| Region | District | DBE % | VBP % | Federal Project # |
|---|---|---|---|---|
| 1 | 1 | 8.00 | 0.00 | 317SBGPTBD |
| County(s) | IL Project # | Airport | Sponsor | City |
|---|---|---|---|---|
|
1C5 4916 | Bolingbrook's Clow International | Village of Bolingbrook | Bolingbrook |
| Contract Specifics |
|---|
| The time limit to award this item has been changed from 45 days to 90 days after the scheduled letting. |
| 120 Calendar Days |
|
This project is currently unfunded but actively seeking discretionary funds. WARNING: FAA Buy American preference provisions apply to this contract. Failure to submit a "Certification of Compliance with FAA Buy American Preference - Construction Projects" form in accordance with the bidding procedures set forth in the proposal document (AppendixA4 BUY AMERICAN PREFERENCE) will result in the bid being declared non-responsive. |
| No More Contract Specifics |
| Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
|---|---|---|---|---|---|---|---|
| AR110949 | EACH | ADJUST CABLE MARKER | Base items | 3.000 | |||
| AR125100 | EACH | ELEVATED RETROREFLECTIVE MARKER | Base items | 12.000 | |||
| AR125106 | EACH | RELOC. ELEV. RETROREFLECTIVE MARKER | Base items | 10.000 | |||
| AR150510 | L SUM | ENGINEER'S FIELD OFFICE | Base items | 1.000 | |||
| AR150520 | L SUM | MOBILIZATION | Base items | 1.000 | |||
| AR150530 | L SUM | TRAFFIC MAINTENANCE | Base items | 1.000 | |||
| AR152410 | CU YD | UNCLASSIFIED EXCAVATION | Base items | 3,860.000 | |||
| AR152460 | CU YD | TOPSOIL STRIPPING | Base items | 5,160.000 | |||
| AR152515 | CU YD | SUBGRADE UNDERCUT | Base items | 390.000 | |||
| AR154606 | SQ YD | GRANULAR DRAINAGE SUBBASE - 6" | Base items | 26,500.000 | |||
| AR156510 | FOOT | SILT FENCE | Base items | 2,290.000 | |||
| AR156513 | SQ YD | SEPARATION FABRIC | Base items | 26,500.000 | |||
| AR156520 | EACH | INLET PROTECTION | Base items | 22.000 | |||
| AR208606 | SQ YD | 6" AGGREGATE BASE COURSE | Base items | 26,500.000 | |||
| AR401614 | TON | BIT. SURF. CSE.-METHOD II, SUPERPAVE | Base items | 2,325.000 | |||
| AR401630 | EACH | BITUMINOUS SURFACE TEST SECTION | Base items | 1.000 | |||
| AR401650 | SQ YD | BITUMINOUS PAVEMENT MILLING | Base items | 435.000 | |||
| AR401660 | FOOT | SAW & SEAL BIT. JOINTS | Base items | 2,210.000 | |||
| AR401665 | FOOT | BITUMINOUS PAVEMENT SAWING | Base items | 1,845.000 | |||
| AR401900 | SQ YD | REMOVE BITUMINOUS PAVEMENT | Base items | 14,830.000 | |||
| AR403614 | TON | BIT. BASE CSE.-METHOD II, SUPERPAVE | Base items | 2,300.000 | |||
| AR403630 | EACH | BITUMINOUS BASE TEST SECTION | Base items | 1.000 | |||
| AR510510 | EACH | TIE DOWN | Base items | 111.000 | |||
| AR510900 | EACH | REMOVE TIE DOWN | Base items | 114.000 | |||
| AR602510 | GALLON | BITUMINOUS PRIME COAT | Base items | 7,890.000 | |||
| AR603510 | GALLON | BITUMINOUS TACK COAT | Base items | 1,890.000 | |||
| AR620520 | SQ FT | PAVEMENT MARKING-WATERBORNE | Base items | 2,340.000 | |||
| AR620900 | SQ FT | PAVEMENT MARKING REMOVAL | Base items | 65.000 | |||
| AR701512 | FOOT | 12" RCP, CLASS IV | Base items | 152.000 | |||
| AR701518 | FOOT | 18" RCP, CLASS IV | Base items | 106.000 | |||
| AR701524 | FOOT | 24" RCP, CLASS IV | Base items | 70.000 | |||
| AR701900 | FOOT | REMOVE PIPE | Base items | 114.000 | |||
| AR751411 | EACH | INLET-TYPE A | Base items | 3.000 | |||
| AR751567 | EACH | MANHOLE 7' | Base items | 1.000 | |||
| AR751900 | EACH | REMOVE INLET | Base items | 1.000 | |||
| AR751927 | EACH | REPLACE FRAME & GRATE | Base items | 1.000 | |||
| AR751940 | EACH | ADJUST INLET | Base items | 3.000 | |||
| AR751943 | EACH | ADJUST MANHOLE | Base items | 5.000 | |||
| AR801700 | EACH | CONSTRUCTION ENTRANCE | Base items | 2.000 | |||
| AR901510 | ACRE | SEEDING | Base items | 2.400 | |||
| AR908510 | ACRE | MULCHING | Base items | 2.400 | |||
| AR910200 | EACH | ROADWAY SIGN | Base items | 1.000 | |||
| No More Pay Items | |||||||