                                               ILLINOIS DEPARTMENT OF TRANSPORTATION                                      PAGE:    1
 11/05/25  14:21:49                   U N I T  P R I C E   T A B U L A T I O N   O F   B I D S
 LETTING DATE: 09/19/2025  LETTING TYPE: SCHEDULED                                 CONTRACT NUMBER: 76F84  LETTING ITEM NUMBER: 067
 RESPONSIBLE DISTRICT: 08                                                                                  BIDS LOCKED: Y
 SECTION: 60R-2                                    COUNTY: MADISON                                         ESTIMATE:
                                                      --------------------------
                                                      SUMMARY OF CONTRACTOR BIDS
                                                      --------------------------

                                                             "AS READ"          SUMMATION    SUMMATION OF                       NBR
 BIDR                     CONTR        COMB  ITEM  CONTR      BIDDER            OF BIDDER     CALCULATED   LOW   BIDR CALC      BLANK
 NBR   BIDDER NAME        GROUP  COMB  GRP   NBR   GROUP      TOTAL PRICE       EXTENSIONS    EXTENSIONS   BID   EXTENSION DIFF BIDS


 0338  Baxmeyer Construction, Inc.
                          NO ALT                           11,876,477.77    11,876,477.77  11,876,477.77

 3108  Keller Construction, Inc.
                          NO ALT                           11,697,743.69    11,697,743.69  11,697,743.69

 5802  Stutz Excavating, Inc.
                          NO ALT                           10,524,883.45 *  10,524,883.45  10,524,883.45    *

 **** TOTAL GROUP NO ALT PAY ITEMS FOR THIS CONTRACT =     190
                                                       ----------------------
                                                       DETAIL CONTRACTOR BIDS
                                                       ----------------------

    ITEM NBR  ITEM DESCRIPTION                                    UNIT OF     UNIT        BIDDER         CALCULATED  BIDR CALC
 BIDR NBR  BIDDER NAME                                  QUANTITY  MEASURE     PRICE       EXTENSION      EXTENSION   EXTENSION DIFF


    C2C01026  S-BUXUS SEMPERVIRENS 2 GAL                 172.000     EACH
 0338      Baxmeyer Construction, Inc.                                    135.0000       23,220.00       23,220.00
 3108      Keller Construction, Inc.                                       90.0000       15,480.00       15,480.00
 5802      Stutz Excavating, Inc.                                          57.6000        9,907.20        9,907.20

    K0012990  P PL ORNAMENT T GAL P                       10.000     UNIT
 0338      Baxmeyer Construction, Inc.                                  4,620.0000       46,200.00       46,200.00
 3108      Keller Construction, Inc.                                    6,800.0000       68,000.00       68,000.00
 5802      Stutz Excavating, Inc.                                       2,035.0000       20,350.00       20,350.00

    K0036118  MULCH PLACEMENT  3                         736.000    SQ YD
 0338      Baxmeyer Construction, Inc.                                     32.0000       23,552.00       23,552.00
 3108      Keller Construction, Inc.                                       27.0000       19,872.00       19,872.00
 5802      Stutz Excavating, Inc.                                          12.0000        8,832.00        8,832.00

    K1004539  PLANT WATERING                              14.000     UNIT
 0338      Baxmeyer Construction, Inc.                                  1,635.0000       22,890.00       22,890.00
 3108      Keller Construction, Inc.                                    1,400.0000       19,600.00       19,600.00
 5802      Stutz Excavating, Inc.                                       1,040.0000       14,560.00       14,560.00

    X0321501  WEED BARRIER FABRIC                        736.000    SQ YD
 0338      Baxmeyer Construction, Inc.                                      3.2500        2,392.00        2,392.00
 3108      Keller Construction, Inc.                                       33.0000       24,288.00       24,288.00
 5802      Stutz Excavating, Inc.                                           4.3000        3,164.80        3,164.80

    X0327068  PAVT COLOR & TEXTURE SPL                 1,483.000    SQ YD
 0338      Baxmeyer Construction, Inc.                                    225.0000      333,675.00      333,675.00
 3108      Keller Construction, Inc.                                       44.4300       65,889.69       65,889.69
 5802      Stutz Excavating, Inc.                                          25.0000       37,075.00       37,075.00

    X0327301  RELOCATE EX MAILBOX                          1.000     EACH
 0338      Baxmeyer Construction, Inc.                                    500.0000          500.00          500.00
 3108      Keller Construction, Inc.                                    4,850.0000        4,850.00        4,850.00
 5802      Stutz Excavating, Inc.                                         250.0000          250.00          250.00

    X0327902  MAILBOX REM & REPL                          11.000     EACH
 0338      Baxmeyer Construction, Inc.                                    650.0000        7,150.00        7,150.00
 3108      Keller Construction, Inc.                                      760.0000        8,360.00        8,360.00
 5802      Stutz Excavating, Inc.                                         350.0000        3,850.00        3,850.00

    X0931400  INLET BOX ADJ SPL                            3.000     EACH
 0338      Baxmeyer Construction, Inc.                                  1,000.0000        3,000.00        3,000.00
 3108      Keller Construction, Inc.                                      799.2400        2,397.72        2,397.72
 5802      Stutz Excavating, Inc.                                       1,170.0000        3,510.00        3,510.00

    X1200160  CONN EX DRG STRUCTURE                        2.000     EACH
 0338      Baxmeyer Construction, Inc.                                  2,375.0000        4,750.00        4,750.00
 3108      Keller Construction, Inc.                                    1,826.9300        3,653.86        3,653.86
 5802      Stutz Excavating, Inc.                                       1,875.0000        3,750.00        3,750.00

    X2020108  GRADING & SHAPING SPL                       47.000    SQ YD
 0338      Baxmeyer Construction, Inc.                                     50.0000        2,350.00        2,350.00
 3108      Keller Construction, Inc.                                       23.0000        1,081.00        1,081.00
 5802      Stutz Excavating, Inc.                                          50.0000        2,350.00        2,350.00

    X2111212  PLNTG SOIL MIX F&P 12                      736.000    SQ YD
 0338      Baxmeyer Construction, Inc.                                     34.5000       25,392.00       25,392.00
 3108      Keller Construction, Inc.                                       60.0000       44,160.00       44,160.00
 5802      Stutz Excavating, Inc.                                          23.7000       17,443.20       17,443.20

    X4400110  TEMP PAVT REMOVAL                        3,695.000    SQ YD
 0338      Baxmeyer Construction, Inc.                                     26.5000       97,917.50       97,917.50
 3108      Keller Construction, Inc.                                        8.4000       31,038.00       31,038.00
 5802      Stutz Excavating, Inc.                                          10.0000       36,950.00       36,950.00

    X4401198  HMA SURF REM VAR DP                      1,328.000    SQ YD
 0338      Baxmeyer Construction, Inc.                                     12.2500       16,268.00       16,268.00
 3108      Keller Construction, Inc.                                       10.4600       13,890.88       13,890.88
 5802      Stutz Excavating, Inc.                                           5.6000        7,436.80        7,436.80

    X4402805  ISLAND REMOVAL                             470.000    SQ FT
 0338      Baxmeyer Construction, Inc.                                      4.5000        2,115.00        2,115.00
 3108      Keller Construction, Inc.                                        7.4000        3,478.00        3,478.00
 5802      Stutz Excavating, Inc.                                           8.5000        3,995.00        3,995.00

    X550A576  TEMP SS CL A 2  24                         444.000     FOOT
 0338      Baxmeyer Construction, Inc.                                    129.5000       57,498.00       57,498.00
 3108      Keller Construction, Inc.                                      187.5000       83,250.00       83,250.00
 5802      Stutz Excavating, Inc.                                         130.0000       57,720.00       57,720.00

    X6020399  CONNECT EX MANHOLE                           1.000     EACH
 0338      Baxmeyer Construction, Inc.                                  3,400.0000        3,400.00        3,400.00
 3108      Keller Construction, Inc.                                    1,826.9500        1,826.95        1,826.95
 5802      Stutz Excavating, Inc.                                       1,875.0000        1,875.00        1,875.00

    X6028104  TEMP MAN TA 4D T1F OL                        2.000     EACH
 0338      Baxmeyer Construction, Inc.                                  4,225.0000        8,450.00        8,450.00
 3108      Keller Construction, Inc.                                    4,565.1600        9,130.32        9,130.32
 5802      Stutz Excavating, Inc.                                       3,004.0000        6,008.00        6,008.00

    X6060034  COMB CC&G TRANSITION                       153.000     FOOT
 0338      Baxmeyer Construction, Inc.                                    207.5000       31,747.50       31,747.50
 3108      Keller Construction, Inc.                                      175.3700       26,831.61       26,831.61
 5802      Stutz Excavating, Inc.                                          55.5000        8,491.50        8,491.50

    X6060077  COMB CC&G TM2.12 MOD                       203.000     FOOT
 0338      Baxmeyer Construction, Inc.                                    147.0000       29,841.00       29,841.00
 3108      Keller Construction, Inc.                                      130.1200       26,414.36       26,414.36
 5802      Stutz Excavating, Inc.                                          53.6500       10,890.95       10,890.95

    X6640300  CH LK FENCE REMOV                          329.000     FOOT
 0338      Baxmeyer Construction, Inc.                                      8.0000        2,632.00        2,632.00
 3108      Keller Construction, Inc.                                       20.5200        6,751.08        6,751.08
 5802      Stutz Excavating, Inc.                                          16.0000        5,264.00        5,264.00

    X6660445  ROW/PROPERTY CORNERS                        46.000     EACH
 0338      Baxmeyer Construction, Inc.                                    475.0000       21,850.00       21,850.00
 3108      Keller Construction, Inc.                                      250.0000       11,500.00       11,500.00
 5802      Stutz Excavating, Inc.                                         375.0000       17,250.00       17,250.00

    X6700410  ENGR FLD OFF A  SPL                         30.000   CAL MO
 0338      Baxmeyer Construction, Inc.                                  1,710.0000       51,300.00       51,300.00
 3108      Keller Construction, Inc.                                    1,030.0000       30,900.00       30,900.00
 5802      Stutz Excavating, Inc.                                       1,125.0000       33,750.00       33,750.00

    X7010216  TRAF CONT & PROT SPL                         1.000    L SUM
 0338      Baxmeyer Construction, Inc.                                 61,500.0000       61,500.00       61,500.00
 3108      Keller Construction, Inc.                                   62,450.0000       62,450.00       62,450.00
 5802      Stutz Excavating, Inc.                                      35,900.0000       35,900.00       35,900.00

    X7240207  REM EX SIGN COMPL                            2.000     EACH
 0338      Baxmeyer Construction, Inc.                                  1,025.0000        2,050.00        2,050.00
 3108      Keller Construction, Inc.                                    3,650.0000        7,300.00        7,300.00
 5802      Stutz Excavating, Inc.                                       1,800.0000        3,600.00        3,600.00

    X7240300  SIGN REMOVAL                                49.000     EACH
 0338      Baxmeyer Construction, Inc.                                    125.0000        6,125.00        6,125.00
 3108      Keller Construction, Inc.                                      180.0000        8,820.00        8,820.00
 5802      Stutz Excavating, Inc.                                         100.0000        4,900.00        4,900.00

    X7800100  PT PVT MK- RAISED MED                      161.000    SQ FT
 0338      Baxmeyer Construction, Inc.                                      4.0000          644.00          644.00
 3108      Keller Construction, Inc.                                        3.4500          555.45          555.45
 5802      Stutz Excavating, Inc.                                           3.6500          587.65          587.65

    X7800200  PAINT PVT MARK CURB                      1,110.000     FOOT
 0338      Baxmeyer Construction, Inc.                                      4.0000        4,440.00        4,440.00
 3108      Keller Construction, Inc.                                        3.4500        3,829.50        3,829.50
 5802      Stutz Excavating, Inc.                                           3.6500        4,051.50        4,051.50

    Z0007601  BLDG REMOV NO   1                            1.000    L SUM
 0338      Baxmeyer Construction, Inc.                                 21,500.0000       21,500.00       21,500.00
 3108      Keller Construction, Inc.                                   43,800.0000       43,800.00       43,800.00
 5802      Stutz Excavating, Inc.                                      32,375.0000       32,375.00       32,375.00

    Z0007602  BLDG REMOV NO   2                            1.000    L SUM
 0338      Baxmeyer Construction, Inc.                                  9,800.0000        9,800.00        9,800.00
 3108      Keller Construction, Inc.                                   23,100.0000       23,100.00       23,100.00
 5802      Stutz Excavating, Inc.                                      12,750.0000       12,750.00       12,750.00

    Z0013798  CONSTRUCTION LAYOUT                          1.000    L SUM
 0338      Baxmeyer Construction, Inc.                                402,000.0000      402,000.00      402,000.00
 3108      Keller Construction, Inc.                                   50,000.0000       50,000.00       50,000.00
 5802      Stutz Excavating, Inc.                                     200,700.0000      200,700.00      200,700.00

    Z0016702  DETOUR SIGNING                               1.000    L SUM
 0338      Baxmeyer Construction, Inc.                                 23,000.0000       23,000.00       23,000.00
 3108      Keller Construction, Inc.                                   19,400.0000       19,400.00       19,400.00
 5802      Stutz Excavating, Inc.                                      16,250.0000       16,250.00       16,250.00

    Z0049901  R&D NON-FR ASB BLD  1                        1.000    L SUM
 0338      Baxmeyer Construction, Inc.                                 14,250.0000       14,250.00       14,250.00
 3108      Keller Construction, Inc.                                        0.0100            0.01            0.01
 5802      Stutz Excavating, Inc.                                       7,885.0000        7,885.00        7,885.00

    Z0049902  R&D NON-FR ASB BLD  2                        1.000    L SUM
 0338      Baxmeyer Construction, Inc.                                  3,000.0000        3,000.00        3,000.00
 3108      Keller Construction, Inc.                                        0.0100            0.01            0.01
 5802      Stutz Excavating, Inc.                                       7,885.0000        7,885.00        7,885.00

    Z0056654  SS 1 WAT MN   24                           127.000     FOOT
 0338      Baxmeyer Construction, Inc.                                    159.0000       20,193.00       20,193.00
 3108      Keller Construction, Inc.                                      238.9300       30,344.11       30,344.11
 5802      Stutz Excavating, Inc.                                         195.0000       24,765.00       24,765.00

    Z0062456  TEMP PAVEMENT                            3,695.000    SQ YD
 0338      Baxmeyer Construction, Inc.                                     77.0000      284,515.00      284,515.00
 3108      Keller Construction, Inc.                                       68.1000      251,629.50      251,629.50
 5802      Stutz Excavating, Inc.                                          62.3500      230,383.25      230,383.25

    Z0076600  TRAINEES                                 3,000.000     HOUR
 0338      Baxmeyer Construction, Inc.                                      0.8000        2,400.00        2,400.00
 3108      Keller Construction, Inc.                                        0.8000        2,400.00        2,400.00
 5802      Stutz Excavating, Inc.                                           0.8000        2,400.00        2,400.00

    Z0076604  TRAINEES TPG                             3,000.000     HOUR
 0338      Baxmeyer Construction, Inc.                                     15.0000       45,000.00       45,000.00
 3108      Keller Construction, Inc.                                       15.0000       45,000.00       45,000.00
 5802      Stutz Excavating, Inc.                                          15.0000       45,000.00       45,000.00

    20100110  TREE REMOV 6-15                            227.000     UNIT
 0338      Baxmeyer Construction, Inc.                                     82.5000       18,727.50       18,727.50
 3108      Keller Construction, Inc.                                       40.0000        9,080.00        9,080.00
 5802      Stutz Excavating, Inc.                                           1.0000          227.00          227.00

    20100210  TREE REMOV OVER 15                       1,050.000     UNIT
 0338      Baxmeyer Construction, Inc.                                     92.0000       96,600.00       96,600.00
 3108      Keller Construction, Inc.                                       55.0000       57,750.00       57,750.00
 5802      Stutz Excavating, Inc.                                           1.0000        1,050.00        1,050.00

    20200100  EARTH EXCAVATION                        24,210.000    CU YD
 0338      Baxmeyer Construction, Inc.                                     28.7500      696,037.50      696,037.50
 3108      Keller Construction, Inc.                                       26.0000      629,460.00      629,460.00
 5802      Stutz Excavating, Inc.                                          21.5000      520,515.00      520,515.00

    20800150  TRENCH BACKFILL                          2,453.000    CU YD
 0338      Baxmeyer Construction, Inc.                                     40.0000       98,120.00       98,120.00
 3108      Keller Construction, Inc.                                       88.0000      215,864.00      215,864.00
 5802      Stutz Excavating, Inc.                                          67.7500      166,190.75      166,190.75

    21001000  GEOTECH FAB F/GR STAB                    3,443.000    SQ YD
 0338      Baxmeyer Construction, Inc.                                      4.7500       16,354.25       16,354.25
 3108      Keller Construction, Inc.                                        2.0000        6,886.00        6,886.00
 5802      Stutz Excavating, Inc.                                           2.2500        7,746.75        7,746.75

    21101615  TOPSOIL F & P  4                         1,002.000    SQ YD
 0338      Baxmeyer Construction, Inc.                                     21.0000       21,042.00       21,042.00
 3108      Keller Construction, Inc.                                       10.0000       10,020.00       10,020.00
 5802      Stutz Excavating, Inc.                                          17.0000       17,034.00       17,034.00

    25000110  SEEDING CL  1A                                .210     ACRE
 0338      Baxmeyer Construction, Inc.                                  3,650.0000          766.50          766.50
 3108      Keller Construction, Inc.                                    7,100.0000        1,491.00        1,491.00
 5802      Stutz Excavating, Inc.                                      12,800.0000        2,688.00        2,688.00

    25000210  SEEDING CL  2A                               5.750     ACRE
 0338      Baxmeyer Construction, Inc.                                  4,200.0000       24,150.00       24,150.00
 3108      Keller Construction, Inc.                                    4,465.0000       25,673.75       25,673.75
 5802      Stutz Excavating, Inc.                                       2,900.0000       16,675.00       16,675.00

    25000400  NITROGEN FERT NUTR                         509.000    POUND
 0338      Baxmeyer Construction, Inc.                                      4.5000        2,290.50        2,290.50
 3108      Keller Construction, Inc.                                        6.9000        3,512.10        3,512.10
 5802      Stutz Excavating, Inc.                                           2.5000        1,272.50        1,272.50

    25000500  PHOSPHORUS FERT NUTR                       509.000    POUND
 0338      Baxmeyer Construction, Inc.                                      4.5000        2,290.50        2,290.50
 3108      Keller Construction, Inc.                                        6.9000        3,512.10        3,512.10
 5802      Stutz Excavating, Inc.                                           2.5000        1,272.50        1,272.50

    25000600  POTASSIUM FERT NUTR                        509.000    POUND
 0338      Baxmeyer Construction, Inc.                                      4.5000        2,290.50        2,290.50
 3108      Keller Construction, Inc.                                        6.9000        3,512.10        3,512.10
 5802      Stutz Excavating, Inc.                                           2.5000        1,272.50        1,272.50

    25000700  AGR GROUND LIMESTONE                        11.300      TON
 0338      Baxmeyer Construction, Inc.                                    700.0000        7,910.00        7,910.00
 3108      Keller Construction, Inc.                                      420.0000        4,746.00        4,746.00
 5802      Stutz Excavating, Inc.                                         195.0000        2,203.50        2,203.50

    25100115  MULCH METHOD 2                               5.750     ACRE
 0338      Baxmeyer Construction, Inc.                                  4,800.0000       27,600.00       27,600.00
 3108      Keller Construction, Inc.                                    5,850.0000       33,637.50       33,637.50
 5802      Stutz Excavating, Inc.                                       3,185.0000       18,313.75       18,313.75

    25100630  EROSION CONTR BLANKET                    1,065.000    SQ YD
 0338      Baxmeyer Construction, Inc.                                      6.5000        6,922.50        6,922.50
 3108      Keller Construction, Inc.                                        3.5500        3,780.75        3,780.75
 5802      Stutz Excavating, Inc.                                           3.0000        3,195.00        3,195.00

    25200110  SODDING SALT TOLERANT                    1,002.000    SQ YD
 0338      Baxmeyer Construction, Inc.                                     25.7500       25,801.50       25,801.50
 3108      Keller Construction, Inc.                                       61.0000       61,122.00       61,122.00
 5802      Stutz Excavating, Inc.                                          25.5000       25,551.00       25,551.00

    25200200  SUPPLE WATERING                             14.000     UNIT
 0338      Baxmeyer Construction, Inc.                                  1,620.0000       22,680.00       22,680.00
 3108      Keller Construction, Inc.                                      900.0000       12,600.00       12,600.00
 5802      Stutz Excavating, Inc.                                         185.0000        2,590.00        2,590.00

    28000250  TEMP EROS CONTR SEED                       566.000    POUND
 0338      Baxmeyer Construction, Inc.                                     10.0000        5,660.00        5,660.00
 3108      Keller Construction, Inc.                                        6.3500        3,594.10        3,594.10
 5802      Stutz Excavating, Inc.                                           6.8500        3,877.10        3,877.10

    28000305  TEMP DITCH CHECKS                          494.000     FOOT
 0338      Baxmeyer Construction, Inc.                                     30.0000       14,820.00       14,820.00
 3108      Keller Construction, Inc.                                       15.4500        7,632.30        7,632.30
 5802      Stutz Excavating, Inc.                                          14.0000        6,916.00        6,916.00

    28000400  PERIMETER EROS BAR                       1,942.000     FOOT
 0338      Baxmeyer Construction, Inc.                                      8.5000       16,507.00       16,507.00
 3108      Keller Construction, Inc.                                        7.0000       13,594.00       13,594.00
 5802      Stutz Excavating, Inc.                                           2.7000        5,243.40        5,243.40

    28000500  INLET & PIPE PROTECT                        90.000     EACH
 0338      Baxmeyer Construction, Inc.                                      0.0100            0.90            0.90
 3108      Keller Construction, Inc.                                      360.8500       32,476.50       32,476.50
 5802      Stutz Excavating, Inc.                                         300.0000       27,000.00       27,000.00

    28001100  TEMP EROS CONTR BLANK                    1,065.000    SQ YD
 0338      Baxmeyer Construction, Inc.                                      6.5000        6,922.50        6,922.50
 3108      Keller Construction, Inc.                                        8.3000        8,839.50        8,839.50
 5802      Stutz Excavating, Inc.                                           3.0000        3,195.00        3,195.00

    28100107  STONE RIPRAP CL A4                         783.000    SQ YD
 0338      Baxmeyer Construction, Inc.                                     71.0000       55,593.00       55,593.00
 3108      Keller Construction, Inc.                                       42.0000       32,886.00       32,886.00
 5802      Stutz Excavating, Inc.                                          76.0000       59,508.00       59,508.00

    28200200  FILTER FABRIC                              412.000    SQ YD
 0338      Baxmeyer Construction, Inc.                                     11.5000        4,738.00        4,738.00
 3108      Keller Construction, Inc.                                        2.5000        1,030.00        1,030.00
 5802      Stutz Excavating, Inc.                                           3.3000        1,359.60        1,359.60

    31100200  SUB GRAN MAT A                           1,530.000    CU YD
 0338      Baxmeyer Construction, Inc.                                     62.7500       96,007.50       96,007.50
 3108      Keller Construction, Inc.                                       59.5500       91,111.50       91,111.50
 5802      Stutz Excavating, Inc.                                          51.2500       78,412.50       78,412.50

    31100910  SUB GRAN MAT A 12                       27,577.000    SQ YD
 0338      Baxmeyer Construction, Inc.                                     20.0000      551,540.00      551,540.00
 3108      Keller Construction, Inc.                                       21.0000      579,117.00      579,117.00
 5802      Stutz Excavating, Inc.                                          18.9500      522,584.15      522,584.15

    31200100  STAB SUBBASE 4                          29,782.000    SQ YD
 0338      Baxmeyer Construction, Inc.                                     39.0000    1,161,498.00    1,161,498.00
 3108      Keller Construction, Inc.                                       37.2000    1,107,890.40    1,107,890.40
 5802      Stutz Excavating, Inc.                                          34.6000    1,030,457.20    1,030,457.20

    40200900  AGG SURF CSE B                               4.000    CU YD
 0338      Baxmeyer Construction, Inc.                                    106.0000          424.00          424.00
 3108      Keller Construction, Inc.                                      167.5000          670.00          670.00
 5802      Stutz Excavating, Inc.                                         250.0000        1,000.00        1,000.00

    40600275  BIT MATLS PR CT                          5,234.000    POUND
 0338      Baxmeyer Construction, Inc.                                      4.5000       23,553.00       23,553.00
 3108      Keller Construction, Inc.                                        3.9100       20,464.94       20,464.94
 5802      Stutz Excavating, Inc.                                           3.1500       16,487.10       16,487.10

    40600290  BIT MATLS TACK CT                        3,463.000    POUND
 0338      Baxmeyer Construction, Inc.                                      2.5000        8,657.50        8,657.50
 3108      Keller Construction, Inc.                                        2.0700        7,168.41        7,168.41
 5802      Stutz Excavating, Inc.                                           2.8000        9,696.40        9,696.40

    40600370  LONG JOINT SEALANT                       2,939.000     FOOT
 0338      Baxmeyer Construction, Inc.                                     15.0000       44,085.00       44,085.00
 3108      Keller Construction, Inc.                                       12.7300       37,413.47       37,413.47
 5802      Stutz Excavating, Inc.                                           7.3000       21,454.70       21,454.70

    40603085  HMA BC IL-19.0  N70                        468.000      TON
 0338      Baxmeyer Construction, Inc.                                    177.5000       83,070.00       83,070.00
 3108      Keller Construction, Inc.                                      151.1300       70,728.84       70,728.84
 5802      Stutz Excavating, Inc.                                         163.0000       76,284.00       76,284.00

    40604062  HMA SC IL-9.5 D N70                        416.000      TON
 0338      Baxmeyer Construction, Inc.                                    212.0000       88,192.00       88,192.00
 3108      Keller Construction, Inc.                                      180.7100       75,175.36       75,175.36
 5802      Stutz Excavating, Inc.                                         168.0000       69,888.00       69,888.00

    40701846  HMA PAVT FD    8 1/4                     1,232.000    SQ YD
 0338      Baxmeyer Construction, Inc.                                    108.0000      133,056.00      133,056.00
 3108      Keller Construction, Inc.                                       91.9500      113,282.40      113,282.40
 5802      Stutz Excavating, Inc.                                          59.4000       73,180.80       73,180.80

    42000205  PCC PVT  7 1/4                             805.000    SQ YD
 0338      Baxmeyer Construction, Inc.                                    130.0000      104,650.00      104,650.00
 3108      Keller Construction, Inc.                                      209.0500      168,285.25      168,285.25
 5802      Stutz Excavating, Inc.                                         102.5000       82,512.50       82,512.50

    42000215  PCC PVT  7 3/4                           5,279.000    SQ YD
 0338      Baxmeyer Construction, Inc.                                     86.0000      453,994.00      453,994.00
 3108      Keller Construction, Inc.                                      106.7000      563,269.30      563,269.30
 5802      Stutz Excavating, Inc.                                          92.4500      488,043.55      488,043.55

    42000300  PCC PVT  8                                  12.000    SQ YD
 0338      Baxmeyer Construction, Inc.                                    435.0000        5,220.00        5,220.00
 3108      Keller Construction, Inc.                                      691.0000        8,292.00        8,292.00
 5802      Stutz Excavating, Inc.                                         276.0000        3,312.00        3,312.00

    42000401  PCC PVT  9    JOINTED                   14,380.000    SQ YD
 0338      Baxmeyer Construction, Inc.                                     98.0000    1,409,240.00    1,409,240.00
 3108      Keller Construction, Inc.                                      139.5000    2,006,010.00    2,006,010.00
 5802      Stutz Excavating, Inc.                                         119.0000    1,711,220.00    1,711,220.00

    42300200  PCC DRIVEWAY PAVT  6                       449.000    SQ YD
 0338      Baxmeyer Construction, Inc.                                    154.0000       69,146.00       69,146.00
 3108      Keller Construction, Inc.                                      137.6000       61,782.40       61,782.40
 5802      Stutz Excavating, Inc.                                         123.0000       55,227.00       55,227.00

    42300400  PCC DRIVEWAY PAVT  8                       870.000    SQ YD
 0338      Baxmeyer Construction, Inc.                                    159.5000      138,765.00      138,765.00
 3108      Keller Construction, Inc.                                      162.3500      141,244.50      141,244.50
 5802      Stutz Excavating, Inc.                                         142.0000      123,540.00      123,540.00

    42400100  PC CONC SIDEWALK 4                      20,833.000    SQ FT
 0338      Baxmeyer Construction, Inc.                                      8.0000      166,664.00      166,664.00
 3108      Keller Construction, Inc.                                        8.9500      186,455.35      186,455.35
 5802      Stutz Excavating, Inc.                                           9.9000      206,246.70      206,246.70

    42400800  DETECTABLE WARNINGS                        580.000    SQ FT
 0338      Baxmeyer Construction, Inc.                                     38.0000       22,040.00       22,040.00
 3108      Keller Construction, Inc.                                       71.0000       41,180.00       41,180.00
 5802      Stutz Excavating, Inc.                                          31.0000       17,980.00       17,980.00

    44000100  PAVEMENT REM                            18,127.000    SQ YD
 0338      Baxmeyer Construction, Inc.                                     10.5000      190,333.50      190,333.50
 3108      Keller Construction, Inc.                                        8.9000      161,330.30      161,330.30
 5802      Stutz Excavating, Inc.                                          11.0000      199,397.00      199,397.00

    44000166  HMA SURF REM    4 1/4                    2,387.000    SQ YD
 0338      Baxmeyer Construction, Inc.                                     13.0000       31,031.00       31,031.00
 3108      Keller Construction, Inc.                                       11.2400       26,829.88       26,829.88
 5802      Stutz Excavating, Inc.                                           9.3000       22,199.10       22,199.10

    44000200  DRIVE PAVEMENT REM                       2,063.000    SQ YD
 0338      Baxmeyer Construction, Inc.                                      9.2500       19,082.75       19,082.75
 3108      Keller Construction, Inc.                                       12.0000       24,756.00       24,756.00
 5802      Stutz Excavating, Inc.                                          26.0000       53,638.00       53,638.00

    44000500  COMB CURB GUTTER REM                     5,257.000     FOOT
 0338      Baxmeyer Construction, Inc.                                      9.0000       47,313.00       47,313.00
 3108      Keller Construction, Inc.                                        2.9000       15,245.30       15,245.30
 5802      Stutz Excavating, Inc.                                           6.0000       31,542.00       31,542.00

    44000600  SIDEWALK REM                             8,744.000    SQ FT
 0338      Baxmeyer Construction, Inc.                                      1.2500       10,930.00       10,930.00
 3108      Keller Construction, Inc.                                        2.0000       17,488.00       17,488.00
 5802      Stutz Excavating, Inc.                                           2.0000       17,488.00       17,488.00

    44003100  MEDIAN REMOVAL                           1,717.000    SQ FT
 0338      Baxmeyer Construction, Inc.                                      2.5000        4,292.50        4,292.50
 3108      Keller Construction, Inc.                                        7.0000       12,019.00       12,019.00
 5802      Stutz Excavating, Inc.                                           3.2500        5,580.25        5,580.25

    44004250  PAVED SHLD REMOVAL                       1,317.000    SQ YD
 0338      Baxmeyer Construction, Inc.                                     22.0000       28,974.00       28,974.00
 3108      Keller Construction, Inc.                                       12.5000       16,462.50       16,462.50
 5802      Stutz Excavating, Inc.                                           7.0000        9,219.00        9,219.00

    48101500  AGGREGATE SHLDS B  6                        35.000    SQ YD
 0338      Baxmeyer Construction, Inc.                                     50.0000        1,750.00        1,750.00
 3108      Keller Construction, Inc.                                       58.8500        2,059.75        2,059.75
 5802      Stutz Excavating, Inc.                                          51.0000        1,785.00        1,785.00

    48203029  HMA SHOULDERS   8                          369.000    SQ YD
 0338      Baxmeyer Construction, Inc.                                    142.0000       52,398.00       52,398.00
 3108      Keller Construction, Inc.                                      120.6500       44,519.85       44,519.85
 5802      Stutz Excavating, Inc.                                         102.5000       37,822.50       37,822.50

    50104400  CONC HEADWALL REMOVAL                        1.000     EACH
 0338      Baxmeyer Construction, Inc.                                    750.0000          750.00          750.00
 3108      Keller Construction, Inc.                                      475.0000          475.00          475.00
 5802      Stutz Excavating, Inc.                                         450.0000          450.00          450.00

    50105220  PIPE CULVERT REMOV                         479.000     FOOT
 0338      Baxmeyer Construction, Inc.                                     23.0000       11,017.00       11,017.00
 3108      Keller Construction, Inc.                                       28.0000       13,412.00       13,412.00
 5802      Stutz Excavating, Inc.                                          10.0000        4,790.00        4,790.00

    542A0217  P CUL CL A 1    12                         252.000     FOOT
 0338      Baxmeyer Construction, Inc.                                     66.0000       16,632.00       16,632.00
 3108      Keller Construction, Inc.                                       75.7100       19,078.92       19,078.92
 5802      Stutz Excavating, Inc.                                          77.0000       19,404.00       19,404.00

    542A0223  P CUL CL A 1    18                         124.000     FOOT
 0338      Baxmeyer Construction, Inc.                                     81.5000       10,106.00       10,106.00
 3108      Keller Construction, Inc.                                      109.8400       13,620.16       13,620.16
 5802      Stutz Excavating, Inc.                                         108.0000       13,392.00       13,392.00

    542A0229  P CUL CL A 1    24                          88.000     FOOT
 0338      Baxmeyer Construction, Inc.                                    102.0000        8,976.00        8,976.00
 3108      Keller Construction, Inc.                                      184.7100       16,254.48       16,254.48
 5802      Stutz Excavating, Inc.                                         112.5000        9,900.00        9,900.00

    54213657  PRC FLAR END SEC 12                         12.000     EACH
 0338      Baxmeyer Construction, Inc.                                  1,575.0000       18,900.00       18,900.00
 3108      Keller Construction, Inc.                                    1,703.6200       20,443.44       20,443.44
 5802      Stutz Excavating, Inc.                                       1,323.0000       15,876.00       15,876.00

    54213660  PRC FLAR END SEC 15                          4.000     EACH
 0338      Baxmeyer Construction, Inc.                                  1,750.0000        7,000.00        7,000.00
 3108      Keller Construction, Inc.                                    1,954.5400        7,818.16        7,818.16
 5802      Stutz Excavating, Inc.                                       1,710.0000        6,840.00        6,840.00

    54213663  PRC FLAR END SEC 18                          7.000     EACH
 0338      Baxmeyer Construction, Inc.                                  2,000.0000       14,000.00       14,000.00
 3108      Keller Construction, Inc.                                    2,203.9200       15,427.44       15,427.44
 5802      Stutz Excavating, Inc.                                       2,125.0000       14,875.00       14,875.00

    54213669  PRC FLAR END SEC 24                          3.000     EACH
 0338      Baxmeyer Construction, Inc.                                  2,650.0000        7,950.00        7,950.00
 3108      Keller Construction, Inc.                                    2,638.7500        7,916.25        7,916.25
 5802      Stutz Excavating, Inc.                                       2,745.0000        8,235.00        8,235.00

    550A0050  STORM SEW CL A 1  12                       593.000     FOOT
 0338      Baxmeyer Construction, Inc.                                     74.5000       44,178.50       44,178.50
 3108      Keller Construction, Inc.                                       76.2500       45,216.25       45,216.25
 5802      Stutz Excavating, Inc.                                         129.5000       76,793.50       76,793.50

    550A0070  STORM SEW CL A 1  15                     2,093.000     FOOT
 0338      Baxmeyer Construction, Inc.                                     89.0000      186,277.00      186,277.00
 3108      Keller Construction, Inc.                                       88.1200      184,435.16      184,435.16
 5802      Stutz Excavating, Inc.                                         101.4500      212,334.85      212,334.85

    550A0090  STORM SEW CL A 1  18                       698.000     FOOT
 0338      Baxmeyer Construction, Inc.                                     83.7500       58,457.50       58,457.50
 3108      Keller Construction, Inc.                                      104.7500       73,115.50       73,115.50
 5802      Stutz Excavating, Inc.                                         106.0000       73,988.00       73,988.00

    550A0120  STORM SEW CL A 1  24                       355.000     FOOT
 0338      Baxmeyer Construction, Inc.                                    106.0000       37,630.00       37,630.00
 3108      Keller Construction, Inc.                                      175.1300       62,171.15       62,171.15
 5802      Stutz Excavating, Inc.                                         139.5000       49,522.50       49,522.50

    550A0140  STORM SEW CL A 1  30                        85.000     FOOT
 0338      Baxmeyer Construction, Inc.                                    140.0000       11,900.00       11,900.00
 3108      Keller Construction, Inc.                                      175.8100       14,943.85       14,943.85
 5802      Stutz Excavating, Inc.                                         250.0000       21,250.00       21,250.00

    550A0340  STORM SEW CL A 2  12                        32.000     FOOT
 0338      Baxmeyer Construction, Inc.                                     73.5000        2,352.00        2,352.00
 3108      Keller Construction, Inc.                                       98.7500        3,160.00        3,160.00
 5802      Stutz Excavating, Inc.                                         134.2500        4,296.00        4,296.00

    550A0360  STORM SEW CL A 2  15                       127.000     FOOT
 0338      Baxmeyer Construction, Inc.                                     86.5000       10,985.50       10,985.50
 3108      Keller Construction, Inc.                                      107.6000       13,665.20       13,665.20
 5802      Stutz Excavating, Inc.                                         108.5000       13,779.50       13,779.50

    55100200  STORM SEWER REM   6                         10.000     FOOT
 0338      Baxmeyer Construction, Inc.                                     29.0000          290.00          290.00
 3108      Keller Construction, Inc.                                       41.0000          410.00          410.00
 5802      Stutz Excavating, Inc.                                          20.0000          200.00          200.00

    55100500  STORM SEWER REM  12                      1,063.000     FOOT
 0338      Baxmeyer Construction, Inc.                                     23.0000       24,449.00       24,449.00
 3108      Keller Construction, Inc.                                       12.3900       13,170.57       13,170.57
 5802      Stutz Excavating, Inc.                                          35.0000       37,205.00       37,205.00

    55100700  STORM SEWER REM  15                        540.000     FOOT
 0338      Baxmeyer Construction, Inc.                                     23.5000       12,690.00       12,690.00
 3108      Keller Construction, Inc.                                       11.7100        6,323.40        6,323.40
 5802      Stutz Excavating, Inc.                                          31.5000       17,010.00       17,010.00

    55100900  STORM SEWER REM  18                         40.000     FOOT
 0338      Baxmeyer Construction, Inc.                                     29.0000        1,160.00        1,160.00
 3108      Keller Construction, Inc.                                        9.7500          390.00          390.00
 5802      Stutz Excavating, Inc.                                          53.0000        2,120.00        2,120.00

    55101200  STORM SEWER REM  24                         96.000     FOOT
 0338      Baxmeyer Construction, Inc.                                     24.0000        2,304.00        2,304.00
 3108      Keller Construction, Inc.                                       20.9700        2,013.12        2,013.12
 5802      Stutz Excavating, Inc.                                          55.0000        5,280.00        5,280.00

    60206600  CB TB T7G                                    1.000     EACH
 0338      Baxmeyer Construction, Inc.                                  5,300.0000        5,300.00        5,300.00
 3108      Keller Construction, Inc.                                    7,532.1100        7,532.11        7,532.11
 5802      Stutz Excavating, Inc.                                       4,975.0000        4,975.00        4,975.00

    60219570  MAN TA 4 DIA T3V F&G                        21.000     EACH
 0338      Baxmeyer Construction, Inc.                                  3,900.0000       81,900.00       81,900.00
 3108      Keller Construction, Inc.                                    4,322.2200       90,766.62       90,766.62
 5802      Stutz Excavating, Inc.                                       2,912.0000       61,152.00       61,152.00

    60220005  MAN TA 4D M IN 604101                        1.000     EACH
 0338      Baxmeyer Construction, Inc.                                  3,650.0000        3,650.00        3,650.00
 3108      Keller Construction, Inc.                                    4,565.1800        4,565.18        4,565.18
 5802      Stutz Excavating, Inc.                                       3,600.0000        3,600.00        3,600.00

    60235700  INLETS TA T3F&G                              2.000     EACH
 0338      Baxmeyer Construction, Inc.                                  2,525.0000        5,050.00        5,050.00
 3108      Keller Construction, Inc.                                    3,796.0200        7,592.04        7,592.04
 5802      Stutz Excavating, Inc.                                       1,892.0000        3,784.00        3,784.00

    60235705  INLETS TA T3V F&G                           22.000     EACH
 0338      Baxmeyer Construction, Inc.                                  2,525.0000       55,550.00       55,550.00
 3108      Keller Construction, Inc.                                    3,796.0300       83,512.66       83,512.66
 5802      Stutz Excavating, Inc.                                       1,872.0000       41,184.00       41,184.00

    60236200  INLETS TA T8G                                5.000     EACH
 0338      Baxmeyer Construction, Inc.                                  2,525.0000       12,625.00       12,625.00
 3108      Keller Construction, Inc.                                    3,796.0300       18,980.15       18,980.15
 5802      Stutz Excavating, Inc.                                       1,935.0000        9,675.00        9,675.00

    60236825  INLETS TA T11V F&G                           2.000     EACH
 0338      Baxmeyer Construction, Inc.                                  2,500.0000        5,000.00        5,000.00
 3108      Keller Construction, Inc.                                    3,796.0200        7,592.04        7,592.04
 5802      Stutz Excavating, Inc.                                       1,892.0000        3,784.00        3,784.00

    60238305  INLET TA M INL 604101                        4.000     EACH
 0338      Baxmeyer Construction, Inc.                                  2,525.0000       10,100.00       10,100.00
 3108      Keller Construction, Inc.                                    3,796.0400       15,184.16       15,184.16
 5802      Stutz Excavating, Inc.                                       2,445.0000        9,780.00        9,780.00

    60240220  INLETS TB T3F&G                              2.000     EACH
 0338      Baxmeyer Construction, Inc.                                  2,850.0000        5,700.00        5,700.00
 3108      Keller Construction, Inc.                                    3,205.6100        6,411.22        6,411.22
 5802      Stutz Excavating, Inc.                                       1,785.0000        3,570.00        3,570.00

    60240222  INLETS TB T3V F&G                           18.000     EACH
 0338      Baxmeyer Construction, Inc.                                  2,850.0000       51,300.00       51,300.00
 3108      Keller Construction, Inc.                                    3,205.6300       57,701.34       57,701.34
 5802      Stutz Excavating, Inc.                                       1,785.0000       32,130.00       32,130.00

    60240312  INLETS TB T11V F&G                           2.000     EACH
 0338      Baxmeyer Construction, Inc.                                  2,875.0000        5,750.00        5,750.00
 3108      Keller Construction, Inc.                                    3,205.6100        6,411.22        6,411.22
 5802      Stutz Excavating, Inc.                                       1,785.0000        3,570.00        3,570.00

    60240328  INLETS TB T24F&G                             1.000     EACH
 0338      Baxmeyer Construction, Inc.                                  2,850.0000        2,850.00        2,850.00
 3108      Keller Construction, Inc.                                    3,205.6300        3,205.63        3,205.63
 5802      Stutz Excavating, Inc.                                       1,785.0000        1,785.00        1,785.00

    60240361  INLET TB M INL 604101                        1.000     EACH
 0338      Baxmeyer Construction, Inc.                                  2,850.0000        2,850.00        2,850.00
 3108      Keller Construction, Inc.                                    3,205.6300        3,205.63        3,205.63
 5802      Stutz Excavating, Inc.                                       2,340.0000        2,340.00        2,340.00

    60500060  REMOV INLETS                                18.000     EACH
 0338      Baxmeyer Construction, Inc.                                    575.0000       10,350.00       10,350.00
 3108      Keller Construction, Inc.                                      522.0000        9,396.00        9,396.00
 5802      Stutz Excavating, Inc.                                         895.0000       16,110.00       16,110.00

    60603800  COMB CC&G TB6.12                           297.000     FOOT
 0338      Baxmeyer Construction, Inc.                                    125.0000       37,125.00       37,125.00
 3108      Keller Construction, Inc.                                      103.2500       30,665.25       30,665.25
 5802      Stutz Excavating, Inc.                                          62.8500       18,666.45       18,666.45

    60604100  COMB CC&G TB6.12 MOD                     3,091.000     FOOT
 0338      Baxmeyer Construction, Inc.                                     80.0000      247,280.00      247,280.00
 3108      Keller Construction, Inc.                                       72.0500      222,706.55      222,706.55
 5802      Stutz Excavating, Inc.                                          37.5000      115,912.50      115,912.50

    60605000  COMB CC&G TY B-6.24                      9,576.000     FOOT
 0338      Baxmeyer Construction, Inc.                                     62.0000      593,712.00      593,712.00
 3108      Keller Construction, Inc.                                       60.8500      582,699.60      582,699.60
 5802      Stutz Excavating, Inc.                                          32.6000      312,177.60      312,177.60

    60606200  COMB CC&G TB9.12 MOD                       635.000     FOOT
 0338      Baxmeyer Construction, Inc.                                    138.0000       87,630.00       87,630.00
 3108      Keller Construction, Inc.                                       99.6500       63,277.75       63,277.75
 5802      Stutz Excavating, Inc.                                          74.3500       47,212.25       47,212.25

    60608300  COMB CC&G TM2.12                           861.000     FOOT
 0338      Baxmeyer Construction, Inc.                                    132.0000      113,652.00      113,652.00
 3108      Keller Construction, Inc.                                       77.1800       66,451.98       66,451.98
 5802      Stutz Excavating, Inc.                                          74.4500       64,101.45       64,101.45

    60618300  CONC MEDIAN SURF 4                      20,340.000    SQ FT
 0338      Baxmeyer Construction, Inc.                                      4.5000       91,530.00       91,530.00
 3108      Keller Construction, Inc.                                       16.0500      326,457.00      326,457.00
 5802      Stutz Excavating, Inc.                                           8.6000      174,924.00      174,924.00

    63000003  SPBGR TY A  9FT POSTS                       75.000     FOOT
 0338      Baxmeyer Construction, Inc.                                     52.0000        3,900.00        3,900.00
 3108      Keller Construction, Inc.                                       45.0000        3,375.00        3,375.00
 5802      Stutz Excavating, Inc.                                          47.4500        3,558.75        3,558.75

    63100167  TR BAR TRM T1 SPL TAN                        2.000     EACH
 0338      Baxmeyer Construction, Inc.                                  4,200.0000        8,400.00        8,400.00
 3108      Keller Construction, Inc.                                    3,800.0000        7,600.00        7,600.00
 5802      Stutz Excavating, Inc.                                       3,815.0000        7,630.00        7,630.00

    66900200  NON SPL WASTE DISPOSL                      650.000    CU YD
 0338      Baxmeyer Construction, Inc.                                    103.0000       66,950.00       66,950.00
 3108      Keller Construction, Inc.                                      136.8800       88,972.00       88,972.00
 5802      Stutz Excavating, Inc.                                         190.0000      123,500.00      123,500.00

    66900530  SOIL DISPOSAL ANALY                          9.000     EACH
 0338      Baxmeyer Construction, Inc.                                  1,550.0000       13,950.00       13,950.00
 3108      Keller Construction, Inc.                                    1,350.0000       12,150.00       12,150.00
 5802      Stutz Excavating, Inc.                                       1,272.0000       11,448.00       11,448.00

    66901001  REG SUB P-CONST PLAN                         1.000    L SUM
 0338      Baxmeyer Construction, Inc.                                  3,500.0000        3,500.00        3,500.00
 3108      Keller Construction, Inc.                                    2,200.0000        2,200.00        2,200.00
 5802      Stutz Excavating, Inc.                                       3,180.0000        3,180.00        3,180.00

    66901003  REG SUB F CON REPORT                         1.000    L SUM
 0338      Baxmeyer Construction, Inc.                                  1,200.0000        1,200.00        1,200.00
 3108      Keller Construction, Inc.                                    2,200.0000        2,200.00        2,200.00
 5802      Stutz Excavating, Inc.                                       1,060.0000        1,060.00        1,060.00

    66901006  REG SUB MON                                 25.000   CAL DA
 0338      Baxmeyer Construction, Inc.                                  1,400.0000       35,000.00       35,000.00
 3108      Keller Construction, Inc.                                      990.0000       24,750.00       24,750.00
 5802      Stutz Excavating, Inc.                                       1,060.0000       26,500.00       26,500.00

    67100100  MOBILIZATION                                 1.000    L SUM
 0338      Baxmeyer Construction, Inc.                                392,036.8700      392,036.87      392,036.87
 3108      Keller Construction, Inc.                                  520,550.0000      520,550.00      520,550.00
 5802      Stutz Excavating, Inc.                                     617,000.0000      617,000.00      617,000.00

    70102620  TR CONT & PROT 701501                        1.000    L SUM
 0338      Baxmeyer Construction, Inc.                                  4,350.0000        4,350.00        4,350.00
 3108      Keller Construction, Inc.                                    6,900.0000        6,900.00        6,900.00
 5802      Stutz Excavating, Inc.                                       4,000.0000        4,000.00        4,000.00

    70102640  TR CONT & PROT 701801                        1.000    L SUM
 0338      Baxmeyer Construction, Inc.                                  1,100.0000        1,100.00        1,100.00
 3108      Keller Construction, Inc.                                    2,250.0000        2,250.00        2,250.00
 5802      Stutz Excavating, Inc.                                         980.0000          980.00          980.00

    70103815  TR CONT SURVEILLANCE                       900.000   CAL DA
 0338      Baxmeyer Construction, Inc.                                    467.0000      420,300.00      420,300.00
 3108      Keller Construction, Inc.                                        0.0100            9.00            9.00
 5802      Stutz Excavating, Inc.                                         360.0000      324,000.00      324,000.00

    70107025  CHANGEABLE MESSAGE SN                      224.000   CAL DA
 0338      Baxmeyer Construction, Inc.                                     75.0000       16,800.00       16,800.00
 3108      Keller Construction, Inc.                                      100.0000       22,400.00       22,400.00
 5802      Stutz Excavating, Inc.                                          68.0000       15,232.00       15,232.00

    70300100  SHORT TERM PAVT MKING                    2,436.000     FOOT
 0338      Baxmeyer Construction, Inc.                                      4.2500       10,353.00       10,353.00
 3108      Keller Construction, Inc.                                        4.9000       11,936.40       11,936.40
 5802      Stutz Excavating, Inc.                                           2.3500        5,724.60        5,724.60

    70300150  SHRT TRM PAVT MK REM                       812.000    SQ FT
 0338      Baxmeyer Construction, Inc.                                      3.0000        2,436.00        2,436.00
 3108      Keller Construction, Inc.                                       10.2800        8,347.36        8,347.36
 5802      Stutz Excavating, Inc.                                           3.2500        2,639.00        2,639.00

    70300211  TEMP PVT MK LTR & SYM PAINT                599.000    SQ FT
 0338      Baxmeyer Construction, Inc.                                      5.0000        2,995.00        2,995.00
 3108      Keller Construction, Inc.                                        4.0000        2,396.00        2,396.00
 5802      Stutz Excavating, Inc.                                           4.2500        2,545.75        2,545.75

    70300221  TEMP PVT MK LINE 4 - PAINT              25,604.000     FOOT
 0338      Baxmeyer Construction, Inc.                                      1.0000       25,604.00       25,604.00
 3108      Keller Construction, Inc.                                        0.8000       20,483.20       20,483.20
 5802      Stutz Excavating, Inc.                                           0.8500       21,763.40       21,763.40

    70300251  TEMP PVT MK LINE 8 - PAINT                 688.000     FOOT
 0338      Baxmeyer Construction, Inc.                                      1.2500          860.00          860.00
 3108      Keller Construction, Inc.                                        1.0000          688.00          688.00
 5802      Stutz Excavating, Inc.                                           1.0500          722.40          722.40

    70300261  TEMP PVT MK LINE 12 - PAINT              1,192.000     FOOT
 0338      Baxmeyer Construction, Inc.                                      5.0000        5,960.00        5,960.00
 3108      Keller Construction, Inc.                                        4.0000        4,768.00        4,768.00
 5802      Stutz Excavating, Inc.                                           4.2500        5,066.00        5,066.00

    70300281  TEMP PVT MK LINE 24 - PAINT                789.000     FOOT
 0338      Baxmeyer Construction, Inc.                                      6.0000        4,734.00        4,734.00
 3108      Keller Construction, Inc.                                        5.0000        3,945.00        3,945.00
 5802      Stutz Excavating, Inc.                                           5.3000        4,181.70        4,181.70

    70400100  TEMP CONC BARRIER                          925.000     FOOT
 0338      Baxmeyer Construction, Inc.                                     58.0000       53,650.00       53,650.00
 3108      Keller Construction, Inc.                                       43.4500       40,191.25       40,191.25
 5802      Stutz Excavating, Inc.                                          53.0000       49,025.00       49,025.00

    70400200  REL TEMP CONC BARRIER                      260.000     FOOT
 0338      Baxmeyer Construction, Inc.                                     16.0000        4,160.00        4,160.00
 3108      Keller Construction, Inc.                                       31.1000        8,086.00        8,086.00
 5802      Stutz Excavating, Inc.                                          14.3000        3,718.00        3,718.00

    70600250  IMP ATTN TEMP NRD TL3                        4.000     EACH
 0338      Baxmeyer Construction, Inc.                                  8,350.0000       33,400.00       33,400.00
 3108      Keller Construction, Inc.                                    8,500.0000       34,000.00       34,000.00
 5802      Stutz Excavating, Inc.                                       7,600.0000       30,400.00       30,400.00

    70600350  IMP ATTN REL NRD  TL3                        2.000     EACH
 0338      Baxmeyer Construction, Inc.                                    750.0000        1,500.00        1,500.00
 3108      Keller Construction, Inc.                                      400.0000          800.00          800.00
 5802      Stutz Excavating, Inc.                                         690.0000        1,380.00        1,380.00

    72000100  SIGN PANEL T1                              585.000    SQ FT
 0338      Baxmeyer Construction, Inc.                                     25.0000       14,625.00       14,625.00
 3108      Keller Construction, Inc.                                       21.0000       12,285.00       12,285.00
 5802      Stutz Excavating, Inc.                                          22.2500       13,016.25       13,016.25

    72000300  SIGN PANEL T3                              170.000    SQ FT
 0338      Baxmeyer Construction, Inc.                                     68.0000       11,560.00       11,560.00
 3108      Keller Construction, Inc.                                       57.7500        9,817.50        9,817.50
 5802      Stutz Excavating, Inc.                                          61.2000       10,404.00       10,404.00

    72501000  TERMINAL MARKER - DA                         2.000     EACH
 0338      Baxmeyer Construction, Inc.                                     49.0000           98.00           98.00
 3108      Keller Construction, Inc.                                       50.0000          100.00          100.00
 5802      Stutz Excavating, Inc.                                          44.5000           89.00           89.00

    72700200  TUB STL SN SUPPORT BA                    1,331.000    POUND
 0338      Baxmeyer Construction, Inc.                                     17.0000       22,627.00       22,627.00
 3108      Keller Construction, Inc.                                       14.5000       19,299.50       19,299.50
 5802      Stutz Excavating, Inc.                                          15.4000       20,497.40       20,497.40

    72800100  TELES STL SIN SUPPORT                    1,188.000     FOOT
 0338      Baxmeyer Construction, Inc.                                     17.0000       20,196.00       20,196.00
 3108      Keller Construction, Inc.                                       14.5000       17,226.00       17,226.00
 5802      Stutz Excavating, Inc.                                          15.4000       18,295.20       18,295.20

    73100100  BASE TEL STL SIN SUPP                       14.000     EACH
 0338      Baxmeyer Construction, Inc.                                    375.0000        5,250.00        5,250.00
 3108      Keller Construction, Inc.                                      321.7500        4,504.50        4,504.50
 5802      Stutz Excavating, Inc.                                         341.0000        4,774.00        4,774.00

    73400100  CONC FOUNDATION                              8.400    CU YD
 0338      Baxmeyer Construction, Inc.                                  3,950.0000       33,180.00       33,180.00
 3108      Keller Construction, Inc.                                    3,350.0000       28,140.00       28,140.00
 5802      Stutz Excavating, Inc.                                       3,550.0000       29,820.00       29,820.00

    78000100  THPL PVT MK LTR & SYM                      160.000    SQ FT
 0338      Baxmeyer Construction, Inc.                                     14.0000        2,240.00        2,240.00
 3108      Keller Construction, Inc.                                       12.0000        1,920.00        1,920.00
 5802      Stutz Excavating, Inc.                                          12.7500        2,040.00        2,040.00

    78000200  THPL PVT MK LINE  4                      5,619.000     FOOT
 0338      Baxmeyer Construction, Inc.                                      3.5000       19,666.50       19,666.50
 3108      Keller Construction, Inc.                                        3.0000       16,857.00       16,857.00
 5802      Stutz Excavating, Inc.                                           3.2000       17,980.80       17,980.80

    78000600  THPL PVT MK LINE 12                        142.000     FOOT
 0338      Baxmeyer Construction, Inc.                                      9.5000        1,349.00        1,349.00
 3108      Keller Construction, Inc.                                        8.0000        1,136.00        1,136.00
 5802      Stutz Excavating, Inc.                                           8.5000        1,207.00        1,207.00

    78009000  MOD URETH PM LTR-SYM                       439.000    SQ FT
 0338      Baxmeyer Construction, Inc.                                     29.0000       12,731.00       12,731.00
 3108      Keller Construction, Inc.                                       25.0000       10,975.00       10,975.00
 5802      Stutz Excavating, Inc.                                          26.5000       11,633.50       11,633.50

    78009004  MOD URETH PM LINE  4                    19,645.000     FOOT
 0338      Baxmeyer Construction, Inc.                                      2.2500       44,201.25       44,201.25
 3108      Keller Construction, Inc.                                        2.0000       39,290.00       39,290.00
 5802      Stutz Excavating, Inc.                                           2.1000       41,254.50       41,254.50

    78009008  MOD URETH PM LINE  8                     1,028.000     FOOT
 0338      Baxmeyer Construction, Inc.                                      3.5000        3,598.00        3,598.00
 3108      Keller Construction, Inc.                                        3.0000        3,084.00        3,084.00
 5802      Stutz Excavating, Inc.                                           3.2000        3,289.60        3,289.60

    78009012  MOD URETH PM LINE 12                       857.000     FOOT
 0338      Baxmeyer Construction, Inc.                                     11.7500       10,069.75       10,069.75
 3108      Keller Construction, Inc.                                       10.0000        8,570.00        8,570.00
 5802      Stutz Excavating, Inc.                                          10.6000        9,084.20        9,084.20

    78009018  MOD URETH PM LINE 18                       193.000     FOOT
 0338      Baxmeyer Construction, Inc.                                     17.5000        3,377.50        3,377.50
 3108      Keller Construction, Inc.                                       15.0000        2,895.00        2,895.00
 5802      Stutz Excavating, Inc.                                          15.9000        3,068.70        3,068.70

    78009024  MOD URETH PM LINE 24                       789.000     FOOT
 0338      Baxmeyer Construction, Inc.                                     29.0000       22,881.00       22,881.00
 3108      Keller Construction, Inc.                                       25.0000       19,725.00       19,725.00
 5802      Stutz Excavating, Inc.                                          26.5000       20,908.50       20,908.50

    78100100  RAISED REFL PAVT MKR                       189.000     EACH
 0338      Baxmeyer Construction, Inc.                                     88.0000       16,632.00       16,632.00
 3108      Keller Construction, Inc.                                       84.0000       15,876.00       15,876.00
 5802      Stutz Excavating, Inc.                                          80.0000       15,120.00       15,120.00

    78200005  GRDRAIL REF TYPE A                           4.000     EACH
 0338      Baxmeyer Construction, Inc.                                     14.0000           56.00           56.00
 3108      Keller Construction, Inc.                                       10.0000           40.00           40.00
 5802      Stutz Excavating, Inc.                                          12.7500           51.00           51.00

    78200020  CURB REFLECTORS                            200.000     EACH
 0338      Baxmeyer Construction, Inc.                                     14.0000        2,800.00        2,800.00
 3108      Keller Construction, Inc.                                       15.0000        3,000.00        3,000.00
 5802      Stutz Excavating, Inc.                                          12.7500        2,550.00        2,550.00

    78300200  RAISED REF PVT MK REM                       14.000     EACH
 0338      Baxmeyer Construction, Inc.                                     36.0000          504.00          504.00
 3108      Keller Construction, Inc.                                      100.0000        1,400.00        1,400.00
 5802      Stutz Excavating, Inc.                                         115.0000        1,610.00        1,610.00

    78300202  PVT MKG REM WTR BLAST                   12,832.000    SQ FT
 0338      Baxmeyer Construction, Inc.                                      1.2500       16,040.00       16,040.00
 3108      Keller Construction, Inc.                                        1.0000       12,832.00       12,832.00
 5802      Stutz Excavating, Inc.                                           1.0500       13,473.60       13,473.60

    80400100  ELECT SERV INSTALL                           1.000     EACH
 0338      Baxmeyer Construction, Inc.                                 18,700.0000       18,700.00       18,700.00
 3108      Keller Construction, Inc.                                   16,000.0000       16,000.00       16,000.00
 5802      Stutz Excavating, Inc.                                      16,960.0000       16,960.00       16,960.00

    81028220  UNDRGRD C GALVS     3                      396.000     FOOT
 0338      Baxmeyer Construction, Inc.                                     91.0000       36,036.00       36,036.00
 3108      Keller Construction, Inc.                                       78.0000       30,888.00       30,888.00
 5802      Stutz Excavating, Inc.                                          82.7000       32,749.20       32,749.20

    81028350  UNDRGRD C PVC 2                            177.000     FOOT
 0338      Baxmeyer Construction, Inc.                                     76.0000       13,452.00       13,452.00
 3108      Keller Construction, Inc.                                       65.0000       11,505.00       11,505.00
 5802      Stutz Excavating, Inc.                                          69.0000       12,213.00       12,213.00

    81603112  UD2#6#8G XLPUSE 1.25P                    5,819.000     FOOT
 0338      Baxmeyer Construction, Inc.                                     23.0000      133,837.00      133,837.00
 3108      Keller Construction, Inc.                                       19.6500      114,343.35      114,343.35
 5802      Stutz Excavating, Inc.                                          20.8500      121,326.15      121,326.15

    81702120  EC C XLP USE 1C  8                          40.000     FOOT
 0338      Baxmeyer Construction, Inc.                                     17.5000          700.00          700.00
 3108      Keller Construction, Inc.                                       15.0000          600.00          600.00
 5802      Stutz Excavating, Inc.                                          15.9000          636.00          636.00

    81702130  EC C XLP USE 1C  6                          70.000     FOOT
 0338      Baxmeyer Construction, Inc.                                     20.0000        1,400.00        1,400.00
 3108      Keller Construction, Inc.                                       17.0000        1,190.00        1,190.00
 5802      Stutz Excavating, Inc.                                          18.0000        1,260.00        1,260.00

    82110008  LUM LED RDWY H                              40.000     EACH
 0338      Baxmeyer Construction, Inc.                                    995.0000       39,800.00       39,800.00
 3108      Keller Construction, Inc.                                      850.0000       34,000.00       34,000.00
 5802      Stutz Excavating, Inc.                                         901.0000       36,040.00       36,040.00

    82500350  LT CONT BASEM 240V100                        1.000     EACH
 0338      Baxmeyer Construction, Inc.                                 17,250.0000       17,250.00       17,250.00
 3108      Keller Construction, Inc.                                   14,785.0000       14,785.00       14,785.00
 5802      Stutz Excavating, Inc.                                      15,672.0000       15,672.00       15,672.00

    83007400  LT P A 35MH 10MA                            40.000     EACH
 0338      Baxmeyer Construction, Inc.                                  5,800.0000      232,000.00      232,000.00
 3108      Keller Construction, Inc.                                    4,975.0000      199,000.00      199,000.00
 5802      Stutz Excavating, Inc.                                       5,273.0000      210,920.00      210,920.00

    83600200  LIGHT POLE FDN 24D                         220.000     FOOT
 0338      Baxmeyer Construction, Inc.                                    575.0000      126,500.00      126,500.00
 3108      Keller Construction, Inc.                                      495.0000      108,900.00      108,900.00
 5802      Stutz Excavating, Inc.                                         525.0000      115,500.00      115,500.00

    83800506  BKWY DEV COU ALU SKRT OVR SSS              160.000     EACH
 0338      Baxmeyer Construction, Inc.                                    345.0000       55,200.00       55,200.00
 3108      Keller Construction, Inc.                                      295.0000       47,200.00       47,200.00
 5802      Stutz Excavating, Inc.                                         313.0000       50,080.00       50,080.00

    84200500  REM LT UNIT SALV                             1.000     EACH
 0338      Baxmeyer Construction, Inc.                                  1,725.0000        1,725.00        1,725.00
 3108      Keller Construction, Inc.                                    1,480.0000        1,480.00        1,480.00
 5802      Stutz Excavating, Inc.                                       1,569.0000        1,569.00        1,569.00

    84200804  REM POLE FDN                                 1.000     EACH
 0338      Baxmeyer Construction, Inc.                                    875.0000          875.00          875.00
 3108      Keller Construction, Inc.                                      750.0000          750.00          750.00
 5802      Stutz Excavating, Inc.                                         795.0000          795.00          795.00

    89502375  REMOV EX TS EQUIP                            2.000     EACH
 0338      Baxmeyer Construction, Inc.                                 22,150.0000       44,300.00       44,300.00
 3108      Keller Construction, Inc.                                   18,960.0000       37,920.00       37,920.00
 5802      Stutz Excavating, Inc.                                      20,100.0000       40,200.00       40,200.00

    89502380  REMOV EX HANDHOLE                           14.000     EACH
 0338      Baxmeyer Construction, Inc.                                    540.0000        7,560.00        7,560.00
 3108      Keller Construction, Inc.                                      460.0000        6,440.00        6,440.00
 5802      Stutz Excavating, Inc.                                         488.0000        6,832.00        6,832.00

    89502382  REMOV EX DBL HANDHOLE                        1.000     EACH
 0338      Baxmeyer Construction, Inc.                                    875.0000          875.00          875.00
 3108      Keller Construction, Inc.                                      750.0000          750.00          750.00
 5802      Stutz Excavating, Inc.                                         795.0000          795.00          795.00

    89502385  REMOV EX CONC FDN                           13.000     EACH
 0338      Baxmeyer Construction, Inc.                                  1,100.0000       14,300.00       14,300.00
 3108      Keller Construction, Inc.                                      925.0000       12,025.00       12,025.00
 5802      Stutz Excavating, Inc.                                         980.0000       12,740.00       12,740.00