                                               ILLINOIS DEPARTMENT OF TRANSPORTATION                                      PAGE:    1
 06/05/20  08:56:21                   U N I T  P R I C E   T A B U L A T I O N   O F   B I D S
 LETTING DATE: 03/06/2020  LETTING TYPE: SCHEDULED                                 CONTRACT NUMBER: 72K76  LETTING ITEM NUMBER: 075
 RESPONSIBLE DISTRICT: 06                                                                                  BIDS LOCKED: Y
 SECTION: (54-10)BRR,BDR                           COUNTY: LOGAN                                           ESTIMATE:
                                                      --------------------------
                                                      SUMMARY OF CONTRACTOR BIDS
                                                      --------------------------

                                                             "AS READ"          SUMMATION    SUMMATION OF                       NBR
 BIDR                     CONTR        COMB  ITEM  CONTR      BIDDER            OF BIDDER     CALCULATED   LOW   BIDR CALC      BLANK
 NBR   BIDDER NAME        GROUP  COMB  GRP   NBR   GROUP      TOTAL PRICE       EXTENSIONS    EXTENSIONS   BID   EXTENSION DIFF BIDS


 0335  Otto Baum Company, Inc.
                          NO ALT                            1,555,951.95     1,555,951.95   1,555,951.95

 1908  Freesen, a div of UCM, Inc.
                          NO ALT                            1,673,607.54     1,673,607.54   1,673,607.54

 2323  Halverson Construction Co., Inc.
                          NO ALT                            1,433,651.45     1,433,651.45   1,433,651.45    *

 5310  Sangamo Construction Company
                          NO ALT                            1,347,949.00 *   1,347,949.00   1,347,949.00

 **** TOTAL GROUP NO ALT PAY ITEMS FOR THIS CONTRACT =      74
                                                       ----------------------
                                                       DETAIL CONTRACTOR BIDS
                                                       ----------------------

    ITEM NBR  ITEM DESCRIPTION                                    UNIT OF     UNIT        BIDDER         CALCULATED  BIDR CALC
 BIDR NBR  BIDDER NAME                                  QUANTITY  MEASURE     PRICE       EXTENSION      EXTENSION   EXTENSION DIFF


    X0323586  PIPE DRAIN REMOVAL                         702.000     FOOT
 1908      Freesen, a div of UCM, Inc.                                     22.0200       15,458.04       15,458.04
 2323      Halverson Construction Co., Inc.                                25.0000       17,550.00       17,550.00
 0335      Otto Baum Company, Inc.                                          3.4300        2,407.86        2,407.86
 5310      Sangamo Construction Company                                    11.0700        7,771.14        7,771.14

    X0327980  PAVMT MRKG REM WTR BL                    1,290.000    SQ FT
 1908      Freesen, a div of UCM, Inc.                                      1.0800        1,393.20        1,393.20
 2323      Halverson Construction Co., Inc.                                 1.0000        1,290.00        1,290.00
 0335      Otto Baum Company, Inc.                                          1.0600        1,367.40        1,367.40
 5310      Sangamo Construction Company                                     1.3300        1,715.70        1,715.70

    X4404260  PAVED SHLD REMOVAL SP                    1,816.000    SQ YD
 1908      Freesen, a div of UCM, Inc.                                     51.7700       94,014.32       94,014.32
 2323      Halverson Construction Co., Inc.                                20.0000       36,320.00       36,320.00
 0335      Otto Baum Company, Inc.                                         16.4300       29,836.88       29,836.88
 5310      Sangamo Construction Company                                    24.5500       44,582.80       44,582.80

    X5030250  BR DECK GROOVING LONG                      764.000    SQ YD
 1908      Freesen, a div of UCM, Inc.                                     14.7800       11,291.92       11,291.92
 2323      Halverson Construction Co., Inc.                                13.2500       10,123.00       10,123.00
 0335      Otto Baum Company, Inc.                                         17.3400       13,247.76       13,247.76
 5310      Sangamo Construction Company                                    12.1600        9,290.24        9,290.24

    X7200201  WIDTH RESTRICT SIGN                          1.000    L SUM
 1908      Freesen, a div of UCM, Inc.                                  1,755.0000        1,755.00        1,755.00
 2323      Halverson Construction Co., Inc.                             2,980.0000        2,980.00        2,980.00
 0335      Otto Baum Company, Inc.                                      3,170.9500        3,170.95        3,170.95
 5310      Sangamo Construction Company                                 1,181.8400        1,181.84        1,181.84

    Z0001495  BR APPROACH SHLD REM                        92.000    SQ YD
 1908      Freesen, a div of UCM, Inc.                                    146.7500       13,501.00       13,501.00
 2323      Halverson Construction Co., Inc.                               105.0000        9,660.00        9,660.00
 0335      Otto Baum Company, Inc.                                         31.9100        2,935.72        2,935.72
 5310      Sangamo Construction Company                                   139.9100       12,871.72       12,871.72

    Z0001800  APPROACH SL REP (PD)                        44.000    SQ YD
 1908      Freesen, a div of UCM, Inc.                                    768.7200       33,823.68       33,823.68
 2323      Halverson Construction Co., Inc.                               715.0000       31,460.00       31,460.00
 0335      Otto Baum Company, Inc.                                        638.4200       28,090.48       28,090.48
 5310      Sangamo Construction Company                                   563.8000       24,807.20       24,807.20

    Z0012130  BR DECK SCAR      3/4                    1,202.000    SQ YD
 1908      Freesen, a div of UCM, Inc.                                     79.1800       95,174.36       95,174.36
 2323      Halverson Construction Co., Inc.                                70.0000       84,140.00       84,140.00
 0335      Otto Baum Company, Inc.                                         81.4100       97,854.82       97,854.82
 5310      Sangamo Construction Company                                    57.1400       68,682.28       68,682.28

    Z0012166  BR DK MIC C OVL 2 3/4                    1,202.000    SQ YD
 1908      Freesen, a div of UCM, Inc.                                    146.4600      176,044.92      176,044.92
 2323      Halverson Construction Co., Inc.                               120.0000      144,240.00      144,240.00
 0335      Otto Baum Company, Inc.                                        136.6400      164,241.28      164,241.28
 5310      Sangamo Construction Company                                    89.3100      107,350.62      107,350.62

    Z0012754  STR REP CON DP = <  5                       28.500    SQ FT
 1908      Freesen, a div of UCM, Inc.                                    102.9700        2,934.65        2,934.65
 2323      Halverson Construction Co., Inc.                               260.0000        7,410.00        7,410.00
 0335      Otto Baum Company, Inc.                                        420.0000       11,970.00       11,970.00
 5310      Sangamo Construction Company                                   255.2200        7,273.77        7,273.77

    Z0016002  DECK SLAB REP (FD-T2)                        9.000    SQ YD
 1908      Freesen, a div of UCM, Inc.                                  1,424.2800       12,818.52       12,818.52
 2323      Halverson Construction Co., Inc.                             1,895.0000       17,055.00       17,055.00
 0335      Otto Baum Company, Inc.                                      3,000.0000       27,000.00       27,000.00
 5310      Sangamo Construction Company                                 1,325.6200       11,930.58       11,930.58

    Z0029090  DIAMOND GRIND BR SEC                     1,082.000    SQ YD
 1908      Freesen, a div of UCM, Inc.                                     22.7100       24,572.22       24,572.22
 2323      Halverson Construction Co., Inc.                                25.0000       27,050.00       27,050.00
 0335      Otto Baum Company, Inc.                                         24.5200       26,530.64       26,530.64
 5310      Sangamo Construction Company                                    19.4600       21,055.72       21,055.72

    Z0040530  PIPE UNDERDRAIN REMOV                    2,034.000     FOOT
 1908      Freesen, a div of UCM, Inc.                                      3.1700        6,447.78        6,447.78
 2323      Halverson Construction Co., Inc.                                 2.2500        4,576.50        4,576.50
 0335      Otto Baum Company, Inc.                                          4.7400        9,641.16        9,641.16
 5310      Sangamo Construction Company                                     4.5600        9,275.04        9,275.04

    Z0048665  RR PROT LIABILITY INS                        1.000    L SUM
 1908      Freesen, a div of UCM, Inc.                                  6,684.7800        6,684.78        6,684.78
 2323      Halverson Construction Co., Inc.                             5,600.0000        5,600.00        5,600.00
 0335      Otto Baum Company, Inc.                                     21,000.0000       21,000.00       21,000.00
 5310      Sangamo Construction Company                                 6,883.9500        6,883.95        6,883.95

    Z0076600  TRAINEES                                   500.000     HOUR
 1908      Freesen, a div of UCM, Inc.                                      0.8000          400.00          400.00
 2323      Halverson Construction Co., Inc.                                 0.8000          400.00          400.00
 0335      Otto Baum Company, Inc.                                          0.8000          400.00          400.00
 5310      Sangamo Construction Company                                     0.8000          400.00          400.00

    Z0076604  TRAINEES TPG                               500.000     HOUR
 1908      Freesen, a div of UCM, Inc.                                     15.0000        7,500.00        7,500.00
 2323      Halverson Construction Co., Inc.                                15.0000        7,500.00        7,500.00
 0335      Otto Baum Company, Inc.                                         15.0000        7,500.00        7,500.00
 5310      Sangamo Construction Company                                    15.0000        7,500.00        7,500.00

    21400100  GRADING & SHAP DITCH                        50.000     FOOT
 1908      Freesen, a div of UCM, Inc.                                     37.8000        1,890.00        1,890.00
 2323      Halverson Construction Co., Inc.                                30.0000        1,500.00        1,500.00
 0335      Otto Baum Company, Inc.                                         50.0200        2,501.00        2,501.00
 5310      Sangamo Construction Company                                    34.4400        1,722.00        1,722.00

    25000210  SEEDING CL  2A                                .250     ACRE
 1908      Freesen, a div of UCM, Inc.                                  6,356.8800        1,589.22        1,589.22
 2323      Halverson Construction Co., Inc.                             5,886.0000        1,471.50        1,471.50
 0335      Otto Baum Company, Inc.                                     11,226.0400        2,806.51        2,806.51
 5310      Sangamo Construction Company                                11,178.4800        2,794.62        2,794.62

    25000400  NITROGEN FERT NUTR                          23.000    POUND
 1908      Freesen, a div of UCM, Inc.                                      3.2400           74.52           74.52
 2323      Halverson Construction Co., Inc.                                 3.0000           69.00           69.00
 0335      Otto Baum Company, Inc.                                          4.2600           97.98           97.98
 5310      Sangamo Construction Company                                     4.2400           97.52           97.52

    25000500  PHOSPHORUS FERT NUTR                        23.000    POUND
 1908      Freesen, a div of UCM, Inc.                                      3.2400           74.52           74.52
 2323      Halverson Construction Co., Inc.                                 3.0000           69.00           69.00
 0335      Otto Baum Company, Inc.                                          4.2600           97.98           97.98
 5310      Sangamo Construction Company                                     4.2400           97.52           97.52

    25000600  POTASSIUM FERT NUTR                         23.000    POUND
 1908      Freesen, a div of UCM, Inc.                                      3.2400           74.52           74.52
 2323      Halverson Construction Co., Inc.                                 3.0000           69.00           69.00
 0335      Otto Baum Company, Inc.                                          4.2600           97.98           97.98
 5310      Sangamo Construction Company                                     4.2400           97.52           97.52

    25100115  MULCH METHOD 2                                .250     ACRE
 1908      Freesen, a div of UCM, Inc.                                  6,356.8800        1,589.22        1,589.22
 2323      Halverson Construction Co., Inc.                             5,886.0000        1,471.50        1,471.50
 0335      Otto Baum Company, Inc.                                     10,933.4000        2,733.35        2,733.35
 5310      Sangamo Construction Company                                10,881.9600        2,720.49        2,720.49

    28000250  TEMP EROS CONTR SEED                        50.000    POUND
 1908      Freesen, a div of UCM, Inc.                                      5.5100          275.50          275.50
 2323      Halverson Construction Co., Inc.                                 9.5000          475.00          475.00
 0335      Otto Baum Company, Inc.                                          3.1900          159.50          159.50
 5310      Sangamo Construction Company                                     3.3000          165.00          165.00

    28100107  STONE RIPRAP CL A4                          28.000    SQ YD
 1908      Freesen, a div of UCM, Inc.                                    251.1200        7,031.36        7,031.36
 2323      Halverson Construction Co., Inc.                               170.0000        4,760.00        4,760.00
 0335      Otto Baum Company, Inc.                                        172.8100        4,838.68        4,838.68
 5310      Sangamo Construction Company                                   189.8700        5,316.36        5,316.36

    28100125  STONE RIPRAP CL B3                           6.000    SQ YD
 1908      Freesen, a div of UCM, Inc.                                    489.7400        2,938.44        2,938.44
 2323      Halverson Construction Co., Inc.                               155.0000          930.00          930.00
 0335      Otto Baum Company, Inc.                                        591.3900        3,548.34        3,548.34
 5310      Sangamo Construction Company                                   163.8600          983.16          983.16

    31101900  SUB GRAN MAT C                             723.000      TON
 1908      Freesen, a div of UCM, Inc.                                     71.5200       51,708.96       51,708.96
 2323      Halverson Construction Co., Inc.                                65.0000       46,995.00       46,995.00
 0335      Otto Baum Company, Inc.                                         49.9300       36,099.39       36,099.39
 5310      Sangamo Construction Company                                    70.2500       50,790.75       50,790.75

    35501316  HMA BASE CSE  8                          1,807.000    SQ YD
 1908      Freesen, a div of UCM, Inc.                                     64.3000      116,190.10      116,190.10
 2323      Halverson Construction Co., Inc.                                76.6800      138,560.76      138,560.76
 0335      Otto Baum Company, Inc.                                         68.4200      123,634.94      123,634.94
 5310      Sangamo Construction Company                                    68.1000      123,056.70      123,056.70

    35501324  HMA BASE CSE 10                             92.000    SQ YD
 1908      Freesen, a div of UCM, Inc.                                    263.3800       24,230.96       24,230.96
 2323      Halverson Construction Co., Inc.                               213.9300       19,681.56       19,681.56
 0335      Otto Baum Company, Inc.                                        280.2600       25,783.92       25,783.92
 5310      Sangamo Construction Company                                   278.9400       25,662.48       25,662.48

    40600290  BIT MATLS TACK CT                        2,538.500    POUND
 1908      Freesen, a div of UCM, Inc.                                      1.0900        2,766.97        2,766.97
 2323      Halverson Construction Co., Inc.                                 2.0000        5,077.00        5,077.00
 0335      Otto Baum Company, Inc.                                          1.1600        2,944.66        2,944.66
 5310      Sangamo Construction Company                                     1.1500        2,919.28        2,919.28

    40600982  HMA SURF REM BUTT JT                       748.000    SQ YD
 1908      Freesen, a div of UCM, Inc.                                     23.4500       17,540.60       17,540.60
 2323      Halverson Construction Co., Inc.                                15.0000       11,220.00       11,220.00
 0335      Otto Baum Company, Inc.                                         19.7000       14,735.60       14,735.60
 5310      Sangamo Construction Company                                    11.6800        8,736.64        8,736.64

    40600990  TEMPORARY RAMP                              64.000    SQ YD
 1908      Freesen, a div of UCM, Inc.                                     49.9200        3,194.88        3,194.88
 2323      Halverson Construction Co., Inc.                                25.5800        1,637.12        1,637.12
 0335      Otto Baum Company, Inc.                                         27.2200        1,742.08        1,742.08
 5310      Sangamo Construction Company                                    47.1200        3,015.68        3,015.68

    40604162  P HMA SC IL-9.5 D N70                      539.000      TON
 1908      Freesen, a div of UCM, Inc.                                    172.8000       93,139.20       93,139.20
 2323      Halverson Construction Co., Inc.                               195.7600      105,514.64      105,514.64
 0335      Otto Baum Company, Inc.                                        183.8700       99,105.93       99,105.93
 5310      Sangamo Construction Company                                   183.0100       98,642.39       98,642.39

    44000155  HMA SURF REM    1 1/2                      267.000    SQ YD
 1908      Freesen, a div of UCM, Inc.                                     23.4500        6,261.15        6,261.15
 2323      Halverson Construction Co., Inc.                                11.5000        3,070.50        3,070.50
 0335      Otto Baum Company, Inc.                                         22.5200        6,012.84        6,012.84
 5310      Sangamo Construction Company                                    10.3200        2,755.44        2,755.44

    48102100  AGG WEDGE SHLD TYPE B                       60.000      TON
 1908      Freesen, a div of UCM, Inc.                                    183.4500       11,007.00       11,007.00
 2323      Halverson Construction Co., Inc.                               110.0000        6,600.00        6,600.00
 0335      Otto Baum Company, Inc.                                        121.1100        7,266.60        7,266.60
 5310      Sangamo Construction Company                                    78.6800        4,720.80        4,720.80

    50102400  CONC REM                                    23.000    CU YD
 1908      Freesen, a div of UCM, Inc.                                  2,912.7800       66,993.94       66,993.94
 2323      Halverson Construction Co., Inc.                             3,200.0000       73,600.00       73,600.00
 0335      Otto Baum Company, Inc.                                      3,288.6600       75,639.18       75,639.18
 5310      Sangamo Construction Company                                 2,313.9000       53,219.70       53,219.70

    50104650  SLOPE WALL REMOV                           115.000    SQ YD
 1908      Freesen, a div of UCM, Inc.                                    136.0900       15,650.35       15,650.35
 2323      Halverson Construction Co., Inc.                               200.0000       23,000.00       23,000.00
 0335      Otto Baum Company, Inc.                                        116.5100       13,398.65       13,398.65
 5310      Sangamo Construction Company                                    98.5900       11,337.85       11,337.85

    50157300  PROTECTIVE SHIELD                        1,292.000    SQ YD
 1908      Freesen, a div of UCM, Inc.                                     59.7800       77,235.76       77,235.76
 2323      Halverson Construction Co., Inc.                                 1.0000        1,292.00        1,292.00
 0335      Otto Baum Company, Inc.                                         31.7100       40,969.32       40,969.32
 5310      Sangamo Construction Company                                     2.0000        2,584.00        2,584.00

    50300255  CONC SUP-STR                                28.000    CU YD
 1908      Freesen, a div of UCM, Inc.                                  3,807.7400      106,616.72      106,616.72
 2323      Halverson Construction Co., Inc.                             3,200.0000       89,600.00       89,600.00
 0335      Otto Baum Company, Inc.                                      3,244.2600       90,839.28       90,839.28
 5310      Sangamo Construction Company                                 2,930.5000       82,054.00       82,054.00

    50300300  PROTECTIVE COAT                          1,292.000    SQ YD
 1908      Freesen, a div of UCM, Inc.                                      6.2000        8,010.40        8,010.40
 2323      Halverson Construction Co., Inc.                                 3.0000        3,876.00        3,876.00
 0335      Otto Baum Company, Inc.                                          5.6600        7,312.72        7,312.72
 5310      Sangamo Construction Company                                     2.8400        3,669.28        3,669.28

    50800205  REINF BARS, EPOXY CTD                    3,500.000    POUND
 1908      Freesen, a div of UCM, Inc.                                      2.1100        7,385.00        7,385.00
 2323      Halverson Construction Co., Inc.                                 3.0000       10,500.00       10,500.00
 0335      Otto Baum Company, Inc.                                          2.3400        8,190.00        8,190.00
 5310      Sangamo Construction Company                                     4.4400       15,540.00       15,540.00

    50800515  BAR SPLICERS                                56.000     EACH
 1908      Freesen, a div of UCM, Inc.                                     20.6700        1,157.52        1,157.52
 2323      Halverson Construction Co., Inc.                                50.0000        2,800.00        2,800.00
 0335      Otto Baum Company, Inc.                                         19.9500        1,117.20        1,117.20
 5310      Sangamo Construction Company                                    40.7400        2,281.44        2,281.44

    51100100  SLOPE WALL   4                             115.000    SQ YD
 1908      Freesen, a div of UCM, Inc.                                    356.4400       40,990.60       40,990.60
 2323      Halverson Construction Co., Inc.                               300.0000       34,500.00       34,500.00
 0335      Otto Baum Company, Inc.                                        334.8600       38,508.90       38,508.90
 5310      Sangamo Construction Company                                   152.4500       17,531.75       17,531.75

    52000110  PREF JT STRIP SEAL                         172.000     FOOT
 1908      Freesen, a div of UCM, Inc.                                    243.0900       41,811.48       41,811.48
 2323      Halverson Construction Co., Inc.                               215.0000       36,980.00       36,980.00
 0335      Otto Baum Company, Inc.                                        212.4400       36,539.68       36,539.68
 5310      Sangamo Construction Company                                   204.0800       35,101.76       35,101.76

    54262712  METAL FL END SEC 12"                         8.000     EACH
 1908      Freesen, a div of UCM, Inc.                                    421.9000        3,375.20        3,375.20
 2323      Halverson Construction Co., Inc.                               450.0000        3,600.00        3,600.00
 0335      Otto Baum Company, Inc.                                        344.6800        2,757.44        2,757.44
 5310      Sangamo Construction Company                                   230.2100        1,841.68        1,841.68

    58700300  CONCRETE SEALER                             29.000    SQ FT
 1908      Freesen, a div of UCM, Inc.                                     45.5200        1,320.08        1,320.08
 2323      Halverson Construction Co., Inc.                                11.0000          319.00          319.00
 0335      Otto Baum Company, Inc.                                         32.6700          947.43          947.43
 5310      Sangamo Construction Company                                     2.1600           62.64           62.64

    59300100  CONTR LOW-STRENG MATL                       78.000    CU YD
 1908      Freesen, a div of UCM, Inc.                                    278.7900       21,745.62       21,745.62
 2323      Halverson Construction Co., Inc.                               350.0000       27,300.00       27,300.00
 0335      Otto Baum Company, Inc.                                        249.1700       19,435.26       19,435.26
 5310      Sangamo Construction Company                                   172.3300       13,441.74       13,441.74

    60100060  CONC HDWL FOR P DRAIN                        8.000     EACH
 1908      Freesen, a div of UCM, Inc.                                    690.2300        5,521.84        5,521.84
 2323      Halverson Construction Co., Inc.                               525.0000        4,200.00        4,200.00
 0335      Otto Baum Company, Inc.                                        680.0500        5,440.40        5,440.40
 5310      Sangamo Construction Company                                   333.5600        2,668.48        2,668.48

    60100945  PIPE DRAINS  12                            200.000     FOOT
 1908      Freesen, a div of UCM, Inc.                                     68.4700       13,694.00       13,694.00
 2323      Halverson Construction Co., Inc.                                55.0000       11,000.00       11,000.00
 0335      Otto Baum Company, Inc.                                         81.4700       16,294.00       16,294.00
 5310      Sangamo Construction Company                                    30.4800        6,096.00        6,096.00

    60108100  PIPE UNDERDRAIN  4 SP                      140.000     FOOT
 1908      Freesen, a div of UCM, Inc.                                     20.9100        2,927.40        2,927.40
 2323      Halverson Construction Co., Inc.                                35.0000        4,900.00        4,900.00
 0335      Otto Baum Company, Inc.                                         20.6000        2,884.00        2,884.00
 5310      Sangamo Construction Company                                    21.9700        3,075.80        3,075.80

    60108104  PIPE UNDERDR T 1 4                       2,034.000     FOOT
 1908      Freesen, a div of UCM, Inc.                                     25.4600       51,785.64       51,785.64
 2323      Halverson Construction Co., Inc.                                15.0000       30,510.00       30,510.00
 0335      Otto Baum Company, Inc.                                         25.0800       51,012.72       51,012.72
 5310      Sangamo Construction Company                                     9.7600       19,851.84       19,851.84

    61000225  TY F INLET BOX 610001                        4.000     EACH
 1908      Freesen, a div of UCM, Inc.                                  2,616.2300       10,464.92       10,464.92
 2323      Halverson Construction Co., Inc.                             4,500.0000       18,000.00       18,000.00
 0335      Otto Baum Company, Inc.                                      3,280.4000       13,121.60       13,121.60
 5310      Sangamo Construction Company                                 7,331.5300       29,326.12       29,326.12

    61000335  TY G INLET BOX 610001                        4.000     EACH
 1908      Freesen, a div of UCM, Inc.                                  1,672.0500        6,688.20        6,688.20
 2323      Halverson Construction Co., Inc.                             3,500.0000       14,000.00       14,000.00
 0335      Otto Baum Company, Inc.                                      2,454.6800        9,818.72        9,818.72
 5310      Sangamo Construction Company                                 5,251.5100       21,006.04       21,006.04

    63000001  SPBGR TY A  6FT POSTS                    1,000.000     FOOT
 1908      Freesen, a div of UCM, Inc.                                     20.5200       20,520.00       20,520.00
 2323      Halverson Construction Co., Inc.                                19.0000       19,000.00       19,000.00
 0335      Otto Baum Company, Inc.                                         24.6900       24,690.00       24,690.00
 5310      Sangamo Construction Company                                    20.1200       20,120.00       20,120.00

    63100085  TRAF BAR TERM T6                             4.000     EACH
 1908      Freesen, a div of UCM, Inc.                                  2,700.0000       10,800.00       10,800.00
 2323      Halverson Construction Co., Inc.                             2,500.0000       10,000.00       10,000.00
 0335      Otto Baum Company, Inc.                                      3,788.1200       15,152.48       15,152.48
 5310      Sangamo Construction Company                                 2,647.6700       10,590.68       10,590.68

    63100167  TR BAR TRM T1 SPL TAN                        4.000     EACH
 1908      Freesen, a div of UCM, Inc.                                  2,700.0000       10,800.00       10,800.00
 2323      Halverson Construction Co., Inc.                             2,500.0000       10,000.00       10,000.00
 0335      Otto Baum Company, Inc.                                      3,229.4800       12,917.92       12,917.92
 5310      Sangamo Construction Company                                 2,647.6700       10,590.68       10,590.68

    63200310  GUARDRAIL REMOV                          1,357.000     FOOT
 1908      Freesen, a div of UCM, Inc.                                      7.5600       10,258.92       10,258.92
 2323      Halverson Construction Co., Inc.                                 7.0000        9,499.00        9,499.00
 0335      Otto Baum Company, Inc.                                          7.6100       10,326.77       10,326.77
 5310      Sangamo Construction Company                                     7.4100       10,055.37       10,055.37

    64200116  SHOULDER RUM STRIP 16                    2,034.000     FOOT
 1908      Freesen, a div of UCM, Inc.                                      1.8700        3,803.58        3,803.58
 2323      Halverson Construction Co., Inc.                                 4.5000        9,153.00        9,153.00
 0335      Otto Baum Company, Inc.                                          1.8400        3,742.56        3,742.56
 5310      Sangamo Construction Company                                     4.2100        8,563.14        8,563.14

    67000400  ENGR FIELD OFFICE A                          6.000   CAL MO
 1908      Freesen, a div of UCM, Inc.                                  3,038.5400       18,231.24       18,231.24
 2323      Halverson Construction Co., Inc.                             2,604.2700       15,625.62       15,625.62
 0335      Otto Baum Company, Inc.                                      2,239.1200       13,434.72       13,434.72
 5310      Sangamo Construction Company                                 1,849.2200       11,095.32       11,095.32

    67100100  MOBILIZATION                                 1.000    L SUM
 1908      Freesen, a div of UCM, Inc.                                114,343.9500      114,343.95      114,343.95
 2323      Halverson Construction Co., Inc.                            86,019.0800       86,019.08       86,019.08
 0335      Otto Baum Company, Inc.                                     75,034.6900       75,034.69       75,034.69
 5310      Sangamo Construction Company                                79,528.9900       79,528.99       79,528.99

    70100207  TRAF CONT-PROT 701402                        1.000     EACH
 1908      Freesen, a div of UCM, Inc.                                 84,715.1300       84,715.13       84,715.13
 2323      Halverson Construction Co., Inc.                            39,650.0000       39,650.00       39,650.00
 0335      Otto Baum Company, Inc.                                    101,689.0000      101,689.00      101,689.00
 5310      Sangamo Construction Company                                92,702.3800       92,702.38       92,702.38

    70100700  TRAF CONT-PROT 701406                        1.000    L SUM
 1908      Freesen, a div of UCM, Inc.                                    121.5400          121.54          121.54
 2323      Halverson Construction Co., Inc.                            13,229.9600       13,229.96       13,229.96
 0335      Otto Baum Company, Inc.                                      1,596.1200        1,596.12        1,596.12
 5310      Sangamo Construction Company                                24,876.9400       24,876.94       24,876.94

    70100800  TRAF CONT-PROT 701401                        1.000    L SUM
 1908      Freesen, a div of UCM, Inc.                                  9,234.0000        9,234.00        9,234.00
 2323      Halverson Construction Co., Inc.                             1,500.0000        1,500.00        1,500.00
 0335      Otto Baum Company, Inc.                                      1,596.1200        1,596.12        1,596.12
 5310      Sangamo Construction Company                                21,886.9500       21,886.95       21,886.95

    70107025  CHANGEABLE MESSAGE SN                       28.000   CAL DA
 1908      Freesen, a div of UCM, Inc.                                    139.5900        3,908.52        3,908.52
 2323      Halverson Construction Co., Inc.                               150.0000        4,200.00        4,200.00
 0335      Otto Baum Company, Inc.                                        159.6100        4,469.08        4,469.08
 5310      Sangamo Construction Company                                   148.0200        4,144.56        4,144.56

    70300100  SHORT TERM PAVT MKING                      395.000     FOOT
 1908      Freesen, a div of UCM, Inc.                                      1.6200          639.90          639.90
 2323      Halverson Construction Co., Inc.                                 2.0000          790.00          790.00
 0335      Otto Baum Company, Inc.                                          5.3200        2,101.40        2,101.40
 5310      Sangamo Construction Company                                     1.4500          572.75          572.75

    70300150  SHRT TRM PAVT MK REM                       132.000    SQ FT
 1908      Freesen, a div of UCM, Inc.                                      3.7500          495.00          495.00
 2323      Halverson Construction Co., Inc.                                 1.0000          132.00          132.00
 0335      Otto Baum Company, Inc.                                          5.3200          702.24          702.24
 5310      Sangamo Construction Company                                     2.6800          353.76          353.76

    70400100  TEMP CONC BARRIER                          750.000     FOOT
 1908      Freesen, a div of UCM, Inc.                                     25.6500       19,237.50       19,237.50
 2323      Halverson Construction Co., Inc.                                32.0000       24,000.00       24,000.00
 0335      Otto Baum Company, Inc.                                         39.3000       29,475.00       29,475.00
 5310      Sangamo Construction Company                                    27.4500       20,587.50       20,587.50

    70400200  REL TEMP CONC BARRIER                      750.000     FOOT
 1908      Freesen, a div of UCM, Inc.                                      4.2600        3,195.00        3,195.00
 2323      Halverson Construction Co., Inc.                                 6.0000        4,500.00        4,500.00
 0335      Otto Baum Company, Inc.                                          8.5100        6,382.50        6,382.50
 5310      Sangamo Construction Company                                     7.2400        5,430.00        5,430.00

    70600260  IMP ATTN TEMP FRN TL3                        2.000     EACH
 1908      Freesen, a div of UCM, Inc.                                  7,274.7400       14,549.48       14,549.48
 2323      Halverson Construction Co., Inc.                             8,800.0000       17,600.00       17,600.00
 0335      Otto Baum Company, Inc.                                      9,151.0700       18,302.14       18,302.14
 5310      Sangamo Construction Company                                 6,382.4300       12,764.86       12,764.86

    70600332  IMP ATTN REL FRN TL3                         2.000     EACH
 1908      Freesen, a div of UCM, Inc.                                  2,430.7500        4,861.50        4,861.50
 2323      Halverson Construction Co., Inc.                             2,500.0000        5,000.00        5,000.00
 0335      Otto Baum Company, Inc.                                      1,968.5500        3,937.10        3,937.10
 5310      Sangamo Construction Company                                 2,019.9600        4,039.92        4,039.92

    72501000  TERMINAL MARKER - DA                         4.000     EACH
 1908      Freesen, a div of UCM, Inc.                                     37.8000          151.20          151.20
 2323      Halverson Construction Co., Inc.                                35.0000          140.00          140.00
 0335      Otto Baum Company, Inc.                                         42.5600          170.24          170.24
 5310      Sangamo Construction Company                                    37.0700          148.28          148.28

    78009005  MOD URETH PM LINE  5                     3,095.000     FOOT
 1908      Freesen, a div of UCM, Inc.                                      3.0200        9,346.90        9,346.90
 2323      Halverson Construction Co., Inc.                                 3.6900       11,420.55       11,420.55
 0335      Otto Baum Company, Inc.                                          2.9800        9,223.10        9,223.10
 5310      Sangamo Construction Company                                     3.7100       11,482.45       11,482.45

    78100100  RAISED REFL PAVT MKR                        12.000     EACH
 1908      Freesen, a div of UCM, Inc.                                    383.8900        4,606.68        4,606.68
 2323      Halverson Construction Co., Inc.                               355.4500        4,265.40        4,265.40
 0335      Otto Baum Company, Inc.                                        378.2300        4,538.76        4,538.76
 5310      Sangamo Construction Company                                    43.4200          521.04          521.04

    78200005  GRDRAIL REF TYPE A                          20.000     EACH
 1908      Freesen, a div of UCM, Inc.                                     10.8000          216.00          216.00
 2323      Halverson Construction Co., Inc.                                10.0000          200.00          200.00
 0335      Otto Baum Company, Inc.                                          9.5800          191.60          191.60
 5310      Sangamo Construction Company                                    10.5900          211.80          211.80

    78300200  RAISED REF PVT MK REM                       12.000     EACH
 1908      Freesen, a div of UCM, Inc.                                     67.1100          805.32          805.32
 2323      Halverson Construction Co., Inc.                               101.9800        1,223.76        1,223.76
 0335      Otto Baum Company, Inc.                                         54.1400          649.68          649.68
 5310      Sangamo Construction Company                                    10.3800          124.56          124.56