                                               ILLINOIS DEPARTMENT OF TRANSPORTATION                                      PAGE:    1
 04/27/22  08:30:38                   U N I T  P R I C E   T A B U L A T I O N   O F   B I D S
 LETTING DATE: 01/21/2022  LETTING TYPE: SCHEDULED                                 CONTRACT NUMBER: 89787  LETTING ITEM NUMBER: 119
 RESPONSIBLE DISTRICT: 04                                                                                  BIDS LOCKED: Y
 SECTION: 19-00128-00-PV                           COUNTY: TAZEWELL                                        ESTIMATE:
 STATE JOB NUMBER:   C-94-074-20                   MUNICIPALITY: MORTON
 PROJECT NUMBER: H1TP-877 /   /
                                                      --------------------------
                                                      SUMMARY OF CONTRACTOR BIDS
                                                      --------------------------

                                                             "AS READ"          SUMMATION    SUMMATION OF                       NBR
 BIDR                     CONTR        COMB  ITEM  CONTR      BIDDER            OF BIDDER     CALCULATED   LOW   BIDR CALC      BLANK
 NBR   BIDDER NAME        GROUP  COMB  GRP   NBR   GROUP      TOTAL PRICE       EXTENSIONS    EXTENSIONS   BID   EXTENSION DIFF BIDS


 0335  Otto Baum Company, Inc.
                          NO ALT                            2,679,141.95     2,679,141.95   2,679,141.95

 1284  R. A. Cullinan and Son, a div of UCM, Inc.
                          NO ALT                            3,077,378.35     3,077,378.35   3,077,378.35

 2024  Gensini Excavating, Inc.
                          NO ALT                            2,572,413.91 *   2,572,413.91   2,572,413.91    *

 2824  Illinois Civil Contractors, Inc.
                          NO ALT                            3,548,992.76     3,548,992.76   3,548,992.76

 5672  Stark Excavating, Inc.
                          NO ALT                            3,320,000.00     3,320,000.00   3,320,000.00

 **** TOTAL GROUP NO ALT PAY ITEMS FOR THIS CONTRACT =     132
                                                       ----------------------
                                                       DETAIL CONTRACTOR BIDS
                                                       ----------------------

    ITEM NBR  ITEM DESCRIPTION                                    UNIT OF     UNIT        BIDDER         CALCULATED  BIDR CALC
 BIDR NBR  BIDDER NAME                                  QUANTITY  MEASURE     PRICE       EXTENSION      EXTENSION   EXTENSION DIFF


    XX006529  CONC C&G OUTLET SP                           2.000     EACH
 2024      Gensini Excavating, Inc.                                     1,500.0000        3,000.00        3,000.00
 2824      Illinois Civil Contractors, Inc.                             1,902.3500        3,804.70        3,804.70
 0335      Otto Baum Company, Inc.                                      1,019.7800        2,039.56        2,039.56
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                   1,618.2000        3,236.40        3,236.40
 5672      Stark Excavating, Inc.                                         620.0000        1,240.00        1,240.00

    XX007531  REL EX LTPOLE/NEW FDN                        4.000     EACH
 2024      Gensini Excavating, Inc.                                     1,000.0000        4,000.00        4,000.00
 2824      Illinois Civil Contractors, Inc.                               754.0000        3,016.00        3,016.00
 0335      Otto Baum Company, Inc.                                        674.7200        2,698.88        2,698.88
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                   2,109.8400        8,439.36        8,439.36
 5672      Stark Excavating, Inc.                                       1,000.0000        4,000.00        4,000.00

    X0325405  FILL EX STORM SEWERS                         2.000    CU YD
 2024      Gensini Excavating, Inc.                                     1,000.0000        2,000.00        2,000.00
 2824      Illinois Civil Contractors, Inc.                             2,018.5900        4,037.18        4,037.18
 0335      Otto Baum Company, Inc.                                        817.1500        1,634.30        1,634.30
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                   1,870.0000        3,740.00        3,740.00
 5672      Stark Excavating, Inc.                                       1,700.0000        3,400.00        3,400.00

    X1200064  GEOTECH FABRIC SPL                       1,531.000    SQ YD
 2024      Gensini Excavating, Inc.                                         3.0000        4,593.00        4,593.00
 2824      Illinois Civil Contractors, Inc.                                 2.5400        3,888.74        3,888.74
 0335      Otto Baum Company, Inc.                                          1.7200        2,633.32        2,633.32
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       3.8300        5,863.73        5,863.73
 5672      Stark Excavating, Inc.                                           1.8000        2,755.80        2,755.80

    X4240420  PC CONC SIDEWALK 4 SP                   19,813.000    SQ FT
 2024      Gensini Excavating, Inc.                                         7.0000      138,691.00      138,691.00
 2824      Illinois Civil Contractors, Inc.                                 9.1900      182,081.47      182,081.47
 0335      Otto Baum Company, Inc.                                          5.9700      118,283.61      118,283.61
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       6.4000      126,803.20      126,803.20
 5672      Stark Excavating, Inc.                                           6.4000      126,803.20      126,803.20

    X6020082  INLETS TG-1                                 16.000     EACH
 2024      Gensini Excavating, Inc.                                     3,500.0000       56,000.00       56,000.00
 2824      Illinois Civil Contractors, Inc.                             5,027.1000       80,433.60       80,433.60
 0335      Otto Baum Company, Inc.                                      3,314.4800       53,031.68       53,031.68
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                   3,960.0000       63,360.00       63,360.00
 5672      Stark Excavating, Inc.                                       4,800.0000       76,800.00       76,800.00

    X6021814  INL-MN G-1 4D                                1.000     EACH
 2024      Gensini Excavating, Inc.                                     5,500.0000        5,500.00        5,500.00
 2824      Illinois Civil Contractors, Inc.                             6,214.3900        6,214.39        6,214.39
 0335      Otto Baum Company, Inc.                                      4,616.7300        4,616.73        4,616.73
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                   5,060.0000        5,060.00        5,060.00
 5672      Stark Excavating, Inc.                                       5,800.0000        5,800.00        5,800.00

    X6026050  SANITARY MANHOLE ADJ                         1.000     EACH
 2024      Gensini Excavating, Inc.                                       500.0000          500.00          500.00
 2824      Illinois Civil Contractors, Inc.                             3,138.8000        3,138.80        3,138.80
 0335      Otto Baum Company, Inc.                                        790.9800          790.98          790.98
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                   1,170.4700        1,170.47        1,170.47
 5672      Stark Excavating, Inc.                                       1,000.0000        1,000.00        1,000.00

    X7010216  TRAF CONT & PROT SPL                         1.000    L SUM
 2024      Gensini Excavating, Inc.                                   107,423.0000      107,423.00      107,423.00
 2824      Illinois Civil Contractors, Inc.                            32,356.7900       32,356.79       32,356.79
 0335      Otto Baum Company, Inc.                                     39,758.5900       39,758.59       39,758.59
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                  31,196.5500       31,196.55       31,196.55
 5672      Stark Excavating, Inc.                                      53,400.0000       53,400.00       53,400.00

    X8140115  HANDHOLE TO BE ADJUST                        2.000     EACH
 2024      Gensini Excavating, Inc.                                     1,800.0000        3,600.00        3,600.00
 2824      Illinois Civil Contractors, Inc.                             2,131.4000        4,262.80        4,262.80
 0335      Otto Baum Company, Inc.                                      1,907.2900        3,814.58        3,814.58
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                   1,694.0000        3,388.00        3,388.00
 5672      Stark Excavating, Inc.                                       1,940.0000        3,880.00        3,880.00

    X8950115  RELOC LIGHT DET                              4.000     EACH
 2024      Gensini Excavating, Inc.                                       900.0000        3,600.00        3,600.00
 2824      Illinois Civil Contractors, Inc.                               987.9200        3,951.68        3,951.68
 0335      Otto Baum Company, Inc.                                        884.0500        3,536.20        3,536.20
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                   1,619.8100        6,479.24        6,479.24
 5672      Stark Excavating, Inc.                                         900.0000        3,600.00        3,600.00

    Z0013798  CONSTRUCTION LAYOUT                          1.000    L SUM
 2024      Gensini Excavating, Inc.                                    25,000.0000       25,000.00       25,000.00
 2824      Illinois Civil Contractors, Inc.                            19,592.1900       19,592.19       19,592.19
 0335      Otto Baum Company, Inc.                                     24,173.1600       24,173.16       24,173.16
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                  25,025.0000       25,025.00       25,025.00
 5672      Stark Excavating, Inc.                                      18,000.0000       18,000.00       18,000.00

    Z0016702  DETOUR SIGNING                               1.000    L SUM
 2024      Gensini Excavating, Inc.                                     6,500.0000        6,500.00        6,500.00
 2824      Illinois Civil Contractors, Inc.                            16,148.7100       16,148.71       16,148.71
 0335      Otto Baum Company, Inc.                                     14,450.7700       14,450.77       14,450.77
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                  13,795.1000       13,795.10       13,795.10
 5672      Stark Excavating, Inc.                                      13,400.0000       13,400.00       13,400.00

    Z0056648  SS 1 WAT MN   12                            49.000     FOOT
 2024      Gensini Excavating, Inc.                                       100.0000        4,900.00        4,900.00
 2824      Illinois Civil Contractors, Inc.                               213.7300       10,472.77       10,472.77
 0335      Otto Baum Company, Inc.                                        117.9400        5,779.06        5,779.06
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                     198.0000        9,702.00        9,702.00
 5672      Stark Excavating, Inc.                                         180.0000        8,820.00        8,820.00

    Z0056669  SS 2 WAT MN   15                           242.000     FOOT
 2024      Gensini Excavating, Inc.                                       110.0000       26,620.00       26,620.00
 2824      Illinois Civil Contractors, Inc.                               217.3000       52,586.60       52,586.60
 0335      Otto Baum Company, Inc.                                        160.4000       38,816.80       38,816.80
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                     201.3000       48,714.60       48,714.60
 5672      Stark Excavating, Inc.                                         183.0000       44,286.00       44,286.00

    Z0068100  STEEL CASINGS  28                           34.000     FOOT
 2024      Gensini Excavating, Inc.                                       500.0000       17,000.00       17,000.00
 2824      Illinois Civil Contractors, Inc.                               890.5500       30,278.70       30,278.70
 0335      Otto Baum Company, Inc.                                      1,099.4400       37,380.96       37,380.96
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                     825.0000       28,050.00       28,050.00
 5672      Stark Excavating, Inc.                                         750.0000       25,500.00       25,500.00

    Z0076600  TRAINEES                                 1,000.000     HOUR
 2024      Gensini Excavating, Inc.                                         0.8000          800.00          800.00
 2824      Illinois Civil Contractors, Inc.                                 0.8000          800.00          800.00
 0335      Otto Baum Company, Inc.                                          0.8000          800.00          800.00
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       0.8000          800.00          800.00
 5672      Stark Excavating, Inc.                                           0.8000          800.00          800.00

    Z0076604  TRAINEES TPG                             1,000.000     HOUR
 2024      Gensini Excavating, Inc.                                        15.0000       15,000.00       15,000.00
 2824      Illinois Civil Contractors, Inc.                                15.0000       15,000.00       15,000.00
 0335      Otto Baum Company, Inc.                                         15.0000       15,000.00       15,000.00
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                      15.0000       15,000.00       15,000.00
 5672      Stark Excavating, Inc.                                          15.0000       15,000.00       15,000.00

    20200100  EARTH EXCAVATION                         2,414.000    CU YD
 2024      Gensini Excavating, Inc.                                        20.2500       48,883.50       48,883.50
 2824      Illinois Civil Contractors, Inc.                                74.1900      179,094.66      179,094.66
 0335      Otto Baum Company, Inc.                                         46.2600      111,671.64      111,671.64
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                      49.3800      119,203.32      119,203.32
 5672      Stark Excavating, Inc.                                          69.0000      166,566.00      166,566.00

    20201200  REM & DISP UNS MATL                        341.000    CU YD
 2024      Gensini Excavating, Inc.                                        21.0000        7,161.00        7,161.00
 2824      Illinois Civil Contractors, Inc.                                68.3700       23,314.17       23,314.17
 0335      Otto Baum Company, Inc.                                         40.3100       13,745.71       13,745.71
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                      58.5300       19,958.73       19,958.73
 5672      Stark Excavating, Inc.                                          30.0000       10,230.00       10,230.00

    20800150  TRENCH BACKFILL                            423.000    CU YD
 2024      Gensini Excavating, Inc.                                        50.0000       21,150.00       21,150.00
 2824      Illinois Civil Contractors, Inc.                               130.6100       55,248.03       55,248.03
 0335      Otto Baum Company, Inc.                                         41.5500       17,575.65       17,575.65
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                     121.0000       51,183.00       51,183.00
 5672      Stark Excavating, Inc.                                         110.0000       46,530.00       46,530.00

    21001000  GEOTECH FAB F/GR STAB                    7,654.000    SQ YD
 2024      Gensini Excavating, Inc.                                         2.5000       19,135.00       19,135.00
 2824      Illinois Civil Contractors, Inc.                                 3.0600       23,421.24       23,421.24
 0335      Otto Baum Company, Inc.                                          2.6800       20,512.72       20,512.72
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       2.7300       20,895.42       20,895.42
 5672      Stark Excavating, Inc.                                           2.7500       21,048.50       21,048.50

    21101615  TOPSOIL F & P  4                         5,483.000    SQ YD
 2024      Gensini Excavating, Inc.                                         6.0000       32,898.00       32,898.00
 2824      Illinois Civil Contractors, Inc.                                10.3900       56,968.37       56,968.37
 0335      Otto Baum Company, Inc.                                          6.1700       33,830.11       33,830.11
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       9.6300       52,801.29       52,801.29
 5672      Stark Excavating, Inc.                                           7.0000       38,381.00       38,381.00

    25000400  NITROGEN FERT NUTR                          68.000    POUND
 2024      Gensini Excavating, Inc.                                        10.0000          680.00          680.00
 2824      Illinois Civil Contractors, Inc.                                 5.9400          403.92          403.92
 0335      Otto Baum Company, Inc.                                          5.3100          361.08          361.08
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       2.2000          149.60          149.60
 5672      Stark Excavating, Inc.                                           5.2500          357.00          357.00

    25000500  PHOSPHORUS FERT NUTR                        68.000    POUND
 2024      Gensini Excavating, Inc.                                        10.0000          680.00          680.00
 2824      Illinois Civil Contractors, Inc.                                 5.9400          403.92          403.92
 0335      Otto Baum Company, Inc.                                          5.3100          361.08          361.08
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       2.2000          149.60          149.60
 5672      Stark Excavating, Inc.                                           5.2500          357.00          357.00

    25000600  POTASSIUM FERT NUTR                         68.000    POUND
 2024      Gensini Excavating, Inc.                                        10.0000          680.00          680.00
 2824      Illinois Civil Contractors, Inc.                                 5.9400          403.92          403.92
 0335      Otto Baum Company, Inc.                                          5.3100          361.08          361.08
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       2.2000          149.60          149.60
 5672      Stark Excavating, Inc.                                           5.2500          357.00          357.00

    25200110  SODDING SALT TOLERANT                    5,483.000    SQ YD
 2024      Gensini Excavating, Inc.                                        20.0000      109,660.00      109,660.00
 2824      Illinois Civil Contractors, Inc.                                14.8400       81,367.72       81,367.72
 0335      Otto Baum Company, Inc.                                         13.2800       72,814.24       72,814.24
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       9.3500       51,266.05       51,266.05
 5672      Stark Excavating, Inc.                                          15.0000       82,245.00       82,245.00

    25200200  SUPPLE WATERING                             68.000     UNIT
 2024      Gensini Excavating, Inc.                                       200.0000       13,600.00       13,600.00
 2824      Illinois Civil Contractors, Inc.                               106.8700        7,267.16        7,267.16
 0335      Otto Baum Company, Inc.                                         95.6300        6,502.84        6,502.84
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                     324.5000       22,066.00       22,066.00
 5672      Stark Excavating, Inc.                                          96.0000        6,528.00        6,528.00

    28000250  TEMP EROS CONTR SEED                       228.000    POUND
 2024      Gensini Excavating, Inc.                                         5.0000        1,140.00        1,140.00
 2824      Illinois Civil Contractors, Inc.                                 2.9700          677.16          677.16
 0335      Otto Baum Company, Inc.                                          1.9700          449.16          449.16
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       6.9400        1,582.32        1,582.32
 5672      Stark Excavating, Inc.                                           2.6000          592.80          592.80

    28000400  PERIMETER EROS BAR                       2,644.000     FOOT
 2024      Gensini Excavating, Inc.                                         3.5000        9,254.00        9,254.00
 2824      Illinois Civil Contractors, Inc.                                 4.7100       12,453.24       12,453.24
 0335      Otto Baum Company, Inc.                                          3.2900        8,698.76        8,698.76
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       6.0300       15,943.32       15,943.32
 5672      Stark Excavating, Inc.                                           4.0000       10,576.00       10,576.00

    28000500  INLET & PIPE PROTECT                         2.000     EACH
 2024      Gensini Excavating, Inc.                                       300.0000          600.00          600.00
 2824      Illinois Civil Contractors, Inc.                               270.8100          541.62          541.62
 0335      Otto Baum Company, Inc.                                        114.9500          229.90          229.90
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                     266.5100          533.02          533.02
 5672      Stark Excavating, Inc.                                         150.0000          300.00          300.00

    28000510  INLET FILTERS                               31.000     EACH
 2024      Gensini Excavating, Inc.                                       275.0000        8,525.00        8,525.00
 2824      Illinois Civil Contractors, Inc.                               270.8100        8,395.11        8,395.11
 0335      Otto Baum Company, Inc.                                        285.9700        8,865.07        8,865.07
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                     507.5000       15,732.50       15,732.50
 5672      Stark Excavating, Inc.                                         125.0000        3,875.00        3,875.00

    28100105  STONE RIPRAP CL A3                          10.000    SQ YD
 2024      Gensini Excavating, Inc.                                       100.0000        1,000.00        1,000.00
 2824      Illinois Civil Contractors, Inc.                               168.7800        1,687.80        1,687.80
 0335      Otto Baum Company, Inc.                                         64.3400          643.40          643.40
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                     174.7900        1,747.90        1,747.90
 5672      Stark Excavating, Inc.                                         190.0000        1,900.00        1,900.00

    28200200  FILTER FABRIC                               10.000    SQ YD
 2024      Gensini Excavating, Inc.                                         5.0000           50.00           50.00
 2824      Illinois Civil Contractors, Inc.                                 2.9800           29.80           29.80
 0335      Otto Baum Company, Inc.                                          1.1200           11.20           11.20
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                      26.4700          264.70          264.70
 5672      Stark Excavating, Inc.                                           4.0000           40.00           40.00

    31101400  SUB GRAN MAT B  6                       10,273.000    SQ YD
 2024      Gensini Excavating, Inc.                                        10.1500      104,270.95      104,270.95
 2824      Illinois Civil Contractors, Inc.                                14.6900      150,910.37      150,910.37
 0335      Otto Baum Company, Inc.                                         11.7800      121,015.94      121,015.94
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                      11.3000      116,084.90      116,084.90
 5672      Stark Excavating, Inc.                                          21.7500      223,437.75      223,437.75

    35101400  AGG BASE CSE B                             698.000      TON
 2024      Gensini Excavating, Inc.                                        28.2500       19,718.50       19,718.50
 2824      Illinois Civil Contractors, Inc.                                43.9600       30,684.08       30,684.08
 0335      Otto Baum Company, Inc.                                         33.4900       23,376.02       23,376.02
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                      70.7500       49,383.50       49,383.50
 5672      Stark Excavating, Inc.                                          27.5000       19,195.00       19,195.00

    35600732  HMA BC WID 14                              201.000    SQ YD
 2024      Gensini Excavating, Inc.                                       240.0000       48,240.00       48,240.00
 2824      Illinois Civil Contractors, Inc.                               323.8400       65,091.84       65,091.84
 0335      Otto Baum Company, Inc.                                        248.6400       49,976.64       49,976.64
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                     223.6100       44,945.61       44,945.61
 5672      Stark Excavating, Inc.                                         256.0000       51,456.00       51,456.00

    40200800  AGG SURF CSE B                              25.000      TON
 2024      Gensini Excavating, Inc.                                        30.0000          750.00          750.00
 2824      Illinois Civil Contractors, Inc.                                68.8800        1,722.00        1,722.00
 0335      Otto Baum Company, Inc.                                         61.1600        1,529.00        1,529.00
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                     112.8600        2,821.50        2,821.50
 5672      Stark Excavating, Inc.                                          68.0000        1,700.00        1,700.00

    40201000  AGGREGATE-TEMP ACCESS                      500.000      TON
 2024      Gensini Excavating, Inc.                                        28.2500       14,125.00       14,125.00
 2824      Illinois Civil Contractors, Inc.                                67.3600       33,680.00       33,680.00
 0335      Otto Baum Company, Inc.                                         16.6300        8,315.00        8,315.00
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                      70.8100       35,405.00       35,405.00
 5672      Stark Excavating, Inc.                                          51.0000       25,500.00       25,500.00

    40600275  BIT MATLS PR CT                            453.000    POUND
 2024      Gensini Excavating, Inc.                                         3.5000        1,585.50        1,585.50
 2824      Illinois Civil Contractors, Inc.                                 6.4600        2,926.38        2,926.38
 0335      Otto Baum Company, Inc.                                          3.7200        1,685.16        1,685.16
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       5.1200        2,319.36        2,319.36
 5672      Stark Excavating, Inc.                                           5.7000        2,582.10        2,582.10

    40600290  BIT MATLS TACK CT                          136.000    POUND
 2024      Gensini Excavating, Inc.                                        10.0000        1,360.00        1,360.00
 2824      Illinois Civil Contractors, Inc.                                37.0700        5,041.52        5,041.52
 0335      Otto Baum Company, Inc.                                         10.6300        1,445.68        1,445.68
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                      29.9900        4,078.64        4,078.64
 5672      Stark Excavating, Inc.                                          30.5000        4,148.00        4,148.00

    40600295  P BIT MATLS TACK CT                      2,712.000    POUND
 2024      Gensini Excavating, Inc.                                         1.2500        3,390.00        3,390.00
 2824      Illinois Civil Contractors, Inc.                                 2.6600        7,213.92        7,213.92
 0335      Otto Baum Company, Inc.                                          1.3300        3,606.96        3,606.96
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       2.1600        5,857.92        5,857.92
 5672      Stark Excavating, Inc.                                           2.1000        5,695.20        5,695.20

    40600990  TEMPORARY RAMP                             163.000    SQ YD
 2024      Gensini Excavating, Inc.                                        16.0000        2,608.00        2,608.00
 2824      Illinois Civil Contractors, Inc.                                33.0900        5,393.67        5,393.67
 0335      Otto Baum Company, Inc.                                         14.8800        2,425.44        2,425.44
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                      26.7700        4,363.51        4,363.51
 5672      Stark Excavating, Inc.                                          26.2500        4,278.75        4,278.75

    40604160  P HMA SC IL-9.5 D N50                      422.000      TON
 2024      Gensini Excavating, Inc.                                       167.0000       70,474.00       70,474.00
 2824      Illinois Civil Contractors, Inc.                               187.9800       79,327.56       79,327.56
 0335      Otto Baum Company, Inc.                                        173.2000       73,090.40       73,090.40
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                     154.8700       65,355.14       65,355.14
 5672      Stark Excavating, Inc.                                         166.0000       70,052.00       70,052.00

    42000501  PCC PVT 10    JOINTED                    6,380.000    SQ YD
 2024      Gensini Excavating, Inc.                                        80.0000      510,400.00      510,400.00
 2824      Illinois Civil Contractors, Inc.                                96.0000      612,480.00      612,480.00
 0335      Otto Baum Company, Inc.                                         82.4000      525,712.00      525,712.00
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                      96.6200      616,435.60      616,435.60
 5672      Stark Excavating, Inc.                                         108.7500      693,825.00      693,825.00

    42001300  PROTECTIVE COAT                         10,102.000    SQ YD
 2024      Gensini Excavating, Inc.                                         0.0100          101.02          101.02
 2824      Illinois Civil Contractors, Inc.                                 0.8000        8,081.60        8,081.60
 0335      Otto Baum Company, Inc.                                          0.6800        6,869.36        6,869.36
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       1.5100       15,254.02       15,254.02
 5672      Stark Excavating, Inc.                                           0.0100          101.02          101.02

    42300300  PCC DRIVEWAY PAVT  7                       894.000    SQ YD
 2024      Gensini Excavating, Inc.                                        70.0000       62,580.00       62,580.00
 2824      Illinois Civil Contractors, Inc.                                98.0300       87,638.82       87,638.82
 0335      Otto Baum Company, Inc.                                         69.0200       61,703.88       61,703.88
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                      96.0200       85,841.88       85,841.88
 5672      Stark Excavating, Inc.                                         110.0000       98,340.00       98,340.00

    42300600  PCC DRIVEWAY PAVT 10                       108.000    SQ YD
 2024      Gensini Excavating, Inc.                                        75.0000        8,100.00        8,100.00
 2824      Illinois Civil Contractors, Inc.                               117.9400       12,737.52       12,737.52
 0335      Otto Baum Company, Inc.                                         70.2300        7,584.84        7,584.84
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                     104.0800       11,240.64       11,240.64
 5672      Stark Excavating, Inc.                                         150.0000       16,200.00       16,200.00

    42400100  PC CONC SIDEWALK 4                       3,320.000    SQ FT
 2024      Gensini Excavating, Inc.                                         6.0000       19,920.00       19,920.00
 2824      Illinois Civil Contractors, Inc.                                 9.2600       30,743.20       30,743.20
 0335      Otto Baum Company, Inc.                                          6.1900       20,550.80       20,550.80
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                      10.5600       35,059.20       35,059.20
 5672      Stark Excavating, Inc.                                          12.2500       40,670.00       40,670.00

    42400800  DETECTABLE WARNINGS                        128.000    SQ FT
 2024      Gensini Excavating, Inc.                                        30.0000        3,840.00        3,840.00
 2824      Illinois Civil Contractors, Inc.                                31.2000        3,993.60        3,993.60
 0335      Otto Baum Company, Inc.                                         25.9200        3,317.76        3,317.76
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                      29.6700        3,797.76        3,797.76
 5672      Stark Excavating, Inc.                                          29.0000        3,712.00        3,712.00

    44000100  PAVEMENT REM                             5,628.000    SQ YD
 2024      Gensini Excavating, Inc.                                        15.0000       84,420.00       84,420.00
 2824      Illinois Civil Contractors, Inc.                                17.6300       99,221.64       99,221.64
 0335      Otto Baum Company, Inc.                                         14.3200       80,592.96       80,592.96
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                      13.5200       76,090.56       76,090.56
 5672      Stark Excavating, Inc.                                          19.0000      106,932.00      106,932.00

    44000157  HMA SURF REM    2                        3,564.000    SQ YD
 2024      Gensini Excavating, Inc.                                         7.0000       24,948.00       24,948.00
 2824      Illinois Civil Contractors, Inc.                                 8.0700       28,761.48       28,761.48
 0335      Otto Baum Company, Inc.                                          7.1700       25,553.88       25,553.88
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       6.5300       23,272.92       23,272.92
 5672      Stark Excavating, Inc.                                           6.8500       24,413.40       24,413.40

    44000200  DRIVE PAVEMENT REM                         896.000    SQ YD
 2024      Gensini Excavating, Inc.                                        10.0000        8,960.00        8,960.00
 2824      Illinois Civil Contractors, Inc.                                22.6700       20,312.32       20,312.32
 0335      Otto Baum Company, Inc.                                         11.3900       10,205.44       10,205.44
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                      20.9900       18,807.04       18,807.04
 5672      Stark Excavating, Inc.                                          17.0000       15,232.00       15,232.00

    44000500  COMB CURB GUTTER REM                     3,716.000     FOOT
 2024      Gensini Excavating, Inc.                                         3.0000       11,148.00       11,148.00
 2824      Illinois Civil Contractors, Inc.                                14.3800       53,436.08       53,436.08
 0335      Otto Baum Company, Inc.                                         12.3200       45,781.12       45,781.12
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       7.0000       26,012.00       26,012.00
 5672      Stark Excavating, Inc.                                           9.5000       35,302.00       35,302.00

    44000600  SIDEWALK REM                             7,015.000    SQ FT
 2024      Gensini Excavating, Inc.                                         2.0000       14,030.00       14,030.00
 2824      Illinois Civil Contractors, Inc.                                 2.5500       17,888.25       17,888.25
 0335      Otto Baum Company, Inc.                                          1.0400        7,295.60        7,295.60
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       1.2800        8,979.20        8,979.20
 5672      Stark Excavating, Inc.                                           0.6000        4,209.00        4,209.00

    44201843  CL D PATCH T3 16                            19.000    SQ YD
 2024      Gensini Excavating, Inc.                                       200.0000        3,800.00        3,800.00
 2824      Illinois Civil Contractors, Inc.                               506.9900        9,632.81        9,632.81
 0335      Otto Baum Company, Inc.                                        295.2700        5,610.13        5,610.13
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                     551.9700       10,487.43       10,487.43
 5672      Stark Excavating, Inc.                                         420.0000        7,980.00        7,980.00

    50105220  PIPE CULVERT REMOV                          64.000     FOOT
 2024      Gensini Excavating, Inc.                                        30.0000        1,920.00        1,920.00
 2824      Illinois Civil Contractors, Inc.                                61.7400        3,951.36        3,951.36
 0335      Otto Baum Company, Inc.                                         13.2400          847.36          847.36
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                      57.2000        3,660.80        3,660.80
 5672      Stark Excavating, Inc.                                          52.0000        3,328.00        3,328.00

    54213660  PRC FLAR END SEC 15                          2.000     EACH
 2024      Gensini Excavating, Inc.                                     1,400.0000        2,800.00        2,800.00
 2824      Illinois Civil Contractors, Inc.                             1,781.1100        3,562.22        3,562.22
 0335      Otto Baum Company, Inc.                                        910.5900        1,821.18        1,821.18
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                   1,650.0000        3,300.00        3,300.00
 5672      Stark Excavating, Inc.                                       1,500.0000        3,000.00        3,000.00

    550A0050  STORM SEW CL A 1  12                       157.000     FOOT
 2024      Gensini Excavating, Inc.                                        70.0000       10,990.00       10,990.00
 2824      Illinois Civil Contractors, Inc.                               170.9900       26,845.43       26,845.43
 0335      Otto Baum Company, Inc.                                        131.1500       20,590.55       20,590.55
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                     158.4000       24,868.80       24,868.80
 5672      Stark Excavating, Inc.                                         144.0000       22,608.00       22,608.00

    550A0070  STORM SEW CL A 1  15                        34.000     FOOT
 2024      Gensini Excavating, Inc.                                        75.0000        2,550.00        2,550.00
 2824      Illinois Civil Contractors, Inc.                               270.7300        9,204.82        9,204.82
 0335      Otto Baum Company, Inc.                                        114.3800        3,888.92        3,888.92
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                     250.8000        8,527.20        8,527.20
 5672      Stark Excavating, Inc.                                         228.0000        7,752.00        7,752.00

    550A0340  STORM SEW CL A 2  12                       119.000     FOOT
 2024      Gensini Excavating, Inc.                                        75.0000        8,925.00        8,925.00
 2824      Illinois Civil Contractors, Inc.                               144.8600       17,238.34       17,238.34
 0335      Otto Baum Company, Inc.                                        109.8300       13,069.77       13,069.77
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                     134.2000       15,969.80       15,969.80
 5672      Stark Excavating, Inc.                                         122.0000       14,518.00       14,518.00

    550A0360  STORM SEW CL A 2  15                       912.000     FOOT
 2024      Gensini Excavating, Inc.                                        80.0000       72,960.00       72,960.00
 2824      Illinois Civil Contractors, Inc.                                71.2400       64,970.88       64,970.88
 0335      Otto Baum Company, Inc.                                         92.7900       84,624.48       84,624.48
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                      66.0000       60,192.00       60,192.00
 5672      Stark Excavating, Inc.                                          60.0000       54,720.00       54,720.00

    55100300  STORM SEWER REM   8                         87.000     FOOT
 2024      Gensini Excavating, Inc.                                        30.0000        2,610.00        2,610.00
 2824      Illinois Civil Contractors, Inc.                                16.6200        1,445.94        1,445.94
 0335      Otto Baum Company, Inc.                                         19.5300        1,699.11        1,699.11
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                      15.4000        1,339.80        1,339.80
 5672      Stark Excavating, Inc.                                          14.0000        1,218.00        1,218.00

    55100500  STORM SEWER REM  12                        457.000     FOOT
 2024      Gensini Excavating, Inc.                                        30.0000       13,710.00       13,710.00
 2824      Illinois Civil Contractors, Inc.                                41.5600       18,992.92       18,992.92
 0335      Otto Baum Company, Inc.                                         33.5800       15,346.06       15,346.06
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                      38.5000       17,594.50       17,594.50
 5672      Stark Excavating, Inc.                                          35.0000       15,995.00       15,995.00

    60108100  PIPE UNDERDRAIN  4 SP                    2,217.000     FOOT
 2024      Gensini Excavating, Inc.                                        20.0000       44,340.00       44,340.00
 2824      Illinois Civil Contractors, Inc.                                59.7200      132,399.24      132,399.24
 0335      Otto Baum Company, Inc.                                         19.5600       43,364.52       43,364.52
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                      13.1400       29,131.38       29,131.38
 5672      Stark Excavating, Inc.                                          16.4000       36,358.80       36,358.80

    60218400  MAN TA 4 DIA T1F CL                          1.000     EACH
 2024      Gensini Excavating, Inc.                                     7,000.0000        7,000.00        7,000.00
 2824      Illinois Civil Contractors, Inc.                             6,411.9900        6,411.99        6,411.99
 0335      Otto Baum Company, Inc.                                      3,993.0800        3,993.08        3,993.08
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                   5,940.0000        5,940.00        5,940.00
 5672      Stark Excavating, Inc.                                       5,400.0000        5,400.00        5,400.00

    60266600  VALVE BOX ADJ                               14.000     EACH
 2024      Gensini Excavating, Inc.                                       150.0000        2,100.00        2,100.00
 2824      Illinois Civil Contractors, Inc.                               191.2500        2,677.50        2,677.50
 0335      Otto Baum Company, Inc.                                        286.6300        4,012.82        4,012.82
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                     428.2100        5,994.94        5,994.94
 5672      Stark Excavating, Inc.                                         400.0000        5,600.00        5,600.00

    60500060  REMOV INLETS                                11.000     EACH
 2024      Gensini Excavating, Inc.                                       250.0000        2,750.00        2,750.00
 2824      Illinois Civil Contractors, Inc.                             2,315.4400       25,469.84       25,469.84
 0335      Otto Baum Company, Inc.                                        585.4900        6,440.39        6,440.39
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                   2,145.0000       23,595.00       23,595.00
 5672      Stark Excavating, Inc.                                       1,950.0000       21,450.00       21,450.00

    60605900  COMB CC&G TB9.12                         4,417.000     FOOT
 2024      Gensini Excavating, Inc.                                        32.0000      141,344.00      141,344.00
 2824      Illinois Civil Contractors, Inc.                                43.3600      191,521.12      191,521.12
 0335      Otto Baum Company, Inc.                                         34.6400      153,004.88      153,004.88
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                      44.2700      195,540.59      195,540.59
 5672      Stark Excavating, Inc.                                          53.0000      234,101.00      234,101.00

    61100500  EXPLOR TRENCH 52                            50.000     FOOT
 2024      Gensini Excavating, Inc.                                       100.0000        5,000.00        5,000.00
 2824      Illinois Civil Contractors, Inc.                                37.2300        1,861.50        1,861.50
 0335      Otto Baum Company, Inc.                                         24.6100        1,230.50        1,230.50
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                      46.3500        2,317.50        2,317.50
 5672      Stark Excavating, Inc.                                          83.0000        4,150.00        4,150.00

    61101009  STORM SEW PROT A   8                       100.000     FOOT
 2024      Gensini Excavating, Inc.                                        40.0000        4,000.00        4,000.00
 2824      Illinois Civil Contractors, Inc.                               151.9900       15,199.00       15,199.00
 0335      Otto Baum Company, Inc.                                         91.3600        9,136.00        9,136.00
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                     140.8000       14,080.00       14,080.00
 5672      Stark Excavating, Inc.                                         156.0000       15,600.00       15,600.00

    61101011  STORM SEW PROT A   10                      100.000     FOOT
 2024      Gensini Excavating, Inc.                                        40.0000        4,000.00        4,000.00
 2824      Illinois Civil Contractors, Inc.                               182.8600       18,286.00       18,286.00
 0335      Otto Baum Company, Inc.                                        115.6000       11,560.00       11,560.00
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                     169.4000       16,940.00       16,940.00
 5672      Stark Excavating, Inc.                                         183.0000       18,300.00       18,300.00

    61101013  STORM SEW PROT A   12                      100.000     FOOT
 2024      Gensini Excavating, Inc.                                        40.0000        4,000.00        4,000.00
 2824      Illinois Civil Contractors, Inc.                               235.1100       23,511.00       23,511.00
 0335      Otto Baum Company, Inc.                                         76.1500        7,615.00        7,615.00
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                     217.8000       21,780.00       21,780.00
 5672      Stark Excavating, Inc.                                         227.0000       22,700.00       22,700.00

    61133100  FLD TILE JUN VAULT 2D                        2.000     EACH
 2024      Gensini Excavating, Inc.                                     2,000.0000        4,000.00        4,000.00
 2824      Illinois Civil Contractors, Inc.                             3,562.2200        7,124.44        7,124.44
 0335      Otto Baum Company, Inc.                                      1,424.5900        2,849.18        2,849.18
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                   3,300.0000        6,600.00        6,600.00
 5672      Stark Excavating, Inc.                                       3,000.0000        6,000.00        6,000.00

    61133200  FLD TILE JUN VAULT 3D                        2.000     EACH
 2024      Gensini Excavating, Inc.                                     2,300.0000        4,600.00        4,600.00
 2824      Illinois Civil Contractors, Inc.                             4,868.3600        9,736.72        9,736.72
 0335      Otto Baum Company, Inc.                                      2,056.8100        4,113.62        4,113.62
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                   4,510.0000        9,020.00        9,020.00
 5672      Stark Excavating, Inc.                                       4,100.0000        8,200.00        8,200.00

    67000500  ENGR FIELD OFFICE B                          9.000   CAL MO
 2024      Gensini Excavating, Inc.                                     4,000.0000       36,000.00       36,000.00
 2824      Illinois Civil Contractors, Inc.                             2,649.2400       23,843.16       23,843.16
 0335      Otto Baum Company, Inc.                                        933.7000        8,403.30        8,403.30
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                   2,684.7400       24,162.66       24,162.66
 5672      Stark Excavating, Inc.                                       1,600.0000       14,400.00       14,400.00

    67100100  MOBILIZATION                                 1.000    L SUM
 2024      Gensini Excavating, Inc.                                    70,000.0000       70,000.00       70,000.00
 2824      Illinois Civil Contractors, Inc.                           211,000.0000      211,000.00      211,000.00
 0335      Otto Baum Company, Inc.                                    143,011.0000      143,011.00      143,011.00
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                  91,025.6000       91,025.60       91,025.60
 5672      Stark Excavating, Inc.                                     156,537.5200      156,537.52      156,537.52

    70300100  SHORT TERM PAVT MKING                    1,000.000     FOOT
 2024      Gensini Excavating, Inc.                                         1.1000        1,100.00        1,100.00
 2824      Illinois Civil Contractors, Inc.                                 4.6900        4,690.00        4,690.00
 0335      Otto Baum Company, Inc.                                          1.2000        1,200.00        1,200.00
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       1.2800        1,280.00        1,280.00
 5672      Stark Excavating, Inc.                                           1.5800        1,580.00        1,580.00

    70300150  SHRT TRM PAVT MK REM                       333.000    SQ FT
 2024      Gensini Excavating, Inc.                                         4.0000        1,332.00        1,332.00
 2824      Illinois Civil Contractors, Inc.                                12.2800        4,089.24        4,089.24
 0335      Otto Baum Company, Inc.                                          2.6600          885.78          885.78
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       8.9500        2,980.35        2,980.35
 5672      Stark Excavating, Inc.                                           2.0000          666.00          666.00

    70306100  TEMP PVT MK LTR & SYM T3 TAPE              219.000    SQ FT
 2024      Gensini Excavating, Inc.                                        11.0000        2,409.00        2,409.00
 2824      Illinois Civil Contractors, Inc.                                32.3600        7,086.84        7,086.84
 0335      Otto Baum Company, Inc.                                         28.9500        6,340.05        6,340.05
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       6.5300        1,430.07        1,430.07
 5672      Stark Excavating, Inc.                                          28.0000        6,132.00        6,132.00

    70306120  TEMP PVT MK L4 T3 TAPE                   4,613.000     FOOT
 2024      Gensini Excavating, Inc.                                         1.1000        5,074.30        5,074.30
 2824      Illinois Civil Contractors, Inc.                                 1.7800        8,211.14        8,211.14
 0335      Otto Baum Company, Inc.                                          1.5900        7,334.67        7,334.67
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       2.1800       10,056.34       10,056.34
 5672      Stark Excavating, Inc.                                           1.5800        7,288.54        7,288.54

    70306210  TEMP PVT MK L24 T3 TAPE                    142.000     FOOT
 2024      Gensini Excavating, Inc.                                         6.6000          937.20          937.20
 2824      Illinois Civil Contractors, Inc.                                23.2700        3,304.34        3,304.34
 0335      Otto Baum Company, Inc.                                         20.8300        2,957.86        2,957.86
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       2.1800          309.56          309.56
 5672      Stark Excavating, Inc.                                          20.9000        2,967.80        2,967.80

    78009000  MOD URETH PM LTR-SYM                       603.000    SQ FT
 2024      Gensini Excavating, Inc.                                         6.0000        3,618.00        3,618.00
 2824      Illinois Civil Contractors, Inc.                                 5.9400        3,581.82        3,581.82
 0335      Otto Baum Company, Inc.                                          5.3100        3,201.93        3,201.93
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       5.5000        3,316.50        3,316.50
 5672      Stark Excavating, Inc.                                           5.2500        3,165.75        3,165.75

    78009004  MOD URETH PM LINE  4                    11,942.000     FOOT
 2024      Gensini Excavating, Inc.                                         1.4000       16,718.80       16,718.80
 2824      Illinois Civil Contractors, Inc.                                 1.5800       18,868.36       18,868.36
 0335      Otto Baum Company, Inc.                                          1.4100       16,838.22       16,838.22
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       1.4600       17,435.32       17,435.32
 5672      Stark Excavating, Inc.                                           1.4000       16,718.80       16,718.80

    78009008  MOD URETH PM LINE  8                     1,472.000     FOOT
 2024      Gensini Excavating, Inc.                                         2.7500        4,048.00        4,048.00
 2824      Illinois Civil Contractors, Inc.                                 3.1700        4,666.24        4,666.24
 0335      Otto Baum Company, Inc.                                          2.8400        4,180.48        4,180.48
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       2.9400        4,327.68        4,327.68
 5672      Stark Excavating, Inc.                                           2.8000        4,121.60        4,121.60

    78009012  MOD URETH PM LINE 12                       113.000     FOOT
 2024      Gensini Excavating, Inc.                                         4.0000          452.00          452.00
 2824      Illinois Civil Contractors, Inc.                                 4.7500          536.75          536.75
 0335      Otto Baum Company, Inc.                                          4.2500          480.25          480.25
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       4.4000          497.20          497.20
 5672      Stark Excavating, Inc.                                           4.2000          474.60          474.60

    78009024  MOD URETH PM LINE 24                       167.000     FOOT
 2024      Gensini Excavating, Inc.                                         8.0000        1,336.00        1,336.00
 2824      Illinois Civil Contractors, Inc.                                 9.5000        1,586.50        1,586.50
 0335      Otto Baum Company, Inc.                                          8.5000        1,419.50        1,419.50
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       8.8000        1,469.60        1,469.60
 5672      Stark Excavating, Inc.                                           8.5000        1,419.50        1,419.50

    78011000  GRV RCSD PM LTR & SYM                      603.000    SQ FT
 2024      Gensini Excavating, Inc.                                         6.0000        3,618.00        3,618.00
 2824      Illinois Civil Contractors, Inc.                                 7.1200        4,293.36        4,293.36
 0335      Otto Baum Company, Inc.                                          6.3800        3,847.14        3,847.14
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       6.6000        3,979.80        3,979.80
 5672      Stark Excavating, Inc.                                           6.3000        3,798.90        3,798.90

    78011025  GRV RCSD PVT MRKG   5                   11,942.000     FOOT
 2024      Gensini Excavating, Inc.                                         1.0000       11,942.00       11,942.00
 2824      Illinois Civil Contractors, Inc.                                 0.8900       10,628.38       10,628.38
 0335      Otto Baum Company, Inc.                                          0.8000        9,553.60        9,553.60
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       0.8300        9,911.86        9,911.86
 5672      Stark Excavating, Inc.                                           0.7900        9,434.18        9,434.18

    78011045  GRV RCSD PVT MRKG   9                    1,472.000     FOOT
 2024      Gensini Excavating, Inc.                                         1.6000        2,355.20        2,355.20
 2824      Illinois Civil Contractors, Inc.                                 1.9000        2,796.80        2,796.80
 0335      Otto Baum Company, Inc.                                          1.7000        2,502.40        2,502.40
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       1.7600        2,590.72        2,590.72
 5672      Stark Excavating, Inc.                                           1.6800        2,472.96        2,472.96

    78011065  GRV RCSD PVT MRKG  13                      113.000     FOOT
 2024      Gensini Excavating, Inc.                                         5.5000          621.50          621.50
 2824      Illinois Civil Contractors, Inc.                                 6.5300          737.89          737.89
 0335      Otto Baum Company, Inc.                                          5.8400          659.92          659.92
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       6.0500          683.65          683.65
 5672      Stark Excavating, Inc.                                           5.7800          653.14          653.14

    78011125  GRV RCSD PVT MRKG  25                      167.000     FOOT
 2024      Gensini Excavating, Inc.                                        11.0000        1,837.00        1,837.00
 2824      Illinois Civil Contractors, Inc.                                13.0600        2,181.02        2,181.02
 0335      Otto Baum Company, Inc.                                         11.6900        1,952.23        1,952.23
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                      12.1000        2,020.70        2,020.70
 5672      Stark Excavating, Inc.                                          11.5500        1,928.85        1,928.85

    78300201  PAVMT MRKG REM GRIND                     2,206.000    SQ FT
 2024      Gensini Excavating, Inc.                                         1.8400        4,059.04        4,059.04
 2824      Illinois Civil Contractors, Inc.                                 2.1800        4,809.08        4,809.08
 0335      Otto Baum Company, Inc.                                          1.9600        4,323.76        4,323.76
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       2.0200        4,456.12        4,456.12
 5672      Stark Excavating, Inc.                                           1.9500        4,301.70        4,301.70

    78300202  PAVMT MRKG REM WTR BL                    2,542.000    SQ FT
 2024      Gensini Excavating, Inc.                                         2.4000        6,100.80        6,100.80
 2824      Illinois Civil Contractors, Inc.                                 2.8500        7,244.70        7,244.70
 0335      Otto Baum Company, Inc.                                          2.5500        6,482.10        6,482.10
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       2.6400        6,710.88        6,710.88
 5672      Stark Excavating, Inc.                                           2.5000        6,355.00        6,355.00

    81028320  UNDRGRD C PVC       1                      232.000     FOOT
 2024      Gensini Excavating, Inc.                                         8.0000        1,856.00        1,856.00
 2824      Illinois Civil Contractors, Inc.                                 9.0800        2,106.56        2,106.56
 0335      Otto Baum Company, Inc.                                          8.1300        1,886.16        1,886.16
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                      11.9900        2,781.68        2,781.68
 5672      Stark Excavating, Inc.                                           8.2500        1,914.00        1,914.00

    81028350  UNDRGRD C PVC       2                    2,521.000     FOOT
 2024      Gensini Excavating, Inc.                                        15.0000       37,815.00       37,815.00
 2824      Illinois Civil Contractors, Inc.                                16.5000       41,596.50       41,596.50
 0335      Otto Baum Company, Inc.                                         14.7700       37,235.17       37,235.17
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                      20.8500       52,562.85       52,562.85
 5672      Stark Excavating, Inc.                                          15.0000       37,815.00       37,815.00

    81028370  UNDRGRD C PVC       3                       53.000     FOOT
 2024      Gensini Excavating, Inc.                                        22.0000        1,166.00        1,166.00
 2824      Illinois Civil Contractors, Inc.                                24.5800        1,302.74        1,302.74
 0335      Otto Baum Company, Inc.                                         21.9900        1,165.47        1,165.47
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                      31.5200        1,670.56        1,670.56
 5672      Stark Excavating, Inc.                                          22.0000        1,166.00        1,166.00

    81028390  UNDRGRD C PVC       4                      230.000     FOOT
 2024      Gensini Excavating, Inc.                                        30.0000        6,900.00        6,900.00
 2824      Illinois Civil Contractors, Inc.                                33.2500        7,647.50        7,647.50
 0335      Otto Baum Company, Inc.                                         29.7500        6,842.50        6,842.50
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                      42.5200        9,779.60        9,779.60
 5672      Stark Excavating, Inc.                                          30.0000        6,900.00        6,900.00

    81400700  HANDHOLE PCC                                 6.000     EACH
 2024      Gensini Excavating, Inc.                                     1,700.0000       10,200.00       10,200.00
 2824      Illinois Civil Contractors, Inc.                             2,018.5900       12,111.54       12,111.54
 0335      Otto Baum Company, Inc.                                      1,806.3500       10,838.10       10,838.10
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                   1,826.3300       10,957.98       10,957.98
 5672      Stark Excavating, Inc.                                       1,810.0000       10,860.00       10,860.00

    81702130  EC C XLP USE 1C  6                       2,619.000     FOOT
 2024      Gensini Excavating, Inc.                                         2.5000        6,547.50        6,547.50
 2824      Illinois Civil Contractors, Inc.                                 2.5500        6,678.45        6,678.45
 0335      Otto Baum Company, Inc.                                          2.2800        5,971.32        5,971.32
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       3.0300        7,935.57        7,935.57
 5672      Stark Excavating, Inc.                                           2.2900        5,997.51        5,997.51

    82110007  LUM LED RDWY G                               4.000     EACH
 2024      Gensini Excavating, Inc.                                     1,000.0000        4,000.00        4,000.00
 2824      Illinois Civil Contractors, Inc.                             1,056.7900        4,227.16        4,227.16
 0335      Otto Baum Company, Inc.                                        945.6800        3,782.72        3,782.72
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                   1,116.5000        4,466.00        4,466.00
 5672      Stark Excavating, Inc.                                         948.0000        3,792.00        3,792.00

    83600200  LIGHT POLE FDN 24D                          22.000     FOOT
 2024      Gensini Excavating, Inc.                                       250.0000        5,500.00        5,500.00
 2824      Illinois Civil Contractors, Inc.                               250.5400        5,511.88        5,511.88
 0335      Otto Baum Company, Inc.                                        224.2000        4,932.40        4,932.40
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                     252.6200        5,557.64        5,557.64
 5672      Stark Excavating, Inc.                                         225.0000        4,950.00        4,950.00

    85000200  MAIN EX TR SIG INSTAL                        2.000     EACH
 2024      Gensini Excavating, Inc.                                     3,000.0000        6,000.00        6,000.00
 2824      Illinois Civil Contractors, Inc.                             3,128.8100        6,257.62        6,257.62
 0335      Otto Baum Company, Inc.                                      2,799.8400        5,599.68        5,599.68
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                   6,600.0000       13,200.00       13,200.00
 5672      Stark Excavating, Inc.                                       2,805.0000        5,610.00        5,610.00

    87100020  FOCC62.5/125 MM12SM12                    2,696.000     FOOT
 2024      Gensini Excavating, Inc.                                         3.0000        8,088.00        8,088.00
 2824      Illinois Civil Contractors, Inc.                                 3.2100        8,654.16        8,654.16
 0335      Otto Baum Company, Inc.                                          2.8700        7,737.52        7,737.52
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       5.9400       16,014.24       16,014.24
 5672      Stark Excavating, Inc.                                           2.8800        7,764.48        7,764.48

    87300925  ELCBL C TRACER 14  1C                    2,696.000     FOOT
 2024      Gensini Excavating, Inc.                                         1.0000        2,696.00        2,696.00
 2824      Illinois Civil Contractors, Inc.                                 0.8300        2,237.68        2,237.68
 0335      Otto Baum Company, Inc.                                          0.7400        1,995.04        1,995.04
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       1.2700        3,423.92        3,423.92
 5672      Stark Excavating, Inc.                                           0.7500        2,022.00        2,022.00

    87301215  ELCBL C SIGNAL 14  2C                      168.000     FOOT
 2024      Gensini Excavating, Inc.                                         2.5000          420.00          420.00
 2824      Illinois Civil Contractors, Inc.                                 2.6700          448.56          448.56
 0335      Otto Baum Company, Inc.                                          2.3900          401.52          401.52
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       1.9300          324.24          324.24
 5672      Stark Excavating, Inc.                                           2.4000          403.20          403.20

    87301225  ELCBL C SIGNAL 14  3C                    1,041.000     FOOT
 2024      Gensini Excavating, Inc.                                         2.0000        2,082.00        2,082.00
 2824      Illinois Civil Contractors, Inc.                                 2.2600        2,352.66        2,352.66
 0335      Otto Baum Company, Inc.                                          2.0200        2,102.82        2,102.82
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       1.7700        1,842.57        1,842.57
 5672      Stark Excavating, Inc.                                           2.0200        2,102.82        2,102.82

    87301245  ELCBL C SIGNAL 14  5C                    2,188.000     FOOT
 2024      Gensini Excavating, Inc.                                         1.9000        4,157.20        4,157.20
 2824      Illinois Civil Contractors, Inc.                                 2.1400        4,682.32        4,682.32
 0335      Otto Baum Company, Inc.                                          1.9100        4,179.08        4,179.08
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       2.1500        4,704.20        4,704.20
 5672      Stark Excavating, Inc.                                           1.9200        4,200.96        4,200.96

    87301255  ELCBL C SIGNAL 14  7C                    1,589.000     FOOT
 2024      Gensini Excavating, Inc.                                         2.5000        3,972.50        3,972.50
 2824      Illinois Civil Contractors, Inc.                                 2.7900        4,433.31        4,433.31
 0335      Otto Baum Company, Inc.                                          2.5000        3,972.50        3,972.50
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       2.8600        4,544.54        4,544.54
 5672      Stark Excavating, Inc.                                           2.5000        3,972.50        3,972.50

    87301295  ELCBL C SIGNAL 20  3C                      876.000     FOOT
 2024      Gensini Excavating, Inc.                                         1.1500        1,007.40        1,007.40
 2824      Illinois Civil Contractors, Inc.                                 1.1900        1,042.44        1,042.44
 0335      Otto Baum Company, Inc.                                          1.0600          928.56          928.56
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       1.7600        1,541.76        1,541.76
 5672      Stark Excavating, Inc.                                           1.0700          937.32          937.32

    87301515  ELCBL C LEAD  18  3PR                      568.000     FOOT
 2024      Gensini Excavating, Inc.                                         4.5000        2,556.00        2,556.00
 2824      Illinois Civil Contractors, Inc.                                 5.0500        2,868.40        2,868.40
 0335      Otto Baum Company, Inc.                                          4.5200        2,567.36        2,567.36
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       2.8600        1,624.48        1,624.48
 5672      Stark Excavating, Inc.                                           4.5300        2,573.04        2,573.04

    87301900  ELCBL C EGRDC   6  1C                      540.000     FOOT
 2024      Gensini Excavating, Inc.                                         2.5000        1,350.00        1,350.00
 2824      Illinois Civil Contractors, Inc.                                 2.7300        1,474.20        1,474.20
 0335      Otto Baum Company, Inc.                                          2.4400        1,317.60        1,317.60
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                       3.5800        1,933.20        1,933.20
 5672      Stark Excavating, Inc.                                           2.4500        1,323.00        1,323.00

    87502490  TS POST GALVS 15                             3.000     EACH
 2024      Gensini Excavating, Inc.                                     1,300.0000        3,900.00        3,900.00
 2824      Illinois Civil Contractors, Inc.                             1,484.2600        4,452.78        4,452.78
 0335      Otto Baum Company, Inc.                                      1,328.2000        3,984.60        3,984.60
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                   1,534.5000        4,603.50        4,603.50
 5672      Stark Excavating, Inc.                                       1,330.0000        3,990.00        3,990.00

    87600100  PED PUSH-BUT POST T1                         1.000     EACH
 2024      Gensini Excavating, Inc.                                     1,300.0000        1,300.00        1,300.00
 2824      Illinois Civil Contractors, Inc.                             1,478.3100        1,478.31        1,478.31
 0335      Otto Baum Company, Inc.                                      1,322.8900        1,322.89        1,322.89
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                   2,391.9500        2,391.95        2,391.95
 5672      Stark Excavating, Inc.                                       1,325.0000        1,325.00        1,325.00

    87702960  STL COMB MAA&P 46                            1.000     EACH
 2024      Gensini Excavating, Inc.                                    27,000.0000       27,000.00       27,000.00
 2824      Illinois Civil Contractors, Inc.                            24,626.7900       24,626.79       24,626.79
 0335      Otto Baum Company, Inc.                                     22,037.4200       22,037.42       22,037.42
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                  24,322.9300       24,322.93       24,322.93
 5672      Stark Excavating, Inc.                                      22,080.0000       22,080.00       22,080.00

    87702970  STL COMB MAA&P 48                            2.000     EACH
 2024      Gensini Excavating, Inc.                                    30,000.0000       60,000.00       60,000.00
 2824      Illinois Civil Contractors, Inc.                            27,191.5800       54,383.16       54,383.16
 0335      Otto Baum Company, Inc.                                     24,332.5400       48,665.08       48,665.08
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                  27,258.0000       54,516.00       54,516.00
 5672      Stark Excavating, Inc.                                      24,380.0000       48,760.00       48,760.00

    87703020  STL COMB MAA&P 58                            1.000     EACH
 2024      Gensini Excavating, Inc.                                    33,500.0000       33,500.00       33,500.00
 2824      Illinois Civil Contractors, Inc.                            34,019.1600       34,019.16       34,019.16
 0335      Otto Baum Company, Inc.                                     30,442.2400       30,442.24       30,442.24
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                  34,012.0000       34,012.00       34,012.00
 5672      Stark Excavating, Inc.                                      30,500.0000       30,500.00       30,500.00

    87800100  CONC FDN TY A                                9.000     FOOT
 2024      Gensini Excavating, Inc.                                       250.0000        2,250.00        2,250.00
 2824      Illinois Civil Contractors, Inc.                               261.2300        2,351.07        2,351.07
 0335      Otto Baum Company, Inc.                                        233.7600        2,103.84        2,103.84
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                     244.9700        2,204.73        2,204.73
 5672      Stark Excavating, Inc.                                         234.0000        2,106.00        2,106.00

    87800415  CONC FDN TY E 36D                           39.000     FOOT
 2024      Gensini Excavating, Inc.                                       400.0000       15,600.00       15,600.00
 2824      Illinois Civil Contractors, Inc.                               439.3400       17,134.26       17,134.26
 0335      Otto Baum Company, Inc.                                        393.1500       15,332.85       15,332.85
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                     561.2800       21,889.92       21,889.92
 5672      Stark Excavating, Inc.                                         394.0000       15,366.00       15,366.00

    87800420  CONC FDN TY E 42D                           21.000     FOOT
 2024      Gensini Excavating, Inc.                                       550.0000       11,550.00       11,550.00
 2824      Illinois Civil Contractors, Inc.                               599.6400       12,592.44       12,592.44
 0335      Otto Baum Company, Inc.                                        536.5900       11,268.39       11,268.39
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                     609.2400       12,794.04       12,794.04
 5672      Stark Excavating, Inc.                                         538.0000       11,298.00       11,298.00

    87900200  DRILL EX HANDHOLE                           15.000     EACH
 2024      Gensini Excavating, Inc.                                       325.0000        4,875.00        4,875.00
 2824      Illinois Civil Contractors, Inc.                               350.2800        5,254.20        5,254.20
 0335      Otto Baum Company, Inc.                                        313.4500        4,701.75        4,701.75
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                     535.7000        8,035.50        8,035.50
 5672      Stark Excavating, Inc.                                         314.0000        4,710.00        4,710.00

    88030020  SH LED 1F 3S MAM                             8.000     EACH
 2024      Gensini Excavating, Inc.                                       700.0000        5,600.00        5,600.00
 2824      Illinois Civil Contractors, Inc.                               765.8800        6,127.04        6,127.04
 0335      Otto Baum Company, Inc.                                        685.3500        5,482.80        5,482.80
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                     816.7500        6,534.00        6,534.00
 5672      Stark Excavating, Inc.                                         687.0000        5,496.00        5,496.00

    88030050  SH LED 1F 3S BM                              4.000     EACH
 2024      Gensini Excavating, Inc.                                       700.0000        2,800.00        2,800.00
 2824      Illinois Civil Contractors, Inc.                               797.9400        3,191.76        3,191.76
 0335      Otto Baum Company, Inc.                                        714.0400        2,856.16        2,856.16
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                     803.0000        3,212.00        3,212.00
 5672      Stark Excavating, Inc.                                         715.0000        2,860.00        2,860.00

    88030070  SH LED 1F 4S BM                              4.000     EACH
 2024      Gensini Excavating, Inc.                                       800.0000        3,200.00        3,200.00
 2824      Illinois Civil Contractors, Inc.                               896.4900        3,585.96        3,585.96
 0335      Otto Baum Company, Inc.                                        802.2300        3,208.92        3,208.92
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                     915.2000        3,660.80        3,660.80
 5672      Stark Excavating, Inc.                                         804.0000        3,216.00        3,216.00

    88030080  SH LED 1F 4S MAM                             4.000     EACH
 2024      Gensini Excavating, Inc.                                       900.0000        3,600.00        3,600.00
 2824      Illinois Civil Contractors, Inc.                               979.6100        3,918.44        3,918.44
 0335      Otto Baum Company, Inc.                                        876.6100        3,506.44        3,506.44
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                     968.0000        3,872.00        3,872.00
 5672      Stark Excavating, Inc.                                         878.0000        3,512.00        3,512.00

    88102717  PED SH LED 1F BM CDT                         4.000     EACH
 2024      Gensini Excavating, Inc.                                       550.0000        2,200.00        2,200.00
 2824      Illinois Civil Contractors, Inc.                               593.7000        2,374.80        2,374.80
 0335      Otto Baum Company, Inc.                                        531.2800        2,125.12        2,125.12
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                     809.3800        3,237.52        3,237.52
 5672      Stark Excavating, Inc.                                         532.0000        2,128.00        2,128.00

    88200110  TS BACKPLATE LOUVERED                       20.000     EACH
 2024      Gensini Excavating, Inc.                                       250.0000        5,000.00        5,000.00
 2824      Illinois Civil Contractors, Inc.                               237.4800        4,749.60        4,749.60
 0335      Otto Baum Company, Inc.                                        212.5100        4,250.20        4,250.20
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                     269.5000        5,390.00        5,390.00
 5672      Stark Excavating, Inc.                                         213.0000        4,260.00        4,260.00

    88600100  DET LOOP T1                              1,905.000     FOOT
 2024      Gensini Excavating, Inc.                                        15.0000       28,575.00       28,575.00
 2824      Illinois Civil Contractors, Inc.                                16.0300       30,537.15       30,537.15
 0335      Otto Baum Company, Inc.                                         14.3400       27,317.70       27,317.70
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                      16.1200       30,708.60       30,708.60
 5672      Stark Excavating, Inc.                                          14.4000       27,432.00       27,432.00

    88800100  PED PUSH-BUTTON                              4.000     EACH
 2024      Gensini Excavating, Inc.                                       600.0000        2,400.00        2,400.00
 2824      Illinois Civil Contractors, Inc.                               700.5700        2,802.28        2,802.28
 0335      Otto Baum Company, Inc.                                        626.9100        2,507.64        2,507.64
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                     512.0500        2,048.20        2,048.20
 5672      Stark Excavating, Inc.                                         628.0000        2,512.00        2,512.00

    89502200  MOD EX CONTR                                 2.000     EACH
 2024      Gensini Excavating, Inc.                                     3,500.0000        7,000.00        7,000.00
 2824      Illinois Civil Contractors, Inc.                             4,096.5500        8,193.10        8,193.10
 0335      Otto Baum Company, Inc.                                      3,665.8200        7,331.64        7,331.64
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                   1,622.5000        3,245.00        3,245.00
 5672      Stark Excavating, Inc.                                       3,675.0000        7,350.00        7,350.00

    89502375  REMOV EX TS EQUIP                            1.000     EACH
 2024      Gensini Excavating, Inc.                                    13,500.0000       13,500.00       13,500.00
 2824      Illinois Civil Contractors, Inc.                            15,733.1200       15,733.12       15,733.12
 0335      Otto Baum Company, Inc.                                      8,766.0900        8,766.09        8,766.09
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                  14,572.9600       14,572.96       14,572.96
 5672      Stark Excavating, Inc.                                      18,050.0000       18,050.00       18,050.00

    89502380  REMOV EX HANDHOLE                            1.000     EACH
 2024      Gensini Excavating, Inc.                                       500.0000          500.00          500.00
 2824      Illinois Civil Contractors, Inc.                               626.1600          626.16          626.16
 0335      Otto Baum Company, Inc.                                        576.2200          576.22          576.22
 1284      R. A. Cullinan and Son, a div of UCM, Inc.                     881.4000          881.40          881.40
 5672      Stark Excavating, Inc.                                           0.0100            0.01            0.01