Home > Notice of Letting > Contract Detail

June 14, 2024 Letting 12:00 PM
153-87867

Bulletin Description

HMA resurfacing, curb and gutter, sidewalks and pavement markings on Carbon Hill Road from IL 113 to Spring Road in Coal City.
Region District DBE % VBP % Federal Project #
2 3 8.00 0.00 ESKP(562)
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Grundy
  • MS 5900
  • CARBON HILL ROAD
  • 23-00037-00-RS (COAL CITY)
  • C-93-113-24
  • 3-10816-0000
Contract Specifics
20 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (0 Submitted / 0 Answered ) Questions not accepted as of June 04, 2024 04:30 PM.

Authorized Bidders

  • 1750 P. T. Ferro Construction Co.
    700 South Rowell Ave.
    Joliet, IL 60433
    P.O. Box 156
    Joliet, IL 60434
    Phone: (815) 726-6284 Fax: (815) 726-5614 Email: estimating@ptferro.com
    $438,984.27

  • 6117 Austin Tyler Construction, Inc.
    23343 S Ridge Road
    Elwood, IL 60421
    Phone: (815) 726-1090 Fax: (815) 726-1171 Email: info@austin-tyler.com
    $509,783.22

  • 1320 D. Construction, Inc.
    1488 So. Broadway
    Coal City, IL 60416
    Phone: (815) 634-2555 Fax: (815) 634-8748 Email: bids@dconstruction.com
    $451,184.50

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
40600290 POUND BITUMINOUS MATERIALS (TACK COAT) Base items 9,277.000
40603200 TON POLYMERIZED HOT-MIX ASPHALT BINDER COURSE, IL-4.75, N50 Base items 1,155.000
40604050 TON HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "C", N50 Base items 1,750.000
42400800 SQ FT DETECTABLE WARNINGS Base items 200.000
44000157 SQ YD HOT-MIX ASPHALT SURFACE REMOVAL, 2" Base items 20,615.000
44000500 FOOT COMBINATION CURB AND GUTTER REMOVAL Base items 500.000
44000600 SQ FT SIDEWALK REMOVAL Base items 1,070.000
48101200 TON AGGREGATE SHOULDERS, TYPE B Base items 25.000
60604400 FOOT COMBINATION CONCRETE CURB AND GUTTER, TYPE B-6.18 Base items 500.000
60605000 FOOT COMBINATION CONCRETE CURB AND GUTTER, TYPE B-6.24 Base items 25.000
67100100 L SUM MOBILIZATION Base items 1.000
78000100 SQ FT THERMOPLASTIC PAVEMENT MARKING - LETTERS AND SYMBOLS Base items 160.000
78000200 FOOT THERMOPLASTIC PAVEMENT MARKING - LINE 4" Base items 11,500.000
78000400 FOOT THERMOPLASTIC PAVEMENT MARKING - LINE 6" Base items 1,200.000
78000500 FOOT THERMOPLASTIC PAVEMENT MARKING - LINE 8" Base items 225.000
78000600 FOOT THERMOPLASTIC PAVEMENT MARKING - LINE 12" Base items 275.000
78000650 FOOT THERMOPLASTIC PAVEMENT MARKING - LINE 24" Base items 80.000
XX006429 SQ FT SIDEWALK, SPECIAL Base items 2,167.000
Z0017400 EACH DRAINAGE & UTILITY STRUCTURES TO BE ADJUSTED Base items 10.000
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.