALYSIS | Base items | 4.000 | |||
66901001 | L SUM | REGULATED SUBSTANCES PRE-CONSTRUCTION PLAN | Base items | 1.000 | |||
66901003 | L SUM | REGULATED SUBSTANCES FINAL CONSTRUCTION REPORT | Base items | 1.000 | |||
66901006 | CAL DA | REGULATED SUBSTANCES MONITORING | Base items | 10.000 | |||
67100100 | L SUM | MOBILIZATION | Base items | 1.000 | |||
70102620 | L SUM | TRAFFIC CONTROL AND PROTECTION, STANDARD 701501 | Base items | 1.000 | |||
70102640 | L SUM | TRAFFIC CONTROL AND PROTECTION, STANDARD 701801 | Base items | 1.000 | |||
72000100 | SQ FT | SIGN PANEL - TYPE 1 | Base items | 483.000 | |||
72400100 | EACH | REMOVE SIGN PANEL ASSEMBLY - TYPE A | Base items | 15.000 | |||
72400310 | SQ FT | REMOVE SIGN PANEL - TYPE 1 | Base items | 15.000 | |||
72400500 | EACH | RELOCATE SIGN PANEL ASSEMBLY - TYPE A | Base items | 1.000 | |||
72800100 | FOOT | TELESCOPING STEEL SIGN SUPPORT | Base items | 315.000 | |||
78000600 | FOOT | THERMOPLASTIC PAVEMENT MARKING - LINE 12" | Base items | 216.000 | |||
78300202 | SQ FT | PAVEMENT MARKING REMOVAL - WATER BLASTING | Base items | 75.000 | |||
K1004595 | L SUM | PRUNING FOR SAFETY AND EQUIPMENT CLEARANCE | Base items | 1.000 | |||
X1400175 | EACH | SOLAR-POWERED FLASHING BEACON ASSEMBLY (DUAL-ALTERNATING) | Base items | 11.000 | |||
X1400326 | EACH | RECTANGULAR RAPID FLASHING BEACON ASSEMBLY (COMPLETE) | Base items | 6.000 | |||
No More Pay Items |