                                               ILLINOIS DEPARTMENT OF TRANSPORTATION                                      PAGE:    1
 09/06/22  12:14:23                   U N I T  P R I C E   T A B U L A T I O N   O F   B I D S
 LETTING DATE: 04/29/2022  LETTING TYPE: SCHEDULED                                 CONTRACT NUMBER: 61G32  LETTING ITEM NUMBER: 182
 RESPONSIBLE DISTRICT: 01                                                                                  BIDS LOCKED: Y
 SECTION: 16-08112-01-BR                           COUNTY: KANE                                            ESTIMATE:
 STATE JOB NUMBER:   C-91-470-16                   MUNICIPALITY:
 PROJECT NUMBER: LQZ2-494 /   /
                                                      --------------------------
                                                      SUMMARY OF CONTRACTOR BIDS
                                                      --------------------------

                                                             "AS READ"          SUMMATION    SUMMATION OF                       NBR
 BIDR                     CONTR        COMB  ITEM  CONTR      BIDDER            OF BIDDER     CALCULATED   LOW   BIDR CALC      BLANK
 NBR   BIDDER NAME        GROUP  COMB  GRP   NBR   GROUP      TOTAL PRICE       EXTENSIONS    EXTENSIONS   BID   EXTENSION DIFF BIDS


 0103  Alliance Contractors, Inc.
                          NO ALT                            2,610,331.34     2,610,331.34   2,610,331.34

 0204  Areatha Construction Co., Inc.
                          NO ALT                            2,281,614.82     2,281,614.82   2,281,614.82

 1216  Copenhaver Construction, Inc.
                          NO ALT                            2,374,658.89     2,374,658.89   2,374,658.89

 2520  Herlihy Mid-Continent Company
                          NO ALT                            2,417,931.00     2,417,931.00   2,417,931.00

 3505  Lorig Construction Company
                          NO ALT                            2,279,676.60 *   2,279,676.60   2,279,676.60    *

 4657  F. H. Paschen, S.N. Nielsen & Associates LLC
                          NO ALT                            2,643,579.64     2,643,579.64   2,643,579.64

 **** TOTAL GROUP NO ALT PAY ITEMS FOR THIS CONTRACT =      88
                                                       ----------------------
                                                       DETAIL CONTRACTOR BIDS
                                                       ----------------------

    ITEM NBR  ITEM DESCRIPTION                                    UNIT OF     UNIT        BIDDER         CALCULATED  BIDR CALC
 BIDR NBR  BIDDER NAME                                  QUANTITY  MEASURE     PRICE       EXTENSION      EXTENSION   EXTENSION DIFF


    A2007116  T-QUERCUS RUBRA     2                        2.000     EACH
 0103      Alliance Contractors, Inc.                                     450.0000          900.00          900.00
 0204      Areatha Construction Co., Inc.                                 608.7000        1,217.40        1,217.40
 1216      Copenhaver Construction, Inc.                                  750.0000        1,500.00        1,500.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                   450.0000          900.00          900.00
 2520      Herlihy Mid-Continent Company                                  450.0000          900.00          900.00
 3505      Lorig Construction Company                                     450.0000          900.00          900.00

    A2008470  T-ULMUS AMER PRNC 2.5                        1.000     EACH
 0103      Alliance Contractors, Inc.                                     600.0000          600.00          600.00
 0204      Areatha Construction Co., Inc.                                 684.7500          684.75          684.75
 1216      Copenhaver Construction, Inc.                                  800.0000          800.00          800.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                   600.0000          600.00          600.00
 2520      Herlihy Mid-Continent Company                                  600.0000          600.00          600.00
 3505      Lorig Construction Company                                     600.0000          600.00          600.00

    C2009650  S-SAMBUCUS EVA   CG5G                       14.000     EACH
 0103      Alliance Contractors, Inc.                                      40.0000          560.00          560.00
 0204      Areatha Construction Co., Inc.                                  76.0000        1,064.00        1,064.00
 1216      Copenhaver Construction, Inc.                                  100.0000        1,400.00        1,400.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                    40.0000          560.00          560.00
 2520      Herlihy Mid-Continent Company                                   40.0000          560.00          560.00
 3505      Lorig Construction Company                                      40.0000          560.00          560.00

    D2002960  E-PINUS STROBUS    5'                        2.000     EACH
 0103      Alliance Contractors, Inc.                                     250.0000          500.00          500.00
 0204      Areatha Construction Co., Inc.                                 456.5000          913.00          913.00
 1216      Copenhaver Construction, Inc.                                  750.0000        1,500.00        1,500.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                   250.0000          500.00          500.00
 2520      Herlihy Mid-Continent Company                                  250.0000          500.00          500.00
 3505      Lorig Construction Company                                     250.0000          500.00          500.00

    X0322936  REMOV EX FLAR END SEC                        4.000     EACH
 0103      Alliance Contractors, Inc.                                     500.0000        2,000.00        2,000.00
 0204      Areatha Construction Co., Inc.                                 791.0000        3,164.00        3,164.00
 1216      Copenhaver Construction, Inc.                                  120.0000          480.00          480.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                   550.0000        2,200.00        2,200.00
 2520      Herlihy Mid-Continent Company                                  550.0000        2,200.00        2,200.00
 3505      Lorig Construction Company                                     650.0000        2,600.00        2,600.00

    X2510635  HD EROS CONT BLANK SP                    3,787.000    SQ YD
 0103      Alliance Contractors, Inc.                                       1.8000        6,816.60        6,816.60
 0204      Areatha Construction Co., Inc.                                   1.8000        6,816.60        6,816.60
 1216      Copenhaver Construction, Inc.                                    2.5000        9,467.50        9,467.50
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                     1.8000        6,816.60        6,816.60
 2520      Herlihy Mid-Continent Company                                    1.8000        6,816.60        6,816.60
 3505      Lorig Construction Company                                       1.8000        6,816.60        6,816.60

    X2511630  EROS CONT BLANKET SPL                    2,390.000    SQ YD
 0103      Alliance Contractors, Inc.                                       1.3500        3,226.50        3,226.50
 0204      Areatha Construction Co., Inc.                                   1.8000        4,302.00        4,302.00
 1216      Copenhaver Construction, Inc.                                    2.0000        4,780.00        4,780.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                     1.3500        3,226.50        3,226.50
 2520      Herlihy Mid-Continent Company                                    1.3500        3,226.50        3,226.50
 3505      Lorig Construction Company                                       1.3500        3,226.50        3,226.50

    X7010216  TRAF CONT & PROT SPL                         1.000    L SUM
 0103      Alliance Contractors, Inc.                                   8,200.0000        8,200.00        8,200.00
 0204      Areatha Construction Co., Inc.                              15,723.9500       15,723.95       15,723.95
 1216      Copenhaver Construction, Inc.                               85,000.0000       85,000.00       85,000.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                10,028.0000       10,028.00       10,028.00
 2520      Herlihy Mid-Continent Company                               10,028.0000       10,028.00       10,028.00
 3505      Lorig Construction Company                                  25,000.0000       25,000.00       25,000.00

    Z0001900  ASB BEARING PAD REMOV                       56.000     EACH
 0103      Alliance Contractors, Inc.                                     100.0000        5,600.00        5,600.00
 0204      Areatha Construction Co., Inc.                                 101.4500        5,681.20        5,681.20
 1216      Copenhaver Construction, Inc.                                    1.0000           56.00           56.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                   100.0000        5,600.00        5,600.00
 2520      Herlihy Mid-Continent Company                                   25.0000        1,400.00        1,400.00
 3505      Lorig Construction Company                                     275.0000       15,400.00       15,400.00

    Z0012754  STR REP CON DP = <  5                      100.000    SQ FT
 0103      Alliance Contractors, Inc.                                     275.0000       27,500.00       27,500.00
 0204      Areatha Construction Co., Inc.                                 111.0000       11,100.00       11,100.00
 1216      Copenhaver Construction, Inc.                                  165.0000       16,500.00       16,500.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                   216.1400       21,614.00       21,614.00
 2520      Herlihy Mid-Continent Company                                  252.3900       25,239.00       25,239.00
 3505      Lorig Construction Company                                     160.0000       16,000.00       16,000.00

    Z0013798  CONSTRUCTION LAYOUT                          1.000    L SUM
 0103      Alliance Contractors, Inc.                                  14,900.0000       14,900.00       14,900.00
 0204      Areatha Construction Co., Inc.                              16,200.0000       16,200.00       16,200.00
 1216      Copenhaver Construction, Inc.                               29,000.0000       29,000.00       29,000.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC               300,000.0000      300,000.00      300,000.00
 2520      Herlihy Mid-Continent Company                               33,000.0000       33,000.00       33,000.00
 3505      Lorig Construction Company                                  37,500.0000       37,500.00       37,500.00

    Z0048665  RR PROT LIABILITY INS                        1.000    L SUM
 0103      Alliance Contractors, Inc.                                     500.0000          500.00          500.00
 0204      Areatha Construction Co., Inc.                              14,704.0000       14,704.00       14,704.00
 1216      Copenhaver Construction, Inc.                               12,000.0000       12,000.00       12,000.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                10,000.0000       10,000.00       10,000.00
 2520      Herlihy Mid-Continent Company                               15,000.0000       15,000.00       15,000.00
 3505      Lorig Construction Company                                   2,000.0000        2,000.00        2,000.00

    Z0073510  TEMP TR SIGNAL TIMING                        5.000     EACH
 0103      Alliance Contractors, Inc.                                     250.0000        1,250.00        1,250.00
 0204      Areatha Construction Co., Inc.                               1,014.0000        5,070.00        5,070.00
 1216      Copenhaver Construction, Inc.                                  300.0000        1,500.00        1,500.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                   250.0000        1,250.00        1,250.00
 2520      Herlihy Mid-Continent Company                                  250.0000        1,250.00        1,250.00
 3505      Lorig Construction Company                                     250.0000        1,250.00        1,250.00

    Z0076600  TRAINEES                                 1,000.000     HOUR
 0103      Alliance Contractors, Inc.                                       0.8000          800.00          800.00
 0204      Areatha Construction Co., Inc.                                   0.8000          800.00          800.00
 1216      Copenhaver Construction, Inc.                                    0.8000          800.00          800.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                     0.8000          800.00          800.00
 2520      Herlihy Mid-Continent Company                                    0.8000          800.00          800.00
 3505      Lorig Construction Company                                       0.8000          800.00          800.00

    Z0076604  TRAINEES TPG                             1,000.000     HOUR
 0103      Alliance Contractors, Inc.                                      15.0000       15,000.00       15,000.00
 0204      Areatha Construction Co., Inc.                                  15.0000       15,000.00       15,000.00
 1216      Copenhaver Construction, Inc.                                   15.0000       15,000.00       15,000.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                    15.0000       15,000.00       15,000.00
 2520      Herlihy Mid-Continent Company                                   15.0000       15,000.00       15,000.00
 3505      Lorig Construction Company                                      15.0000       15,000.00       15,000.00

    20100110  TREE REMOV 6-15                             13.000     UNIT
 0103      Alliance Contractors, Inc.                                      50.0000          650.00          650.00
 0204      Areatha Construction Co., Inc.                                  71.0000          923.00          923.00
 1216      Copenhaver Construction, Inc.                                   30.0000          390.00          390.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                    50.0000          650.00          650.00
 2520      Herlihy Mid-Continent Company                                   42.0000          546.00          546.00
 3505      Lorig Construction Company                                      50.0000          650.00          650.00

    20100210  TREE REMOV OVER 15                          54.000     UNIT
 0103      Alliance Contractors, Inc.                                      70.0000        3,780.00        3,780.00
 0204      Areatha Construction Co., Inc.                                 101.0000        5,454.00        5,454.00
 1216      Copenhaver Construction, Inc.                                   31.0000        1,674.00        1,674.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                    70.0000        3,780.00        3,780.00
 2520      Herlihy Mid-Continent Company                                   45.0000        2,430.00        2,430.00
 3505      Lorig Construction Company                                      70.0000        3,780.00        3,780.00

    20200100  EARTH EXCAVATION                           477.000    CU YD
 0103      Alliance Contractors, Inc.                                      10.0000        4,770.00        4,770.00
 0204      Areatha Construction Co., Inc.                                  17.5500        8,371.35        8,371.35
 1216      Copenhaver Construction, Inc.                                   25.0000       11,925.00       11,925.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                    30.0000       14,310.00       14,310.00
 2520      Herlihy Mid-Continent Company                                   19.0000        9,063.00        9,063.00
 3505      Lorig Construction Company                                      32.0000       15,264.00       15,264.00

    20201200  REM & DISP UNS MATL                        915.000    CU YD
 0103      Alliance Contractors, Inc.                                      15.0000       13,725.00       13,725.00
 0204      Areatha Construction Co., Inc.                                  44.8500       41,037.75       41,037.75
 1216      Copenhaver Construction, Inc.                                   25.0000       22,875.00       22,875.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                    35.0000       32,025.00       32,025.00
 2520      Herlihy Mid-Continent Company                                   11.4000       10,431.00       10,431.00
 3505      Lorig Construction Company                                      50.0000       45,750.00       45,750.00

    20400800  FURNISHED EXCAVATION                     3,318.000    CU YD
 0103      Alliance Contractors, Inc.                                       5.0000       16,590.00       16,590.00
 0204      Areatha Construction Co., Inc.                                  28.6500       95,060.70       95,060.70
 1216      Copenhaver Construction, Inc.                                   15.0000       49,770.00       49,770.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                    42.0000      139,356.00      139,356.00
 2520      Herlihy Mid-Continent Company                                   29.0000       96,222.00       96,222.00
 3505      Lorig Construction Company                                      27.0000       89,586.00       89,586.00

    20800150  TRENCH BACKFILL                             30.000    CU YD
 0103      Alliance Contractors, Inc.                                      35.0000        1,050.00        1,050.00
 0204      Areatha Construction Co., Inc.                                  90.0000        2,700.00        2,700.00
 1216      Copenhaver Construction, Inc.                                   39.0000        1,170.00        1,170.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                    90.0000        2,700.00        2,700.00
 2520      Herlihy Mid-Continent Company                                   90.0000        2,700.00        2,700.00
 3505      Lorig Construction Company                                      50.0000        1,500.00        1,500.00

    21001000  GEOTECH FAB F/GR STAB                      278.000    SQ YD
 0103      Alliance Contractors, Inc.                                       1.0000          278.00          278.00
 0204      Areatha Construction Co., Inc.                                   2.1500          597.70          597.70
 1216      Copenhaver Construction, Inc.                                    2.0000          556.00          556.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                     2.5000          695.00          695.00
 2520      Herlihy Mid-Continent Company                                    2.0000          556.00          556.00
 3505      Lorig Construction Company                                       2.5000          695.00          695.00

    21101625  TOPSOIL F & P  6                         7,514.000    SQ YD
 0103      Alliance Contractors, Inc.                                       0.5000        3,757.00        3,757.00
 0204      Areatha Construction Co., Inc.                                   6.6000       49,592.40       49,592.40
 1216      Copenhaver Construction, Inc.                                    5.0000       37,570.00       37,570.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                     5.0000       37,570.00       37,570.00
 2520      Herlihy Mid-Continent Company                                    4.0000       30,056.00       30,056.00
 3505      Lorig Construction Company                                       5.0000       37,570.00       37,570.00

    21301052  EXPLOR TRENCH 52                            25.000     FOOT
 0103      Alliance Contractors, Inc.                                      25.0000          625.00          625.00
 0204      Areatha Construction Co., Inc.                                  25.0000          625.00          625.00
 1216      Copenhaver Construction, Inc.                                   10.0000          250.00          250.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                    46.2400        1,156.00        1,156.00
 2520      Herlihy Mid-Continent Company                                  219.0000        5,475.00        5,475.00
 3505      Lorig Construction Company                                     100.0000        2,500.00        2,500.00

    25000210  SEEDING CL  2A                                .500     ACRE
 0103      Alliance Contractors, Inc.                                   2,500.0000        1,250.00        1,250.00
 0204      Areatha Construction Co., Inc.                               3,550.0000        1,775.00        1,775.00
 1216      Copenhaver Construction, Inc.                                3,000.0000        1,500.00        1,500.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                 2,500.0000        1,250.00        1,250.00
 2520      Herlihy Mid-Continent Company                                2,500.0000        1,250.00        1,250.00
 3505      Lorig Construction Company                                   2,500.0000        1,250.00        1,250.00

    25000312  SEEDING CL  4A                                .500     ACRE
 0103      Alliance Contractors, Inc.                                   2,000.0000        1,000.00        1,000.00
 0204      Areatha Construction Co., Inc.                               3,043.0000        1,521.50        1,521.50
 1216      Copenhaver Construction, Inc.                                6,000.0000        3,000.00        3,000.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                 2,000.0000        1,000.00        1,000.00
 2520      Herlihy Mid-Continent Company                                2,000.0000        1,000.00        1,000.00
 3505      Lorig Construction Company                                   2,000.0000        1,000.00        1,000.00

    25000314  SEEDING CL  4B                                .030     ACRE
 0103      Alliance Contractors, Inc.                                  10,000.0000          300.00          300.00
 0204      Areatha Construction Co., Inc.                              20,289.0000          608.67          608.67
 1216      Copenhaver Construction, Inc.                               10,000.0000          300.00          300.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                10,000.0000          300.00          300.00
 2520      Herlihy Mid-Continent Company                               10,000.0000          300.00          300.00
 3505      Lorig Construction Company                                  10,000.0000          300.00          300.00

    25000400  NITROGEN FERT NUTR                          29.000    POUND
 0103      Alliance Contractors, Inc.                                       2.0000           58.00           58.00
 0204      Areatha Construction Co., Inc.                                   5.0000          145.00          145.00
 1216      Copenhaver Construction, Inc.                                    1.0000           29.00           29.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                     2.0000           58.00           58.00
 2520      Herlihy Mid-Continent Company                                    2.0000           58.00           58.00
 3505      Lorig Construction Company                                       2.0000           58.00           58.00

    25000600  POTASSIUM FERT NUTR                         29.000    POUND
 0103      Alliance Contractors, Inc.                                       2.0000           58.00           58.00
 0204      Areatha Construction Co., Inc.                                   5.0000          145.00          145.00
 1216      Copenhaver Construction, Inc.                                    1.0000           29.00           29.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                     2.0000           58.00           58.00
 2520      Herlihy Mid-Continent Company                                    2.0000           58.00           58.00
 3505      Lorig Construction Company                                       2.0000           58.00           58.00

    25100115  MULCH METHOD 2                               1.500     ACRE
 0103      Alliance Contractors, Inc.                                   1,800.0000        2,700.00        2,700.00
 0204      Areatha Construction Co., Inc.                               3,043.0000        4,564.50        4,564.50
 1216      Copenhaver Construction, Inc.                                1,500.0000        2,250.00        2,250.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                 1,800.0000        2,700.00        2,700.00
 2520      Herlihy Mid-Continent Company                                1,800.0000        2,700.00        2,700.00
 3505      Lorig Construction Company                                   1,800.0000        2,700.00        2,700.00

    28000250  TEMP EROS CONTR SEED                       149.000    POUND
 0103      Alliance Contractors, Inc.                                       3.0000          447.00          447.00
 0204      Areatha Construction Co., Inc.                                   3.0000          447.00          447.00
 1216      Copenhaver Construction, Inc.                                    0.0100            1.49            1.49
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                     3.0000          447.00          447.00
 2520      Herlihy Mid-Continent Company                                    3.0000          447.00          447.00
 3505      Lorig Construction Company                                       3.0000          447.00          447.00

    28000305  TEMP DITCH CHECKS                           10.000     FOOT
 0103      Alliance Contractors, Inc.                                      12.0000          120.00          120.00
 0204      Areatha Construction Co., Inc.                                   8.0000           80.00           80.00
 1216      Copenhaver Construction, Inc.                                   25.0000          250.00          250.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                    12.0000          120.00          120.00
 2520      Herlihy Mid-Continent Company                                   12.0000          120.00          120.00
 3505      Lorig Construction Company                                      12.0000          120.00          120.00

    28000400  PERIMETER EROS BAR                       2,920.000     FOOT
 0103      Alliance Contractors, Inc.                                       2.7500        8,030.00        8,030.00
 0204      Areatha Construction Co., Inc.                                   2.3000        6,716.00        6,716.00
 1216      Copenhaver Construction, Inc.                                    2.5000        7,300.00        7,300.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                     2.7500        8,030.00        8,030.00
 2520      Herlihy Mid-Continent Company                                    2.7500        8,030.00        8,030.00
 3505      Lorig Construction Company                                       2.7500        8,030.00        8,030.00

    28000510  INLET FILTERS                                4.000     EACH
 0103      Alliance Contractors, Inc.                                      25.0000          100.00          100.00
 0204      Areatha Construction Co., Inc.                                   2.5000           10.00           10.00
 1216      Copenhaver Construction, Inc.                                   80.0000          320.00          320.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                   175.0000          700.00          700.00
 2520      Herlihy Mid-Continent Company                                  175.0000          700.00          700.00
 3505      Lorig Construction Company                                     175.0000          700.00          700.00

    30300001  AGG SUBGRADE IMPROVE                        93.000    CU YD
 0103      Alliance Contractors, Inc.                                      40.0000        3,720.00        3,720.00
 0204      Areatha Construction Co., Inc.                                  42.2000        3,924.60        3,924.60
 1216      Copenhaver Construction, Inc.                                   47.0000        4,371.00        4,371.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                    55.0000        5,115.00        5,115.00
 2520      Herlihy Mid-Continent Company                                   41.6000        3,868.80        3,868.80
 3505      Lorig Construction Company                                      85.0000        7,905.00        7,905.00

    30300112  AGG SUBGRADE IMPR  12                    3,051.000    SQ YD
 0103      Alliance Contractors, Inc.                                      14.0000       42,714.00       42,714.00
 0204      Areatha Construction Co., Inc.                                  18.8500       57,511.35       57,511.35
 1216      Copenhaver Construction, Inc.                                   14.0000       42,714.00       42,714.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                    17.0000       51,867.00       51,867.00
 2520      Herlihy Mid-Continent Company                                   18.0000       54,918.00       54,918.00
 3505      Lorig Construction Company                                      21.0000       64,071.00       64,071.00

    40201000  AGGREGATE-TEMP ACCESS                      100.000      TON
 0103      Alliance Contractors, Inc.                                      15.0000        1,500.00        1,500.00
 0204      Areatha Construction Co., Inc.                                  26.6500        2,665.00        2,665.00
 1216      Copenhaver Construction, Inc.                                   15.0000        1,500.00        1,500.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                    30.0000        3,000.00        3,000.00
 2520      Herlihy Mid-Continent Company                                   34.0000        3,400.00        3,400.00
 3505      Lorig Construction Company                                      25.0000        2,500.00        2,500.00

    40600275  BIT MATLS PR CT                          7,836.000    POUND
 0103      Alliance Contractors, Inc.                                       0.0100           78.36           78.36
 0204      Areatha Construction Co., Inc.                                   0.0100           78.36           78.36
 1216      Copenhaver Construction, Inc.                                    0.1000          783.60          783.60
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                     0.0100           78.36           78.36
 2520      Herlihy Mid-Continent Company                                    0.0100           78.36           78.36
 3505      Lorig Construction Company                                       0.0100           78.36           78.36

    40600290  BIT MATLS TACK CT                          784.000    POUND
 0103      Alliance Contractors, Inc.                                       0.0100            7.84            7.84
 0204      Areatha Construction Co., Inc.                                   0.0100            7.84            7.84
 1216      Copenhaver Construction, Inc.                                    0.1000           78.40           78.40
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                     0.0100            7.84            7.84
 2520      Herlihy Mid-Continent Company                                    0.0100            7.84            7.84
 3505      Lorig Construction Company                                       0.0100            7.84            7.84

    40603080  HMA BC IL-19.0  N50                        145.000      TON
 0103      Alliance Contractors, Inc.                                     106.0000       15,370.00       15,370.00
 0204      Areatha Construction Co., Inc.                                 107.0000       15,515.00       15,515.00
 1216      Copenhaver Construction, Inc.                                  135.0000       19,575.00       19,575.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                   106.0000       15,370.00       15,370.00
 2520      Herlihy Mid-Continent Company                                  122.6000       17,777.00       17,777.00
 3505      Lorig Construction Company                                     110.0000       15,950.00       15,950.00

    40604060  HMA SC IL-9.5 D N50                         36.000      TON
 0103      Alliance Contractors, Inc.                                     223.5000        8,046.00        8,046.00
 0204      Areatha Construction Co., Inc.                                 226.0000        8,136.00        8,136.00
 1216      Copenhaver Construction, Inc.                                  270.0000        9,720.00        9,720.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                   223.5000        8,046.00        8,046.00
 2520      Herlihy Mid-Continent Company                                  244.9000        8,816.40        8,816.40
 3505      Lorig Construction Company                                     225.0000        8,100.00        8,100.00

    40701831  HMA PAVT FD    7 1/2                     3,051.000    SQ YD
 0103      Alliance Contractors, Inc.                                      40.0000      122,040.00      122,040.00
 0204      Areatha Construction Co., Inc.                                  40.6000      123,870.60      123,870.60
 1216      Copenhaver Construction, Inc.                                   45.0000      137,295.00      137,295.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                    43.7500      133,481.25      133,481.25
 2520      Herlihy Mid-Continent Company                                   38.3000      116,853.30      116,853.30
 3505      Lorig Construction Company                                      45.0000      137,295.00      137,295.00

    42000070  PVT CON HMA BR APP SL                      143.000    SQ YD
 0103      Alliance Contractors, Inc.                                      42.0000        6,006.00        6,006.00
 0204      Areatha Construction Co., Inc.                                  42.6000        6,091.80        6,091.80
 1216      Copenhaver Construction, Inc.                                  129.0000       18,447.00       18,447.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                    43.7500        6,256.25        6,256.25
 2520      Herlihy Mid-Continent Company                                  111.6000       15,958.80       15,958.80
 3505      Lorig Construction Company                                      50.0000        7,150.00        7,150.00

    44000100  PAVEMENT REM                             3,753.000    SQ YD
 0103      Alliance Contractors, Inc.                                      15.0000       56,295.00       56,295.00
 0204      Areatha Construction Co., Inc.                                   5.0000       18,765.00       18,765.00
 1216      Copenhaver Construction, Inc.                                   12.0000       45,036.00       45,036.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                     5.0000       18,765.00       18,765.00
 2520      Herlihy Mid-Continent Company                                   21.2500       79,751.25       79,751.25
 3505      Lorig Construction Company                                       9.0000       33,777.00       33,777.00

    44000200  DRIVE PAVEMENT REM                         411.000    SQ YD
 0103      Alliance Contractors, Inc.                                      15.0000        6,165.00        6,165.00
 0204      Areatha Construction Co., Inc.                                   8.6000        3,534.60        3,534.60
 1216      Copenhaver Construction, Inc.                                   16.0000        6,576.00        6,576.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                     8.5000        3,493.50        3,493.50
 2520      Herlihy Mid-Continent Company                                   14.8000        6,082.80        6,082.80
 3505      Lorig Construction Company                                       7.0000        2,877.00        2,877.00

    48203021  HMA SHOULDERS   6                        2,258.000    SQ YD
 0103      Alliance Contractors, Inc.                                      27.5000       62,095.00       62,095.00
 0204      Areatha Construction Co., Inc.                                  27.9000       62,998.20       62,998.20
 1216      Copenhaver Construction, Inc.                                   46.0000      103,868.00      103,868.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                    27.5000       62,095.00       62,095.00
 2520      Herlihy Mid-Continent Company                                   42.6000       96,190.80       96,190.80
 3505      Lorig Construction Company                                      31.0000       69,998.00       69,998.00

    50100100  REM EXIST STRUCT                             1.000     EACH
 0103      Alliance Contractors, Inc.                                 330,465.0000      330,465.00      330,465.00
 0204      Areatha Construction Co., Inc.                             165,000.0000      165,000.00      165,000.00
 1216      Copenhaver Construction, Inc.                              170,000.0000      170,000.00      170,000.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC               295,000.0000      295,000.00      295,000.00
 2520      Herlihy Mid-Continent Company                              222,997.9000      222,997.90      222,997.90
 3505      Lorig Construction Company                                 200,000.0000      200,000.00      200,000.00

    50102400  CONC REM                                     4.000    CU YD
 0103      Alliance Contractors, Inc.                                   5,000.0000       20,000.00       20,000.00
 0204      Areatha Construction Co., Inc.                               2,000.0000        8,000.00        8,000.00
 1216      Copenhaver Construction, Inc.                                1,400.0000        5,600.00        5,600.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                 5,000.0000       20,000.00       20,000.00
 2520      Herlihy Mid-Continent Company                                1,500.0000        6,000.00        6,000.00
 3505      Lorig Construction Company                                   2,500.0000       10,000.00       10,000.00

    50104650  SLOPE WALL REMOV                            54.000    SQ YD
 0103      Alliance Contractors, Inc.                                      30.0000        1,620.00        1,620.00
 0204      Areatha Construction Co., Inc.                                  34.2500        1,849.50        1,849.50
 1216      Copenhaver Construction, Inc.                                   25.0000        1,350.00        1,350.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                    30.0000        1,620.00        1,620.00
 2520      Herlihy Mid-Continent Company                                   35.0000        1,890.00        1,890.00
 3505      Lorig Construction Company                                     125.0000        6,750.00        6,750.00

    50200100  STRUCTURE EXCAVATION                        83.000    CU YD
 0103      Alliance Contractors, Inc.                                      40.0000        3,320.00        3,320.00
 0204      Areatha Construction Co., Inc.                                  25.0000        2,075.00        2,075.00
 1216      Copenhaver Construction, Inc.                                   59.0000        4,897.00        4,897.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                    31.0000        2,573.00        2,573.00
 2520      Herlihy Mid-Continent Company                                   50.0000        4,150.00        4,150.00
 3505      Lorig Construction Company                                      75.0000        6,225.00        6,225.00

    50300225  CONC STRUCT                                 85.700    CU YD
 0103      Alliance Contractors, Inc.                                   2,050.0000      175,685.00      175,685.00
 0204      Areatha Construction Co., Inc.                               1,300.0000      111,410.00      111,410.00
 1216      Copenhaver Construction, Inc.                                1,100.0000       94,270.00       94,270.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                   900.0000       77,130.00       77,130.00
 2520      Herlihy Mid-Continent Company                                1,400.0000      119,980.00      119,980.00
 3505      Lorig Construction Company                                   1,000.0000       85,700.00       85,700.00

    50300255  CONC SUP-STR                               218.800    CU YD
 0103      Alliance Contractors, Inc.                                   1,850.0000      404,780.00      404,780.00
 0204      Areatha Construction Co., Inc.                               1,200.0000      262,560.00      262,560.00
 1216      Copenhaver Construction, Inc.                                1,190.0000      260,372.00      260,372.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                 1,150.0000      251,620.00      251,620.00
 2520      Herlihy Mid-Continent Company                                1,515.0000      331,482.00      331,482.00
 3505      Lorig Construction Company                                   1,000.0000      218,800.00      218,800.00

    50300260  BR DECK GROOVING                           749.000    SQ YD
 0103      Alliance Contractors, Inc.                                       9.0000        6,741.00        6,741.00
 0204      Areatha Construction Co., Inc.                                   7.3500        5,505.15        5,505.15
 1216      Copenhaver Construction, Inc.                                   10.0000        7,490.00        7,490.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                    10.0000        7,490.00        7,490.00
 2520      Herlihy Mid-Continent Company                                    7.5000        5,617.50        5,617.50
 3505      Lorig Construction Company                                       8.0000        5,992.00        5,992.00

    50300300  PROTECTIVE COAT                            974.000    SQ YD
 0103      Alliance Contractors, Inc.                                       1.7500        1,704.50        1,704.50
 0204      Areatha Construction Co., Inc.                                   1.5000        1,461.00        1,461.00
 1216      Copenhaver Construction, Inc.                                    1.0000          974.00          974.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                     5.0000        4,870.00        4,870.00
 2520      Herlihy Mid-Continent Company                                    2.5000        2,435.00        2,435.00
 3505      Lorig Construction Company                                       1.0000          974.00          974.00

    50301350  CONC SUPSTR APP SLAB                        97.100    CU YD
 0103      Alliance Contractors, Inc.                                     865.0000       83,991.50       83,991.50
 0204      Areatha Construction Co., Inc.                                 400.0000       38,840.00       38,840.00
 1216      Copenhaver Construction, Inc.                                  810.0000       78,651.00       78,651.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                   300.0000       29,130.00       29,130.00
 2520      Herlihy Mid-Continent Company                                  400.0000       38,840.00       38,840.00
 3505      Lorig Construction Company                                     425.0000       41,267.50       41,267.50

    50500105  F & E STRUCT STEEL                           1.000    L SUM
 0103      Alliance Contractors, Inc.                                 503,400.0000      503,400.00      503,400.00
 0204      Areatha Construction Co., Inc.                             437,262.0000      437,262.00      437,262.00
 1216      Copenhaver Construction, Inc.                              400,000.0000      400,000.00      400,000.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC               423,000.0000      423,000.00      423,000.00
 2520      Herlihy Mid-Continent Company                              372,999.4100      372,999.41      372,999.41
 3505      Lorig Construction Company                                 450,000.0000      450,000.00      450,000.00

    50500505  STUD SHEAR CONNECTORS                    4,122.000     EACH
 0103      Alliance Contractors, Inc.                                       4.2500       17,518.50       17,518.50
 0204      Areatha Construction Co., Inc.                                   3.8500       15,869.70       15,869.70
 1216      Copenhaver Construction, Inc.                                    4.2000       17,312.40       17,312.40
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                     3.8000       15,663.60       15,663.60
 2520      Herlihy Mid-Continent Company                                    3.5000       14,427.00       14,427.00
 3505      Lorig Construction Company                                       4.0000       16,488.00       16,488.00

    50800205  REINF BARS, EPOXY CTD                  103,290.000    POUND
 0103      Alliance Contractors, Inc.                                       1.7000      175,593.00      175,593.00
 0204      Areatha Construction Co., Inc.                                   1.7500      180,757.50      180,757.50
 1216      Copenhaver Construction, Inc.                                    2.3000      237,567.00      237,567.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                     1.6900      174,560.10      174,560.10
 2520      Herlihy Mid-Continent Company                                    1.7800      183,856.20      183,856.20
 3505      Lorig Construction Company                                       1.8000      185,922.00      185,922.00

    51100100  SLOPE WALL   4                              54.000    SQ YD
 0103      Alliance Contractors, Inc.                                     400.0000       21,600.00       21,600.00
 0204      Areatha Construction Co., Inc.                                 154.3500        8,334.90        8,334.90
 1216      Copenhaver Construction, Inc.                                   97.0000        5,238.00        5,238.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                   192.0300       10,369.62       10,369.62
 2520      Herlihy Mid-Continent Company                                  325.0000       17,550.00       17,550.00
 3505      Lorig Construction Company                                     250.0000       13,500.00       13,500.00

    51201400  FUR STL PILE HP10X42                       460.000     FOOT
 0103      Alliance Contractors, Inc.                                     165.0000       75,900.00       75,900.00
 0204      Areatha Construction Co., Inc.                                 121.0000       55,660.00       55,660.00
 1216      Copenhaver Construction, Inc.                                  110.0000       50,600.00       50,600.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                    48.0000       22,080.00       22,080.00
 2520      Herlihy Mid-Continent Company                                   38.0000       17,480.00       17,480.00
 3505      Lorig Construction Company                                      67.0000       30,820.00       30,820.00

    51202305  DRIVING PILES                              460.000     FOOT
 0103      Alliance Contractors, Inc.                                       1.0000          460.00          460.00
 0204      Areatha Construction Co., Inc.                                   1.0000          460.00          460.00
 1216      Copenhaver Construction, Inc.                                    1.0000          460.00          460.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                     1.0000          460.00          460.00
 2520      Herlihy Mid-Continent Company                                    1.0000          460.00          460.00
 3505      Lorig Construction Company                                       1.0000          460.00          460.00

    51203400  TEST PILE ST HP10X42                         2.000     EACH
 0103      Alliance Contractors, Inc.                                   5,000.0000       10,000.00       10,000.00
 0204      Areatha Construction Co., Inc.                              18,000.0000       36,000.00       36,000.00
 1216      Copenhaver Construction, Inc.                               12,000.0000       24,000.00       24,000.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                 1,500.0000        3,000.00        3,000.00
 2520      Herlihy Mid-Continent Company                               20,000.0000       40,000.00       40,000.00
 3505      Lorig Construction Company                                   7,000.0000       14,000.00       14,000.00

    51500100  NAME PLATES                                  1.000     EACH
 0103      Alliance Contractors, Inc.                                     750.0000          750.00          750.00
 0204      Areatha Construction Co., Inc.                                 700.0000          700.00          700.00
 1216      Copenhaver Construction, Inc.                                1,100.0000        1,100.00        1,100.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                 2,500.0000        2,500.00        2,500.00
 2520      Herlihy Mid-Continent Company                                  550.0000          550.00          550.00
 3505      Lorig Construction Company                                     850.0000          850.00          850.00

    52100520  ANCHOR BOLTS    1                           48.000     EACH
 0103      Alliance Contractors, Inc.                                     135.0000        6,480.00        6,480.00
 0204      Areatha Construction Co., Inc.                                 140.0000        6,720.00        6,720.00
 1216      Copenhaver Construction, Inc.                                  100.0000        4,800.00        4,800.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                   166.0300        7,969.44        7,969.44
 2520      Herlihy Mid-Continent Company                                  151.0000        7,248.00        7,248.00
 3505      Lorig Construction Company                                     200.0000        9,600.00        9,600.00

    54262715  METAL FL END SEC 15"                         4.000     EACH
 0103      Alliance Contractors, Inc.                                     300.0000        1,200.00        1,200.00
 0204      Areatha Construction Co., Inc.                                 558.0000        2,232.00        2,232.00
 1216      Copenhaver Construction, Inc.                                  300.0000        1,200.00        1,200.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                   550.0000        2,200.00        2,200.00
 2520      Herlihy Mid-Continent Company                                  550.0000        2,200.00        2,200.00
 3505      Lorig Construction Company                                   1,200.0000        4,800.00        4,800.00

    55100500  STORM SEWER REM  12                        158.000     FOOT
 0103      Alliance Contractors, Inc.                                      20.0000        3,160.00        3,160.00
 0204      Areatha Construction Co., Inc.                                  60.9000        9,622.20        9,622.20
 1216      Copenhaver Construction, Inc.                                   15.0000        2,370.00        2,370.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                    60.0000        9,480.00        9,480.00
 2520      Herlihy Mid-Continent Company                                   60.0000        9,480.00        9,480.00
 3505      Lorig Construction Company                                      31.0000        4,898.00        4,898.00

    58600101  GRANULAR BACKFILL STR                      102.000    CU YD
 0103      Alliance Contractors, Inc.                                      60.0000        6,120.00        6,120.00
 0204      Areatha Construction Co., Inc.                                  58.5000        5,967.00        5,967.00
 1216      Copenhaver Construction, Inc.                                   43.0000        4,386.00        4,386.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                    75.0000        7,650.00        7,650.00
 2520      Herlihy Mid-Continent Company                                   42.0000        4,284.00        4,284.00
 3505      Lorig Construction Company                                      92.0000        9,384.00        9,384.00

    59100100  GEOCOMPOSITE WALL DR                        56.000    SQ YD
 0103      Alliance Contractors, Inc.                                      35.0000        1,960.00        1,960.00
 0204      Areatha Construction Co., Inc.                                  42.5000        2,380.00        2,380.00
 1216      Copenhaver Construction, Inc.                                   33.0000        1,848.00        1,848.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                    20.4900        1,147.44        1,147.44
 2520      Herlihy Mid-Continent Company                                   15.0000          840.00          840.00
 3505      Lorig Construction Company                                      25.0000        1,400.00        1,400.00

    60105100  PIPE DRAINS CS/AA 15                        38.000     FOOT
 0103      Alliance Contractors, Inc.                                      55.0000        2,090.00        2,090.00
 0204      Areatha Construction Co., Inc.                                 202.0000        7,676.00        7,676.00
 1216      Copenhaver Construction, Inc.                                  125.0000        4,750.00        4,750.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                   200.0000        7,600.00        7,600.00
 2520      Herlihy Mid-Continent Company                                  200.0000        7,600.00        7,600.00
 3505      Lorig Construction Company                                      86.0000        3,268.00        3,268.00

    60108204  PIPE UNDERDR T 2 4                          64.000     FOOT
 0103      Alliance Contractors, Inc.                                      29.5000        1,888.00        1,888.00
 0204      Areatha Construction Co., Inc.                                  40.0000        2,560.00        2,560.00
 1216      Copenhaver Construction, Inc.                                   16.0000        1,024.00        1,024.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                    40.0000        2,560.00        2,560.00
 2520      Herlihy Mid-Continent Company                                   40.0000        2,560.00        2,560.00
 3505      Lorig Construction Company                                      41.0000        2,624.00        2,624.00

    60146304  P UNDR FOR STRUCT  4                       146.000     FOOT
 0103      Alliance Contractors, Inc.                                      25.0000        3,650.00        3,650.00
 0204      Areatha Construction Co., Inc.                                  45.0000        6,570.00        6,570.00
 1216      Copenhaver Construction, Inc.                                   15.0000        2,190.00        2,190.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                    45.0000        6,570.00        6,570.00
 2520      Herlihy Mid-Continent Company                                   30.0000        4,380.00        4,380.00
 3505      Lorig Construction Company                                      27.0000        3,942.00        3,942.00

    61000050  CONC THRUST BLOCKS                           4.000     EACH
 0103      Alliance Contractors, Inc.                                     650.0000        2,600.00        2,600.00
 0204      Areatha Construction Co., Inc.                                 500.0000        2,000.00        2,000.00
 1216      Copenhaver Construction, Inc.                                  550.0000        2,200.00        2,200.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                 2,000.0000        8,000.00        8,000.00
 2520      Herlihy Mid-Continent Company                                2,000.0000        8,000.00        8,000.00
 3505      Lorig Construction Company                                   1,600.0000        6,400.00        6,400.00

    61000115  TY E INLET BOX 610001                        4.000     EACH
 0103      Alliance Contractors, Inc.                                   7,700.0000       30,800.00       30,800.00
 0204      Areatha Construction Co., Inc.                               6,000.0000       24,000.00       24,000.00
 1216      Copenhaver Construction, Inc.                                9,000.0000       36,000.00       36,000.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                 9,500.0000       38,000.00       38,000.00
 2520      Herlihy Mid-Continent Company                                9,500.0000       38,000.00       38,000.00
 3505      Lorig Construction Company                                   6,000.0000       24,000.00       24,000.00

    63000003  SPBGR TY A  9FT POSTS                      644.000     FOOT
 0103      Alliance Contractors, Inc.                                      37.6400       24,240.16       24,240.16
 0204      Areatha Construction Co., Inc.                                  38.0000       24,472.00       24,472.00
 1216      Copenhaver Construction, Inc.                                   43.0000       27,692.00       27,692.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                    37.6400       24,240.16       24,240.16
 2520      Herlihy Mid-Continent Company                                   37.6400       24,240.16       24,240.16
 3505      Lorig Construction Company                                      38.0000       24,472.00       24,472.00

    63100085  TRAF BAR TERM T6                             4.000     EACH
 0103      Alliance Contractors, Inc.                                   4,420.0000       17,680.00       17,680.00
 0204      Areatha Construction Co., Inc.                               4,484.0000       17,936.00       17,936.00
 1216      Copenhaver Construction, Inc.                                5,000.0000       20,000.00       20,000.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                 4,420.0000       17,680.00       17,680.00
 2520      Herlihy Mid-Continent Company                                4,420.0000       17,680.00       17,680.00
 3505      Lorig Construction Company                                   4,500.0000       18,000.00       18,000.00

    63100167  TR BAR TRM T1 SPL TAN                        6.000     EACH
 0103      Alliance Contractors, Inc.                                   3,381.0000       20,286.00       20,286.00
 0204      Areatha Construction Co., Inc.                               3,430.0000       20,580.00       20,580.00
 1216      Copenhaver Construction, Inc.                                4,300.0000       25,800.00       25,800.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                 3,381.0000       20,286.00       20,286.00
 2520      Herlihy Mid-Continent Company                                3,381.0000       20,286.00       20,286.00
 3505      Lorig Construction Company                                   3,400.0000       20,400.00       20,400.00

    63200310  GUARDRAIL REMOV                          1,207.000     FOOT
 0103      Alliance Contractors, Inc.                                       5.9400        7,169.58        7,169.58
 0204      Areatha Construction Co., Inc.                                   6.0000        7,242.00        7,242.00
 1216      Copenhaver Construction, Inc.                                    7.0000        8,449.00        8,449.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                     5.9400        7,169.58        7,169.58
 2520      Herlihy Mid-Continent Company                                    5.9400        7,169.58        7,169.58
 3505      Lorig Construction Company                                       6.0000        7,242.00        7,242.00

    66201120  CONC SHLD CURB                              20.000     FOOT
 0103      Alliance Contractors, Inc.                                      95.0000        1,900.00        1,900.00
 0204      Areatha Construction Co., Inc.                                 153.0000        3,060.00        3,060.00
 1216      Copenhaver Construction, Inc.                                   35.0000          700.00          700.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                   140.1300        2,802.60        2,802.60
 2520      Herlihy Mid-Continent Company                                   50.0000        1,000.00        1,000.00
 3505      Lorig Construction Company                                      49.0000          980.00          980.00

    67000400  ENGR FIELD OFFICE A                         12.000   CAL MO
 0103      Alliance Contractors, Inc.                                     500.0000        6,000.00        6,000.00
 0204      Areatha Construction Co., Inc.                               2,500.0000       30,000.00       30,000.00
 1216      Copenhaver Construction, Inc.                                1,500.0000       18,000.00       18,000.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                 3,200.0000       38,400.00       38,400.00
 2520      Herlihy Mid-Continent Company                                2,725.0000       32,700.00       32,700.00
 3505      Lorig Construction Company                                   2,600.0000       31,200.00       31,200.00

    67100100  MOBILIZATION                                 1.000    L SUM
 0103      Alliance Contractors, Inc.                                 156,000.0000      156,000.00      156,000.00
 0204      Areatha Construction Co., Inc.                             137,000.0000      137,000.00      137,000.00
 1216      Copenhaver Construction, Inc.                              120,000.0000      120,000.00      120,000.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC               158,000.0000      158,000.00      158,000.00
 2520      Herlihy Mid-Continent Company                              148,000.0000      148,000.00      148,000.00
 3505      Lorig Construction Company                                 120,000.0000      120,000.00      120,000.00

    70107025  CHANGEABLE MESSAGE SN                       21.000   CAL DA
 0103      Alliance Contractors, Inc.                                      40.0000          840.00          840.00
 0204      Areatha Construction Co., Inc.                                  40.0000          840.00          840.00
 1216      Copenhaver Construction, Inc.                                  120.0000        2,520.00        2,520.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                    40.0000          840.00          840.00
 2520      Herlihy Mid-Continent Company                                   40.0000          840.00          840.00
 3505      Lorig Construction Company                                      55.0000        1,155.00        1,155.00

    72000100  SIGN PANEL T1                               51.000    SQ FT
 0103      Alliance Contractors, Inc.                                      45.0000        2,295.00        2,295.00
 0204      Areatha Construction Co., Inc.                                  26.0000        1,326.00        1,326.00
 1216      Copenhaver Construction, Inc.                                   45.0000        2,295.00        2,295.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                    18.0000          918.00          918.00
 2520      Herlihy Mid-Continent Company                                   18.0000          918.00          918.00
 3505      Lorig Construction Company                                      18.0000          918.00          918.00

    72400100  REMOV SIN PAN ASSY TA                        9.000     EACH
 0103      Alliance Contractors, Inc.                                     125.0000        1,125.00        1,125.00
 0204      Areatha Construction Co., Inc.                                 101.0000          909.00          909.00
 1216      Copenhaver Construction, Inc.                                  150.0000        1,350.00        1,350.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                    30.0000          270.00          270.00
 2520      Herlihy Mid-Continent Company                                   30.0000          270.00          270.00
 3505      Lorig Construction Company                                      30.0000          270.00          270.00

    72501000  TERMINAL MARKER - DA                         6.000     EACH
 0103      Alliance Contractors, Inc.                                      20.0000          120.00          120.00
 0204      Areatha Construction Co., Inc.                                  20.3000          121.80          121.80
 1216      Copenhaver Construction, Inc.                                   24.0000          144.00          144.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                    20.0000          120.00          120.00
 2520      Herlihy Mid-Continent Company                                   20.0000          120.00          120.00
 3505      Lorig Construction Company                                      20.0000          120.00          120.00

    72800100  TELES STL SIN SUPPORT                      162.000     FOOT
 0103      Alliance Contractors, Inc.                                      15.0000        2,430.00        2,430.00
 0204      Areatha Construction Co., Inc.                                  12.9500        2,097.90        2,097.90
 1216      Copenhaver Construction, Inc.                                   40.0000        6,480.00        6,480.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                    12.0000        1,944.00        1,944.00
 2520      Herlihy Mid-Continent Company                                   12.0000        1,944.00        1,944.00
 3505      Lorig Construction Company                                      12.0000        1,944.00        1,944.00

    78000200  THPL PVT MK LINE  4                      5,901.000     FOOT
 0103      Alliance Contractors, Inc.                                       0.8000        4,720.80        4,720.80
 0204      Areatha Construction Co., Inc.                                   1.3500        7,966.35        7,966.35
 1216      Copenhaver Construction, Inc.                                    1.5000        8,851.50        8,851.50
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                     0.8000        4,720.80        4,720.80
 2520      Herlihy Mid-Continent Company                                    0.8000        4,720.80        4,720.80
 3505      Lorig Construction Company                                       0.8000        4,720.80        4,720.80

    78000650  THPL PVT MK LINE 24                         20.000     FOOT
 0103      Alliance Contractors, Inc.                                      10.0000          200.00          200.00
 0204      Areatha Construction Co., Inc.                                  25.4000          508.00          508.00
 1216      Copenhaver Construction, Inc.                                   30.0000          600.00          600.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                    10.0000          200.00          200.00
 2520      Herlihy Mid-Continent Company                                   10.0000          200.00          200.00
 3505      Lorig Construction Company                                      10.0000          200.00          200.00

    78200005  GRDRAIL REF TYPE A                          17.000     EACH
 0103      Alliance Contractors, Inc.                                      10.0000          170.00          170.00
 0204      Areatha Construction Co., Inc.                                  10.0000          170.00          170.00
 1216      Copenhaver Construction, Inc.                                   13.0000          221.00          221.00
 4657      F. H. Paschen, S.N. Nielsen & Associates LLC                    10.0000          170.00          170.00
 2520      Herlihy Mid-Continent Company                                   10.0000          170.00          170.00
 3505      Lorig Construction Company                                      10.0000          170.00          170.00