001-61J93
|
Executed
|
10/01/2024
|
23 / 22 |
2 |
1
|
1
|
McHenry
|
|
Pavement reconstruction, construction of a multi-use path, replace two bridges, curb and gutter, storm sewer, traffic signals, lighting and landscaping on Randall Road from Ackman Road to Acorn lane/Polaris Drive, located in the Village of Lake in the Hills, and the City of Crystal Lake.
|
002-61K49
|
Executed
|
10/15/2024
|
|
|
1
|
1
|
Lake
|
|
Resurfacing Indian Creek Road from Gilmer Road to the east village limits of Hawthorne Woods
|
003-61K50
|
Active
|
06/18/2024
|
1 / 1 |
|
1
|
1
|
Cook
|
|
Sidewalk construction, signage and parkway restoration on various routes in Country Club Hills.
|
004-61K51
|
Executed
|
08/30/2024
|
|
|
1
|
1
|
Lake
|
|
HMA Resurfacing, curb and gutter, sidewalks, drainage adjustments, and parkway restoration on North Avenue from Glen Flora Avenue to Julian Street in Waukegan
|
005-61K52
|
Rejected
|
09/23/2024
|
9 / 9 |
|
1
|
1
|
Lake
|
|
Construction of a Open-spandrel arch ridge with cast-in-place concrete deck and bituminous overlay on Lake Road over an unamed ravine in Lake Forest.
|
006-61K55
|
Executed
|
09/06/2024
|
|
|
1
|
1
|
Cook
|
|
Resurfacing Hampton Avenue from Ogden Avenue to Hillgrove Avenue in Western Springs.
|
007-61K57
|
Executed
|
09/03/2024
|
2 / 2 |
|
1
|
1
|
DuPage
|
|
Resurfacing St. Charles Road from IL 53 to Grace Street in Lombard.
|
008-62K73
|
Executed
|
08/30/2024
|
16 / 16 |
2 |
1
|
1
|
Cook
|
|
(7.2-Mile) Bridge repair project on the outbound lanes of I-90 (Kennedy Expressway) from I-94 (Edens Expressway) to Hubbard Street in the City of Chicago in Cook County. The scope of work includes bridge deck overlay, joint repair, pavement patching, overhead sign replacement and ITS work.
|
009-62R85
|
Executed
|
08/30/2024
|
2 / 2 |
|
1
|
1
|
Will
|
|
Installation of new fiber optic cable, conduit, PTZ cameras, network switches along IL Route 7 from 7th Street to Gougar Rd. just east of the City of Lockport Downtown area.
|
010-62T02
|
Executed
|
09/03/2024
|
|
1 |
1
|
1
|
McHenry
|
|
This is a bridge repair project of (SN 056-0054); IL 47 over Slough Creek. Scope of work includes bridge deck scarification and overlay, joint repair, approach slab repair, structural repair of concrete and bridge painting. The project is located within unincorporated McHenry County.
|
011-62T29
|
Executed
|
09/10/2024
|
|
|
1
|
1
|
Will
|
|
(1.13-Mile) SMART Overlay improvements. It begins 0.2 miles south of McClintock Rd. and proceeds southeasterly to a point 0.5 miles northeast of I-55, through the Village of Channahon and City of Joliet in Will County.
|
012-62T49
|
Executed
|
08/30/2024
|
|
1 |
1
|
1
|
Cook
|
|
(276- Ft) The proposed improvement consists of bridge overlay and joint repair of Michigan Ave. located over I-55 (Steven-s Expressway) (SN 016-0184). The project is located in the City of Chicago. Cook County.
|
013-62T86
|
Executed
|
09/10/2024
|
|
|
1
|
1
|
Kane
|
|
(0.55-Mile) SMART Overlay project consisting of hot-mix asphalt surface removal pavement patching, grading and shaping shoulders, hot-mix asphalt surface, detector loop replacement, and thermoplastic pavement marking on Hill Avenue from Montgomery Road to the Kendall County Line within the City of Aurora, in Kane County.
|
014-62U90
|
Executed
|
09/06/2024
|
3 / 2 |
1 |
1
|
1
|
Cook
|
|
Toll Plaza 31 Relocation Kennedy Express (I-90) to I-190 WB Ramp to Airport in Rosemont, Illinois
|
015-62W96
|
Executed
|
08/30/2024
|
|
|
1
|
1
|
Will
|
|
(2,365-Ft) Patching project includes full depth patches and HMA/ PCC surface removal and replacement with HMA surface course. Location: US 52 / IL 53 (Chicago Street) from North of Doris Avenue to I-80 interchange, within the City of Joliet in Will County.
|
016-64P26
|
Withdrawn
|
07/29/2024
|
1 / 1 |
|
2
|
2
|
Jo Daviess
|
|
1.5 miles of Reconstruction/HSIP Safety Funds_on US 20 (EB): 0.1 mile West to Frentress Lake Road and 0.2 mile West_to 0.6 mile East of Barge Terminal Rd and US 20 (WB): 0.4 mile to 0.1 mile East of Barge Terminal Rd.
|
017-64S29
|
Withdrawn
|
07/23/2024
|
2 / 0 |
1 |
2
|
2
|
Lee
|
|
Deck repair, joint replacement, deck overlay and other miscellaneous repairs on SN 052-0062 over UP RR at the the south edge of Dixon.
|
018-64S90
|
Withdrawn
|
07/23/2024
|
|
1 |
2
|
2
|
Lee
|
|
Partial cleaning and painting of structural steel on SN 052-0031 carrying US 30 over UPRR, 0.9 miles east of Whiteside County line.
|
019-64T21
|
Executed
|
08/27/2024
|
6 / 6 |
|
2
|
2
|
Whiteside
|
|
Bridge repair and joint replacement, SN 098-0065 carrying IL 78 over I-88, 2 miles west of Lyndon.
|
020-66P43
|
Executed
|
09/03/2024
|
|
|
2
|
3
|
Livingston
|
|
HMA milling and resurfacing, pavement marking, and raised reflective markers on FAP 786 (IL 170) from south of IL 17 to the intersection of IL 23, including the northbound right turn lane of IL 23.
|
021-66P59
|
Executed
|
09/03/2024
|
|
|
2
|
3
|
Various
|
|
Vegetation management control along various routes in various counties in District 3.
|
022-68H92
|
Executed
|
09/03/2024
|
1 / 1 |
1 |
3
|
4
|
Fulton
|
|
Slope stabilization and culvert extension along US 24 east of IL 78.
|
023-68H99
|
Executed
|
09/06/2024
|
|
1 |
3
|
4
|
Henderson
|
|
Slope stabilization and culvert extension along IL 94, 1/2 mile south of CH 14.
|
024-68J22
|
Executed
|
08/30/2024
|
|
|
3
|
4
|
Marshall
|
|
Variable depth mill and resurface.
|
025-68J29
|
Executed
|
08/30/2024
|
1 / 1 |
|
3
|
4
|
Tazewell
|
|
Remove and replace chain link fence around the D4 Operations Bridge Yard in East Peoria.
|
026-70991
|
Withdrawn
|
07/22/2024
|
|
|
3
|
5
|
Champaign
|
|
3.038 miles of standard overlay with ADA improvements and traffic signal modernization from Springfield Ave in Champaign to Curtis Rd in Savoy.
|
027-70G11
|
Executed
|
09/03/2024
|
|
|
3
|
5
|
McLean
|
|
7.36 miles of Smart Overlay 2.5 miles south of I-74 to 1 mile south of Heyworth.
|
028-70H38
|
Executed
|
09/03/2024
|
|
|
3
|
5
|
McLean
|
|
18.83 miles of patching on FAI 39 and FAI 55.
|
029-70H40
|
Executed
|
09/03/2024
|
|
|
3
|
5
|
McLean
|
|
1.2 miles of Smart Overlay on US 24 from 0.4 miles west of I-55 to the U.P. RR in Chenoa.
|
030-72715
|
Withdrawn
|
07/31/2024
|
|
|
4
|
6
|
Sangamon
|
|
Substructure repairs on SN 084-0073 and 084-0178 carrying Dirksen Parkway over NSRR and ICRR in Springfield.
|
031-72732
|
Withdrawn
|
07/31/2024
|
|
1 |
4
|
6
|
Morgan
|
|
Deck patching on 4 bridges carrying US 67 over IL 104 ramps and NSRR northwest of Jacksonville. (SN 069-0073, 0074, 0075, 0076)
|
032-72740
|
Deleted
|
06/26/2024
|
|
|
4
|
6
|
Logan
|
|
Bridge bearing replacement on SN 054-0062 carrying TR 65A over I-55, I-55 West Frontage Road and the UP Railroad at the Lawndale overhead.
|
033-72742
|
Executed
|
08/30/2024
|
|
|
4
|
6
|
Montgomery
|
|
Bridge bearing replacement at SN 068-0047 carrying TR 48 over I-55 and SN 068-0050 carrying TR 235 over I-55 north of Litchfield.
|
034-72743
|
Executed
|
09/03/2024
|
|
|
4
|
6
|
Sangamon
|
|
Pipe culvert removal and replacement on I-55 from 1 mile south of IL 29 to 0.2 miles south of IL 29.
|
035-72744
|
Executed
|
08/30/2024
|
|
|
4
|
6
|
Sangamon
|
|
Bridge bearing replacement on SN 084-0145 carrying Farmingdale Road over I-72 and SN 084-0146 carrying Curran Road over I-72 west of Springfield. , Bridge bearing replacement on SN 084-0145 carrying Farmingdale Road over I-72 and SN 084-0146 carrying Curran Road over I-72 west of Springfield.
|
036-72746
|
Executed
|
08/02/2024
|
|
|
4
|
6
|
Montgomery
|
|
Bridge washing and painting on SN 068-0043 carrying IL 108 over I-55 at the Carlinville interchange.
|
037-72M26
|
Executed
|
09/03/2024
|
|
|
4
|
6
|
Montgomery
|
|
0.3 miles of resurfacing and ADA improvements on North Spruce Street from Madison Street to 120- north of West State Street (IL 16) in Nokomis.
|
038-74838
|
Executed
|
08/30/2024
|
|
1 |
4
|
7
|
Wabash
|
|
1.6 miles of resurfacing, ADA improvements and traffic signal upgrades on IL 15/IL 1 from 0.2 miles east of Empire Street to Cherry Street in Mount Carmel.
|
039-76M93
|
Executed
|
09/06/2024
|
3 / 3 |
1 |
5
|
8
|
Randolph
|
|
Intersection improvements and pavement replacement at the intersection of IL 4 and IL 150.
|
040-76R85
|
Executed
|
09/06/2024
|
|
|
5
|
8
|
Randolph, St. Clair
|
|
Navigation lighting repairs at various locations along the Kaskaskia River.
|
041-76U11
|
Executed
|
09/10/2024
|
1 / 1 |
|
5
|
8
|
Madison, St. Clair
|
|
Dynamic message sign replacement at various locations in District 8.
|
042-76U13
|
Executed
|
09/06/2024
|
|
|
5
|
8
|
Various
|
|
Weed spraying for Johnson Grass on various routes in District 8.
|
043-76U14
|
Executed
|
08/30/2024
|
2 / 2 |
|
5
|
8
|
Washington
|
|
8 miles of pavement patching on I-64 from 0.9 miles west of CH 11 to the Jefferson County line.
|
044-78911
|
Executed
|
09/03/2024
|
|
|
5
|
9
|
Jefferson
|
|
Removal and replacement of an existing bridge with a triple barrel reinforced concrete box culvert and single barrel precast box culvert overflow structure on IL 15 west of Mt. Vernon.
|
045-78927
|
Executed
|
09/03/2024
|
|
|
5
|
9
|
Franklin
|
|
0.38 miles of resurfacing and ADA ramps on IL 154 from IL 148 to the BNSF Railroad in Sesser.
|
046-78978
|
Executed
|
09/03/2024
|
|
|
5
|
9
|
Williamson
|
|
1.4 miles of HMA resurfacing, ADA improvements and traffic signal upgrades on IL 148 from Hemlock Street to Herrin Street in Herrin.
|
047-78A63
|
Executed
|
08/30/2024
|
|
|
5
|
9
|
Various
|
|
Repairing or replacing damaged guardrail, barrier terminals, impact attenuators, cable median barrier and fence on a work order basis throughout District 9.
|
048-87848
|
Executed
|
08/30/2024
|
|
|
2
|
3
|
DeKalb
|
|
Construct a two-cell concrete box culvert with aggregate roadway surface and grading on Anderland Road over North Branch of Kishwaukee River.
|
049-87865
|
Executed
|
09/17/2024
|
|
|
2
|
3
|
LaSalle
|
|
Resurfacing 8th Street from Crosat St. to Sterling St. and Richard Hallett Road from US 6 to the south city limits of LaSalle.
|
050-89861
|
Executed
|
09/27/2024
|
|
|
3
|
4
|
Tazewell
|
|
Sidewalk construction on Eleanor Court from Briarwood Ct. to Groveland St. Sidewalk replacement on Groveland Street from Allyn St. to Eller Ave. in Creve Coeur.
|
051-93809
|
Executed
|
09/20/2024
|
|
|
4
|
6
|
Sangamon
|
|
Replace the bridge carrying West Divernon Road over Sugar Creek, 1 mile east of IL 4 in Auburn.
|
052-93821
|
Executed
|
09/03/2024
|
|
|
4
|
6
|
Sangamon
|
|
HMA Milling, resurfcing and patching, on Cardinal Hill Road from IL 29 to Buckhart Road, on Est Lake Shore Drive from Birkdale Drive to Long Bay Drive, and on Rochester Road from East Lake Shore Drive to Education Avenue.
|
053-95939
|
Executed
|
08/30/2024
|
|
|
4
|
7
|
Moultrie
|
|
Remove and replace guardrail at various locations in Moultrie County
|
054-95943
|
Executed
|
08/30/2024
|
2 / 2 |
|
4
|
7
|
Effingham
|
|
Concrete Sidewalk construction with ADA Ramps, erosion control and utility relocation at various locations in Dieterich.
|
055-95945
|
Executed
|
09/10/2024
|
|
|
4
|
7
|
Moultrie
|
|
Construct a single-span PPC deck beam bridge with aggregate approaches and guardrail to carry N 1400 E Road over Whitley Creek.
|
056-95963
|
Executed
|
09/03/2024
|
|
|
4
|
7
|
Edwards
|
|
construc a single-span PPC deck beam bridge with aggregate approaches to carry E 100 N Road over Stinking Creek west of Grayville.
|
057-97837
|
Executed
|
09/03/2024
|
|
|
5
|
8
|
St. Clair
|
|
Construction of new HMA Pavement with Aggregate Base, curb and gutter, drainage facilities, sidewalks and ADA Ramps on McAlister Road from IL 4 to Herman Street in Lebanon.
|
058-97840
|
Rejected
|
08/16/2024
|
|
|
5
|
8
|
Madison
|
|
HMA resurfacing with patching, sidewalks, and curb and gutter, on Wood River Avenue from Gerguson Ave. to the north city limits of Wood River.
|
059-97844
|
Executed
|
08/30/2024
|
1 / 1 |
|
5
|
8
|
St. Clair
|
|
Resurfacing and sidewalk construction on Spostsylvania Street from South Van Buren Street to New Baldwin Road in New Athens.
|
060-62R82
|
Executed
|
08/30/2024
|
|
|
1
|
1
|
Cook
|
|
Installation of new fiber optic cable, conduit, PTZ cameras, network switches along four different corridors. Located within Village of Northlake, Broadview, Berwyn, Justice, Bridgeview, Westchester, and Burbank in Cook County.
|
061-76818
|
Executed
|
09/06/2024
|
14 / 14 |
2 |
5
|
8
|
Madison
|
|
Reconstruction of the IL 111 and I-270 interchange.
|
062-78916
|
Deleted
|
06/27/2024
|
|
|
5
|
9
|
Williamson
|
|
Signal modifications, railroad interconnects and fiber optic installation on IL 37 from IL 13 to Boulevard Street in Marion.
|
063-85761
|
Executed
|
08/30/2024
|
5 / 5 |
2 |
2
|
2
|
Carroll
|
|
HMA reconstruction and widening of Ideal Road between Morrison Road and Dutchtown Road. Work road widening, full depth reclamation with soil cement base stabalization, aggregate shoulders, driveways, cast-in-place box Culverts, pipe culverts, guardrail replacement, pavement markings, signing, and other necessary work to complete the project.
|
064-97819
|
Executed
|
08/30/2024
|
4 / 3 |
1 |
5
|
8
|
St. Clair
|
|
Intersection Improvements of Queeny Avenue and Falling Springs Road in Sauget. Includes Construction of dedicated left turn lane, shoulder modifications, drainage improvements, pavement markings and signage.
|
065-62R97
|
Executed
|
08/30/2024
|
2 / 1 |
1 |
1
|
1
|
Kane, McHenry
|
|
Location 1: 7,089 Feet (1.34 Miles), SMART Overlay, Designed Overlay and ADA Improvements and is located on US 14 from 0.4 Mile SE of Cary/Algonquin Rd to SE of Spring Beach Way within the Village of Cary in McHenry County. Location 2: 1,148.44 Feet (0.22 Miles). Shoulder and Drainage repairs and is located on IL 31 north of Main St in within the Village of Carpentersville in Kane County.
|
066-66K82
|
Executed
|
08/30/2024
|
1 / 1 |
|
2
|
3
|
Bureau, LaSalle
|
|
Milling and resurfacing (designed overlay), structure repairs, patching, pavement marking, and raised reflective markers on FAI 80 (I-80) from 1 mile west of IL 89 to 0.7 mile west of IL 251.
|
067-66P31
|
Executed
|
09/17/2024
|
|
|
2
|
3
|
Various
|
|
One year contract to repair damaged High Tension Cable Median Barrier, Guardrail, Attenuators, etc., caused by motorists along various routes in District 3. Funded by MCHD funds, Contract Maintenance funds, and Maintenance of HTC Median Barrier funds.
|
068-68J11
|
Executed
|
09/20/2024
|
|
|
3
|
4
|
Various
|
|
Replace traffic signal equipment at various locations in District 4.
|
069-68J26
|
Executed
|
09/03/2024
|
|
|
3
|
4
|
Various
|
|
Add aggregate surface to shoulders along various routes in D4.
|
070-76R78
|
Active
|
06/26/2024
|
|
1 |
5
|
8
|
St. Clair
|
|
Modernization of 16 traffic signals along IL 159 from the intersection of Ludwig/Salem Avenue to the intersection of IL 161/N. Belt West Road. Limits of this project also includes I-64 from IL 159 westward to milepost 10.8.
|
071-93592
|
Executed
|
09/03/2024
|
|
|
4
|
6
|
Cass
|
|
Replace the bridge carrying TR 143 over Little Indian Creek, 2 miles southwest of Philadelphia.
|