20200100
|
CU YD
|
EARTH EXCAVATION
|
Base items
|
865.000
|
|
20400800
|
CU YD
|
FURNISHED EXCAVATION
|
Base items
|
595.000
|
|
20800150
|
CU YD
|
TRENCH BACKFILL
|
Base items
|
17.000
|
|
21101615
|
SQ YD
|
TOPSOIL FURNISH AND PLACE, 4"
|
Base items
|
3,290.000
|
|
25000100
|
ACRE
|
SEEDING, CLASS 1
|
Base items
|
0.750
|
|
25000400
|
POUND
|
NITROGEN FERTILIZER NUTRIENT
|
Base items
|
61.000
|
|
25000500
|
POUND
|
PHOSPHORUS FERTILIZER NUTRIENT
|
Base items
|
61.000
|
|
25000600
|
POUND
|
POTASSIUM FERTILIZER NUTRIENT
|
Base items
|
61.000
|
|
25100630
|
SQ YD
|
EROSION CONTROL BLANKET
|
Base items
|
3,290.000
|
|
28000250
|
POUND
|
TEMPORARY EROSION CONTROL SEEDING
|
Base items
|
68.000
|
|
28000305
|
FOOT
|
TEMPORARY DITCH CHECKS
|
Base items
|
140.000
|
|
28000400
|
FOOT
|
PERIMETER EROSION BARRIER
|
Base items
|
2,735.000
|
|
28100225
|
TON
|
STONE RIPRAP, CLASS B3
|
Base items
|
10.000
|
|
30300001
|
CU YD
|
AGGREGATE SUBGRADE IMPROVEMENT
|
Base items
|
190.000
|
|
31101200
|
SQ YD
|
SUBBASE GRANULAR MATERIAL, TYPE B 4"
|
Base items
|
1,196.000
|
|
35501336
|
SQ YD
|
HOT-MIX ASPHALT BASE COURSE, 13"
|
Base items
|
1,566.000
|
|
40200800
|
TON
|
AGGREGATE SURFACE COURSE, TYPE B
|
Base items
|
37.000
|
|
40600295
|
POUND
|
POLYMERIZED BITUMINOUS MATERIALS (TACK COAT)
|
Base items
|
13,016.000
|
|
40600982
|
SQ YD
|
HOT-MIX ASPHALT SURFACE REMOVAL - BUTT JOINT
|
Base items
|
215.000
|
|
40603200
|
TON
|
POLYMERIZED HOT-MIX ASPHALT BINDER COURSE, IL-4.75, N50
|
Base items
|
224.000
|
|
40604170
|
TON
|
POLYMERIZED HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "E", N50
|
Base items
|
336.000
|
|
40800050
|
TON
|
INCIDENTAL HOT-MIX ASPHALT SURFACING
|
Base items
|
36.000
|
|
44000100
|
SQ YD
|
PAVEMENT REMOVAL
|
Base items
|
604.000
|
|
44000152
|
SQ YD
|
HOT-MIX ASPHALT SURFACE REMOVAL, 3/4"
|
Base items
|
3,816.000
|
|
44004250
|
SQ YD
|
PAVED SHOULDER REMOVAL
|
Base items
|
921.000
|
|
44200101
|
SQ YD
|
PAVEMENT PATCHING, TYPE IV, 8 INCH
|
Base items
|
26.000
|
|
44200184
|
SQ YD
|
PAVEMENT PATCHING, TYPE III, 15 INCH
|
Base items
|
24.000
|
|
48101500
|
SQ YD
|
AGGREGATE SHOULDERS, TYPE B 6"
|
Base items
|
1,091.000
|
|
48102100
|
TON
|
AGGREGATE WEDGE SHOULDER, TYPE B
|
Base items
|
5.000
|
|
48203029
|
SQ YD
|
HOT-MIX ASPHALT SHOULDERS, 8"
|
Base items
|
1,150.000
|
|
50105220
|
FOOT
|
PIPE CULVERT REMOVAL
|
Base items
|
47.000
|
|
54213660
|
EACH
|
PRECAST REINFORCED CONCRETE FLARED END SECTIONS 15"
|
Base items
|
2.000
|
|
54214299
|
EACH
|
END SECTIONS, EQUIVALENT ROUND-SIZE 24"
|
Base items
|
2.000
|
|
54214509
|
EACH
|
PRECAST REINFORCED CONCRETE FLARED END SECTIONS, EQUIVALENT ROUND-SIZE 24"
|
Base items
|
2.000
|
|
542A0220
|
FOOT
|
PIPE CULVERTS, CLASS A, TYPE 1 15"
|
Base items
|
72.000
|
|
542A5479
|
FOOT
|
PIPE CULVERTS, CLASS A, TYPE 1 EQUIVALENT ROUND-SIZE 24"
|
Base items
|
56.000
|
|
542D5479
|
FOOT
|
PIPE CULVERTS, CLASS D, TYPE 1 EQUIVALENT ROUND-SIZE 24"
|
Base items
|
32.000
|
|
67100100
|
L SUM
|
MOBILIZATION
|
Base items
|
1.000
|
|
70100450
|
L SUM
|
TRAFFIC CONTROL AND PROTECTION, STANDARD 701201
|
Base items
|
1.000
|
|
70107005
|
FOOT
|
PAVEMENT MARKING BLACKOUT TAPE, 5"
|
Base items
|
5,393.000
|
|
70107025
|
CAL DA
|
CHANGEABLE MESSAGE SIGN
|
Base items
|
15.000
|
|
70300100
|
FOOT
|
SHORT TERM PAVEMENT MARKING
|
Base items
|
748.000
|
|
70300150
|
SQ FT
|
SHORT TERM PAVEMENT MARKING REMOVAL
|
Base items
|
5,320.000
|
|
70300211
|
SQ FT
|
TEMPORARY PAVEMENT MARKING LETTERS AND SYMBOLS - PAINT
|
Base items
|
31.000
|
|
70300221
|
FOOT
|
TEMPORARY PAVEMENT MARKING - LINE 4"- PAINT
|
Base items
|
6,103.000
|
|
70300251
|
FOOT
|
TEMPORARY PAVEMENT MARKING - LINE 8"- PAINT
|
Base items
|
160.000
|
|
70300261
|
FOOT
|
TEMPORARY PAVEMENT MARKING - LINE 12"- PAINT
|
Base items
|
271.000
|
|
70306120
|
FOOT
|
TEMPORARY PAVEMENT MARKING - LINE 4" - TYPE III TAPE
|
Base items
|
13,112.000
|
|
70400100
|
FOOT
|
TEMPORARY CONCRETE BARRIER
|
Base items
|
1,250.000
|
|
70400125
|
EACH
|
PINNING TEMPORARY CONCRETE BARRIER
|
Base items
|
306.000
|
|
70400200
|
FOOT
|
RELOCATE TEMPORARY CONCRETE BARRIER
|
Base items
|
1,150.000
|
|
70600251
|
EACH
|
IMPACT ATTENUATORS, TEMPORARY (NON- REDIRECTIVE, NARROW), TEST LEVEL 3
|
Base items
|
4.000
|
|
70600352
|
EACH
|
IMPACT ATTENUATORS, RELOCATE (NON- REDIRECTIVE,NARROW), TEST LEVEL 3
|
Base items
|
2.000
|
|
72400500
|
EACH
|
RELOCATE SIGN PANEL ASSEMBLY - TYPE A
|
Base items
|
1.000
|
|
78009000
|
SQ FT
|
MODIFIED URETHANE PAVEMENT MARKING - LETTERS AND SYMBOLS
|
Base items
|
31.000
|
|
78009004
|
FOOT
|
MODIFIED URETHANE PAVEMENT MARKING - LINE 4"
|
Base items
|
6,103.000
|
|
78009006
|
FOOT
|
MODIFIED URETHANE PAVEMENT MARKING - LINE 6"
|
Base items
|
40.000
|
|
78009008
|
FOOT
|
MODIFIED URETHANE PAVEMENT MARKING - LINE 8"
|
Base items
|
160.000
|
|
78009012
|
FOOT
|
MODIFIED URETHANE PAVEMENT MARKING - LINE 12"
|
Base items
|
271.000
|
|
78100100
|
EACH
|
RAISED REFLECTIVE PAVEMENT MARKER
|
Base items
|
64.000
|
|
78300200
|
EACH
|
RAISED REFLECTIVE PAVEMENT MARKER REMOVAL
|
Base items
|
13.000
|
|
78300202
|
SQ FT
|
PAVEMENT MARKING REMOVAL - WATER BLASTING
|
Base items
|
2,443.000
|
|
89502385
|
EACH
|
REMOVE EXISTING CONCRETE FOUNDATION
|
Base items
|
1.000
|
|
X4400110
|
SQ YD
|
TEMPORARY PAVEMENT REMOVAL
|
Base items
|
1,112.000
|
|
Z0013798
|
L SUM
|
CONSTRUCTION LAYOUT
|
Base items
|
1.000
|
|
Z0023600
|
EACH
|
FILLING EXISTING CULVERTS
|
Base items
|
3.000
|
|
Z0029604
|
EACH
|
HEADWALL REMOVAL
|
Base items
|
3.000
|
|
Z0034105
|
TON
|
MATERIAL TRANSFER DEVICE
|
Base items
|
560.000
|
|
Z0062456
|
SQ YD
|
TEMPORARY PAVEMENT
|
Base items
|
1,112.000
|
|