June 14, 2024 Letting 12:00 PM
146-87817

Bulletin Description

Replace the bridge carrying CH 12 over East Bureau Creek, 2 miles west of Arlington.
Region District DBE % VBP % Federal Project #
2 3 8.00 0.00 ZBL2(106)
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Bureau
  • FAS 1225
  • CH 12
  • 22-00283-00-BR
  • C-93-004-24
  • 3-10762-0000
Contract Specifics
30 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (0 Submitted / 0 Answered ) Questions not accepted as of June 04, 2024 04:30 PM.

Authorized Bidders

  • 5570 Sjostrom & Sons, Inc.
    1129 Harrison Ave.
    Rockford, IL 61104
    Phone: (815) 226-0330 Fax: (815) 226-8868 Email: heavyhighway@sjostromconstruction.com
    $436,741.60

  • 1045 Civil Constructors, Inc. d/b/a/ Helm Civil
    2283 Bus Hwy 20 East
    Freeport, IL 61032
    PO Box 750
    Freeport, IL 61032
    Phone: (815) 235-2200 Fax: (815) 235-2219 Email: civilestimating@helmgroup.com

  • 1304 Curnyn Construction Co.
    1 Hawkeye Lane
    Geneseo, IL 61254
    PO Box 106
    Geneseo, IL 61254
    Phone: (309) 944-6456 Fax: (309) 944-8282 Email: curnynco@nbson.net

  • 1320 D. Construction, Inc.
    1488 So. Broadway
    Coal City, IL 60416
    Phone: (815) 634-2555 Fax: (815) 634-8748 Email: bids@dconstruction.com
    $447,698.86

  • 4117 Miller Trucking & Excavating Company
    3303 John Deere Rd.
    Silvis, IL 61282
    Phone: (309) 755-7644 Fax: (309) 796-2967 Email: megan@mte47.com

  • 5040 Riber Construction, Inc.
    405 S. Old Rt. 66
    Dwight, IL 60420
    Phone: (815) 584-3337 Fax: (815) 584-3340 Email: estimating@riberinc.com

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
25100630 SQ YD EROSION CONTROL BLANKET Base items 1,341.000
28000250 POUND TEMPORARY EROSION CONTROL SEEDING Base items 30.000
28000400 FOOT PERIMETER EROSION BARRIER Base items 731.000
28001100 SQ YD TEMPORARY EROSION CONTROL BLANKET Base items 1,341.000
30300112 SQ YD AGGREGATE SUBGRADE IMPROVEMENT 12" Base items 532.000
40600275 POUND BITUMINOUS MATERIALS (PRIME COAT) Base items 1,196.000
40600290 POUND BITUMINOUS MATERIALS (TACK COAT) Base items 110.000
40603080 TON HOT-MIX ASPHALT BINDER COURSE, IL-19.0, N50 Base items 69.000
40604050 TON HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "C", N50 Base items 41.000
44000100 SQ YD PAVEMENT REMOVAL Base items 504.000
50100100 EACH REMOVAL OF EXISTING STRUCTURES Base items 1.000
50105220 FOOT PIPE CULVERT REMOVAL Base items 20.000
50800205 POUND REINFORCEMENT BARS, EPOXY COATED Base items 25,920.000
51500100 EACH NAME PLATES Base items 1.000
54003000 CU YD CONCRETE BOX CULVERTS Base items 205.900
59100100 SQ YD GEOCOMPOSITE WALL DRAIN Base items 173.000
63200310 FOOT GUARDRAIL REMOVAL Base items 118.000
67100100 L SUM MOBILIZATION Base items 1.000
X2020410 CU YD EARTH EXCAVATION (SPECIAL) Base items 203.000
X2070302 TON POROUS GRANULAR EMBANKMENT (SPECIAL) Base items 376.000
X2501000 ACRE SEEDING, CLASS 2 (SPECIAL) Base items 0.300
X2810210 TON STONE RIPRAP, CLASS A5 (SPECIAL) Base items 119.000
X5810103 SQ YD MEMBRANE WATERPROOFING SYSTEM FOR BURIED STRUCTURES Base items 173.000
X7010216 L SUM TRAFFIC CONTROL AND PROTECTION, (SPECIAL) Base items 1.000
Z0013798 L SUM CONSTRUCTION LAYOUT Base items 1.000
No More Pay Items