| Region | District | DBE % | VBP % | Federal Project # |
|---|---|---|---|---|
| 3 | 4 | 0.00 | 0.00 | N/A |
| County(s) | Key Route(s) | Marked Route(s) | Section(s) | State Job #(s) | PPS #(s) |
|---|---|---|---|---|---|
|
|
|
|
|
|
| Contract Specifics |
|---|
| 25 Working Days |
| No More Contract Specifics |
| Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
|---|---|---|---|---|---|---|---|
| 20200100 | CU YD | EARTH EXCAVATION | Base items | 705.000 | |||
| 21001000 | SQ YD | GEOTECHNICAL FABRIC FOR GROUND STABILIZATION | Base items | 485.000 | |||
| 21101505 | CU YD | TOPSOIL EXCAVATION AND PLACEMENT | Base items | 10.000 | |||
| 28000400 | FOOT | PERIMETER EROSION BARRIER | Base items | 200.000 | |||
| 28000510 | EACH | INLET FILTERS | Base items | 1.000 | |||
| 35101800 | SQ YD | AGGREGATE BASE COURSE, TYPE B 6" | Base items | 485.000 | |||
| 35102000 | SQ YD | AGGREGATE BASE COURSE, TYPE B 8" | Base items | 2,623.000 | |||
| 40600275 | POUND | BITUMINOUS MATERIALS (PRIME COAT) | Base items | 590.000 | |||
| 40602978 | TON | HOT-MIX ASPHALT BINDER COURSE, IL- 9.5, N50 | Base items | 367.000 | |||
| 40604050 | TON | HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "C", N50 | Base items | 220.000 | |||
| 42000401 | SQ YD | PORTLAND CEMENT CONCRETE PAVEMENT 9" (JOINTED) | Base items | 485.000 | |||
| 44000100 | SQ YD | PAVEMENT REMOVAL | Base items | 550.000 | |||
| 44200050 | SQ YD | WELDED WIRE REINFORCEMENT | Base items | 485.000 | |||
| 60255700 | EACH | MANHOLES TO BE ADJUSTED WITH NEW TYPE 1 FRAME, OPEN LID | Base items | 2.000 | |||
| 60600605 | FOOT | CONCRETE CURB, TYPE B | Base items | 550.000 | |||
| 60603800 | FOOT | COMBINATION CONCRETE CURB AND GUTTER, TYPE B-6.12 | Base items | 82.000 | |||
| 67100100 | L SUM | MOBILIZATION | Base items | 1.000 | |||
| 70100450 | L SUM | TRAFFIC CONTROL AND PROTECTION, STANDARD 701201 | Base items | 1.000 | |||
| X0350810 | EACH | BOLLARD REMOVAL | Base items | 26.000 | |||
| Z0001110 | EACH | GAS VALVE TO BE ADJUSTED | Base items | 1.000 | |||
| Z0004002 | EACH | BOLLARDS | Base items | 26.000 | |||
| Z0004544 | SQ YD | HOT-MIX ASPHALT DRIVEWAY PAVEMENT REMOVAL | Base items | 3,012.000 | |||
| Z0012450 | CU YD | CONCRETE STEPS | Base items | 3.000 | |||
| Z0013798 | L SUM | CONSTRUCTION LAYOUT | Base items | 1.000 | |||
| No More Pay Items | |||||||