                                               ILLINOIS DEPARTMENT OF TRANSPORTATION                                      PAGE:    1
 09/04/24  08:37:51                   U N I T  P R I C E   T A B U L A T I O N   O F   B I D S
 LETTING DATE: 04/26/2024  LETTING TYPE: SCHEDULED                                 CONTRACT NUMBER: 61J14  LETTING ITEM NUMBER: 207
 RESPONSIBLE DISTRICT: 01                                                                                  BIDS LOCKED: Y
 SECTION: 14-00124-04-BR                           COUNTY: DUPAGE                                          ESTIMATE:
 STATE JOB NUMBER:   C-91-175-15                   MUNICIPALITY:
 PROJECT NUMBER: 26XM-359 /   /
                                                      --------------------------
                                                      SUMMARY OF CONTRACTOR BIDS
                                                      --------------------------

                                                             "AS READ"          SUMMATION    SUMMATION OF                       NBR
 BIDR                     CONTR        COMB  ITEM  CONTR      BIDDER            OF BIDDER     CALCULATED   LOW   BIDR CALC      BLANK
 NBR   BIDDER NAME        GROUP  COMB  GRP   NBR   GROUP      TOTAL PRICE       EXTENSIONS    EXTENSIONS   BID   EXTENSION DIFF BIDS


 1552  Dunnet Bay Construction Company
                          NO ALT                            8,419,194.30 *   8,419,194.30   8,419,194.30    *

 2520  Herlihy Mid-Continent Company
                          NO ALT                            9,040,309.00     9,040,309.00   9,040,309.00

 3505  Lorig Construction Company
                          NO ALT                            9,261,752.51     9,261,752.51   9,261,752.51

 **** TOTAL GROUP NO ALT PAY ITEMS FOR THIS CONTRACT =     226
                                                       ----------------------
                                                       DETAIL CONTRACTOR BIDS
                                                       ----------------------

    ITEM NBR  ITEM DESCRIPTION                                    UNIT OF     UNIT        BIDDER         CALCULATED  BIDR CALC
 BIDR NBR  BIDDER NAME                                  QUANTITY  MEASURE     PRICE       EXTENSION      EXTENSION   EXTENSION DIFF


    A2002920  T-CELTIS OCCID  2-1/2                       15.000     EACH
 1552      Dunnet Bay Construction Company                                470.0000        7,050.00        7,050.00
 2520      Herlihy Mid-Continent Company                                  510.0000        7,650.00        7,650.00
 3505      Lorig Construction Company                                     510.0000        7,650.00        7,650.00

    A2005820  T-PLATANUS OCC  2-1/2                       15.000     EACH
 1552      Dunnet Bay Construction Company                                565.0000        8,475.00        8,475.00
 2520      Herlihy Mid-Continent Company                                  570.0000        8,550.00        8,550.00
 3505      Lorig Construction Company                                     570.0000        8,550.00        8,550.00

    A2006520  T-QUERCUS BICOL 2-1/2                       15.000     EACH
 1552      Dunnet Bay Construction Company                                445.0000        6,675.00        6,675.00
 2520      Herlihy Mid-Continent Company                                  485.0000        7,275.00        7,275.00
 3505      Lorig Construction Company                                     485.0000        7,275.00        7,275.00

    A2007820  T-TILIA AMER    2-1/2                       15.000     EACH
 1552      Dunnet Bay Construction Company                                470.0000        7,050.00        7,050.00
 2520      Herlihy Mid-Continent Company                                  510.0000        7,650.00        7,650.00
 3505      Lorig Construction Company                                     510.0000        7,650.00        7,650.00

    B2001122  T-CERCIS CAN TF 2-1/2                       16.000     EACH
 1552      Dunnet Bay Construction Company                                500.0000        8,000.00        8,000.00
 2520      Herlihy Mid-Continent Company                                  475.0000        7,600.00        7,600.00
 3505      Lorig Construction Company                                     475.0000        7,600.00        7,600.00

    C2C01536  S-CORNUS RACEMOSA 3'C                       45.000     EACH
 1552      Dunnet Bay Construction Company                                 60.0000        2,700.00        2,700.00
 2520      Herlihy Mid-Continent Company                                   90.0000        4,050.00        4,050.00
 3505      Lorig Construction Company                                      90.0000        4,050.00        4,050.00

    C2C043G5  S-LIND BENZOIN     5G                       47.000     EACH
 1552      Dunnet Bay Construction Company                                 70.0000        3,290.00        3,290.00
 2520      Herlihy Mid-Continent Company                                   80.0000        3,760.00        3,760.00
 3505      Lorig Construction Company                                      80.0000        3,760.00        3,760.00

    C2C09636  S-SAMBUCUS CANAD  3'C                       45.000     EACH
 1552      Dunnet Bay Construction Company                                 60.0000        2,700.00        2,700.00
 2520      Herlihy Mid-Continent Company                                  105.0000        4,725.00        4,725.00
 3505      Lorig Construction Company                                     105.0000        4,725.00        4,725.00

    C2C100G5  S-VIBURN LENTAG CG 5G                       46.000     EACH
 1552      Dunnet Bay Construction Company                                 70.0000        3,220.00        3,220.00
 2520      Herlihy Mid-Continent Company                                   80.0000        3,680.00        3,680.00
 3505      Lorig Construction Company                                      80.0000        3,680.00        3,680.00

    K0029634  WEED CONTR PRE-EM GRN                       14.000    POUND
 1552      Dunnet Bay Construction Company                                 20.0000          280.00          280.00
 2520      Herlihy Mid-Continent Company                                   10.0000          140.00          140.00
 3505      Lorig Construction Company                                      10.0000          140.00          140.00

    XX003338  TEST HOLE                                    5.000     EACH
 1552      Dunnet Bay Construction Company                              1,685.0000        8,425.00        8,425.00
 2520      Herlihy Mid-Continent Company                                  690.0000        3,450.00        3,450.00
 3505      Lorig Construction Company                                   2,500.0000       12,500.00       12,500.00

    XX006520  AGGREGATE DRIVEWAY 6"                      334.000    SQ YD
 1552      Dunnet Bay Construction Company                                 18.5000        6,179.00        6,179.00
 2520      Herlihy Mid-Continent Company                                   11.3000        3,774.20        3,774.20
 3505      Lorig Construction Company                                      20.0000        6,680.00        6,680.00

    XX007092  REC REF PVT MARKR REM                       72.000     EACH
 1552      Dunnet Bay Construction Company                                 15.0000        1,080.00        1,080.00
 2520      Herlihy Mid-Continent Company                                   55.0000        3,960.00        3,960.00
 3505      Lorig Construction Company                                      25.0000        1,800.00        1,800.00

    XX008956  STL CAS P BOR/JKD 20                       112.000     FOOT
 1552      Dunnet Bay Construction Company                                845.0000       94,640.00       94,640.00
 2520      Herlihy Mid-Continent Company                                  977.0000      109,424.00      109,424.00
 3505      Lorig Construction Company                                     545.0000       61,040.00       61,040.00

    XX009122  S-CORNUS STOLO CG5 SP                       45.000     EACH
 1552      Dunnet Bay Construction Company                                 75.0000        3,375.00        3,375.00
 2520      Herlihy Mid-Continent Company                                   95.0000        4,275.00        4,275.00
 3505      Lorig Construction Company                                     100.0000        4,500.00        4,500.00

    X0300249  REMOV EX GATE                                1.000     EACH
 1552      Dunnet Bay Construction Company                                300.0000          300.00          300.00
 2520      Herlihy Mid-Continent Company                                  300.0000          300.00          300.00
 3505      Lorig Construction Company                                     300.0000          300.00          300.00

    X0323013  TUBULAR STEEL GATE                           1.000     EACH
 1552      Dunnet Bay Construction Company                              3,480.0000        3,480.00        3,480.00
 2520      Herlihy Mid-Continent Company                                3,480.0000        3,480.00        3,480.00
 3505      Lorig Construction Company                                   3,500.0000        3,500.00        3,500.00

    X0326671  CONC SURF COLOR TRMNT                    1,746.000    SQ FT
 1552      Dunnet Bay Construction Company                                 15.0000       26,190.00       26,190.00
 2520      Herlihy Mid-Continent Company                                   13.8300       24,147.18       24,147.18
 3505      Lorig Construction Company                                      15.0000       26,190.00       26,190.00

    X0327999  ANTI-GRAFFITI COATING                    2,967.000    SQ FT
 1552      Dunnet Bay Construction Company                                  3.0000        8,901.00        8,901.00
 2520      Herlihy Mid-Continent Company                                    5.3300       15,814.11       15,814.11
 3505      Lorig Construction Company                                      15.0000       44,505.00       44,505.00

    X2511630  EROS CONT BLANKET SPL                   13,944.000    SQ YD
 1552      Dunnet Bay Construction Company                                  1.4000       19,521.60       19,521.60
 2520      Herlihy Mid-Continent Company                                    1.2000       16,732.80       16,732.80
 3505      Lorig Construction Company                                       1.2000       16,732.80       16,732.80

    X4400501  CC&G RMVL REPL < = 10                       30.000     FOOT
 1552      Dunnet Bay Construction Company                                105.0000        3,150.00        3,150.00
 2520      Herlihy Mid-Continent Company                                  105.0000        3,150.00        3,150.00
 3505      Lorig Construction Company                                     150.0000        4,500.00        4,500.00

    X4403800  MEDIAN SURF REMOVAL                      5,677.000    SQ FT
 1552      Dunnet Bay Construction Company                                  5.5000       31,223.50       31,223.50
 2520      Herlihy Mid-Continent Company                                    0.6500        3,690.05        3,690.05
 3505      Lorig Construction Company                                       2.0000       11,354.00       11,354.00

    X4404260  PAVED SHLD REMOVAL SP                      214.000    SQ YD
 1552      Dunnet Bay Construction Company                                 40.0000        8,560.00        8,560.00
 2520      Herlihy Mid-Continent Company                                   24.6500        5,275.10        5,275.10
 3505      Lorig Construction Company                                      35.0000        7,490.00        7,490.00

    X5021512  COFFERDAM TYP 1 IS WW                        4.000     EACH
 1552      Dunnet Bay Construction Company                             30,000.0000      120,000.00      120,000.00
 2520      Herlihy Mid-Continent Company                              170,000.0000      680,000.00      680,000.00
 3505      Lorig Construction Company                                     500.0000        2,000.00        2,000.00

    X5030282  FORM LINER TEX SUR SP                    1,746.000    SQ FT
 1552      Dunnet Bay Construction Company                                 20.5000       35,793.00       35,793.00
 2520      Herlihy Mid-Continent Company                                   19.0000       33,174.00       33,174.00
 3505      Lorig Construction Company                                      32.0000       55,872.00       55,872.00

    X5120013  PILE REMOVAL                                 2.000     EACH
 1552      Dunnet Bay Construction Company                              1,920.0000        3,840.00        3,840.00
 2520      Herlihy Mid-Continent Company                               12,000.0000       24,000.00       24,000.00
 3505      Lorig Construction Company                                   2,000.0000        4,000.00        4,000.00

    X5427602  REMOV EX FLAR END SEC                        3.000     EACH
 1552      Dunnet Bay Construction Company                                300.0000          900.00          900.00
 2520      Herlihy Mid-Continent Company                                  618.0000        1,854.00        1,854.00
 3505      Lorig Construction Company                                   1,100.0000        3,300.00        3,300.00

    X5610651  ABAN EX WM FILL CLSM                       136.000     FOOT
 1552      Dunnet Bay Construction Company                                250.0000       34,000.00       34,000.00
 2520      Herlihy Mid-Continent Company                                  121.0000       16,456.00       16,456.00
 3505      Lorig Construction Company                                      50.0000        6,800.00        6,800.00

    X5630710  CONN TO EX W MAIN 10                         2.000     EACH
 1552      Dunnet Bay Construction Company                              5,400.0000       10,800.00       10,800.00
 2520      Herlihy Mid-Continent Company                                4,377.0000        8,754.00        8,754.00
 3505      Lorig Construction Company                                   3,600.0000        7,200.00        7,200.00

    X6026050  SANITARY MANHOLE ADJ                         2.000     EACH
 1552      Dunnet Bay Construction Company                              1,260.0000        2,520.00        2,520.00
 2520      Herlihy Mid-Continent Company                                1,486.0000        2,972.00        2,972.00
 3505      Lorig Construction Company                                   1,700.0000        3,400.00        3,400.00

    X6026051  SAN MAN RECONST                              2.000     EACH
 1552      Dunnet Bay Construction Company                              2,233.0000        4,466.00        4,466.00
 2520      Herlihy Mid-Continent Company                                2,679.0000        5,358.00        5,358.00
 3505      Lorig Construction Company                                   3,500.0000        7,000.00        7,000.00

    X6060500  CORRUGATED MED REM                         884.000    SQ FT
 1552      Dunnet Bay Construction Company                                 10.3000        9,105.20        9,105.20
 2520      Herlihy Mid-Continent Company                                    2.4500        2,165.80        2,165.80
 3505      Lorig Construction Company                                       5.5000        4,862.00        4,862.00

    X6062400  CONC GUTTER SPL                            153.000     FOOT
 1552      Dunnet Bay Construction Company                                 47.0000        7,191.00        7,191.00
 2520      Herlihy Mid-Continent Company                                   47.0000        7,191.00        7,191.00
 3505      Lorig Construction Company                                      75.0000       11,475.00       11,475.00

    X6370050  CONC BAR WALL SPL                           88.000     FOOT
 1552      Dunnet Bay Construction Company                                325.0000       28,600.00       28,600.00
 2520      Herlihy Mid-Continent Company                                  400.0000       35,200.00       35,200.00
 3505      Lorig Construction Company                                     350.0000       30,800.00       30,800.00

    X6640298  CH LK FENCE SPL                            162.000     FOOT
 1552      Dunnet Bay Construction Company                                 42.8000        6,933.60        6,933.60
 2520      Herlihy Mid-Continent Company                                   42.8000        6,933.60        6,933.60
 3505      Lorig Construction Company                                      45.0000        7,290.00        7,290.00

    X6700407  ENGRS FLD OFC TY A D1                       18.000   CAL MO
 1552      Dunnet Bay Construction Company                              4,985.0000       89,730.00       89,730.00
 2520      Herlihy Mid-Continent Company                                4,808.0000       86,544.00       86,544.00
 3505      Lorig Construction Company                                   4,000.0000       72,000.00       72,000.00

    X7010216  TRAF CONT & PROT SPL                         1.000    L SUM
 1552      Dunnet Bay Construction Company                            165,000.0000      165,000.00      165,000.00
 2520      Herlihy Mid-Continent Company                               59,000.0000       59,000.00       59,000.00
 3505      Lorig Construction Company                                 600,000.0000      600,000.00      600,000.00

    X7810300  RCSD REFL PAVT MARKER                      186.000     EACH
 1552      Dunnet Bay Construction Company                                 35.0000        6,510.00        6,510.00
 2520      Herlihy Mid-Continent Company                                   35.0000        6,510.00        6,510.00
 3505      Lorig Construction Company                                      35.0000        6,510.00        6,510.00

    X8140115  HANDHOLE TO BE ADJUST                        5.000     EACH
 1552      Dunnet Bay Construction Company                              1,730.0000        8,650.00        8,650.00
 2520      Herlihy Mid-Continent Company                                1,989.4000        9,947.00        9,947.00
 3505      Lorig Construction Company                                   1,750.0000        8,750.00        8,750.00

    X8440118  RELOC LT UNIT & POLE                         1.000     EACH
 1552      Dunnet Bay Construction Company                              5,050.0000        5,050.00        5,050.00
 2520      Herlihy Mid-Continent Company                                1,674.0000        1,674.00        1,674.00
 3505      Lorig Construction Company                                   5,100.0000        5,100.00        5,100.00

    Z0005216  HMA STAB 6 AT SPBGR                         96.000    SQ YD
 1552      Dunnet Bay Construction Company                                 86.0000        8,256.00        8,256.00
 2520      Herlihy Mid-Continent Company                                   57.2500        5,496.00        5,496.00
 3505      Lorig Construction Company                                      57.2200        5,493.12        5,493.12

    Z0013797  STAB CONSTR ENTRANCE                       249.000    SQ YD
 1552      Dunnet Bay Construction Company                                 42.0000       10,458.00       10,458.00
 2520      Herlihy Mid-Continent Company                                   35.7500        8,901.75        8,901.75
 3505      Lorig Construction Company                                       3.0000          747.00          747.00

    Z0013798  CONSTRUCTION LAYOUT                          1.000    L SUM
 1552      Dunnet Bay Construction Company                              2,500.0000        2,500.00        2,500.00
 2520      Herlihy Mid-Continent Company                              125,000.0000      125,000.00      125,000.00
 3505      Lorig Construction Company                                 350,000.0000      350,000.00      350,000.00

    Z0018002  DRAINAGE SCUPPR DS-11                        4.000     EACH
 1552      Dunnet Bay Construction Company                              1,475.0000        5,900.00        5,900.00
 2520      Herlihy Mid-Continent Company                                1,700.0000        6,800.00        6,800.00
 3505      Lorig Construction Company                                   2,400.0000        9,600.00        9,600.00

    Z0018400  DRAINAGE STR ADJ                             2.000     EACH
 1552      Dunnet Bay Construction Company                                555.0000        1,110.00        1,110.00
 2520      Herlihy Mid-Continent Company                                  613.0000        1,226.00        1,226.00
 3505      Lorig Construction Company                                   1,600.0000        3,200.00        3,200.00

    Z0018600  DRAINAGE STR RECONST                         2.000     EACH
 1552      Dunnet Bay Construction Company                              1,526.0000        3,052.00        3,052.00
 2520      Herlihy Mid-Continent Company                                2,098.0000        4,196.00        4,196.00
 3505      Lorig Construction Company                                   2,300.0000        4,600.00        4,600.00

    Z0018700  DRAINAGE STR REMOVED                        13.000     EACH
 1552      Dunnet Bay Construction Company                                461.0000        5,993.00        5,993.00
 2520      Herlihy Mid-Continent Company                                1,041.0000       13,533.00       13,533.00
 3505      Lorig Construction Company                                   1,300.0000       16,900.00       16,900.00

    Z0022800  FENCE REMOVAL                              210.000     FOOT
 1552      Dunnet Bay Construction Company                                  8.3000        1,743.00        1,743.00
 2520      Herlihy Mid-Continent Company                                    8.3000        1,743.00        1,743.00
 3505      Lorig Construction Company                                       8.5000        1,785.00        1,785.00

    Z0023201  SED CONT SILT CURTAIN                        4.000     EACH
 1552      Dunnet Bay Construction Company                              3,400.0000       13,600.00       13,600.00
 2520      Herlihy Mid-Continent Company                                1,200.0000        4,800.00        4,800.00
 3505      Lorig Construction Company                                   7,000.0000       28,000.00       28,000.00

    Z0030850  TEMP INFO SIGNING                           52.000    SQ FT
 1552      Dunnet Bay Construction Company                                 15.0000          780.00          780.00
 2520      Herlihy Mid-Continent Company                                   15.0000          780.00          780.00
 3505      Lorig Construction Company                                      20.0000        1,040.00        1,040.00

    Z0033044  RE-OPTIMIZE TR SIG SYS 1                     1.000     EACH
 1552      Dunnet Bay Construction Company                              1,100.0000        1,100.00        1,100.00
 2520      Herlihy Mid-Continent Company                                1,200.0000        1,200.00        1,200.00
 3505      Lorig Construction Company                                   1,100.0000        1,100.00        1,100.00

    Z0053700  RESET SURVEY MONUMENT                        1.000     EACH
 1552      Dunnet Bay Construction Company                              3,000.0000        3,000.00        3,000.00
 2520      Herlihy Mid-Continent Company                                2,800.0000        2,800.00        2,800.00
 3505      Lorig Construction Company                                   2,100.0000        2,100.00        2,100.00

    Z0062456  TEMP PAVEMENT                            1,281.000    SQ YD
 1552      Dunnet Bay Construction Company                                 87.2500      111,767.25      111,767.25
 2520      Herlihy Mid-Continent Company                                   56.0000       71,736.00       71,736.00
 3505      Lorig Construction Company                                      65.0000       83,265.00       83,265.00

    Z0073510  TEMP TR SIGNAL TIMING                        1.000     EACH
 1552      Dunnet Bay Construction Company                              2,200.0000        2,200.00        2,200.00
 2520      Herlihy Mid-Continent Company                                1,000.0000        1,000.00        1,000.00
 3505      Lorig Construction Company                                   2,200.0000        2,200.00        2,200.00

    Z0076600  TRAINEES                                 2,000.000     HOUR
 1552      Dunnet Bay Construction Company                                  0.8000        1,600.00        1,600.00
 2520      Herlihy Mid-Continent Company                                    0.8000        1,600.00        1,600.00
 3505      Lorig Construction Company                                       0.8000        1,600.00        1,600.00

    Z0076604  TRAINEES TPG                             2,000.000     HOUR
 1552      Dunnet Bay Construction Company                                 15.0000       30,000.00       30,000.00
 2520      Herlihy Mid-Continent Company                                   15.0000       30,000.00       30,000.00
 3505      Lorig Construction Company                                      15.0000       30,000.00       30,000.00

    20101000  TEMPORARY FENCE                          1,000.000     FOOT
 1552      Dunnet Bay Construction Company                                  3.1000        3,100.00        3,100.00
 2520      Herlihy Mid-Continent Company                                    3.0000        3,000.00        3,000.00
 3505      Lorig Construction Company                                       3.0000        3,000.00        3,000.00

    20101100  TREE TRUNK PROTECTION                        2.000     EACH
 1552      Dunnet Bay Construction Company                                 95.0000          190.00          190.00
 2520      Herlihy Mid-Continent Company                                  300.0000          600.00          600.00
 3505      Lorig Construction Company                                     125.0000          250.00          250.00

    20101300  TREE PRUN 1-10                              50.000     EACH
 1552      Dunnet Bay Construction Company                                 45.0000        2,250.00        2,250.00
 2520      Herlihy Mid-Continent Company                                   45.0000        2,250.00        2,250.00
 3505      Lorig Construction Company                                     100.0000        5,000.00        5,000.00

    20200100  EARTH EXCAVATION                        10,536.000    CU YD
 1552      Dunnet Bay Construction Company                                 29.0000      305,544.00      305,544.00
 2520      Herlihy Mid-Continent Company                                   15.8000      166,468.80      166,468.80
 3505      Lorig Construction Company                                      31.0000      326,616.00      326,616.00

    20201200  REM & DISP UNS MATL                        393.000    CU YD
 1552      Dunnet Bay Construction Company                                 32.0000       12,576.00       12,576.00
 2520      Herlihy Mid-Continent Company                                   62.8500       24,700.05       24,700.05
 3505      Lorig Construction Company                                      80.0000       31,440.00       31,440.00

    20400800  FURNISHED EXCAVATION                     5,265.000    CU YD
 1552      Dunnet Bay Construction Company                                 19.0000      100,035.00      100,035.00
 2520      Herlihy Mid-Continent Company                                   12.7000       66,865.50       66,865.50
 3505      Lorig Construction Company                                       1.0000        5,265.00        5,265.00

    20800150  TRENCH BACKFILL                          1,463.000    CU YD
 1552      Dunnet Bay Construction Company                                 42.0000       61,446.00       61,446.00
 2520      Herlihy Mid-Continent Company                                   74.0000      108,262.00      108,262.00
 3505      Lorig Construction Company                                      33.0000       48,279.00       48,279.00

    20900110  POROUS GRAN BACKFILL                       356.000    CU YD
 1552      Dunnet Bay Construction Company                                165.0000       58,740.00       58,740.00
 2520      Herlihy Mid-Continent Company                                   64.9000       23,104.40       23,104.40
 3505      Lorig Construction Company                                     115.0000       40,940.00       40,940.00

    21001000  GEOTECH FAB F/GR STAB                      982.000    SQ YD
 1552      Dunnet Bay Construction Company                                  3.0000        2,946.00        2,946.00
 2520      Herlihy Mid-Continent Company                                    3.5000        3,437.00        3,437.00
 3505      Lorig Construction Company                                       2.0000        1,964.00        1,964.00

    21101505  TOPSOIL EXC & PLAC                         500.000    CU YD
 1552      Dunnet Bay Construction Company                                 31.0000       15,500.00       15,500.00
 2520      Herlihy Mid-Continent Company                                   20.0000       10,000.00       10,000.00
 3505      Lorig Construction Company                                      57.0000       28,500.00       28,500.00

    21101625  TOPSOIL F & P  6                        14,461.000    SQ YD
 1552      Dunnet Bay Construction Company                                  6.5000       93,996.50       93,996.50
 2520      Herlihy Mid-Continent Company                                    5.7500       83,150.75       83,150.75
 3505      Lorig Construction Company                                       6.0000       86,766.00       86,766.00

    25000200  SEEDING CL  2                                 .250     ACRE
 1552      Dunnet Bay Construction Company                              3,500.0000          875.00          875.00
 2520      Herlihy Mid-Continent Company                                3,000.0000          750.00          750.00
 3505      Lorig Construction Company                                   3,000.0000          750.00          750.00

    25000210  SEEDING CL  2A                                .250     ACRE
 1552      Dunnet Bay Construction Company                              3,500.0000          875.00          875.00
 2520      Herlihy Mid-Continent Company                                3,200.0000          800.00          800.00
 3505      Lorig Construction Company                                   3,200.0000          800.00          800.00

    25000300  SEEDING CL  3                                 .250     ACRE
 1552      Dunnet Bay Construction Company                              4,000.0000        1,000.00        1,000.00
 2520      Herlihy Mid-Continent Company                                3,200.0000          800.00          800.00
 3505      Lorig Construction Company                                   3,200.0000          800.00          800.00

    25000310  SEEDING CL  4                                1.000     ACRE
 1552      Dunnet Bay Construction Company                              2,200.0000        2,200.00        2,200.00
 2520      Herlihy Mid-Continent Company                                2,500.0000        2,500.00        2,500.00
 3505      Lorig Construction Company                                   2,500.0000        2,500.00        2,500.00

    25000314  SEEDING CL  4B                               1.500     ACRE
 1552      Dunnet Bay Construction Company                              4,000.0000        6,000.00        6,000.00
 2520      Herlihy Mid-Continent Company                                5,800.0000        8,700.00        8,700.00
 3505      Lorig Construction Company                                   5,800.0000        8,700.00        8,700.00

    25000400  NITROGEN FERT NUTR                         266.000    POUND
 1552      Dunnet Bay Construction Company                                  2.0000          532.00          532.00
 2520      Herlihy Mid-Continent Company                                    5.0000        1,330.00        1,330.00
 3505      Lorig Construction Company                                       5.0000        1,330.00        1,330.00

    25000600  POTASSIUM FERT NUTR                        266.000    POUND
 1552      Dunnet Bay Construction Company                                  2.0000          532.00          532.00
 2520      Herlihy Mid-Continent Company                                    5.0000        1,330.00        1,330.00
 3505      Lorig Construction Company                                       5.0000        1,330.00        1,330.00

    25100115  MULCH METHOD 2                               3.000     ACRE
 1552      Dunnet Bay Construction Company                              2,500.0000        7,500.00        7,500.00
 2520      Herlihy Mid-Continent Company                                1,900.0000        5,700.00        5,700.00
 3505      Lorig Construction Company                                   1,900.0000        5,700.00        5,700.00

    25200110  SODDING SALT TOLERANT                      567.000    SQ YD
 1552      Dunnet Bay Construction Company                                 12.0000        6,804.00        6,804.00
 2520      Herlihy Mid-Continent Company                                   10.0000        5,670.00        5,670.00
 3505      Lorig Construction Company                                      10.0000        5,670.00        5,670.00

    25200200  SUPPLE WATERING                             26.000     UNIT
 1552      Dunnet Bay Construction Company                                  1.0000           26.00           26.00
 2520      Herlihy Mid-Continent Company                                    1.0000           26.00           26.00
 3505      Lorig Construction Company                                       1.0000           26.00           26.00

    28000250  TEMP EROS CONTR SEED                       289.000    POUND
 1552      Dunnet Bay Construction Company                                  4.0000        1,156.00        1,156.00
 2520      Herlihy Mid-Continent Company                                    5.0000        1,445.00        1,445.00
 3505      Lorig Construction Company                                       5.0000        1,445.00        1,445.00

    28000305  TEMP DITCH CHECKS                          600.000     FOOT
 1552      Dunnet Bay Construction Company                                  8.0000        4,800.00        4,800.00
 2520      Herlihy Mid-Continent Company                                   10.0000        6,000.00        6,000.00
 3505      Lorig Construction Company                                      10.0000        6,000.00        6,000.00

    28000400  PERIMETER EROS BAR                       9,694.000     FOOT
 1552      Dunnet Bay Construction Company                                  2.8000       27,143.20       27,143.20
 2520      Herlihy Mid-Continent Company                                    2.2500       21,811.50       21,811.50
 3505      Lorig Construction Company                                       2.2500       21,811.50       21,811.50

    28000510  INLET FILTERS                               32.000     EACH
 1552      Dunnet Bay Construction Company                                185.0000        5,920.00        5,920.00
 2520      Herlihy Mid-Continent Company                                  150.0000        4,800.00        4,800.00
 3505      Lorig Construction Company                                     150.0000        4,800.00        4,800.00

    28100107  STONE RIPRAP CL A4                       1,354.000    SQ YD
 1552      Dunnet Bay Construction Company                                101.0000      136,754.00      136,754.00
 2520      Herlihy Mid-Continent Company                                  128.0000      173,312.00      173,312.00
 3505      Lorig Construction Company                                     141.0000      190,914.00      190,914.00

    28200200  FILTER FABRIC                            1,187.000    SQ YD
 1552      Dunnet Bay Construction Company                                  4.5000        5,341.50        5,341.50
 2520      Herlihy Mid-Continent Company                                    4.0000        4,748.00        4,748.00
 3505      Lorig Construction Company                                       3.0000        3,561.00        3,561.00

    30300001  AGG SUBGRADE IMPROVE                       539.000    CU YD
 1552      Dunnet Bay Construction Company                                 59.0000       31,801.00       31,801.00
 2520      Herlihy Mid-Continent Company                                   53.1500       28,647.85       28,647.85
 3505      Lorig Construction Company                                     100.0000       53,900.00       53,900.00

    30300116  AGG SUBGRADE IMPR  16                    7,880.000    SQ YD
 1552      Dunnet Bay Construction Company                                 43.1800      340,258.40      340,258.40
 2520      Herlihy Mid-Continent Company                                   22.1000      174,148.00      174,148.00
 3505      Lorig Construction Company                                      33.0000      260,040.00      260,040.00

    31101100  SUB GRAN MAT B                             192.000    CU YD
 1552      Dunnet Bay Construction Company                                 57.5000       11,040.00       11,040.00
 2520      Herlihy Mid-Continent Company                                   61.4000       11,788.80       11,788.80
 3505      Lorig Construction Company                                      86.0000       16,512.00       16,512.00

    31101180  SUB GRAN MAT B  2                        1,091.000    SQ YD
 1552      Dunnet Bay Construction Company                                 11.0000       12,001.00       12,001.00
 2520      Herlihy Mid-Continent Company                                    5.0500        5,509.55        5,509.55
 3505      Lorig Construction Company                                       9.0000        9,819.00        9,819.00

    31101400  SUB GRAN MAT B  6                          104.000    SQ YD
 1552      Dunnet Bay Construction Company                                 20.0000        2,080.00        2,080.00
 2520      Herlihy Mid-Continent Company                                   10.9000        1,133.60        1,133.60
 3505      Lorig Construction Company                                      16.0000        1,664.00        1,664.00

    35101800  AGG BASE CSE B  6                          726.000    SQ YD
 1552      Dunnet Bay Construction Company                                 14.5000       10,527.00       10,527.00
 2520      Herlihy Mid-Continent Company                                   10.8500        7,877.10        7,877.10
 3505      Lorig Construction Company                                      17.0000       12,342.00       12,342.00

    35102000  AGG BASE CSE B  8                          166.000    SQ YD
 1552      Dunnet Bay Construction Company                                 22.0000        3,652.00        3,652.00
 2520      Herlihy Mid-Continent Company                                   17.8500        2,963.10        2,963.10
 3505      Lorig Construction Company                                      32.0000        5,312.00        5,312.00

    35501290  HMA BASE CSE  3                            679.000    SQ YD
 1552      Dunnet Bay Construction Company                                 26.0000       17,654.00       17,654.00
 2520      Herlihy Mid-Continent Company                                   19.0000       12,901.00       12,901.00
 3505      Lorig Construction Company                                      35.0000       23,765.00       23,765.00

    35501308  HMA BASE CSE  6                            170.000    SQ YD
 1552      Dunnet Bay Construction Company                                 68.0000       11,560.00       11,560.00
 2520      Herlihy Mid-Continent Company                                   71.6500       12,180.50       12,180.50
 3505      Lorig Construction Company                                      75.0000       12,750.00       12,750.00

    40201000  AGGREGATE-TEMP ACCESS                      215.000      TON
 1552      Dunnet Bay Construction Company                                 12.2500        2,633.75        2,633.75
 2520      Herlihy Mid-Continent Company                                   37.4500        8,051.75        8,051.75
 3505      Lorig Construction Company                                      50.0000       10,750.00       10,750.00

    40600275  BIT MATLS PR CT                         18,407.000    POUND
 1552      Dunnet Bay Construction Company                                  0.0100          184.07          184.07
 2520      Herlihy Mid-Continent Company                                    0.0100          184.07          184.07
 3505      Lorig Construction Company                                       0.0100          184.07          184.07

    40600290  BIT MATLS TACK CT                        4,404.000    POUND
 1552      Dunnet Bay Construction Company                                  0.0100           44.04           44.04
 2520      Herlihy Mid-Continent Company                                    0.0100           44.04           44.04
 3505      Lorig Construction Company                                       0.0100           44.04           44.04

    40600370  LONG JOINT SEALANT                       6,719.000     FOOT
 1552      Dunnet Bay Construction Company                                  4.0000       26,876.00       26,876.00
 2520      Herlihy Mid-Continent Company                                    3.4500       23,180.55       23,180.55
 3505      Lorig Construction Company                                       4.3000       28,891.70       28,891.70

    40600400  MIX CR JTS FLANGEWYS                         5.000      TON
 1552      Dunnet Bay Construction Company                                500.0000        2,500.00        2,500.00
 2520      Herlihy Mid-Continent Company                                  980.0000        4,900.00        4,900.00
 3505      Lorig Construction Company                                     370.1500        1,850.75        1,850.75

    40600982  HMA SURF REM BUTT JT                       458.000    SQ YD
 1552      Dunnet Bay Construction Company                                 20.0000        9,160.00        9,160.00
 2520      Herlihy Mid-Continent Company                                   24.5000       11,221.00       11,221.00
 3505      Lorig Construction Company                                      11.5700        5,299.06        5,299.06

    40603085  HMA BC IL-19.0  N70                      3,591.000      TON
 1552      Dunnet Bay Construction Company                                 88.0000      316,008.00      316,008.00
 2520      Herlihy Mid-Continent Company                                  115.0500      413,144.55      413,144.55
 3505      Lorig Construction Company                                      96.0000      344,736.00      344,736.00

    40603200  P HMA BC IL-4.75 N50                        75.000      TON
 1552      Dunnet Bay Construction Company                                130.0000        9,750.00        9,750.00
 2520      Herlihy Mid-Continent Company                                  191.1500       14,336.25       14,336.25
 3505      Lorig Construction Company                                     215.0000       16,125.00       16,125.00

    40604060  HMA SC IL-9.5 D N50                        199.000      TON
 1552      Dunnet Bay Construction Company                                150.0000       29,850.00       29,850.00
 2520      Herlihy Mid-Continent Company                                  169.8000       33,790.20       33,790.20
 3505      Lorig Construction Company                                     178.7800       35,577.22       35,577.22

    40604062  HMA SC IL-9.5 D N70                        955.000      TON
 1552      Dunnet Bay Construction Company                                101.0000       96,455.00       96,455.00
 2520      Herlihy Mid-Continent Company                                  122.3000      116,796.50      116,796.50
 3505      Lorig Construction Company                                     110.0000      105,050.00      105,050.00

    42000070  PVT CON HMA BR APP SL                      191.000    SQ YD
 1552      Dunnet Bay Construction Company                                125.0000       23,875.00       23,875.00
 2520      Herlihy Mid-Continent Company                                   98.3500       18,784.85       18,784.85
 3505      Lorig Construction Company                                     128.0000       24,448.00       24,448.00

    42001300  PROTECTIVE COAT                          2,202.000    SQ YD
 1552      Dunnet Bay Construction Company                                  0.7000        1,541.40        1,541.40
 2520      Herlihy Mid-Continent Company                                    0.7000        1,541.40        1,541.40
 3505      Lorig Construction Company                                       2.6500        5,835.30        5,835.30

    42300300  PCC DRIVEWAY PAVT  7                        24.000    SQ YD
 1552      Dunnet Bay Construction Company                                 84.1000        2,018.40        2,018.40
 2520      Herlihy Mid-Continent Company                                   84.1000        2,018.40        2,018.40
 3505      Lorig Construction Company                                     100.0000        2,400.00        2,400.00

    42400200  PC CONC SIDEWALK 5                       9,977.000    SQ FT
 1552      Dunnet Bay Construction Company                                  8.5000       84,804.50       84,804.50
 2520      Herlihy Mid-Continent Company                                    8.7500       87,298.75       87,298.75
 3505      Lorig Construction Company                                      11.2500      112,241.25      112,241.25

    42400410  PC CONC SIDEWALK 8                         142.000    SQ FT
 1552      Dunnet Bay Construction Company                                 11.3000        1,604.60        1,604.60
 2520      Herlihy Mid-Continent Company                                   11.3000        1,604.60        1,604.60
 3505      Lorig Construction Company                                      15.0000        2,130.00        2,130.00

    42400800  DETECTABLE WARNINGS                         53.000    SQ FT
 1552      Dunnet Bay Construction Company                                 40.0000        2,120.00        2,120.00
 2520      Herlihy Mid-Continent Company                                   40.0000        2,120.00        2,120.00
 3505      Lorig Construction Company                                      55.0000        2,915.00        2,915.00

    44000100  PAVEMENT REM                             6,752.000    SQ YD
 1552      Dunnet Bay Construction Company                                 20.0000      135,040.00      135,040.00
 2520      Herlihy Mid-Continent Company                                   10.2000       68,870.40       68,870.40
 3505      Lorig Construction Company                                      19.0000      128,288.00      128,288.00

    44000160  HMA SURF REM    2 3/4                    1,772.000    SQ YD
 1552      Dunnet Bay Construction Company                                  8.0000       14,176.00       14,176.00
 2520      Herlihy Mid-Continent Company                                    6.3500       11,252.20       11,252.20
 3505      Lorig Construction Company                                      10.7800       19,102.16       19,102.16

    44000200  DRIVE PAVEMENT REM                         154.000    SQ YD
 1552      Dunnet Bay Construction Company                                 30.0000        4,620.00        4,620.00
 2520      Herlihy Mid-Continent Company                                   26.1000        4,019.40        4,019.40
 3505      Lorig Construction Company                                      25.0000        3,850.00        3,850.00

    44000500  COMB CURB GUTTER REM                     2,079.000     FOOT
 1552      Dunnet Bay Construction Company                                 11.0000       22,869.00       22,869.00
 2520      Herlihy Mid-Continent Company                                   11.8500       24,636.15       24,636.15
 3505      Lorig Construction Company                                       9.0000       18,711.00       18,711.00

    44000600  SIDEWALK REM                               882.000    SQ FT
 1552      Dunnet Bay Construction Company                                  2.0000        1,764.00        1,764.00
 2520      Herlihy Mid-Continent Company                                    2.1500        1,896.30        1,896.30
 3505      Lorig Construction Company                                       3.2500        2,866.50        2,866.50

    44004250  PAVED SHLD REMOVAL                       1,616.000    SQ YD
 1552      Dunnet Bay Construction Company                                 20.0000       32,320.00       32,320.00
 2520      Herlihy Mid-Continent Company                                    9.3000       15,028.80       15,028.80
 3505      Lorig Construction Company                                      13.0000       21,008.00       21,008.00

    44201835  CL D PATCH T1 16                            22.000    SQ YD
 1552      Dunnet Bay Construction Company                                255.0000        5,610.00        5,610.00
 2520      Herlihy Mid-Continent Company                                  179.0000        3,938.00        3,938.00
 3505      Lorig Construction Company                                     198.7600        4,372.72        4,372.72

    44201839  CL D PATCH T2 16                            66.000    SQ YD
 1552      Dunnet Bay Construction Company                                230.0000       15,180.00       15,180.00
 2520      Herlihy Mid-Continent Company                                  160.5700       10,597.62       10,597.62
 3505      Lorig Construction Company                                     127.5100        8,415.66        8,415.66

    44201843  CL D PATCH T3 16                            66.000    SQ YD
 1552      Dunnet Bay Construction Company                                200.0000       13,200.00       13,200.00
 2520      Herlihy Mid-Continent Company                                  149.6000        9,873.60        9,873.60
 3505      Lorig Construction Company                                     127.4400        8,411.04        8,411.04

    44201845  CL D PATCH T4 16                            22.000    SQ YD
 1552      Dunnet Bay Construction Company                                195.0000        4,290.00        4,290.00
 2520      Herlihy Mid-Continent Company                                  135.5200        2,981.44        2,981.44
 3505      Lorig Construction Company                                     198.7600        4,372.72        4,372.72

    50100100  REM EXIST STRUCT                             1.000     EACH
 1552      Dunnet Bay Construction Company                            606,000.0000      606,000.00      606,000.00
 2520      Herlihy Mid-Continent Company                              854,100.0000      854,100.00      854,100.00
 3505      Lorig Construction Company                               1,050,000.0000    1,050,000.00    1,050,000.00

    50200100  STRUCTURE EXCAVATION                     1,184.000    CU YD
 1552      Dunnet Bay Construction Company                                100.0000      118,400.00      118,400.00
 2520      Herlihy Mid-Continent Company                                   61.6000       72,934.40       72,934.40
 3505      Lorig Construction Company                                      65.0000       76,960.00       76,960.00

    50200450  REM/DISP UNS MATL-STR                      146.000    CU YD
 1552      Dunnet Bay Construction Company                                 60.0000        8,760.00        8,760.00
 2520      Herlihy Mid-Continent Company                                   70.6500       10,314.90       10,314.90
 3505      Lorig Construction Company                                      91.0000       13,286.00       13,286.00

    50300100  FLOOR DRAINS                                 4.000     EACH
 1552      Dunnet Bay Construction Company                                500.0000        2,000.00        2,000.00
 2520      Herlihy Mid-Continent Company                                  500.0000        2,000.00        2,000.00
 3505      Lorig Construction Company                                   1,400.0000        5,600.00        5,600.00

    50300225  CONC STRUCT                                167.300    CU YD
 1552      Dunnet Bay Construction Company                              1,000.0000      167,300.00      167,300.00
 2520      Herlihy Mid-Continent Company                                  900.0000      150,570.00      150,570.00
 3505      Lorig Construction Company                                     825.0000      138,022.50      138,022.50

    50300255  CONC SUP-STR                               474.000    CU YD
 1552      Dunnet Bay Construction Company                                900.0000      426,600.00      426,600.00
 2520      Herlihy Mid-Continent Company                                2,100.0000      995,400.00      995,400.00
 3505      Lorig Construction Company                                     825.0000      391,050.00      391,050.00

    50300260  BR DECK GROOVING                           995.000    SQ YD
 1552      Dunnet Bay Construction Company                                 10.7500       10,696.25       10,696.25
 2520      Herlihy Mid-Continent Company                                   11.5000       11,442.50       11,442.50
 3505      Lorig Construction Company                                      12.0000       11,940.00       11,940.00

    50300300  PROTECTIVE COAT                          1,752.000    SQ YD
 1552      Dunnet Bay Construction Company                                  2.5400        4,450.08        4,450.08
 2520      Herlihy Mid-Continent Company                                    1.0000        1,752.00        1,752.00
 3505      Lorig Construction Company                                       1.0000        1,752.00        1,752.00

    50301350  CONC SUPSTR APP SLAB                       237.400    CU YD
 1552      Dunnet Bay Construction Company                                625.0000      148,375.00      148,375.00
 2520      Herlihy Mid-Continent Company                                  420.0000       99,708.00       99,708.00
 3505      Lorig Construction Company                                     550.0000      130,570.00      130,570.00

    50401310  F&E PP CON BEAMS IL36                    1,530.000     FOOT
 1552      Dunnet Bay Construction Company                                800.0000    1,224,000.00    1,224,000.00
 2520      Herlihy Mid-Continent Company                                  506.5000      774,945.00      774,945.00
 3505      Lorig Construction Company                                     500.0000      765,000.00      765,000.00

    50800205  REINF BARS, EPOXY CTD                  221,570.000    POUND
 1552      Dunnet Bay Construction Company                                  1.8000      398,826.00      398,826.00
 2520      Herlihy Mid-Continent Company                                    1.5500      343,433.50      343,433.50
 3505      Lorig Construction Company                                       2.0000      443,140.00      443,140.00

    50800515  BAR SPLICERS                               614.000     EACH
 1552      Dunnet Bay Construction Company                                 58.0000       35,612.00       35,612.00
 2520      Herlihy Mid-Continent Company                                   44.0000       27,016.00       27,016.00
 3505      Lorig Construction Company                                      67.0000       41,138.00       41,138.00

    50901720  BICYCLE RAILING                            687.000     FOOT
 1552      Dunnet Bay Construction Company                                284.0000      195,108.00      195,108.00
 2520      Herlihy Mid-Continent Company                                  276.3700      189,866.19      189,866.19
 3505      Lorig Construction Company                                     281.0000      193,047.00      193,047.00

    50901750  PARAPET RAILING                            326.000     FOOT
 1552      Dunnet Bay Construction Company                                161.0000       52,486.00       52,486.00
 2520      Herlihy Mid-Continent Company                                  154.0000       50,204.00       50,204.00
 3505      Lorig Construction Company                                     155.0000       50,530.00       50,530.00

    51201610  FUR STL PILE HP12X63                     1,106.000     FOOT
 1552      Dunnet Bay Construction Company                                100.0000      110,600.00      110,600.00
 2520      Herlihy Mid-Continent Company                                   41.0000       45,346.00       45,346.00
 3505      Lorig Construction Company                                      74.0000       81,844.00       81,844.00

    51202305  DRIVING PILES                            1,106.000     FOOT
 1552      Dunnet Bay Construction Company                                  0.0100           11.06           11.06
 2520      Herlihy Mid-Continent Company                                    1.0000        1,106.00        1,106.00
 3505      Lorig Construction Company                                       1.0000        1,106.00        1,106.00

    51203610  TEST PILE ST HP12X63                         2.000     EACH
 1552      Dunnet Bay Construction Company                             20,000.0000       40,000.00       40,000.00
 2520      Herlihy Mid-Continent Company                               35,000.0000       70,000.00       70,000.00
 3505      Lorig Construction Company                                   5,000.0000       10,000.00       10,000.00

    51204650  PILE SHOES                                  30.000     EACH
 1552      Dunnet Bay Construction Company                                115.0000        3,450.00        3,450.00
 2520      Herlihy Mid-Continent Company                                  500.0000       15,000.00       15,000.00
 3505      Lorig Construction Company                                     115.0000        3,450.00        3,450.00

    51500100  NAME PLATES                                  1.000     EACH
 1552      Dunnet Bay Construction Company                                550.0000          550.00          550.00
 2520      Herlihy Mid-Continent Company                                2,100.0000        2,100.00        2,100.00
 3505      Lorig Construction Company                                     650.0000          650.00          650.00

    52200020  TEMP SOIL RETEN SYSTM                    9,172.000    SQ FT
 1552      Dunnet Bay Construction Company                                  0.0100           91.72           91.72
 2520      Herlihy Mid-Continent Company                                    1.0000        9,172.00        9,172.00
 3505      Lorig Construction Company                                       1.0000        9,172.00        9,172.00

    52200900  CONC STR RETAIN WALL                       400.000    CU YD
 1552      Dunnet Bay Construction Company                                700.0000      280,000.00      280,000.00
 2520      Herlihy Mid-Continent Company                                  950.0000      380,000.00      380,000.00
 3505      Lorig Construction Company                                     800.0000      320,000.00      320,000.00

    54213657  PRC FLAR END SEC 12                          2.000     EACH
 1552      Dunnet Bay Construction Company                              1,454.9600        2,909.92        2,909.92
 2520      Herlihy Mid-Continent Company                                1,728.0000        3,456.00        3,456.00
 3505      Lorig Construction Company                                   1,600.0000        3,200.00        3,200.00

    54213663  PRC FLAR END SEC 18                          1.000     EACH
 1552      Dunnet Bay Construction Company                              1,780.0000        1,780.00        1,780.00
 2520      Herlihy Mid-Continent Company                                2,288.0000        2,288.00        2,288.00
 3505      Lorig Construction Company                                   2,900.0000        2,900.00        2,900.00

    54213669  PRC FLAR END SEC 24                          3.000     EACH
 1552      Dunnet Bay Construction Company                              2,217.0000        6,651.00        6,651.00
 2520      Herlihy Mid-Continent Company                                2,775.0000        8,325.00        8,325.00
 3505      Lorig Construction Company                                   3,800.0000       11,400.00       11,400.00

    54213693  PRC FLAR END SEC 48                          1.000     EACH
 1552      Dunnet Bay Construction Company                              6,510.0000        6,510.00        6,510.00
 2520      Herlihy Mid-Continent Company                                5,684.0000        5,684.00        5,684.00
 3505      Lorig Construction Company                                   7,700.0000        7,700.00        7,700.00

    550A0050  STORM SEW CL A 1  12                       113.000     FOOT
 1552      Dunnet Bay Construction Company                                 94.0000       10,622.00       10,622.00
 2520      Herlihy Mid-Continent Company                                   75.0000        8,475.00        8,475.00
 3505      Lorig Construction Company                                     100.0000       11,300.00       11,300.00

    550A0090  STORM SEW CL A 1  18                        86.000     FOOT
 1552      Dunnet Bay Construction Company                                 87.0000        7,482.00        7,482.00
 2520      Herlihy Mid-Continent Company                                   94.0000        8,084.00        8,084.00
 3505      Lorig Construction Company                                      91.0000        7,826.00        7,826.00

    550A0120  STORM SEW CL A 1  24                       108.000     FOOT
 1552      Dunnet Bay Construction Company                                111.0000       11,988.00       11,988.00
 2520      Herlihy Mid-Continent Company                                  127.0000       13,716.00       13,716.00
 3505      Lorig Construction Company                                     140.0000       15,120.00       15,120.00

    550A0340  STORM SEW CL A 2  12                       691.000     FOOT
 1552      Dunnet Bay Construction Company                                 82.0000       56,662.00       56,662.00
 2520      Herlihy Mid-Continent Company                                   77.0000       53,207.00       53,207.00
 3505      Lorig Construction Company                                     107.5000       74,282.50       74,282.50

    550A0360  STORM SEW CL A 2  15                       206.000     FOOT
 1552      Dunnet Bay Construction Company                                 88.0000       18,128.00       18,128.00
 2520      Herlihy Mid-Continent Company                                   86.0000       17,716.00       17,716.00
 3505      Lorig Construction Company                                     127.4000       26,244.40       26,244.40

    550A0380  STORM SEW CL A 2  18                        88.000     FOOT
 1552      Dunnet Bay Construction Company                                113.0000        9,944.00        9,944.00
 2520      Herlihy Mid-Continent Company                                   96.0000        8,448.00        8,448.00
 3505      Lorig Construction Company                                     166.2000       14,625.60       14,625.60

    550A0410  STORM SEW CL A 2  24                       360.000     FOOT
 1552      Dunnet Bay Construction Company                                121.0000       43,560.00       43,560.00
 2520      Herlihy Mid-Continent Company                                  129.0000       46,440.00       46,440.00
 3505      Lorig Construction Company                                     202.3000       72,828.00       72,828.00

    550A0480  STORM SEW CL A 2  48                       152.000     FOOT
 1552      Dunnet Bay Construction Company                                308.0000       46,816.00       46,816.00
 2520      Herlihy Mid-Continent Company                                  281.0000       42,712.00       42,712.00
 3505      Lorig Construction Company                                     307.7000       46,770.40       46,770.40

    550A2420  SS RG CL A 1   48                           49.000     FOOT
 1552      Dunnet Bay Construction Company                                326.0000       15,974.00       15,974.00
 2520      Herlihy Mid-Continent Company                                  281.0000       13,769.00       13,769.00
 3505      Lorig Construction Company                                     309.2000       15,150.80       15,150.80

    550A2520  SS RG CL A 2   12                           41.000     FOOT
 1552      Dunnet Bay Construction Company                                 84.0000        3,444.00        3,444.00
 2520      Herlihy Mid-Continent Company                                   77.0000        3,157.00        3,157.00
 3505      Lorig Construction Company                                     244.5000       10,024.50       10,024.50

    550A2560  SS RG CL A 2   24                           76.000     FOOT
 1552      Dunnet Bay Construction Company                                125.0000        9,500.00        9,500.00
 2520      Herlihy Mid-Continent Company                                  106.0000        8,056.00        8,056.00
 3505      Lorig Construction Company                                     209.1000       15,891.60       15,891.60

    550A2620  SS RG CL A 2   48                           74.000     FOOT
 1552      Dunnet Bay Construction Company                                288.0000       21,312.00       21,312.00
 2520      Herlihy Mid-Continent Company                                  281.0000       20,794.00       20,794.00
 3505      Lorig Construction Company                                     328.3000       24,294.20       24,294.20

    55100500  STORM SEWER REM  12                        580.000     FOOT
 1552      Dunnet Bay Construction Company                                 12.0000        6,960.00        6,960.00
 2520      Herlihy Mid-Continent Company                                   30.0000       17,400.00       17,400.00
 3505      Lorig Construction Company                                      61.4000       35,612.00       35,612.00

    55100900  STORM SEWER REM  18                         53.000     FOOT
 1552      Dunnet Bay Construction Company                                 21.0000        1,113.00        1,113.00
 2520      Herlihy Mid-Continent Company                                   35.0000        1,855.00        1,855.00
 3505      Lorig Construction Company                                      52.9000        2,803.70        2,803.70

    55101200  STORM SEWER REM  24                         48.000     FOOT
 1552      Dunnet Bay Construction Company                                 40.0000        1,920.00        1,920.00
 2520      Herlihy Mid-Continent Company                                   43.0000        2,064.00        2,064.00
 3505      Lorig Construction Company                                      58.7000        2,817.60        2,817.60

    55101900  STORM SEWER REM  48                        309.000     FOOT
 1552      Dunnet Bay Construction Company                                 59.0000       18,231.00       18,231.00
 2520      Herlihy Mid-Continent Company                                   97.0000       29,973.00       29,973.00
 3505      Lorig Construction Company                                      91.0000       28,119.00       28,119.00

    56100800  WATER MAIN  10                             144.000     FOOT
 1552      Dunnet Bay Construction Company                                 81.0000       11,664.00       11,664.00
 2520      Herlihy Mid-Continent Company                                  237.0000       34,128.00       34,128.00
 3505      Lorig Construction Company                                     140.7000       20,260.80       20,260.80

    56105100  WATER VALVES  10                             1.000     EACH
 1552      Dunnet Bay Construction Company                                561.0000          561.00          561.00
 2520      Herlihy Mid-Continent Company                                3,271.0000        3,271.00        3,271.00
 3505      Lorig Construction Company                                   4,205.7000        4,205.70        4,205.70

    56109422  DI WT MNF 10 45.0  DB                        4.000     EACH
 1552      Dunnet Bay Construction Company                                716.0000        2,864.00        2,864.00
 2520      Herlihy Mid-Continent Company                                2,162.0000        8,648.00        8,648.00
 3505      Lorig Construction Company                                   1,513.6000        6,054.40        6,054.40

    56400300  FIRE HYDNTS TO BE ADJ                        1.000     EACH
 1552      Dunnet Bay Construction Company                              2,505.0000        2,505.00        2,505.00
 2520      Herlihy Mid-Continent Company                                2,311.0000        2,311.00        2,311.00
 3505      Lorig Construction Company                                   5,488.4000        5,488.40        5,488.40

    56400800  FIRE HYDNT & VAL MVD                         1.000     EACH
 1552      Dunnet Bay Construction Company                              6,640.0000        6,640.00        6,640.00
 2520      Herlihy Mid-Continent Company                                9,114.0000        9,114.00        9,114.00
 3505      Lorig Construction Company                                   4,516.8000        4,516.80        4,516.80

    58600101  GRANULAR BACKFILL STR                      304.000    CU YD
 1552      Dunnet Bay Construction Company                                 83.0000       25,232.00       25,232.00
 2520      Herlihy Mid-Continent Company                                   42.0000       12,768.00       12,768.00
 3505      Lorig Construction Company                                     105.0000       31,920.00       31,920.00

    59100100  GEOCOMPOSITE WALL DR                       423.000    SQ YD
 1552      Dunnet Bay Construction Company                                 21.2500        8,988.75        8,988.75
 2520      Herlihy Mid-Continent Company                                   10.7500        4,547.25        4,547.25
 3505      Lorig Construction Company                                      40.0000       16,920.00       16,920.00

    60100060  CONC HDWL FOR P DRAIN                        2.000     EACH
 1552      Dunnet Bay Construction Company                                846.0000        1,692.00        1,692.00
 2520      Herlihy Mid-Continent Company                                  634.0000        1,268.00        1,268.00
 3505      Lorig Construction Company                                   1,155.0000        2,310.00        2,310.00

    60108204  PIPE UNDERDR T 2 4                       1,888.000     FOOT
 1552      Dunnet Bay Construction Company                                 18.0000       33,984.00       33,984.00
 2520      Herlihy Mid-Continent Company                                   40.0000       75,520.00       75,520.00
 3505      Lorig Construction Company                                      46.0000       86,848.00       86,848.00

    60146304  P UNDR FOR STRUCT  4                       625.000     FOOT
 1552      Dunnet Bay Construction Company                                 35.5000       22,187.50       22,187.50
 2520      Herlihy Mid-Continent Company                                   40.0000       25,000.00       25,000.00
 3505      Lorig Construction Company                                      40.0000       25,000.00       25,000.00

    60202405  CB TA 4 DIA                                  9.000     EACH
 1552      Dunnet Bay Construction Company                              3,675.0000       33,075.00       33,075.00
 2520      Herlihy Mid-Continent Company                                3,934.0000       35,406.00       35,406.00
 3505      Lorig Construction Company                                   3,600.0000       32,400.00       32,400.00

    60220200  MAN TA 4 DIA                                 5.000     EACH
 1552      Dunnet Bay Construction Company                              4,370.0000       21,850.00       21,850.00
 2520      Herlihy Mid-Continent Company                                4,312.0000       21,560.00       21,560.00
 3505      Lorig Construction Company                                   3,900.0000       19,500.00       19,500.00

    60222900  MAN TA 5 DIA                                 2.000     EACH
 1552      Dunnet Bay Construction Company                              6,282.0000       12,564.00       12,564.00
 2520      Herlihy Mid-Continent Company                                6,785.0000       13,570.00       13,570.00
 3505      Lorig Construction Company                                   6,500.0000       13,000.00       13,000.00

    60224075  MAN TA 6 DIA                                 3.000     EACH
 1552      Dunnet Bay Construction Company                              9,578.0000       28,734.00       28,734.00
 2520      Herlihy Mid-Continent Company                               13,305.0000       39,915.00       39,915.00
 3505      Lorig Construction Company                                  12,000.0000       36,000.00       36,000.00

    60238800  INLETS TA                                    9.000     EACH
 1552      Dunnet Bay Construction Company                              2,030.0000       18,270.00       18,270.00
 2520      Herlihy Mid-Continent Company                                1,608.0000       14,472.00       14,472.00
 3505      Lorig Construction Company                                   1,500.0000       13,500.00       13,500.00

    60240395  INLETS TB                                    6.000     EACH
 1552      Dunnet Bay Construction Company                              2,315.0000       13,890.00       13,890.00
 2520      Herlihy Mid-Continent Company                                2,206.0000       13,236.00       13,236.00
 3505      Lorig Construction Company                                   1,700.0000       10,200.00       10,200.00

    60248900  VV TA 5 DIA T1F CL                           1.000     EACH
 1552      Dunnet Bay Construction Company                              3,700.0000        3,700.00        3,700.00
 2520      Herlihy Mid-Continent Company                                5,689.0000        5,689.00        5,689.00
 3505      Lorig Construction Company                                   5,400.0000        5,400.00        5,400.00

    60265700  VV ADJUST                                    4.000     EACH
 1552      Dunnet Bay Construction Company                                555.0000        2,220.00        2,220.00
 2520      Herlihy Mid-Continent Company                                  613.0000        2,452.00        2,452.00
 3505      Lorig Construction Company                                   1,200.0000        4,800.00        4,800.00

    60402210  GRATES T8                                    1.000     EACH
 1552      Dunnet Bay Construction Company                                365.0000          365.00          365.00
 2520      Herlihy Mid-Continent Company                                  253.0000          253.00          253.00
 3505      Lorig Construction Company                                     400.0000          400.00          400.00

    60404940  FR & GRATES T23                             23.000     EACH
 1552      Dunnet Bay Construction Company                                535.0000       12,305.00       12,305.00
 2520      Herlihy Mid-Continent Company                                  427.0000        9,821.00        9,821.00
 3505      Lorig Construction Company                                     550.0000       12,650.00       12,650.00

    60406100  FR & LIDS T1 CL                             12.000     EACH
 1552      Dunnet Bay Construction Company                                500.0000        6,000.00        6,000.00
 2520      Herlihy Mid-Continent Company                                  390.0000        4,680.00        4,680.00
 3505      Lorig Construction Company                                     550.0000        6,600.00        6,600.00

    60603800  COMB CC&G TB6.12                           626.000     FOOT
 1552      Dunnet Bay Construction Company                                 36.0000       22,536.00       22,536.00
 2520      Herlihy Mid-Continent Company                                   37.9500       23,756.70       23,756.70
 3505      Lorig Construction Company                                      48.0000       30,048.00       30,048.00

    60604400  COMB CC&G TB6.18                         1,688.000     FOOT
 1552      Dunnet Bay Construction Company                                 37.0000       62,456.00       62,456.00
 2520      Herlihy Mid-Continent Company                                   35.5500       60,008.40       60,008.40
 3505      Lorig Construction Company                                      51.0000       86,088.00       86,088.00

    60605000  COMB CC&G TY B-6.24                        658.000     FOOT
 1552      Dunnet Bay Construction Company                                 42.0000       27,636.00       27,636.00
 2520      Herlihy Mid-Continent Company                                   41.8000       27,504.40       27,504.40
 3505      Lorig Construction Company                                      54.0000       35,532.00       35,532.00

    60606800  COMB CC&G TB9.18                           318.000     FOOT
 1552      Dunnet Bay Construction Company                                 44.0000       13,992.00       13,992.00
 2520      Herlihy Mid-Continent Company                                   44.0000       13,992.00       13,992.00
 3505      Lorig Construction Company                                      56.0000       17,808.00       17,808.00

    60608562  COMB CC&G TM4.12                           157.000     FOOT
 1552      Dunnet Bay Construction Company                                 34.5000        5,416.50        5,416.50
 2520      Herlihy Mid-Continent Company                                   34.5000        5,416.50        5,416.50
 3505      Lorig Construction Company                                      48.0000        7,536.00        7,536.00

    60618300  CONC MEDIAN SURF 4                         544.000    SQ FT
 1552      Dunnet Bay Construction Company                                  7.7500        4,216.00        4,216.00
 2520      Herlihy Mid-Continent Company                                    7.7500        4,216.00        4,216.00
 3505      Lorig Construction Company                                      11.0000        5,984.00        5,984.00

    61000050  CONC THRUST BLOCKS                           5.000     EACH
 1552      Dunnet Bay Construction Company                                300.0000        1,500.00        1,500.00
 2520      Herlihy Mid-Continent Company                                1,380.0000        6,900.00        6,900.00
 3505      Lorig Construction Company                                   1,400.0000        7,000.00        7,000.00

    63000001  SPBGR TY A  6FT POSTS                       24.000     FOOT
 1552      Dunnet Bay Construction Company                                 55.0000        1,320.00        1,320.00
 2520      Herlihy Mid-Continent Company                                   39.4100          945.84          945.84
 3505      Lorig Construction Company                                      40.0000          960.00          960.00

    63100085  TRAF BAR TERM T6                             2.000     EACH
 1552      Dunnet Bay Construction Company                              4,750.0000        9,500.00        9,500.00
 2520      Herlihy Mid-Continent Company                                4,563.0000        9,126.00        9,126.00
 3505      Lorig Construction Company                                   4,600.0000        9,200.00        9,200.00

    63100167  TR BAR TRM T1 SPL TAN                        2.000     EACH
 1552      Dunnet Bay Construction Company                              4,240.0000        8,480.00        8,480.00
 2520      Herlihy Mid-Continent Company                                3,932.1000        7,864.20        7,864.20
 3505      Lorig Construction Company                                   4,000.0000        8,000.00        8,000.00

    63200310  GUARDRAIL REMOV                          1,044.000     FOOT
 1552      Dunnet Bay Construction Company                                  7.1400        7,454.16        7,454.16
 2520      Herlihy Mid-Continent Company                                    7.1400        7,454.16        7,454.16
 3505      Lorig Construction Company                                       7.5000        7,830.00        7,830.00

    67100100  MOBILIZATION                                 1.000    L SUM
 1552      Dunnet Bay Construction Company                            505,151.6500      505,151.65      505,151.65
 2520      Herlihy Mid-Continent Company                              540,000.3500      540,000.35      540,000.35
 3505      Lorig Construction Company                                 550,000.0000      550,000.00      550,000.00

    70107025  CHANGEABLE MESSAGE SN                      360.000   CAL DA
 1552      Dunnet Bay Construction Company                                 30.0000       10,800.00       10,800.00
 2520      Herlihy Mid-Continent Company                                   30.0000       10,800.00       10,800.00
 3505      Lorig Construction Company                                      30.0000       10,800.00       10,800.00

    70300100  SHORT TERM PAVT MKING                    8,196.000     FOOT
 1552      Dunnet Bay Construction Company                                  1.3000       10,654.80       10,654.80
 2520      Herlihy Mid-Continent Company                                    1.3000       10,654.80       10,654.80
 3505      Lorig Construction Company                                       1.0000        8,196.00        8,196.00

    70301100  TEMP PVT MK LTR & SYM EPOXY                182.000    SQ FT
 1552      Dunnet Bay Construction Company                                  3.0000          546.00          546.00
 2520      Herlihy Mid-Continent Company                                    3.0000          546.00          546.00
 3505      Lorig Construction Company                                       3.0000          546.00          546.00

    70301120  TEMP PVT MK L4 EPOXY                     9,548.000     FOOT
 1552      Dunnet Bay Construction Company                                  0.6500        6,206.20        6,206.20
 2520      Herlihy Mid-Continent Company                                    0.6500        6,206.20        6,206.20
 3505      Lorig Construction Company                                       0.6500        6,206.20        6,206.20

    70301130  TEMP PVT MK L6 EPOXY                       830.000     FOOT
 1552      Dunnet Bay Construction Company                                  0.7000          581.00          581.00
 2520      Herlihy Mid-Continent Company                                    0.7000          581.00          581.00
 3505      Lorig Construction Company                                       0.7000          581.00          581.00

    70301160  TEMP PVT MK L12 EPOXY                      160.000     FOOT
 1552      Dunnet Bay Construction Company                                  1.5000          240.00          240.00
 2520      Herlihy Mid-Continent Company                                    1.5000          240.00          240.00
 3505      Lorig Construction Company                                       1.5000          240.00          240.00

    70301210  TEMP PVT MK L24 EPOXY                       24.000     FOOT
 1552      Dunnet Bay Construction Company                                  3.6000           86.40           86.40
 2520      Herlihy Mid-Continent Company                                    3.6000           86.40           86.40
 3505      Lorig Construction Company                                       3.6000           86.40           86.40

    70307100  TEMP PVT MK LTR & SYM T4 TAPE               37.000    SQ FT
 1552      Dunnet Bay Construction Company                                  6.0000          222.00          222.00
 2520      Herlihy Mid-Continent Company                                    6.0000          222.00          222.00
 3505      Lorig Construction Company                                       6.0000          222.00          222.00

    70307120  TEMP PVT MK L4 T4 TAPE                  18,078.000     FOOT
 1552      Dunnet Bay Construction Company                                  1.1000       19,885.80       19,885.80
 2520      Herlihy Mid-Continent Company                                    1.1000       19,885.80       19,885.80
 3505      Lorig Construction Company                                       1.1000       19,885.80       19,885.80

    70307130  TEMP PVT MK L6 T4 TAPE                     318.000     FOOT
 1552      Dunnet Bay Construction Company                                  1.7000          540.60          540.60
 2520      Herlihy Mid-Continent Company                                    1.7000          540.60          540.60
 3505      Lorig Construction Company                                       1.7000          540.60          540.60

    70307210  TEMP PVT MK L24 T4 TAPE                     66.000     FOOT
 1552      Dunnet Bay Construction Company                                  7.1000          468.60          468.60
 2520      Herlihy Mid-Continent Company                                    7.1000          468.60          468.60
 3505      Lorig Construction Company                                       7.1000          468.60          468.60

    70400100  TEMP CONC BARRIER                        1,963.000     FOOT
 1552      Dunnet Bay Construction Company                                 28.2000       55,356.60       55,356.60
 2520      Herlihy Mid-Continent Company                                   28.0000       54,964.00       54,964.00
 3505      Lorig Construction Company                                      22.0000       43,186.00       43,186.00

    70400125  PIN TEMP CONC BARRIER                      210.000     EACH
 1552      Dunnet Bay Construction Company                                 24.0000        5,040.00        5,040.00
 2520      Herlihy Mid-Continent Company                                   11.5000        2,415.00        2,415.00
 3505      Lorig Construction Company                                      25.0000        5,250.00        5,250.00

    70400200  REL TEMP CONC BARRIER                      888.000     FOOT
 1552      Dunnet Bay Construction Company                                  2.1000        1,864.80        1,864.80
 2520      Herlihy Mid-Continent Company                                    6.0000        5,328.00        5,328.00
 3505      Lorig Construction Company                                       4.0000        3,552.00        3,552.00

    70600240  IMP ATTN TEMP NRD TL2                        1.000     EACH
 1552      Dunnet Bay Construction Company                              2,500.0000        2,500.00        2,500.00
 2520      Herlihy Mid-Continent Company                                2,500.0000        2,500.00        2,500.00
 3505      Lorig Construction Company                                   2,500.0000        2,500.00        2,500.00

    70600260  IMP ATTN TEMP FRN TL3                        5.000     EACH
 1552      Dunnet Bay Construction Company                              4,200.0000       21,000.00       21,000.00
 2520      Herlihy Mid-Continent Company                                4,200.0000       21,000.00       21,000.00
 3505      Lorig Construction Company                                   8,500.0000       42,500.00       42,500.00

    70600332  IMP ATTN REL FRN TL3                         4.000     EACH
 1552      Dunnet Bay Construction Company                              2,100.0000        8,400.00        8,400.00
 2520      Herlihy Mid-Continent Company                                2,100.0000        8,400.00        8,400.00
 3505      Lorig Construction Company                                   3,000.0000       12,000.00       12,000.00

    72000100  SIGN PANEL T1                                9.000    SQ FT
 1552      Dunnet Bay Construction Company                                 30.0000          270.00          270.00
 2520      Herlihy Mid-Continent Company                                   30.0000          270.00          270.00
 3505      Lorig Construction Company                                      30.0000          270.00          270.00

    72400100  REMOV SIN PAN ASSY TA                        2.000     EACH
 1552      Dunnet Bay Construction Company                                 50.0000          100.00          100.00
 2520      Herlihy Mid-Continent Company                                   50.0000          100.00          100.00
 3505      Lorig Construction Company                                      50.0000          100.00          100.00

    72400200  REMOV SIN PAN ASSY TB                        2.000     EACH
 1552      Dunnet Bay Construction Company                                 75.0000          150.00          150.00
 2520      Herlihy Mid-Continent Company                                   75.0000          150.00          150.00
 3505      Lorig Construction Company                                      75.0000          150.00          150.00

    72400500  RELOC SIN PAN ASSY TA                        8.000     EACH
 1552      Dunnet Bay Construction Company                                100.0000          800.00          800.00
 2520      Herlihy Mid-Continent Company                                  100.0000          800.00          800.00
 3505      Lorig Construction Company                                     100.0000          800.00          800.00

    72400600  RELOC SIN PAN ASSY TB                        4.000     EACH
 1552      Dunnet Bay Construction Company                                200.0000          800.00          800.00
 2520      Herlihy Mid-Continent Company                                  200.0000          800.00          800.00
 3505      Lorig Construction Company                                     200.0000          800.00          800.00

    72501000  TERMINAL MARKER - DA                         2.000     EACH
 1552      Dunnet Bay Construction Company                                 35.0000           70.00           70.00
 2520      Herlihy Mid-Continent Company                                   35.0000           70.00           70.00
 3505      Lorig Construction Company                                      35.0000           70.00           70.00

    72800100  TELES STL SIN SUPPORT                        8.000     FOOT
 1552      Dunnet Bay Construction Company                                 25.0000          200.00          200.00
 2520      Herlihy Mid-Continent Company                                   25.0000          200.00          200.00
 3505      Lorig Construction Company                                      25.0000          200.00          200.00

    78000100  THPL PVT MK LTR & SYM                      270.000    SQ FT
 1552      Dunnet Bay Construction Company                                  5.0000        1,350.00        1,350.00
 2520      Herlihy Mid-Continent Company                                    5.0000        1,350.00        1,350.00
 3505      Lorig Construction Company                                       5.0000        1,350.00        1,350.00

    78000200  THPL PVT MK LINE  4                      8,871.000     FOOT
 1552      Dunnet Bay Construction Company                                  0.8500        7,540.35        7,540.35
 2520      Herlihy Mid-Continent Company                                    0.8500        7,540.35        7,540.35
 3505      Lorig Construction Company                                       0.8500        7,540.35        7,540.35

    78000400  THPL PVT MK LINE  6                      1,573.000     FOOT
 1552      Dunnet Bay Construction Company                                  1.0000        1,573.00        1,573.00
 2520      Herlihy Mid-Continent Company                                    1.0000        1,573.00        1,573.00
 3505      Lorig Construction Company                                       1.0000        1,573.00        1,573.00

    78000600  THPL PVT MK LINE 12                        170.000     FOOT
 1552      Dunnet Bay Construction Company                                  2.5000          425.00          425.00
 2520      Herlihy Mid-Continent Company                                    2.5000          425.00          425.00
 3505      Lorig Construction Company                                       2.5000          425.00          425.00

    78000650  THPL PVT MK LINE 24                         18.000     FOOT
 1552      Dunnet Bay Construction Company                                  8.0000          144.00          144.00
 2520      Herlihy Mid-Continent Company                                    8.0000          144.00          144.00
 3505      Lorig Construction Company                                       8.0000          144.00          144.00

    78009004  MOD URETH PM LINE  4                       935.000     FOOT
 1552      Dunnet Bay Construction Company                                  3.2500        3,038.75        3,038.75
 2520      Herlihy Mid-Continent Company                                    3.2500        3,038.75        3,038.75
 3505      Lorig Construction Company                                       3.2500        3,038.75        3,038.75

    78200006  GRDRAIL REF TYPE B                           8.000     EACH
 1552      Dunnet Bay Construction Company                                 12.0000           96.00           96.00
 2520      Herlihy Mid-Continent Company                                   12.0000           96.00           96.00
 3505      Lorig Construction Company                                      12.0000           96.00           96.00

    78200011  BARR WALL REF TYPE C                        20.000     EACH
 1552      Dunnet Bay Construction Company                                 12.0000          240.00          240.00
 2520      Herlihy Mid-Continent Company                                   12.0000          240.00          240.00
 3505      Lorig Construction Company                                      12.0000          240.00          240.00

    78300202  PVT MKG REM WTR BLAST                    6,066.000    SQ FT
 1552      Dunnet Bay Construction Company                                  1.0500        6,369.30        6,369.30
 2520      Herlihy Mid-Continent Company                                    1.0500        6,369.30        6,369.30
 3505      Lorig Construction Company                                       1.0500        6,369.30        6,369.30

    85000200  MAIN EX TR SIG INSTAL                        1.000     EACH
 1552      Dunnet Bay Construction Company                              8,400.0000        8,400.00        8,400.00
 2520      Herlihy Mid-Continent Company                                3,542.0000        3,542.00        3,542.00
 3505      Lorig Construction Company                                   8,400.0000        8,400.00        8,400.00