Home > Notice of Letting > Contract Detail

June 14, 2024 Letting 12:00 PM
060-72730

Bulletin Description

Parking lot paving, access road paving, and security fence installation at the District 6 Bridge Maintenance Facility off of Chatham Road just north of I-72 in Springfield.
Region District DBE % VBP % Federal Project #
4 6 1.00 0.00 N/A
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Sangamon
  • FAU 8006
  • OLD CHATHAM ROAD
  • D6 MG-PRKG-FNC 2024
  • C-96-034-24
  • N/A
Contract Specifics
30 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (1 Submitted / 1 Answered ) Questions not accepted as of June 04, 2024 04:30 PM.

  • In respect to the electrical conduit referenced as incidental to the gates, where is it coming from and how far will it have to go in order to tie into the key pad locations? Are loops going to be required on the inside of the gate for exiting?
    There will be existing electrical conduit from the breaker box in the shop out to each proposed gate motor location (approx. 230' to the south entrance motor and approximately 160' to the north entrance motor). There will be existing control wire conduit from each gate motor location to the respective gate control keypad locations (approximately 15' at each location). All conduits will be 1.25" and will be stubbed off above dirt grade. Installation of the conduits is currently in process, so exact lengths and locations are not available at this time. The contractor will be responsible for any conduits necessary to connect the existing stubs to the gate motors and keypads. The contractor will be responsible for supplying and pulling all electric and control wiring necessary for the operation of the gate openers and control keypads. No loops will be required. (06/05/2024)

Authorized Bidders

  • 0635 P. H. Broughton & Sons, Inc.
    905 N. Lincoln Ave.
    Springfield, IL 62702
    Phone: (217) 787-2393 Fax: (217) 787-2397 Email: kent@phbroughton.com
    $420,225.46

  • 2825 Illinois Valley Paving, a div of UCM, Inc.
    3151 Robbins Road
    Springfield, IL 62704
    P.O. Box 13420
    Springfield, IL 62791
    Phone: (217) 546-6192 Fax: (217) 546-1904 Email: IVP@ucm.biz
    $635,241.43

  • 1810 Truman L. Flatt & Sons Co., Inc.
    2300 North 16th Street
    Springfield, IL 62702
    Phone: (217) 544-3471 Fax: (217) 544-0861 Email: rem@trumanlflatt.com
    $452,942.77

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
35800200 TON AGGREGATE BASE REPAIR Base items 100.000
40600290 POUND BITUMINOUS MATERIALS (TACK COAT) Base items 2,090.000
40600982 SQ YD HOT-MIX ASPHALT SURFACE REMOVAL - BUTT JOINT Base items 336.000
40603080 TON HOT-MIX ASPHALT BINDER COURSE, IL-19.0, N50 Base items 1,301.000
40604050 TON HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "C", N50 Base items 781.000
48101200 TON AGGREGATE SHOULDERS, TYPE B Base items 75.000
66404800 EACH CHAIN LINK GATES, 8' X 5' SINGLE Base items 2.000
67100100 L SUM MOBILIZATION Base items 1.000
70100450 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701201 Base items 1.000
X3580302 SQ YD PREPARATION OF BASE (SPECIAL) Base items 2,391.000
X6640308 EACH CHAIN LINK GATES (SPECIAL) Base items 2.000
X6640570 FOOT CHAIN LINK FENCE, 8' (SPECIAL) Base items 1,420.000
X7011800 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD BLR 21 Base items 1.000
Z0076604 HOUR TRAINEES TRAINING PROGRAM GRADUATE Base items 500.000 $15.00
No More Pay Items