001-62J23
|
Executed
|
07/26/2024
|
4 / 4 |
2 |
1
|
1
|
Cook
|
|
(810-Ft) Bridge Replacement, Drainage and ADA Improvements, Traffic Signal and Lighting, I-90 at Foster Avenue. (SN 016-1100)
|
002-62P44
|
Executed
|
08/07/2024
|
3 / 2 |
1 |
1
|
1
|
Cook
|
|
Bridge Superstructure, Lighting, and Resurfacing, I-290 at Ashland Avenue. The project is on Ashland Avenue over FAI 290 from Congress Parkway to Van Buren Street in the City of Chicago, Cook County.
|
003-62R71
|
Executed
|
07/31/2024
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
(4.77-Mile) Standard Overlay, ADA Improvements. Project consisting of asphalt surface removal, pavement patching, hot-mix asphalt resurfacing, detector loop loop replacement, curb ramps (ADA) sidewalk replacement and pavement markings. Located on 79th Street from IL 171 (Archer Ave.) to IL 50 (Cicero Ave.) within the Villages of Justice and Bridgeview and the City of Burbank, in Cook County.
|
004-62R84
|
Executed
|
07/23/2024
|
2 / 1 |
|
1
|
1
|
Cook, Lake
|
|
Installation of new fiber optic cable, conduit, PTZ cameras, network switches along six different corridors located in Cook and Lake Counties located primarily within Village of Skokie, Elmwood Park, North Chicago, and Lincolnwood.
|
005-62T24
|
Executed
|
07/26/2024
|
|
1 |
1
|
1
|
Cook
|
|
(550-Ft) Bridge deck overlay, partial full-depth slab repair, concrete repairs to the abutments and parapets, and ADA ramp replacements improvements at the intersection with IL 21 / Milwaukee Avenue. Located in the City of Niles in Cook County.
|
006-62T28
|
Executed
|
07/31/2024
|
|
1 |
1
|
1
|
Will
|
|
(1.14-Mile) SMART Overlay and curb ramps (ADA) improvements on US 30 (Center St/ Western Ave/ Cass St) from US 30 (Jefferson St/ Center St) to US 6 (Collins St). Located in the City of Joliet in Will County.
|
007-62T43
|
Executed
|
07/31/2024
|
|
|
1
|
1
|
Cook
|
|
(1,000-Ft) Bridge Preservation Project: Deck repairs, scarification, overlay, joints repairs and replacement, approach slab patching, miscellaneous. located on (SN 016-1016), 26th Street at Des Plaines River within the Village of North Riverside in Cook County.
|
008-62T55
|
Executed
|
07/31/2024
|
1 / 1 |
1 |
1
|
1
|
Will
|
|
(2,710-Ft) Smart overlay and ADA project, located on FAP 607: US 6, US 30 (Collins Street) within the City of Joliet in Will County.
|
009-62T56
|
Executed
|
07/23/2024
|
|
|
1
|
1
|
Will
|
|
(4,758-Ft) SMART Overlay: hot-mix asphalt surface removal, earth excavation, new shoulders, pavement patching, hot-mix asphalt surface, curb and gutter removal and replacement, longitudinal joint sealing, pavement markings, and detector loops replacement. Located on US 6 (Channahon Road) from Southwest of Terry Drive to Northeast of Hollywood Road, in the City of Joliet in Will Co.
|
010-62U21
|
Active
|
04/24/2024
|
|
|
1
|
1
|
Cook
|
|
(1,356-Ft) This project consists of pavement marking and traffic signal modernization. The project is located in the Village of Western Springs and unincorporated Proviso Township, Cook County.
|
011-62U79
|
Executed
|
07/23/2024
|
|
|
1
|
1
|
Will
|
|
(0.71-Mile) Designed Overlay, ADA Improvements Located along IL 53 (Baltimore Street) from IL 102 (Water Street) to Kankakee Street and from Forked Creek to to just South of Wilmington/ Peotone Road within the City of Wilmington in Will County.
|
012-62V07
|
Executed
|
08/02/2024
|
3 / 3 |
1 |
1
|
1
|
McHenry
|
|
(2.61-miles) Designed Overlay, HMA Shoulder Widening, and ADA improvements located on IL 176 (Terra Cotta Avenue) from Hickory Drive to Mistwood Lane within the City of Crystal Lake in McHenry County.
|
013-62W85
|
Executed
|
07/26/2024
|
|
|
1
|
1
|
Various
|
|
Repair to the high tension cable barrier median system. This work includes removing and replacing damaged high tension cable barrier system components and replacing with new material. This work is located on various counties.
|
014-62W86
|
Executed
|
07/26/2024
|
|
|
1
|
1
|
Various
|
|
Project consists of installing fence and gates at new locations and repairing existing damaged pedestrian fence barrier. This contract is to provide prompt installation of new fence and repair of damaged fence. This work is located on various State maintained arterial and expressway routes within the counties of Cook, DuPage, Kane, Lake, McHenry and Will.
|
015-64R17
|
Executed
|
07/23/2024
|
|
|
2
|
2
|
Ogle
|
|
4.51 mi. resurfacing, IL 64 from Illinois Railway in Mt. Morris to west of Illinois St. in Oregon.
|
016-64R35
|
Executed
|
08/13/2024
|
1 / 1 |
|
2
|
2
|
Jo Daviess
|
|
Culvert end section and erosion repair 0.4 mile east of Galena Ridge Dr. on US 20.
|
017-64R99
|
Executed
|
07/26/2024
|
8 / 8 |
2 |
2
|
2
|
Ogle
|
|
6.35 miles of cold milling, patching, and hot-mix asphalt resurfacing on IL 64 from IL 251 to the DeKalb County Line.
|
018-64S29
|
Withdrawn
|
06/04/2024
|
2 / 2 |
|
2
|
2
|
Lee
|
|
Deck repair, joint replacement, deck overlay and other miscellaneous repairs on SN 052-0062 over UP RR at the the south edge of Dixon.
|
019-64S85
|
Executed
|
07/31/2024
|
|
|
2
|
2
|
Jo Daviess
|
|
House and garage demolition at William Dr 3.2 mi S of Galena and Lust cleanup at IL 35: SE of 4th St in East Dubuque.
|
020-64S90
|
Withdrawn
|
06/04/2024
|
1 / 1 |
|
2
|
2
|
Lee
|
|
Partial cleaning and painting of structural steel on SN 052-0031 carrying US 30 over UPRR, 0.9 miles east of Whiteside County line.
|
021-64S92
|
Executed
|
07/26/2024
|
|
2 |
2
|
2
|
Winnebago
|
|
3.21 miles of tree removal for reconstruction of I-39/US 20, I-39 from 0.3 mi east of Mulford Rd. to 0.2 mi north of Harrison_Ave.
|
022-64T17
|
Executed
|
07/23/2024
|
1 / 1 |
|
2
|
2
|
Carroll, Ogle
|
|
6.65 miles, design overlay, cold milling, pavement patching, 0.2 mile NW of IL 64 to IL 26.
|
023-64T18
|
Executed
|
07/26/2024
|
|
|
2
|
2
|
Henry
|
|
6 mi patching, milling, and resurfacing W South St in Kewanee to US 34.
|
024-64T19
|
Executed
|
07/26/2024
|
1 / 1 |
|
2
|
2
|
Ogle
|
|
3.55 miles of cold milling, patching, and hot-mix asphalt resurfacing on IL 38 from 0.5 mile west of Mulford Road to DeKalb County Line.
|
025-64T24
|
Executed
|
08/02/2024
|
|
|
2
|
2
|
Rock Island
|
|
Pavement patching on I-88 from the I-88/I-80 interchange to 0.2 miles NE of 256th St North.
|
026-64T25
|
Executed
|
07/23/2024
|
1 / 1 |
|
2
|
2
|
Henry
|
|
Lighting controller, coupling, and luminaire replacement.
|
027-64T26
|
Executed
|
07/26/2024
|
|
|
2
|
2
|
Ogle
|
|
Inlet replacement and pavement patching along IL 2 on SN 071-0097 approach pavement.
|
028-64T28
|
Executed
|
07/23/2024
|
|
|
2
|
2
|
Various
|
|
Maintenance of signs along state maintained routes in District 2.
|
029-66L10
|
Executed
|
08/13/2024
|
1 / 1 |
|
2
|
3
|
Kankakee
|
|
This project is located on FAP 41 (IL 17) 0.7 mile east of Union Hill Road, consisting of replacing SN 046-0031 with SN 046-0162, carrying FAP 41 (IL 17) over Horse Creek.
|
030-66N38
|
Executed
|
07/31/2024
|
|
|
2
|
3
|
Grundy
|
|
Variable depth milling and resufacing of Ashley Road and US-6 intersection in Morris city (Grundy County).
|
031-66N60
|
Executed
|
07/26/2024
|
|
|
2
|
3
|
DeKalb
|
|
I+stallation of a flashing red beacon at each of the stop controlled approaches to the intersections of IL 23 with and Melms, Perry and Baseline RD. It also includes the installation of a flashing yellow beacon at each of the advanced intersection warning signs adjacent to IL 23.
|
032-66N62
|
Executed
|
07/31/2024
|
|
|
2
|
3
|
Grundy
|
|
Installation of flashing beacons.
|
033-66P02
|
Executed
|
07/26/2024
|
|
|
2
|
3
|
Livingston
|
|
Pavement patching_(ramps and parking areas), sidewalk (ADA), curb and gutter, driveway pavement, and striping on FAI 55 at the Northbound Limestone Rest Area, 3.52 miles south of IL 116 (Pontiac) and Southbound Limestone Rest Area, 2.52 miles south of IL 116 (Pontiac).
|
034-66P06
|
Executed
|
07/31/2024
|
1 / 1 |
|
2
|
3
|
LaSalle
|
|
Removal and replacement of the finger plate expansion joint elastomeric troughs on SN 050-0191 carrying I-39 over the Illinois River, IAIS Railroad, and an abandoned railroad approximately 2.82 miles south of Interstate 80 (I-80).
|
035-66P14
|
Executed
|
07/23/2024
|
|
|
2
|
3
|
Iroquois
|
|
Class A pavement patching on FAI 57 beginning at MM 285.5, 2.5 miles north of US 24 (Gilman Interchange) and ending at MM 293.5, 0.64 mile north of IL 116 (Ashkum Interchange).
|
036-66P29
|
Executed
|
07/31/2024
|
|
|
2
|
3
|
Iroquois
|
|
8.09 miles, Crack and joint sealing, US 24 to US 45/52.
|
037-66P38
|
Executed
|
07/23/2024
|
|
|
2
|
3
|
LaSalle
|
|
Class A pavement patching, joint and pothole repairs, striping and traffic control on FAI 39 beginning at the Marshall/LaSalle County Line and ending at the LaSalle/Lee County Line in LaSalle County.
|
038-68E35
|
Executed
|
07/23/2024
|
4 / 3 |
1 |
3
|
4
|
Knox
|
|
Superstructure replacement of SN 048-0051 and 048-0052 carrying I-74 over the Spoon River and TR 238A 0.2 mile west of the Spoon River rest area.
|
039-68H95
|
Executed
|
07/26/2024
|
|
|
3
|
4
|
Tazewell
|
|
4.2 miles of construction of HMA shoulders with an aggregate shoulder wedge, between Pekin and Tremont.
|
040-68H98
|
Executed
|
07/26/2024
|
3 / 2 |
|
3
|
4
|
Henderson
|
|
Slope stabilization and culvert extension along IL 94, 500 feet north of CH 14.
|
041-68J07
|
Executed
|
07/26/2024
|
|
|
3
|
4
|
Peoria
|
|
PCC island and median replacement, 1/4 mile HMA mill and overlay.
|
042-68J11
|
Rejected
|
06/24/2024
|
|
|
3
|
4
|
Various
|
|
Replace traffic signal equipment at various locations in District 4.
|
043-68J24
|
Executed
|
07/31/2024
|
|
|
3
|
4
|
Peoria, Tazewell
|
|
D4 highway lighting 2025: Inspection of existing high mast towers, luminaire repair and re-lamping, maintenance of existing lighting controllers in Peoria and Tazewell Counties.
|
044-68J25
|
Executed
|
07/31/2024
|
1 / 1 |
|
3
|
4
|
Tazewell
|
|
Lighting upgrades at I-74 and I-155 interchange in Morton in Tazewell County.
|
045-68J26
|
Rejected
|
06/24/2024
|
|
|
3
|
4
|
Various
|
|
Add aggregate surface to shoulders along various routes in D4.
|
046-78376
|
Executed
|
08/13/2024
|
|
|
5
|
9
|
Hamilton
|
|
Removal of SN 033-9900, pavement removal, curb and gutter removal, full-depth HMA pavement, Combination concrete curb and gutter, PCC sidewalk, storm sewer and tree removal on IL 14 from Pearl Street to Virginia Street in McLeansboro.
|
047-70991
|
Withdrawn
|
06/04/2024
|
2 / 2 |
|
3
|
5
|
Champaign
|
|
3.038 miles of standard overlay with ADA improvements and traffic signal modernization from Springfield Ave in Champaign to Curtis Rd in Savoy.
|
048-70G24
|
Executed
|
08/02/2024
|
|
|
3
|
5
|
Vermilion
|
|
0.657 miles of Smart Overlay on Bowman Ave from IL 119 north of Bismarck to CR 2820.
|
049-70G90
|
Executed
|
07/31/2024
|
|
|
3
|
5
|
McLean
|
|
Traffic signal modernization on IL 9 at Towanda Barnes Rd in Bloomington.
|
050-70H04
|
Executed
|
07/26/2024
|
|
|
3
|
5
|
Champaign
|
|
1.605 miles of median cable improvements on I-74 from east of US 45 to High Cross Rd in Urbana.
|
051-70H07
|
Executed
|
07/31/2024
|
1 / 1 |
|
3
|
5
|
DeWitt
|
|
1.26 miles, SMART Overlay and Bridge Deck Overlay, 0.4 mi N of Autumn Rd to 0.3 mi S of Tabor Rd N of Clinton.
|
052-70H09
|
Executed
|
07/31/2024
|
1 / 1 |
1 |
3
|
5
|
DeWitt
|
|
3.29 miles, Class A Patching, Spl, N First St in Wapella to 0.2 mi south of US 51 Bus north of Clinton.
|
053-70H23
|
Executed
|
07/31/2024
|
|
|
3
|
5
|
DeWitt
|
|
1.805 mi of intermittent smart overlay at 0.4 mi south of Texas Church Rd. to 0.1 mi north of Ospur Rd, also 0.2 mi south of Little Gallilee Rd to Gulf Rd south of Clinton.
|
054-70H25
|
Executed
|
07/31/2024
|
|
|
3
|
5
|
Vermilion
|
|
Patching on FAI 74 from ILL 49(N) to Middle Fork Vermilion River west of Danville.
|
055-70H29
|
Executed
|
07/31/2024
|
|
|
3
|
5
|
Piatt
|
|
16.064 miles of contract maintenance patching from Macon/Piatt County Line to ILL 10 east of White Heath.
|
056-70H35
|
Executed
|
07/23/2024
|
|
|
3
|
5
|
Various
|
|
District wide on-call guardrail and fence repairs.
|
057-72284
|
Executed
|
07/31/2024
|
|
|
4
|
6
|
Pike
|
|
24.4 miles of patching the right wheel path of driving lane on I-72 from 0.9 miles east of IL 96 to 0.4 miles east of US 54/IL 107.
|
058-72726
|
Executed
|
07/31/2024
|
|
|
4
|
6
|
Morgan
|
|
Patching on I-72 and IL 267 from Loves Drive to south Woods Road, south of Jacksonville.
|
059-72727
|
Executed
|
07/31/2024
|
|
|
4
|
6
|
Montgomery
|
|
Patching on IL 16 from west of the I-55 southbound ramp to OLD US 66, I-55 northbound ramp south of IL 16 to IL 16, and on Old US 66 from Ferdon Street to IL 16 in Litchfield.
|
060-72730
|
Executed
|
07/23/2024
|
1 / 1 |
|
4
|
6
|
Sangamon
|
|
Parking lot paving, access road paving, and security fence installation at the District 6 Bridge Maintenance Facility off of Chatham Road just north of I-72 in Springfield.
|
061-72733
|
Executed
|
07/23/2024
|
1 / 1 |
|
4
|
6
|
Brown, Mason
|
|
Installation of conduit, handholes, fiber optic cable runs and CCTV Cameras at various locations in Havana and Mt. Sterling.
|
062-72734
|
Executed
|
07/23/2024
|
|
|
4
|
6
|
Christian
|
|
Installation of CCTV cameras at various locations in Pana and Taylorville.
|
063-72737
|
Executed
|
09/13/2024
|
|
|
4
|
6
|
Sangamon
|
|
Tree removal, vegetation removal, erosion control, fence removal and replacement and temporary seeding on I-72 from 0.2 miles east of IL 4 to 0.1 miles east of Chatham Road in Springfield.
|
064-72738
|
Executed
|
08/13/2024
|
|
|
4
|
6
|
Sangamon
|
|
Bridge bearing replacement at SN 084-0169 carrying J David Jones Parkway over Spring Creek in Springfield.
|
065-72739
|
Executed
|
08/13/2024
|
|
|
4
|
6
|
Pike
|
|
Bridge bearing replacement at SN 075-0080 carrying US 54 over The Sny, 1 mile southwest of IL 96.
|
066-72911
|
Executed
|
07/23/2024
|
|
|
4
|
6
|
Morgan
|
|
Bridge deck patching on SN 069-0062 carrying IL 100 over Spring Creek.
|
067-72912
|
Executed
|
08/13/2024
|
|
|
4
|
6
|
Sangamon
|
|
Bridge deck patching on SN 084-0037 carrying 11th Street over I-55 southeast of Springfield.
|
068-74956
|
Executed
|
07/31/2024
|
|
|
4
|
7
|
Wayne
|
|
6.9 miles of HMA shoulders with rumble strips, aggregate shoulders, and curb and gutter replacement on US 45 from just south of the Norfolk Southern Railroad to 0.1 miles south of County Road 150N.
|
069-74984
|
Executed
|
08/13/2024
|
|
|
4
|
7
|
Effingham
|
|
Culvert replacement on IL 37 over a stream 0.1 miles northeast of Iowa Street, northeast of Edgewood. (SN 025-8633)
|
070-74985
|
Executed
|
07/31/2024
|
|
|
4
|
7
|
Macon
|
|
2.3 miles of resurfacing on Main Street from 0.1 miles north of Eldorado Street in Harristown north of Glasgow Road.
|
071-74A65
|
Executed
|
07/31/2024
|
1 / 1 |
|
4
|
7
|
Clark
|
|
9.5 miles of microsurfacing joint repair on I-70 from 0.7 miles east of the Martinsville interchange to 0.8 miles east of Clarksville Road.
|
072-74B43
|
Executed
|
08/07/2024
|
|
|
4
|
7
|
Cumberland
|
|
7.25 miles of crack and joint sealing on I-70 from 7.5 miles east of the Effingham County line to 1.8 miles east of IL 130.
|
073-74C42
|
Executed
|
07/31/2024
|
|
|
4
|
7
|
Cumberland
|
|
5.9 miles of patching, HMA surface removal and resurfacing on IL 121 from US 45 to the Montrose Blacktop.
|
074-74C75
|
Executed
|
07/26/2024
|
|
|
4
|
7
|
Coles, Cumberland
|
|
31.5 miles of aggregate shoulder reconstruction on US 45 from 0.1 miles north of the Lake Land College entrance to IL 121; on US 40 from the Effingham County line to IL 130 in Greenup; on IL 121 from the Montrose Blacktop to 0.1 miles east of 1500E in Toledo; on the Montrose Blacktop from IL 121 to the Effingham County line.
|
075-74C77
|
Executed
|
07/26/2024
|
|
|
4
|
7
|
Shelby
|
|
13 miles of shoulder reconstruction on IL 32 from IL 16 to the Effingham County line.
|
076-74C78
|
Executed
|
07/31/2024
|
|
|
4
|
7
|
Macon
|
|
Parking lot rehabilitation at the Decatur Maintenance Yard.
|
077-74C79
|
Executed
|
08/02/2024
|
1 / 1 |
|
4
|
7
|
Wabash
|
|
Removing and replacing the concrete apron in front of the Browns Maintenance Yard.
|
078-74C87
|
Executed
|
07/31/2024
|
|
|
4
|
7
|
Effingham
|
|
5 miles of patching on I-57 and I-70, including ramps, from the Little Wabash River south of Effingham to I-57 north of Effingham.
|
079-74C93
|
Executed
|
07/26/2024
|
|
|
4
|
7
|
Macon
|
|
Painting of 6 structures at various locations in Macon County.
|
080-74C94
|
Executed
|
07/31/2024
|
|
|
4
|
7
|
Coles
|
|
19.75 miles of patching on I-57 from milepost 182 to milepost 202.
|
081-74C95
|
Executed
|
08/02/2024
|
|
|
4
|
7
|
Various
|
|
Repair of existing guardrail damage and on call repair of guardrail damage at various locations throughout District 7.
|
082-74C99
|
Executed
|
08/27/2024
|
|
|
4
|
7
|
Various
|
|
Applying a bituminous surface treatment, A2, to the Robinson, Lawrence, and Olney Maintenance Yards in District 7.
|
083-76H70
|
Executed
|
07/26/2024
|
1 / 1 |
|
5
|
8
|
Marion
|
|
Bridge demolition on Old US 51 over East Fork Kaskaskia Overflow, 5 miles north of Sandoval (SN 061-0009).
|
084-76T26
|
Executed
|
08/16/2024
|
|
|
5
|
8
|
St. Clair
|
|
Bridge deck repairs and bridge joint replacement on SN 082-0289 carrying IL 177 over Loop Creek, 0.3 miles east of IL 158.
|
085-76T38
|
Executed
|
08/02/2024
|
|
|
5
|
8
|
St. Clair
|
|
Deep well and pump repairs at various locations in District 8.
|
086-76T47
|
Executed
|
07/31/2024
|
|
|
5
|
8
|
St. Clair
|
|
Adding a new precast concrete vault that will contain two new flow meters installed on 12-inch piping that is the discharge from the 25th Street Pump Station-s deep groundwater wells in East St. Louis.
|
087-76T50
|
Executed
|
08/07/2024
|
|
|
5
|
8
|
St. Clair
|
|
Intersection improvements and resurfacing at IL 3 and IL 157 in Cahokia Heights.
|
088-76T58
|
Executed
|
07/31/2024
|
|
|
5
|
8
|
Various
|
|
Guardrail and cable median repairs at various locations in District 8.
|
089-76T62
|
Executed
|
07/23/2024
|
|
|
5
|
8
|
Various
|
|
Provide operable and properly maintained traffic signals, flashing beacons, highway lighting, navigation/aviation lighting, data collection stations at various locations throughout District 8.
|
090-76T63
|
Executed
|
07/23/2024
|
|
|
5
|
8
|
Various
|
|
Maintain and service all ITS equipment at various locations throughout District 8.
|
091-76T76
|
Executed
|
07/16/2024
|
2 / 2 |
|
5
|
8
|
Randolph
|
|
48.7 miles of pavement patching on IL 3 from the Monroe County line to the Jackson County line and on IL 150 from the Mississippi River in Chester to the Perry County line.
|
092-76T81
|
Executed
|
07/31/2024
|
|
|
5
|
8
|
Marion
|
|
1 mile of patching on US 50 from 0.1 miles east of Selmaville Road to 0.2 miles east of Baldridge Lane and from 0.1 miles west of Weymeyer Avenue to 0.1 miles west of Lackey Street.
|
093-76T88
|
Executed
|
08/07/2024
|
3 / 3 |
|
5
|
8
|
Madison
|
|
Patching, milling and resurfacing on US 67 from 10th Street in Alton to IL 111 in Godfrey.
|
094-76U10
|
Executed
|
07/23/2024
|
|
|
5
|
8
|
Various
|
|
Oil and chip at various maintenance yards throughout District 8.
|
095-78718
|
Executed
|
08/13/2024
|
|
|
5
|
9
|
Johnson
|
|
Removal and replacement of SN 044-2007 carrying US 45 over an unnamed stream, 1 mile south of New Burnside.
|
096-78861
|
Executed
|
08/20/2024
|
|
|
5
|
9
|
Alexander
|
|
HMA surface removal, HMA resurfacing and pavement patching on Old IL 3 from the Old IL 3 and IL 3 intersection approximately 0.1 miles south of Bean Ridge Road in Thebes to the Old IL 3 and IL 3 intersection approximately 0.1 miles south of Levee Road.
|
097-78961
|
Executed
|
07/26/2024
|
2 / 2 |
1 |
5
|
9
|
Franklin
|
|
4.7 miles of resurfacing on IL 149 from the Williamson County line to 1.5 miles east of IL 184 in Royalton.
|
098-78A25
|
Withdrawn
|
05/29/2024
|
|
|
5
|
9
|
Johnson
|
|
0.6 miles of patching, HMA surface removal, HMA resurfacing and ADA improvements on IL 146 from 0.1 miles west of 11th Street to US 45 in Vienna.
|
099-78A30
|
Executed
|
07/26/2024
|
|
|
5
|
9
|
White
|
|
0.75 miles of patching, HMA surface removal, resurfacing, and ADA upgrades on Norris City Road from US 45 in Norris City to IL 1.
|
100-78A41
|
Executed
|
08/07/2024
|
|
|
5
|
9
|
Union
|
|
Pavement patching and pavement marking at two locations: 1) Entirety of Choate Mental Health Road (also known as Anna Quarry Road); 2) US 51 southbound left turn lane onto IL 146 in Anna.
|
101-78A50
|
Executed
|
07/26/2024
|
|
|
5
|
9
|
Gallatin, Hardin
|
|
12.6 miles of tree pruning along IL 1 and IL 34 in Gallatin and Hardin Counties.
|
102-78A51
|
Executed
|
08/13/2024
|
1 / 1 |
|
5
|
9
|
Saline
|
|
0.8 miles of resurfacing on US 45 / IL 34 from Poplar Street to IL 145 in Harrisburg.
|
103-78A55
|
Executed
|
07/26/2024
|
|
|
5
|
9
|
Jackson
|
|
Replacing the joints at each end of SN 039-0074 carrying IL 4 over Beaucup Creek, 0.5 miles west of IL 13/127.
|
104-78A64
|
Executed
|
07/26/2024
|
|
|
5
|
9
|
Various
|
|
Electrical repair and/or replacement on various routes in District 9.
|
105-62F11
|
Executed
|
08/07/2024
|
3 / 3 |
2 |
1
|
1
|
Cook
|
|
(1.73-Mile) Intersection improvements, roadway reconstruction and widening, resurfacing, railroad crossing improvements, traffic signal modernization, drainage improvements, lighting and landscaping in the Villages of McCook, LaGrange Brookfield, Cook County, IL.
|
106-62L00
|
Executed
|
07/31/2024
|
1 / 1 |
|
1
|
1
|
Cook
|
|
(3.02-Mile) Standard/SMART Overlay and ADA improvements includes combination curb and gutter removal and replacement, pavement marking, sidewalk removal and replacement. This project is located in the City of Chicago.
|
107-62M79
|
Executed
|
07/16/2024
|
5 / 5 |
1 |
1
|
1
|
Will
|
Voluntary
|
Rehabilitate bascule spans of US 30 (Cass St) bridge over Des Plaines River (SN 099-0101) including structural, mechanical, and electrical improvements for total length of 552 ft (0.1 mile). The project is located within the City of Joliet in Will County, Illinois.
|
108-62R41
|
Executed
|
07/31/2024
|
2 / 2 |
1 |
1
|
1
|
Cook
|
|
(2.02-miles) Designed Overlay, (ADA) improvements consists of rumble strips pavement patching, PCC curb and gutter removal and replacement, pedestrian curb ramps improvements (ADA), asphalt surface removal, asphalt resurfacing, pavement markings and raised reflective pavement markers. Located on Kean Kean Avenue from South of US 12/ 20 (95th Street) to 111 Street within the Village of Palos Park in Cook County.
|
109-62T19
|
Executed
|
07/31/2024
|
1 / 1 |
1 |
1
|
1
|
Will
|
|
(304-Ft) Bridge deck overlay and bridge joint repairs improvement of the structure that carries IL 126 / Lockport Street over the DuPage River. The improvement is located in the Village of Plainfield in Will County.
|
110-62T40
|
Executed
|
08/16/2024
|
1 / 1 |
|
1
|
1
|
Cook
|
|
This is a bridge repair project OF (SN 016-2603): Lawrence Avenue over Des Plaines River. Scope of work includes bridge deck and approach slab patching, joint replacement, curb and gutter removal and replacement, and milling and resurfacing of the bridge deck and approach pavements. The project is located within the City of Chicago and Village of Schiller Park in Cook County.
|
111-62U76
|
Executed
|
08/13/2024
|
|
1 |
1
|
1
|
Will
|
|
(3,093-Ft) Traffic Signal Modernization, Left Turn Lanes includes resurfacing, traffic signals, drainage improvements, and pavement markings. Located on IL 7 (Renwick Road) at the intersection with IL 53 (Independence Blvd) in the Cities of Lockport and Crest Hill in Will County.
|
112-62U77
|
Executed
|
07/31/2024
|
1 / 1 |
2 |
1
|
1
|
Lake
|
|
(0.35-Mile) Designed Overlay consists of ADA pedestrian ramps improvements, pavement patching, hot-mix asphalt surface removal, combination concrete curb and gutter removal and replacement, structure adjustments and drainage structure cleaning, asphalt leveling binder and surface course, pavement markings, raised reflective pavement marker installation. Located on IL 176 (Park Avenue) from Garfield Rd to Park Pl, within the Village of Libertyville in Lake County.
|
113-62W74
|
Executed
|
07/26/2024
|
|
|
1
|
1
|
Cook
|
|
The length of the project is 695 ft (0.131 miles). This project consists of resurfacing and patching, pavement marking at various locations along I-290. The project is located in the Village of Schaumburg, Cook County.
|
114-61H55
|
Executed
|
08/16/2024
|
|
|
1
|
1
|
Cook
|
|
HMA Resurfacing with construction of a right turn lane, traffic signals, street lighting, curb and gutter, pavement markings, and landscaping at the intersection of 111th Street and Roberts Road in Palos Hills
|
115-61J93
|
Withdrawn
|
05/15/2024
|
|
|
1
|
1
|
McHenry
|
|
Pavement reconstruction, construction of a multi-use path, replace two bridges, curb and gutter, storm sewer, traffic signals, lighting and landscaping on Randall Road from Ackman Road to Acorn Lane/Polaris Drive in Crystal Lake and Lake in the Hills.
|
116-61K36
|
Rejected
|
07/31/2024
|
|
|
1
|
1
|
Cook
|
|
Sidewalk construction on 91st Street from 0.1 mile east of California Avenue to Western Avenue at the CSX Railroad in Evergreen Park. , Sidewalk Construction on 91st Street from 0.1 mile east of California Avenue to Western Avenue at the CSX Railroad in Evergreen Park.
|
117-61K38
|
Executed
|
07/31/2024
|
|
|
1
|
1
|
Kane
|
|
Resurface Main Street from Cross Street to 630' north of IL 47 in Sugar Grove.
|
118-61K40
|
Executed
|
08/16/2024
|
2 / 1 |
1 |
1
|
1
|
Cook
|
|
Resurface 9th Avenue from Chicago Avenue to Main Street in Melrose Park.
|
119-61K43
|
Rejected
|
07/31/2024
|
|
|
1
|
1
|
McHenry
|
|
HMA resurfacing, PCC sidewalks, curb and gutter, outdoor fireplace construction, shelter construction, landscaping at the downtown Cary Gateway Plaza on the northwest corner of Main Street and Spring Street.
|
120-61K47
|
Executed
|
07/31/2024
|
|
|
1
|
1
|
Cook
|
|
Resurface 154th Street from Dr. MLK Drive/South park Avenue to Dante Avenue in South Holland.
|
121-62V20
|
Executed
|
07/31/2024
|
|
|
1
|
1
|
Cook
|
|
The length of the project is 1,269-Ft (0.24-Miles) This project consists of pavement patching, hot-mix asphalt pavement resurfacing and overlay, pavement marking, electrical detection ramp improvements at various locations along I-55 The project is in the City of Chicago and Hodgkins, Cook County.
|
122-62V24
|
Executed
|
08/30/2024
|
|
|
1
|
1
|
Cook
|
|
This improvement consists of cleaning and painting existing steel structures at 2 locations. Location 1 is at the structure carrying Metra RR over I-57 (SN 016 -0068) in the Village of Calumet Park. Location 2 is at the structure carrying a Bike Path over I-57 (SN 016-0070) in the City of Chicago. All are located within Cook County.
|
123-62W18
|
Executed
|
07/23/2024
|
|
|
1
|
1
|
Cook
|
|
Trombone Mast Arm replacement and APS push button installation at various locations in District 1.
|
124-64T44
|
Executed
|
07/23/2024
|
|
|
2
|
2
|
Ogle
|
|
13 miles of aggregate shoulder improvement.
|
125-66K85
|
Executed
|
08/07/2024
|
|
|
2
|
3
|
LaSalle
|
|
2.6 Miles. SN 050-0040 Bridge Replacement with 2 span SN 050-0265 US 34 reprofiling and detour route improvements. Located on US 34 over Indian Creek in Earlville 0.3 miles east of 1251st Road.
|
126-66N52
|
Executed
|
07/31/2024
|
2 / 2 |
|
2
|
3
|
Kankakee
|
|
This project consists of bridge repairs including expansion joint replacement, deck and approach patching, structural repair of concrete, drain cleaning, traffic control, pavement striping; on F.A.P. Route 332 (IL 1/17) at two structures, Structure No. 046-0023 and Structure No. 046-0111 carrying IL 1/17 over the Kankakee River in Momence.
|
127-66N75
|
Executed
|
07/26/2024
|
|
|
2
|
3
|
LaSalle
|
|
3.46 Miles OF Class B pavement patching and shoulder repair. Work is at the exterior ramps of I-39.
|
128-66P12
|
Executed
|
07/23/2024
|
|
|
2
|
3
|
Ford
|
|
This project consists of Class B pavement patching on F.A.P. Route 681 (IL 116) beginning at the Ford/Iroquois County Line and ending at the Ford/Livingston County Line.
|
129-66P13
|
Rejected
|
06/24/2024
|
|
|
2
|
3
|
Ford
|
|
This project consists of Class B pavement patching on F.A.P. Route 796 (IL 115) beginning at Pine street (1450E Rd.) in Piper City and ending at the intersection of IL 115/116.
|
130-66P15
|
Executed
|
07/26/2024
|
|
|
2
|
3
|
Bureau, Putnam
|
|
17.63 Miles. Centerline joint repair 3' wide and 2" depth resurfacing. This project begins south of the interchange between I 80 and I 180 and continues south to IL 29 and east toward Hennipen. The project terminates at both: the west side of Coffee Creek in Hennepin IL 29 and south at The Illinois River Road National Scenic Byway.
|
131-66P23
|
Executed
|
08/02/2024
|
|
|
2
|
3
|
Bureau
|
|
This project consists of Crack and Joint Sealing, located on FAP 698 (IL 89), FAU 5605 (US 6), FAS 1248 (US 34/US 6), FAP 316 (IL 26) in Bureau County.
|
132-66P24
|
Executed
|
08/02/2024
|
|
|
2
|
3
|
LaSalle
|
|
14.45 miles of routing and crack sealing. Work begins in Ottawa at IL 23 and E Freemont Street on IL 23/IL71 including Columbus Street and LaSalle Street. Work continues at the intersection of Hitt Street and IL 23 to McKinley Rd. Work continues in Streator on IL 18, 0.1 miles east of IL 251 to east 0.1 miles West of E 16th Rd.
|
133-66P28
|
Executed
|
07/26/2024
|
|
|
2
|
3
|
Bureau
|
|
This project is located at Structure_No. 006-0057 (EB) carrying F.A.I. Route 180 (I-180), Roadway "F" and structure No. 006-0058 (WB) carrying_F.A.I. Route 180 (I-180), Roadway "E" over IL Route 29 and the IAIS Railroad approximately 2.0 miles southwest of Bureau Junction. Removal of PCC slope wall/riprap placement.
|
134-66P31
|
Rejected
|
06/24/2024
|
|
|
2
|
3
|
Various
|
|
One year contract to repair damaged High Tension Cable Median Barrier, Guardrail, Attenuators, etc., caused by motorists along various routes in District 3. Funded by MCHD funds, Contract Maintenance funds, and Maintenance of HTC Median Barrier funds.
|
135-66P40
|
Executed
|
08/07/2024
|
|
|
2
|
3
|
Grundy, LaSalle
|
|
Centerline striping on I-39 in LaSalle County and on I-80 in LaSalle and Grundy Counties.
|
136-68J08
|
Executed
|
07/16/2024
|
|
|
3
|
4
|
Tazewell
|
|
4.61 miles of CIR and Mill and Overlay on IL 122 in Tazewell County.
|
137-70C14
|
Executed
|
07/31/2024
|
6 / 6 |
1 |
3
|
5
|
Edgar
|
|
Gross Length 75,737.81 FT = 14.344 MI, Net Length 75,460.81 = 14.292 MI. Standard Overlay Resurfacing and Culvert Replacement of FAP 749 (ILL 133) from Coles Co Line to ILL 16 in Paris.
|
138-70H24
|
Executed
|
08/02/2024
|
|
|
3
|
5
|
Vermilion
|
|
4.02 miles of patching from 0.1 mile east of I-74 to Logan Ave in Danville.
|
139-72715
|
Deleted
|
05/08/2024
|
|
|
4
|
6
|
Sangamon
|
|
Substructure repairs on SN 084-0073 and 084-0178 carrying Dirksen Parkway over NSRR and ICRR in Springfield.
|
140-72K98
|
Executed
|
08/13/2024
|
7 / 7 |
2 |
4
|
6
|
Sangamon
|
|
Bridge repairs, bridge widening, bridge deck removal and replacement on SN 084-0018 and 084-0019 carrying I-55 over the Sangamon River, 2.2 miles south of Business I-55 Sherman Interchange.
|
141-78776
|
Executed
|
07/26/2024
|
3 / 3 |
1 |
5
|
9
|
Perry
|
|
0.75 miles of pavement reconstruction on US 51 from Park Street to Stacy Street in DuQuoin.
|
142-78A28
|
Executed
|
07/26/2024
|
|
|
5
|
9
|
Jefferson, White
|
|
Bridge repairs/rehabilitation at three locations: 1) SN 041-0051 carrying County Highway 10 (E. Richview Road) over I-57, 0.4 miles north of I-64; 2) SN 041-0053 carrying Township Road 1A (N. Old Centralia Lane) over I-57 in Jefferson County, 2.5 miles north of I-64; 3) SN 097-0045 carrying Township Road 214 (County Road 950 E) over I-64, 3 miles east of Burnt Prairie.
|
143-85751
|
Executed
|
07/26/2024
|
|
|
2
|
2
|
Rock Island
|
|
Construct a PCC Shared-Use Path with aggregate base, storm sewer pipes, and riprap along the Mississippi River from 17th Street to intersection of 1st Avenue/19th Street in Moline.
|
144-85760
|
Executed
|
07/23/2024
|
2 / 2 |
1 |
2
|
2
|
Ogle
|
|
Resurface Caron Road from 7th Avenue south of Creston Road, and resurface Creston Road from West ;of Carton Road to the I-39 overpass in Rochelle.
|
145-87816
|
Executed
|
08/02/2024
|
|
|
2
|
3
|
Bureau
|
|
Replace the bridge carring TR 85 over Masters Creek, 3 miles southest of Ohio.
|
146-87817
|
Executed
|
07/26/2024
|
|
|
2
|
3
|
Bureau
|
|
Replace the bridge carrying CH 12 over East Bureau Creek, 2 miles west of Arlington.
|
147-87819
|
Executed
|
09/13/2024
|
|
|
2
|
3
|
Ford
|
|
Constuct a cast-in-place box culvert with HMA approaches and guardrail to carry Thawville Road over an unnamed creek.
|
148-87823
|
Executed
|
07/26/2024
|
|
|
2
|
3
|
Livingston
|
|
Construct a single-span PPC deck beam bridge on spill-through abutments to carry TR 18C (400 E Road) over Scattering Point Creek, 1 mile south of Flanagan . Projects includes HMA approaches, aggregate shoulders, channel excavation, and seeding.
|
149-87825
|
Executed
|
09/06/2024
|
1 / 1 |
|
2
|
3
|
DeKalb
|
|
HMA resurfacing with 3-foot HMA shoulders on Glidden Road from IL 72 to IL 64.
|
150-87835
|
Executed
|
07/31/2024
|
2 / 2 |
|
2
|
3
|
Kankakee
|
|
Construct a three-span PPC deck beam bridge with HMA approaches and guardrail to carry CH 17 over Exline Slough, 5.9 miles northeast of Manteno.
|
151-87839
|
Executed
|
07/31/2024
|
|
|
2
|
3
|
DeKalb
|
|
Resurface Sycamore Street from the CN Railroad to Walnut Street, and resurface West Hill Street from Emmett Street to Sycamore Street in Genoa.
|
152-87849
|
Executed
|
08/13/2024
|
|
|
2
|
3
|
Grundy
|
|
Remove and replace two precast channel beam superstructures on Gardner Road over Johnny Run and West Fork of Mazon River. Includes the salvage and reinstallation of S1 bridge rail and HMA approach pavment.
|
153-87867
|
Executed
|
07/31/2024
|
|
|
2
|
3
|
Grundy
|
|
HMA resurfacing, curb and gutter, sidewalks and pavement markings on Carbon Hill Road from IL 113 to Spring Road in Coal City.
|
154-89845
|
Executed
|
07/26/2024
|
|
|
3
|
4
|
Knox
|
|
PCC sidewalk with ADA Ramps and drainage improvements at various locations in Galesburg.
|
155-91641
|
Executed
|
07/26/2024
|
1 / 1 |
|
3
|
5
|
Vermilion
|
|
Guardrail improvements at various locations in Vermilion County.
|
156-91646
|
Executed
|
07/26/2024
|
|
|
3
|
5
|
Champaign
|
|
Rehabiliatate the structure carrying TR 27 over Wilcat Slough, 4 miles northwest of Rantoul.
|
157-91647
|
Executed
|
07/26/2024
|
|
|
3
|
5
|
Champaign
|
|
Rehabilitate the structure carrying TR 312 over an unnamed stream, 3 miles southeast of St. Joseph.
|
158-91648
|
Executed
|
08/23/2024
|
|
|
3
|
5
|
Champaign
|
|
Rehabilitate the structure carrying TR 155 over Stony Creek, 2.5 miles south of Royal.
|
159-93808
|
Executed
|
07/31/2024
|
|
|
4
|
6
|
Christian
|
|
Replace the bridge carrying TR 12A over Clear Creek, 2.5 miles northwest of Morrisonville.
|
160-93819
|
Executed
|
07/26/2024
|
|
|
4
|
6
|
Cass
|
|
Construct an HMA/PCC Multi-Use Path along 15th Street and Sangamon Street in Beardstown. Includes curb and gutter, inlet and storm sewer improvements, striping and signage.
|
161-95953
|
Executed
|
07/26/2024
|
|
|
4
|
7
|
Clay
|
|
Replace the structure carrying Campground Lane over Brush Creek, 1 mile East of Eenia.
|
162-95959
|
Executed
|
07/26/2024
|
|
|
4
|
7
|
Crawford
|
|
Replace the bridge carrying TR 47 over Hutson Creek, 2 miles west of Hutsonville.
|
163-95960
|
Executed
|
08/02/2024
|
|
|
4
|
7
|
Coles
|
|
Resurfacing, with pavement markings and rumble strips on Westfield Road from Lincoln National Memorial to the Coles/Clark County Line.
|
164-95961
|
Executed
|
08/13/2024
|
|
|
4
|
7
|
Shelby
|
|
Resurfacing on CH 5 from N 2075 E Road to N 1875 E Road.
|
165-95962
|
Executed
|
08/27/2024
|
|
|
4
|
7
|
Jasper
|
|
Reconstruct CH 10 with soil-cement base course and bituminous cover coat from IL 130 to St. Marie Road.
|
166-95964
|
Executed
|
08/02/2024
|
|
|
4
|
7
|
Moultrie
|
|
Cement processed modified soil base with bituminous surface treatment and aggregate shoulders on CH 8 from 2200 N Rd. to Il 133, and from 2500 N Rd. to 2400 N Road.
|
167-97829
|
Executed
|
08/20/2024
|
|
|
5
|
8
|
Madison
|
|
Resurface Third Street from Ewing Avenue to McCambridge Avenue in Madison.
|
168-97831
|
Executed
|
07/31/2024
|
|
|
5
|
8
|
St. Clair
|
|
HMA resurfacing and installation of waterproofing system on three separate PPC deck beam structures. Includes removal of existng HMA surface and waterproofing membrane system, repairs to the beam keyways and dowel bar grout.
|
169-97832
|
Executed
|
07/31/2024
|
1 / 1 |
|
5
|
8
|
Madison
|
|
Resurface South Moreland Road from IL 143 to 0.2 miles south of IL 140.
|
170-97835
|
Executed
|
08/02/2024
|
1 / 1 |
|
5
|
8
|
Madison
|
|
HMA resurfacing with pavement patching, dowel bar retrofitting, thermoplastic pavement markings and signage on University Drive from University Park Drive to Stadium Drive on the SIU Campus in Edwardsville.
|
171-97836
|
Executed
|
07/31/2024
|
1 / 1 |
|
5
|
8
|
Madison
|
|
Rehabilitate the structure carrying Brown Street over Shields Branch in Alton. Includes linging the existing structure with precast concrete box culvert sections, HMA resurfacing, sidewalk, guardrail, pedestrian railing, riprap, storm sewer, pavment markings, and other work.
|
172-99724
|
Executed
|
07/26/2024
|
|
|
5
|
9
|
Saline
|
|
Resurfacing Harco Road from IL 34 to IL 13.
|
173-99728
|
Executed
|
07/26/2024
|
|
|
5
|
9
|
Union
|
|
4 foot HMA shoulders with rumble strips on Lick Creek Road from north of IL 146 to FAI 57.
|
174-99732
|
Executed
|
07/26/2024
|
|
|
5
|
9
|
Franklin
|
|
Resurface 21 Mine Road from the Jefferson County Line to IL 154.
|
175-99733
|
Executed
|
08/02/2024
|
1 / 1 |
|
5
|
9
|
Jefferson
|
|
Cold-in-Place recycling and resurfacing with aggregate shoulders on Old Fairfield Road from 0.2 mile west of Campground Lane to IL 15.
|
176-99734
|
Executed
|
08/02/2024
|
|
|
5
|
9
|
Union
|
|
Replace existing structure with a single-span PC deck beam bridge with aggregate approaches to carry New Hope Road over a tributary to Bradshaw Creek, 0.3 mile east of CH 20.
|
177-46630
|
Executed
|
07/31/2024
|
|
|
1
|
1
|
Various
|
|
This work consists of Curb and Median Painting as well as various sizes of pain pavement marking lines, letters and symbols and the removal of existing pavement markings located on various state-maintained highways in various counties throughout District 1.
|
178-46631
|
Executed
|
09/13/2024
|
|
|
1
|
1
|
Various
|
|
This work shall consist of placing various widths of thermoplastic, preform plastic, hot spray thermoplastic and modified urethane pavement marking lines, letters and symbols and the removal of existing pavement markings and the installation of grooved pavement markings. Located on various arterial routes throughout District 1.
|
179-62R72
|
Executed
|
07/26/2024
|
|
|
1
|
1
|
Cook
|
|
(2,763-Ft) SMART Overlay, ADA Improvements: Hot-mix asphalt surface removal, pavement patching, asphalt surface overlay, sidewalk removal / replacement, removal and replacement of curb and gutter, longitudinal joint sealing, pavement markings, raised reflective pavement markers located on Palatine Road North Frontage Road, from East of Salt Creek to Alison Drive within the Village of Palatine in Cook County.
|
180-62T91
|
Executed
|
07/26/2024
|
|
1 |
1
|
1
|
Various
|
|
This work consists of applying selective and non-selective herbicide mixtures to control weeds within medians, guardrails, interchanges, infields, shoulders and slopes within the limits of the right of way within various areas in District One.
|
181-62U10
|
Executed
|
08/13/2024
|
|
|
1
|
1
|
Cook
|
|
(3.48-Mile) Standard overlay and ADA improvement project. The project begins at Palatine Road South Frontage Road East of US Route 12 to East of Pinecrest Drive and is located within the City of Arlington Heights in Cook County.
|
182-66K66
|
Executed
|
07/23/2024
|
2 / 2 |
|
2
|
3
|
Bureau
|
|
Arispie Township superstructure replacement of SN 006-0053 and SN006-0054 and bridge replacement of SN 006-0051 and SN 006-0052. SN 006-0051 and SN 006-0052 carry I 180 over Bureau Creek and SN 006-0053 and SN 006-0054 carry I 180 over CH 23 (Bottom Road).
|
183-66P27
|
Executed
|
07/23/2024
|
|
|
2
|
3
|
Bureau
|
|
Class B Pavement Patching on F.A.I. Route 80 (I-80) beginning at M.M. 45.0, 0.1 miles east of IL Route 40 and ending at M.M. 59.6, 0.47 miles east of US Route 34.
|
184-66H56
|
Executed
|
07/26/2024
|
2 / 2 |
1 |
2
|
3
|
Livingston
|
|
Milling and resurfacing, culvert repairs, and latex overlays on I-55 0.8 miles north of Wolf Creek to 1.8 miles south of IL 17 and CH1 in Odell from OR 66 to 0.25 miles east of N 2000 Rd.
|
185-72732
|
Deleted
|
05/08/2024
|
|
|
4
|
6
|
Morgan
|
|
Deck patching on 4 bridges carrying US 67 over IL 104 ramps and NSRR northwest of Jacksonville. (SN 069-0073, 0074, 0075, 0076)
|
186-74562
|
Executed
|
08/13/2024
|
|
|
4
|
7
|
Clark
|
|
Replacement of SN 012-0018 carrying US 40 over North Fork Embarras River, 0.6 miles west of Washington Street in Martinsville.
|
187-74564
|
Deleted
|
05/08/2024
|
|
|
4
|
7
|
Coles
|
|
Superstructure and substructure replacement of SN 015-0068 carrying 900N over Riley Creek, 0.3 miles west of Charleston.
|
188-74B41
|
Deleted
|
05/08/2024
|
|
|
4
|
7
|
Cumberland
|
|
Bridge deck overlay, bridge joint replacement and repair, bridge approach roadway and bridge deck repairs on SN 018-0044 and 018-0054 carrying I-70 over Cottonwood Creek, 0.1 miles east of County Road 1125E.
|
189-74B53
|
Executed
|
08/02/2024
|
|
|
4
|
7
|
Crawford
|
|
7.2 miles of patching, milling and resurfacing on IL 33 from 0.2 miles east of Roosevelt Street in Oblong to 0.2 miles east of North Glendale Road in Robinson.
|
190-74C70
|
Executed
|
08/23/2024
|
|
|
4
|
7
|
Edwards, Richland
|
|
25.4 miles of shoulder reconstruction on IL 130 from 0.1 miles south of US 50 in Olney to Maple Street in Albion and on West Salem Road from IL 130 to 0.3 miles east of Meridian Road (700E).
|
191-76K05
|
Executed
|
08/02/2024
|
8 / 8 |
1 |
5
|
8
|
St. Clair
|
|
4.5 miles of patching and resurfacing of mainline I-255, ramps and shoulders, structure rehabilitation, concrete barrier wall replacement, lighting replacement, guardrail replacement, pipe underdrain replacement and other drainage repairs, and sign truss replacement and repairs on I-255 from IL 15 to IL 157.
|
192-76R78
|
Active
|
05/02/2024
|
2 / 2 |
1 |
5
|
8
|
St. Clair
|
|
Modernization of 16 traffic signals along IL 159 from the intersection of Ludwig/Salem Avenue to the intersection of IL 161/N. Belt West Road. Limits of this project also includes I-64 from IL 159 westward to milepost 10.8.
|
193-78885
|
Executed
|
08/02/2024
|
9 / 9 |
2 |
5
|
9
|
Jefferson
|
|
Expanding approximately 6.4 miles of I-57 (north of the Atchison Creek Bridge, near mile marker 85 to the Tri-Level south of Mt. Vernon) by adding an additional lane in each direction, installing a median barrier, resurfacing the existing lanes, adding storm sewers and drainage structures, replacement of SN 041-0003 over Dodd-s Creek and overlay of SN 041-0005 over Casey Fork Creek.
|
194-76L11
|
Executed
|
08/13/2024
|
1 / 1 |
1 |
5
|
8
|
Marion
|
|
11.5 miles of resurfacing and ADA improvements on IL 37 from Cherry Street in Kinmundy to Madison Street in Salem.
|
195-76P46
|
Executed
|
08/16/2024
|
|
2 |
5
|
8
|
Madison
|
|
Bridge repair on SN 060-0124, HMA overlay and joint repair on IL 111 over NW and CNW and MCT Bike Trail, 0.2 miles north of IL 162 in Pontoon Beach.
|
196-76P58
|
Executed
|
07/26/2024
|
|
|
5
|
8
|
Madison
|
|
2.2 miles of resurfacing and ADA improvements on Beltline Road from IL 157 to IL 159 in Collinsville.
|
197-74C76
|
Executed
|
08/16/2024
|
|
|
4
|
7
|
Macon
|
|
9.5 miles of shoulder reconstruction on Old US 36 from the Sangamon County to 900' west of US 36 in Harristown.
|
198-46653
|
Executed
|
07/31/2024
|
|
|
4
|
6
|
Various
|
|
Installation of pavement markings on various routes in various counties of District 6.
|
199-46938
|
Executed
|
07/26/2024
|
2 / 2 |
1 |
5
|
9
|
Massac
|
|
Reconstruction of bridge approaches at the Fort Massac State Park bridge over Massac Creek.
|
200-70G11
|
Withdrawn
|
06/04/2024
|
1 / 1 |
|
3
|
5
|
McLean
|
|
7.36 miles of Smart Overlay 2.5 miles south of I-74 to 1 mile south of Heyworth.
|
201-64P26
|
Withdrawn
|
06/05/2024
|
|
|
2
|
2
|
Jo Daviess
|
|
1.5 miles of Reconstruction/HSIP Safety Funds_on US 20 (EB): 0.1 mile West to Frentress Lake Road and 0.2 mile West_to 0.6 mile East of Barge Terminal Rd and US 20 (WB): 0.4 mile to 0.1 mile East of Barge Terminal Rd.
|
202-66P41
|
Executed
|
07/23/2024
|
|
|
2
|
3
|
Various
|
|
This project is located on IL 23 in LaSalle CO., IL 47 in Grundy Co. and IL 17 in Kankakee Co. This work consists of pavement striping.
|
203-46644
|
Executed
|
07/31/2024
|
|
|
2
|
3
|
Various
|
|
Removing and replacing raised reflective pavememt_markers and reflectors on various highways, freeways, and expressways in various counties in District 3.
|
204-46646
|
Executed
|
08/02/2024
|
|
|
3
|
4
|
Various
|
|
Pavement marking in District 4.
|
205-61J28
|
Executed
|
08/16/2024
|
3 / 3 |
1 |
1
|
1
|
Kane
|
|
Reconstruction of the existing intersection of us 20 and Reinking road in the c ty of Elgin to a three-leg roundabout. Work includes pavement removal, storm se sewers, watermains, pcc roadway pavement, curb and gutter, sidewalks, lighting, landscaping, pavement markings and other necessary work.
|
206-87722
|
Executed
|
08/02/2024
|
3 / 3 |
|
2
|
3
|
DeKalb
|
|
Replace the bridge carrying Pearl Street over South branch of the Kishwaukee ri ver in the Village of Kirkland.
|
207-87749
|
Executed
|
08/13/2024
|
2 / 2 |
1 |
2
|
3
|
DeKalb
|
|
HMA bike path with concrete sidewalk, curb and gutter, storm sewers, and other work along Fairview Drive from Macom Drive to West of Peace Road in the City of Dekalb.
|
208-87789
|
Executed
|
07/26/2024
|
1 / 1 |
1 |
2
|
3
|
DeKalb
|
|
Replace the bridge carrying Perry Road over Branch Battle Creek located 1 mile East of Somonauk Road.
|
209-87801
|
Executed
|
07/26/2024
|
|
|
2
|
3
|
LaSalle
|
|
HMA Resurfacing and widening with HMA shoulders, aggregate shoulder, culvert re placement, pavement marking, shoulder rubmble strips, gaurdrail replacement, an d other work along county highway from 21st road to the Livingston county line.
|
210-87805
|
Withdrawn
|
06/12/2024
|
|
1 |
2
|
3
|
Kankakee
|
|
Reconstruction of Manteno-Deselm Road to provide a 3 lane roadway with a bi-dir ectional turn lane from US 45/52 to Spruce St. in Manteno.
|
211-87818
|
Executed
|
07/26/2024
|
2 / 2 |
1 |
2
|
3
|
DeKalb
|
|
Replace the bridge carrying TR 230 over West branch of Big Rock Creek located 0 .8 miles Northeast of Hinckley Scott Road.
|
212-87832
|
Executed
|
08/07/2024
|
|
|
2
|
3
|
DeKalb
|
|
Construction of single lane roundabout at the intersection of Lucinda Avenue an d Normal Road in the City of Dekalb. Work includes aggregate subgrade improveme nt, HMA pavement, driveways, sewer construction, pavement markings, traffic sig nal removal, lighting, and other necessary work.
|
213-87838
|
Executed
|
07/26/2024
|
3 / 3 |
1 |
2
|
3
|
LaSalle
|
|
Reconstruction of Plank Road to provide a 3 lane roadway with bi-directional tu rn lane from Ed Urban Drive to Midtown Road in the City of Peru.
|
214-89851
|
Executed
|
08/07/2024
|
|
|
3
|
4
|
Mercer
|
|
Construction of sidewalk with storm sewers, seeding, and other work along South east 6th street from College Avenue to Southeast 8th Avenue in the City of Aled o.
|
215-93654
|
Executed
|
08/13/2024
|
2 / 2 |
|
4
|
6
|
Sangamon
|
|
Removal of existing structure and construction of steel girder structure with c ast-in-place concrete deck, aggregate approach roadways, guardrail, and other w ork on Oak Crest Road over the Sangamon River.
|
216-93820
|
Executed
|
08/13/2024
|
|
|
4
|
6
|
Sangamon
|
|
Sidewalk construction with detectable warnings, incidental HMA resurfacing, see ding, and other related work at various locations in the Village of New Berlin.
|
217-95958
|
Executed
|
08/13/2024
|
|
|
4
|
7
|
Coles
|
|
Reconstruction of Douglas Street from Hayes Avenue to Coolidge Avenue in the Ci ty of Charleston.
|
218-46652
|
Executed
|
07/31/2024
|
|
|
2
|
3
|
Various
|
|
Removing and replacing raised reflective pavement markers and reflectors on various highways, freeways, and expressways in various counties in District 3.
|
219-46649
|
Executed
|
07/31/2024
|
|
|
1
|
1
|
DuPage, McHenry
|
|
This work shall consist of applying water borne, lead free, white and yellow paint pavement marking lines of 4,6, and 8 inches in width. The location of the work is on various State-maintained highways in McHenry and DuPage Counties.
|
220-46647
|
Executed
|
07/31/2024
|
|
|
1
|
1
|
Cook
|
|
This work shall consist of applying water borne, lead free, white and yellow paint pavement marking lines of 4,6, and 8 inches in width. The location of the work is on various State-maintained highways in McHenry and DuPage Counties.
|
221-62W28
|
Active
|
05/08/2024
|
|
|
1
|
1
|
Cook
|
|
The improvement consists of the litter picking and debris removal, graffiti cleaning, and posting security at graffiti cleaning locations._This work is located on various routes in District 1 in Cook County.
|
222-62W17
|
Active
|
05/08/2024
|
|
|
1
|
1
|
Cook
|
|
The work to be completed under this contract consists of expressway daytime sweeping in Cook County. This work is located on various State maintained expressway routes located within Cook County.
|
223-62U73
|
Executed
|
07/26/2024
|
|
|
1
|
1
|
DuPage
|
|
(2,000-Ft) Traffic Signal Modernization and Intersection Improvements located at IL 83 (Kingery Highway) and Bluff Rd. in the Downers Grove Township, DuPage County.
|
224-62T51
|
Executed
|
08/02/2024
|
|
|
1
|
1
|
Cook
|
|
This project consists of Traffic Signal Modernization and ADA Improvements of at the intersection of IL 1 (Halsted St.) and IL 83 (147th St.) in the city of Harvey in Cook County. Project length is 1,332 ft (0.25 mile)
|
225-66P20
|
Executed
|
07/26/2024
|
|
|
2
|
3
|
Kankakee
|
|
Repair and maintain traffic signal, flashing beacons, and roadway lighting in Kankakee County.
|
226-68H22
|
Executed
|
07/26/2024
|
1 / 1 |
|
3
|
4
|
Marshall
|
|
NB and SN I-39 over TR 39, Sandy Creek and North Fork Sandy Creek in Marshall County.
|
227-68H71
|
Executed
|
07/31/2024
|
3 / 3 |
1 |
3
|
4
|
Tazewell
|
|
D4 Bridge Joint Repair 2024 at SN's 090-0130, 090-0132, 090-0133, 090-0137, 090-0138 and 090-0139 in Tazewell County.
|
228-46648
|
Executed
|
07/31/2024
|
|
|
1
|
1
|
Lake, Will
|
|
This work shall consist of applying water borne, lead free, white and yellow paint pavement marking lines of 4,6, and 8 inches in width. The location of of the work is on various State-maintained highways in Lake and Will Counties.
|
229-62U83
|
Executed
|
07/23/2024
|
7 / 7 |
2 |
1
|
1
|
Cook, Kane
|
|
6,108 feet (1.16 mi) project which includes pavement reconstruction and widening, pavement rehabilitation, drainage, lighting, signing, noise barriers, safety improvements, superstructure replacement and widening of US 20 over St Charles St (SN 045-0006), and superstructure replacement of US 20 over Liberty St (045-0007) and US 20 over Poplar Creek (SN 016-0217) from E of Grace St to W of Shales Pkwy in the City of Elgin within Kane and Cook Counties.
|
230-62N40
|
Executed
|
08/20/2024
|
19 / 19 |
2 |
1
|
1
|
Cook, DuPage
|
|
(10.1-Mile) Changeable Message Signs, Signal Timing/ Progression, Signing (New) Surveillance, Traffic Signal Modernization and ADA Improvements. Located on IL 64 (North Avenue) from York Rd to IL 50 (Cicero Ave) in the Cities of Chicago, Elmhurst, Northlake, the Villages of Elmwood Park, Melrose Park, Oak Park, River Forest, River Grove and Stone Park in DuPage and Cook Co.
|
231-62N32
|
Executed
|
07/26/2024
|
13 / 13 |
2 |
1
|
1
|
DuPage
|
|
(14.64-Mile) Changeable Message Signs, Signal Timing/ Progression, Signing (New), Surveillance, Traffic Signal Modernization and ADA improvements. Located on IL 56 from IL 59 to York Rd in the Cities of Wheaton, Warrenville, Oakbrook Terrace, the Villages of Downers Grove, Oak Brook, Lombard, and Milton Township in DuPage County.
|
232-62W48
|
Executed
|
07/26/2024
|
7 / 7 |
2 |
1
|
1
|
Cook
|
|
(4,823-feet) Bridge Rehabilitation / Bikeway: rehabilitation and modification of SN 016-0194 and SN 016-0195. Widening of the existing west side concrete sidewalk for bikeway, bridge joints replacement/ repair, deck hydroscarification, repair and overlay with latex modified concrete, approach slabs and substructure repairs, median removal, guardrail, pavement markings and all incidental and collateral work necessary to complete the project. Located on IL 1 (Halsted Street) over IHB Railroad and over CSX Railroad within the Village of Riverdale, in Cook County.
|
233-46643
|
Executed
|
07/31/2024
|
|
|
5
|
9
|
Various
|
|
Installation of urethane pavement marking lines, letters and symbols, and the removal of existing pavement markings throughout District 9.
|
234-46650
|
Executed
|
07/31/2024
|
1 / 1 |
|
4
|
6
|
Various
|
|
Installation of pavement markings on various routes in various counties of District 6.
|
235-60J10
|
Executed
|
07/26/2024
|
13 / 13 |
2 |
1
|
1
|
Cook
|
|
Bridge replacement for the Rand Road Bridge over the Des Plaines River (SN 016-0362) roadway reconstruction and widening, traffic signal modernization, drainage improvements, lighting, and landscaping, in the City of Des Plaines, Cook County, IL.
|
236-62U70
|
Rejected
|
06/24/2024
|
|
|
1
|
1
|
Various
|
|
This work is located on various State maintained expressway routes located within the counties of Cook and DuPage.
|
237-76T28
|
Executed
|
07/26/2024
|
|
|
5
|
8
|
Madison
|
|
Bridge joint repair/replacement and bridge deck repairs on IL 4 over US 40.
|
238-64T08
|
Executed
|
07/31/2024
|
|
|
2
|
2
|
Various
|
|
Maintain and service all Intelligent Transportation System equipment located at the Department's Districts 2 and 3 to ensure the safety of the motoring public.
|
01A-RA019
|
Rejected
|
07/18/2024
|
2 / 2 |
1 |
3
|
5
|
Champaign
|
|
Rehabilitate Runway 9/27
|
02A-CN028
|
Active
|
05/07/2024
|
|
1 |
3
|
4
|
Fulton
|
|
Rehabilitate Runway 18/36
|
03A-VA023
|
Active
|
05/07/2024
|
|
1 |
4
|
7
|
Fayette
|
|
Rehabilitate Runway 9/27
|
04A-MC029
|
Active
|
05/07/2024
|
|
|
4
|
7
|
Lawrence
|
|
Replace Runway End Identifier Lights (REILs) on Runway 4/22
|
05A-RO028
|
Active
|
05/07/2024
|
|
|
2
|
2
|
Winnebago
|
|
Reconstruct Airport Terminal Entrance Road Including Relocation of Main Terminal Entrance
|
06A-MR025
|
Awarded
|
11/13/2024
|
|
1 |
2
|
3
|
Grundy
|
|
Replace Electric Vault and Associated Equipment
|
07A-SD064
|
Rejected
|
11/14/2024
|
|
1 |
5
|
8
|
St. Clair
|
|
Taxiway B Relocation, Phase 3: Southeast and taxiway B1 intersection
|
08A-OL018
|
Active
|
05/07/2024
|
|
|
4
|
7
|
Richland
|
|
Rehabilitate Aircraft Hangar Access Pavements
|