                                               ILLINOIS DEPARTMENT OF TRANSPORTATION                                      PAGE:    1
 08/31/26  15:30:27                   U N I T  P R I C E   T A B U L A T I O N   O F   B I D S
 LETTING DATE: 06/12/2026  LETTING TYPE: SCHEDULED                                 CONTRACT NUMBER: 64L94  LETTING ITEM NUMBER: 045
 RESPONSIBLE DISTRICT: 02                                                                                  BIDS LOCKED: Y
 SECTION: 104R                                     COUNTY: HENRY                                           ESTIMATE:
                                                      --------------------------
                                                      SUMMARY OF CONTRACTOR BIDS
                                                      --------------------------

                                                             "AS READ"          SUMMATION    SUMMATION OF                       NBR
 BIDR                     CONTR        COMB  ITEM  CONTR      BIDDER            OF BIDDER     CALCULATED   LOW   BIDR CALC      BLANK
 NBR   BIDDER NAME        GROUP  COMB  GRP   NBR   GROUP      TOTAL PRICE       EXTENSIONS    EXTENSIONS   BID   EXTENSION DIFF BIDS


 0049  Advanced Asphalt Company
                          NO ALT                           16,898,480.51    16,898,480.51  16,898,480.51

 1799  Fischer Excavating, Inc.
                          NO ALT                           17,403,865.97    17,403,865.97  17,403,865.97

 2024  Gensini Excavating, Inc.
                          NO ALT                           14,585,886.19    14,585,886.19  14,585,886.19

 6210  Valley Construction Co.
                          NO ALT                           14,149,819.79 *  14,149,819.79  14,149,819.79    *

 **** TOTAL GROUP NO ALT PAY ITEMS FOR THIS CONTRACT =     229
                                                       ----------------------
                                                       DETAIL CONTRACTOR BIDS
                                                       ----------------------

    ITEM NBR  ITEM DESCRIPTION                                    UNIT OF     UNIT        BIDDER         CALCULATED  BIDR CALC
 BIDR NBR  BIDDER NAME                                  QUANTITY  MEASURE     PRICE       EXTENSION      EXTENSION   EXTENSION DIFF


    A2006420  T-QUERCUS ALBA  2-1/2                        2.000     EACH
 0049      Advanced Asphalt Company                                       800.0000        1,600.00        1,600.00
 1799      Fischer Excavating, Inc.                                       800.0000        1,600.00        1,600.00
 2024      Gensini Excavating, Inc.                                       877.4900        1,754.98        1,754.98
 6210      Valley Construction Co.                                        800.0000        1,600.00        1,600.00

    A2007720  T-TAXODI DIS SB 2-1/2                        3.000     EACH
 0049      Advanced Asphalt Company                                       800.0000        2,400.00        2,400.00
 1799      Fischer Excavating, Inc.                                       800.0000        2,400.00        2,400.00
 2024      Gensini Excavating, Inc.                                       877.4900        2,632.47        2,632.47
 6210      Valley Construction Co.                                        800.0000        2,400.00        2,400.00

    A2008453  T-ULMUS ACCOL HE    3                        4.000     EACH
 0049      Advanced Asphalt Company                                       800.0000        3,200.00        3,200.00
 1799      Fischer Excavating, Inc.                                       800.0000        3,200.00        3,200.00
 2024      Gensini Excavating, Inc.                                       877.4900        3,509.96        3,509.96
 6210      Valley Construction Co.                                        800.0000        3,200.00        3,200.00

    A2008750  T-ULMUS X PAT PE 3 TF                        4.000     EACH
 0049      Advanced Asphalt Company                                       800.0000        3,200.00        3,200.00
 1799      Fischer Excavating, Inc.                                       800.0000        3,200.00        3,200.00
 2024      Gensini Excavating, Inc.                                       877.4900        3,509.96        3,509.96
 6210      Valley Construction Co.                                        800.0000        3,200.00        3,200.00

    A2012000  T-AESCUL ARNOLDIANA 2                        6.000     EACH
 0049      Advanced Asphalt Company                                       650.0000        3,900.00        3,900.00
 1799      Fischer Excavating, Inc.                                       650.0000        3,900.00        3,900.00
 2024      Gensini Excavating, Inc.                                       712.9600        4,277.76        4,277.76
 6210      Valley Construction Co.                                        650.0000        3,900.00        3,900.00

    A2012006  T-A CARNEA FM 6CBB                           2.000     EACH
 0049      Advanced Asphalt Company                                       800.0000        1,600.00        1,600.00
 1799      Fischer Excavating, Inc.                                       800.0000        1,600.00        1,600.00
 2024      Gensini Excavating, Inc.                                       877.4900        1,754.98        1,754.98
 6210      Valley Construction Co.                                        800.0000        1,600.00        1,600.00

    A2014916  T-GLED TRI-IN IMP 2                          4.000     EACH
 0049      Advanced Asphalt Company                                       650.0000        2,600.00        2,600.00
 1799      Fischer Excavating, Inc.                                       650.0000        2,600.00        2,600.00
 2024      Gensini Excavating, Inc.                                       712.9600        2,851.84        2,851.84
 6210      Valley Construction Co.                                        650.0000        2,600.00        2,600.00

    A3005210  T-ZELKOVA SER   2-1/2                        3.000     EACH
 0049      Advanced Asphalt Company                                       750.0000        2,250.00        2,250.00
 1799      Fischer Excavating, Inc.                                       750.0000        2,250.00        2,250.00
 2024      Gensini Excavating, Inc.                                       822.6500        2,467.95        2,467.95
 6210      Valley Construction Co.                                        750.0000        2,250.00        2,250.00

    D2001578  E-JUNIP VIRG       8'                        4.000     EACH
 0049      Advanced Asphalt Company                                       650.0000        2,600.00        2,600.00
 1799      Fischer Excavating, Inc.                                       650.0000        2,600.00        2,600.00
 2024      Gensini Excavating, Inc.                                       712.9600        2,851.84        2,851.84
 6210      Valley Construction Co.                                        650.0000        2,600.00        2,600.00

    X0301339  REM EX PARKING BLOCKS                       18.000     EACH
 0049      Advanced Asphalt Company                                        75.0000        1,350.00        1,350.00
 1799      Fischer Excavating, Inc.                                        75.0000        1,350.00        1,350.00
 2024      Gensini Excavating, Inc.                                       244.3400        4,398.12        4,398.12
 6210      Valley Construction Co.                                        150.0000        2,700.00        2,700.00

    X0327999  ANTI-GRAFFITI COATING                    5,730.000    SQ FT
 0049      Advanced Asphalt Company                                        21.8200      125,028.60      125,028.60
 1799      Fischer Excavating, Inc.                                        10.0000       57,300.00       57,300.00
 2024      Gensini Excavating, Inc.                                         7.5700       43,376.10       43,376.10
 6210      Valley Construction Co.                                         21.8200      125,028.60      125,028.60

    X0328635  SAN SVC CONN SHRT                            2.000     EACH
 0049      Advanced Asphalt Company                                     2,500.0000        5,000.00        5,000.00
 1799      Fischer Excavating, Inc.                                     1,450.0000        2,900.00        2,900.00
 2024      Gensini Excavating, Inc.                                     6,085.3100       12,170.62       12,170.62
 6210      Valley Construction Co.                                      2,950.0000        5,900.00        5,900.00

    X1200198  SAN SEW PVC 8                              238.000     FOOT
 0049      Advanced Asphalt Company                                       400.0000       95,200.00       95,200.00
 1799      Fischer Excavating, Inc.                                       175.0000       41,650.00       41,650.00
 2024      Gensini Excavating, Inc.                                       185.9200       44,248.96       44,248.96
 6210      Valley Construction Co.                                        110.0000       26,180.00       26,180.00

    X1200246  WATERMAIN CASING PIPE                    1,078.000     FOOT
 0049      Advanced Asphalt Company                                        95.0000      102,410.00      102,410.00
 1799      Fischer Excavating, Inc.                                       130.0000      140,140.00      140,140.00
 2024      Gensini Excavating, Inc.                                        68.6300       73,983.14       73,983.14
 6210      Valley Construction Co.                                         55.0000       59,290.00       59,290.00

    X1200317  SAN SEW REMOV                              245.000     FOOT
 0049      Advanced Asphalt Company                                        45.0000       11,025.00       11,025.00
 1799      Fischer Excavating, Inc.                                        34.0000        8,330.00        8,330.00
 2024      Gensini Excavating, Inc.                                        20.5300        5,029.85        5,029.85
 6210      Valley Construction Co.                                         24.5000        6,002.50        6,002.50

    X2070302  POROUS GRAN EMB SPEC                        45.000      TON
 0049      Advanced Asphalt Company                                        60.0000        2,700.00        2,700.00
 1799      Fischer Excavating, Inc.                                        45.0000        2,025.00        2,025.00
 2024      Gensini Excavating, Inc.                                        54.2400        2,440.80        2,440.80
 6210      Valley Construction Co.                                         85.0000        3,825.00        3,825.00

    X2100104  GEOTECHNICAL REINF                       4,783.000    SQ YD
 0049      Advanced Asphalt Company                                         8.0000       38,264.00       38,264.00
 1799      Fischer Excavating, Inc.                                         2.5000       11,957.50       11,957.50
 2024      Gensini Excavating, Inc.                                         2.0100        9,613.83        9,613.83
 6210      Valley Construction Co.                                          2.5000       11,957.50       11,957.50

    X4060310  HMA SC "C"   N50  SPL                    1,375.000      TON
 0049      Advanced Asphalt Company                                       140.0000      192,500.00      192,500.00
 1799      Fischer Excavating, Inc.                                       140.0000      192,500.00      192,500.00
 2024      Gensini Excavating, Inc.                                       153.5600      211,145.00      211,145.00
 6210      Valley Construction Co.                                        120.0000      165,000.00      165,000.00

    X4401196  HMA SURF REM-LONG JT                       109.000    SQ YD
 0049      Advanced Asphalt Company                                        20.0000        2,180.00        2,180.00
 1799      Fischer Excavating, Inc.                                        20.0000        2,180.00        2,180.00
 2024      Gensini Excavating, Inc.                                        21.9400        2,391.46        2,391.46
 6210      Valley Construction Co.                                         35.0000        3,815.00        3,815.00

    X4811410  AGG SHLDS SPL C                             64.000      TON
 0049      Advanced Asphalt Company                                        85.0000        5,440.00        5,440.00
 1799      Fischer Excavating, Inc.                                        90.0000        5,760.00        5,760.00
 2024      Gensini Excavating, Inc.                                        61.8400        3,957.76        3,957.76
 6210      Valley Construction Co.                                         70.0000        4,480.00        4,480.00

    X5010523  REM CONC END SEC                             1.000     EACH
 0049      Advanced Asphalt Company                                     1,500.0000        1,500.00        1,500.00
 1799      Fischer Excavating, Inc.                                       600.0000          600.00          600.00
 2024      Gensini Excavating, Inc.                                       274.8700          274.87          274.87
 6210      Valley Construction Co.                                        450.0000          450.00          450.00

    X5030290  STAIN CONC STRUCTURES                    5,730.000    SQ FT
 0049      Advanced Asphalt Company                                         3.8400       22,003.20       22,003.20
 1799      Fischer Excavating, Inc.                                         4.0000       22,920.00       22,920.00
 2024      Gensini Excavating, Inc.                                        28.0600      160,783.80      160,783.80
 6210      Valley Construction Co.                                          3.8400       22,003.20       22,003.20

    X5091765  PIPE HANDRAIL SPL                           35.000     FOOT
 0049      Advanced Asphalt Company                                       280.0000        9,800.00        9,800.00
 1799      Fischer Excavating, Inc.                                       280.0000        9,800.00        9,800.00
 2024      Gensini Excavating, Inc.                                       307.1200       10,749.20       10,749.20
 6210      Valley Construction Co.                                        280.0000        9,800.00        9,800.00

    X5220102  RETAINING WALL REMOV                       714.000     FOOT
 0049      Advanced Asphalt Company                                        42.0000       29,988.00       29,988.00
 1799      Fischer Excavating, Inc.                                        20.0000       14,280.00       14,280.00
 2024      Gensini Excavating, Inc.                                        51.2100       36,563.94       36,563.94
 6210      Valley Construction Co.                                         23.0000       16,422.00       16,422.00

    X5420201  DROP BOX NO.1                                1.000     EACH
 0049      Advanced Asphalt Company                                    18,000.0000       18,000.00       18,000.00
 1799      Fischer Excavating, Inc.                                    27,000.0000       27,000.00       27,000.00
 2024      Gensini Excavating, Inc.                                    46,299.8000       46,299.80       46,299.80
 6210      Valley Construction Co.                                     23,500.0000       23,500.00       23,500.00

    X5420202  DROP BOX NO.2                                1.000     EACH
 0049      Advanced Asphalt Company                                    11,000.0000       11,000.00       11,000.00
 1799      Fischer Excavating, Inc.                                    20,000.0000       20,000.00       20,000.00
 2024      Gensini Excavating, Inc.                                    27,032.0500       27,032.05       27,032.05
 6210      Valley Construction Co.                                     17,500.0000       17,500.00       17,500.00

    X5610012  CAP EXIST WATER MAIN                         5.000     EACH
 0049      Advanced Asphalt Company                                       600.0000        3,000.00        3,000.00
 1799      Fischer Excavating, Inc.                                     1,850.0000        9,250.00        9,250.00
 2024      Gensini Excavating, Inc.                                       784.7300        3,923.65        3,923.65
 6210      Valley Construction Co.                                      2,750.0000       13,750.00       13,750.00

    X5610700  WATER MAIN REMOVAL                       2,459.000     FOOT
 0049      Advanced Asphalt Company                                        30.0000       73,770.00       73,770.00
 1799      Fischer Excavating, Inc.                                        34.0000       83,606.00       83,606.00
 2024      Gensini Excavating, Inc.                                        22.9900       56,532.41       56,532.41
 6210      Valley Construction Co.                                         18.0000       44,262.00       44,262.00

    X5610704  WATER MAIN REMOV   4                       875.000     FOOT
 0049      Advanced Asphalt Company                                        30.0000       26,250.00       26,250.00
 1799      Fischer Excavating, Inc.                                        34.0000       29,750.00       29,750.00
 2024      Gensini Excavating, Inc.                                        22.9900       20,116.25       20,116.25
 6210      Valley Construction Co.                                         24.0000       21,000.00       21,000.00

    X5610706  WATER MAIN REMOV   6                     2,550.000     FOOT
 0049      Advanced Asphalt Company                                        30.0000       76,500.00       76,500.00
 1799      Fischer Excavating, Inc.                                        34.0000       86,700.00       86,700.00
 2024      Gensini Excavating, Inc.                                        22.9900       58,624.50       58,624.50
 6210      Valley Construction Co.                                         24.0000       61,200.00       61,200.00

    X5610804  NON-PRES CONN EX WM                          6.000     EACH
 0049      Advanced Asphalt Company                                     4,000.0000       24,000.00       24,000.00
 1799      Fischer Excavating, Inc.                                     7,000.0000       42,000.00       42,000.00
 2024      Gensini Excavating, Inc.                                     5,569.2700       33,415.62       33,415.62
 6210      Valley Construction Co.                                      3,400.0000       20,400.00       20,400.00

    X5610806  PRESS CONN EX WTR MN                         1.000     EACH
 0049      Advanced Asphalt Company                                     6,200.0000        6,200.00        6,200.00
 1799      Fischer Excavating, Inc.                                    11,500.0000       11,500.00       11,500.00
 2024      Gensini Excavating, Inc.                                    13,947.6000       13,947.60       13,947.60
 6210      Valley Construction Co.                                      8,000.0000        8,000.00        8,000.00

    X5620030  WAT SER CONN        1                       44.000     EACH
 0049      Advanced Asphalt Company                                     2,000.0000       88,000.00       88,000.00
 1799      Fischer Excavating, Inc.                                     3,100.0000      136,400.00      136,400.00
 2024      Gensini Excavating, Inc.                                     3,071.2700      135,135.88      135,135.88
 6210      Valley Construction Co.                                      3,485.0000      153,340.00      153,340.00

    X5620126  WATER SERVICE LINE SP                      162.000     FOOT
 0049      Advanced Asphalt Company                                        54.0000        8,748.00        8,748.00
 1799      Fischer Excavating, Inc.                                       115.0000       18,630.00       18,630.00
 2024      Gensini Excavating, Inc.                                        58.3500        9,452.70        9,452.70
 6210      Valley Construction Co.                                         73.0000       11,826.00       11,826.00

    X5630405  REM EX WATER VALVE                          19.000     EACH
 0049      Advanced Asphalt Company                                       300.0000        5,700.00        5,700.00
 1799      Fischer Excavating, Inc.                                       515.0000        9,785.00        9,785.00
 2024      Gensini Excavating, Inc.                                       530.6400       10,082.16       10,082.16
 6210      Valley Construction Co.                                        640.0000       12,160.00       12,160.00

    X5640150  FIRE HYDNT ASSY COMP                        15.000     EACH
 0049      Advanced Asphalt Company                                    10,400.0000      156,000.00      156,000.00
 1799      Fischer Excavating, Inc.                                     8,500.0000      127,500.00      127,500.00
 2024      Gensini Excavating, Inc.                                     8,913.2600      133,698.90      133,698.90
 6210      Valley Construction Co.                                      7,900.0000      118,500.00      118,500.00

    X6020133  DROP MAN CONNECTION                          3.000     EACH
 0049      Advanced Asphalt Company                                     1,500.0000        4,500.00        4,500.00
 1799      Fischer Excavating, Inc.                                     5,200.0000       15,600.00       15,600.00
 2024      Gensini Excavating, Inc.                                     2,514.1700        7,542.51        7,542.51
 6210      Valley Construction Co.                                      2,350.0000        7,050.00        7,050.00

    X6022230  MAN TA 4 DIA SPL F&G                         2.000     EACH
 0049      Advanced Asphalt Company                                     6,000.0000       12,000.00       12,000.00
 1799      Fischer Excavating, Inc.                                     6,850.0000       13,700.00       13,700.00
 2024      Gensini Excavating, Inc.                                     5,257.8600       10,515.72       10,515.72
 6210      Valley Construction Co.                                      5,045.0000       10,090.00       10,090.00

    X6023508  INLETS TA W/SPL F&G                          1.000     EACH
 0049      Advanced Asphalt Company                                     2,700.0000        2,700.00        2,700.00
 1799      Fischer Excavating, Inc.                                     5,800.0000        5,800.00        5,800.00
 2024      Gensini Excavating, Inc.                                     2,380.2000        2,380.20        2,380.20
 6210      Valley Construction Co.                                      3,450.0000        3,450.00        3,450.00

    X6024210  DOUBLE INLET SPL                             1.000     EACH
 0049      Advanced Asphalt Company                                     6,000.0000        6,000.00        6,000.00
 1799      Fischer Excavating, Inc.                                    10,500.0000       10,500.00       10,500.00
 2024      Gensini Excavating, Inc.                                     5,502.7600        5,502.76        5,502.76
 6210      Valley Construction Co.                                      8,300.0000        8,300.00        8,300.00

    X6024240  INLETS SPL                                  21.000     EACH
 0049      Advanced Asphalt Company                                     3,300.0000       69,300.00       69,300.00
 1799      Fischer Excavating, Inc.                                     5,230.4500      109,839.45      109,839.45
 2024      Gensini Excavating, Inc.                                     2,894.2900       60,780.09       60,780.09
 6210      Valley Construction Co.                                      4,550.0000       95,550.00       95,550.00

    X6024246  INLETS SPL N3                               17.000     EACH
 0049      Advanced Asphalt Company                                     8,100.0000      137,700.00      137,700.00
 1799      Fischer Excavating, Inc.                                     5,300.0000       90,100.00       90,100.00
 2024      Gensini Excavating, Inc.                                     5,850.1300       99,452.21       99,452.21
 6210      Valley Construction Co.                                     12,250.0000      208,250.00      208,250.00

    X6024250  INLETS SPL N5                               27.000     EACH
 0049      Advanced Asphalt Company                                     6,800.0000      183,600.00      183,600.00
 1799      Fischer Excavating, Inc.                                     6,000.0000      162,000.00      162,000.00
 2024      Gensini Excavating, Inc.                                     4,708.3400      127,125.18      127,125.18
 6210      Valley Construction Co.                                     10,300.0000      278,100.00      278,100.00

    X6024502  INLETS TB W/SPL F&G                         10.000     EACH
 0049      Advanced Asphalt Company                                     3,500.0000       35,000.00       35,000.00
 1799      Fischer Excavating, Inc.                                     5,800.0000       58,000.00       58,000.00
 2024      Gensini Excavating, Inc.                                     3,109.5000       31,095.00       31,095.00
 6210      Valley Construction Co.                                      4,000.0000       40,000.00       40,000.00

    X6026054  SAN MAN REMOVED                              2.000     EACH
 0049      Advanced Asphalt Company                                     3,950.0000        7,900.00        7,900.00
 1799      Fischer Excavating, Inc.                                       850.0000        1,700.00        1,700.00
 2024      Gensini Excavating, Inc.                                     1,058.8100        2,117.62        2,117.62
 6210      Valley Construction Co.                                      1,500.0000        3,000.00        3,000.00

    X6026055  SAN MANHOLE SPL                              3.000     EACH
 0049      Advanced Asphalt Company                                    15,600.0000       46,800.00       46,800.00
 1799      Fischer Excavating, Inc.                                    11,000.0000       33,000.00       33,000.00
 2024      Gensini Excavating, Inc.                                     6,438.9200       19,316.76       19,316.76
 6210      Valley Construction Co.                                      7,225.0000       21,675.00       21,675.00

    X6026608  GATE VALVE 4 WITH BOX                        3.000     EACH
 0049      Advanced Asphalt Company                                     3,000.0000        9,000.00        9,000.00
 1799      Fischer Excavating, Inc.                                     2,000.0000        6,000.00        6,000.00
 2024      Gensini Excavating, Inc.                                     2,214.6000        6,643.80        6,643.80
 6210      Valley Construction Co.                                      1,750.0000        5,250.00        5,250.00

    X6026616  GATE VLVE 8 W/VLT BOX                       10.000     EACH
 0049      Advanced Asphalt Company                                     4,400.0000       44,000.00       44,000.00
 1799      Fischer Excavating, Inc.                                     5,700.0000       57,000.00       57,000.00
 2024      Gensini Excavating, Inc.                                     3,203.9800       32,039.80       32,039.80
 6210      Valley Construction Co.                                      2,750.0000       27,500.00       27,500.00

    X6026617  GATE VALVE 6 WITH BOX                        9.000     EACH
 0049      Advanced Asphalt Company                                     3,400.0000       30,600.00       30,600.00
 1799      Fischer Excavating, Inc.                                     2,800.0000       25,200.00       25,200.00
 2024      Gensini Excavating, Inc.                                     2,498.6900       22,488.21       22,488.21
 6210      Valley Construction Co.                                      2,050.0000       18,450.00       18,450.00

    X6640104  FENCE REMOVAL                            1,554.000     FOOT
 0049      Advanced Asphalt Company                                        20.0000       31,080.00       31,080.00
 1799      Fischer Excavating, Inc.                                         6.0000        9,324.00        9,324.00
 2024      Gensini Excavating, Inc.                                        10.9700       17,047.38       17,047.38
 6210      Valley Construction Co.                                         10.0000       15,540.00       15,540.00

    X6640560  CH LK FENCE   6 SPL                         49.000     FOOT
 0049      Advanced Asphalt Company                                       155.0000        7,595.00        7,595.00
 1799      Fischer Excavating, Inc.                                       150.0000        7,350.00        7,350.00
 2024      Gensini Excavating, Inc.                                       219.3700       10,749.13       10,749.13
 6210      Valley Construction Co.                                        105.0000        5,145.00        5,145.00

    X7010216  TRAF CONT & PROT SPL                         1.000    L SUM
 0049      Advanced Asphalt Company                                   135,000.0000      135,000.00      135,000.00
 1799      Fischer Excavating, Inc.                                    25,000.0000       25,000.00       25,000.00
 2024      Gensini Excavating, Inc.                                   148,625.2900      148,625.29      148,625.29
 6210      Valley Construction Co.                                     25,000.0000       25,000.00       25,000.00

    X7240207  REM EX SIGN COMPL                           40.000     EACH
 0049      Advanced Asphalt Company                                       500.0000       20,000.00       20,000.00
 1799      Fischer Excavating, Inc.                                        75.0000        3,000.00        3,000.00
 2024      Gensini Excavating, Inc.                                        19.2200          768.80          768.80
 6210      Valley Construction Co.                                        100.0000        4,000.00        4,000.00

    X7240600  REM RE-ERECT EX SIGN                         3.000     EACH
 0049      Advanced Asphalt Company                                     1,700.0000        5,100.00        5,100.00
 1799      Fischer Excavating, Inc.                                       400.0000        1,200.00        1,200.00
 2024      Gensini Excavating, Inc.                                        76.8700          230.61          230.61
 6210      Valley Construction Co.                                        370.0000        1,110.00        1,110.00

    X7820007  GRDRAIL REFL TY C SPL                        7.000     EACH
 0049      Advanced Asphalt Company                                        65.0000          455.00          455.00
 1799      Fischer Excavating, Inc.                                        40.0000          280.00          280.00
 2024      Gensini Excavating, Inc.                                        43.8800          307.16          307.16
 6210      Valley Construction Co.                                         40.0000          280.00          280.00

    X8900104  TEMP TR SIGNAL TIMING                        1.000     EACH
 0049      Advanced Asphalt Company                                   207,520.0000      207,520.00      207,520.00
 1799      Fischer Excavating, Inc.                                    11,000.0000       11,000.00       11,000.00
 2024      Gensini Excavating, Inc.                                    18,098.2800       18,098.28       18,098.28
 6210      Valley Construction Co.                                     11,000.0000       11,000.00       11,000.00

    Z0012450  CONCRETE STEPS                              32.000    CU YD
 0049      Advanced Asphalt Company                                     1,500.0000       48,000.00       48,000.00
 1799      Fischer Excavating, Inc.                                     1,500.0000       48,000.00       48,000.00
 2024      Gensini Excavating, Inc.                                       490.4000       15,692.80       15,692.80
 6210      Valley Construction Co.                                      1,300.0000       41,600.00       41,600.00

    Z0012455  CONC STEP REMOV                              5.000     EACH
 0049      Advanced Asphalt Company                                     1,000.0000        5,000.00        5,000.00
 1799      Fischer Excavating, Inc.                                       650.0000        3,250.00        3,250.00
 2024      Gensini Excavating, Inc.                                     1,117.4500        5,587.25        5,587.25
 6210      Valley Construction Co.                                        410.0000        2,050.00        2,050.00

    Z0013798  CONSTRUCTION LAYOUT                          1.000    L SUM
 0049      Advanced Asphalt Company                                   180,000.0000      180,000.00      180,000.00
 1799      Fischer Excavating, Inc.                                   152,400.0000      152,400.00      152,400.00
 2024      Gensini Excavating, Inc.                                    79,522.7500       79,522.75       79,522.75
 6210      Valley Construction Co.                                    150,000.0000      150,000.00      150,000.00

    Z0054500  ROCK FILL                                   15.000      TON
 0049      Advanced Asphalt Company                                        84.0000        1,260.00        1,260.00
 1799      Fischer Excavating, Inc.                                        65.0000          975.00          975.00
 2024      Gensini Excavating, Inc.                                       122.6000        1,839.00        1,839.00
 6210      Valley Construction Co.                                        125.0000        1,875.00        1,875.00

    Z0056652  SS 1 WAT MN   18                            94.000     FOOT
 0049      Advanced Asphalt Company                                       175.0000       16,450.00       16,450.00
 1799      Fischer Excavating, Inc.                                       150.0000       14,100.00       14,100.00
 2024      Gensini Excavating, Inc.                                       182.8100       17,184.14       17,184.14
 6210      Valley Construction Co.                                        105.0000        9,870.00        9,870.00

    Z0056668  SS 2 WAT MN   12                            35.000     FOOT
 0049      Advanced Asphalt Company                                       135.0000        4,725.00        4,725.00
 1799      Fischer Excavating, Inc.                                       135.0000        4,725.00        4,725.00
 2024      Gensini Excavating, Inc.                                       201.1200        7,039.20        7,039.20
 6210      Valley Construction Co.                                         95.0000        3,325.00        3,325.00

    Z0056669  SS 2 WAT MN   15                           237.000     FOOT
 0049      Advanced Asphalt Company                                       155.0000       36,735.00       36,735.00
 1799      Fischer Excavating, Inc.                                       160.0000       37,920.00       37,920.00
 2024      Gensini Excavating, Inc.                                       206.9900       49,056.63       49,056.63
 6210      Valley Construction Co.                                        100.0000       23,700.00       23,700.00

    Z0056670  SS 2 WAT MN   18                            38.000     FOOT
 0049      Advanced Asphalt Company                                       175.0000        6,650.00        6,650.00
 1799      Fischer Excavating, Inc.                                       180.0000        6,840.00        6,840.00
 2024      Gensini Excavating, Inc.                                       217.9400        8,281.72        8,281.72
 6210      Valley Construction Co.                                        115.0000        4,370.00        4,370.00

    Z0062456  TEMP PAVEMENT                              153.000    SQ YD
 0049      Advanced Asphalt Company                                       150.0000       22,950.00       22,950.00
 1799      Fischer Excavating, Inc.                                       200.0000       30,600.00       30,600.00
 2024      Gensini Excavating, Inc.                                       147.5800       22,579.74       22,579.74
 6210      Valley Construction Co.                                        125.0000       19,125.00       19,125.00

    Z0076600  TRAINEES                                 2,000.000     HOUR
 0049      Advanced Asphalt Company                                         0.8000        1,600.00        1,600.00
 1799      Fischer Excavating, Inc.                                         0.8000        1,600.00        1,600.00
 2024      Gensini Excavating, Inc.                                         0.8000        1,600.00        1,600.00
 6210      Valley Construction Co.                                          0.8000        1,600.00        1,600.00

    Z0076604  TRAINEES TPG                             2,000.000     HOUR
 0049      Advanced Asphalt Company                                        15.0000       30,000.00       30,000.00
 1799      Fischer Excavating, Inc.                                        15.0000       30,000.00       30,000.00
 2024      Gensini Excavating, Inc.                                        15.0000       30,000.00       30,000.00
 6210      Valley Construction Co.                                         15.0000       30,000.00       30,000.00

    20100110  TREE REMOV 6-15                             62.000     UNIT
 0049      Advanced Asphalt Company                                        90.0000        5,580.00        5,580.00
 1799      Fischer Excavating, Inc.                                        35.0000        2,170.00        2,170.00
 2024      Gensini Excavating, Inc.                                        98.7200        6,120.64        6,120.64
 6210      Valley Construction Co.                                         80.0000        4,960.00        4,960.00

    20100210  TREE REMOV OVER 15                         172.000     UNIT
 0049      Advanced Asphalt Company                                       125.0000       21,500.00       21,500.00
 1799      Fischer Excavating, Inc.                                        55.0000        9,460.00        9,460.00
 2024      Gensini Excavating, Inc.                                       137.1100       23,582.92       23,582.92
 6210      Valley Construction Co.                                         65.0000       11,180.00       11,180.00

    20100500  TREE REMOV ACRES                              .250     ACRE
 0049      Advanced Asphalt Company                                    50,000.0000       12,500.00       12,500.00
 1799      Fischer Excavating, Inc.                                    50,000.0000       12,500.00       12,500.00
 2024      Gensini Excavating, Inc.                                    54,843.2800       13,710.82       13,710.82
 6210      Valley Construction Co.                                     32,500.0000        8,125.00        8,125.00

    20200100  EARTH EXCAVATION                        32,675.000    CU YD
 0049      Advanced Asphalt Company                                        35.0000    1,143,625.00    1,143,625.00
 1799      Fischer Excavating, Inc.                                        43.0000    1,405,025.00    1,405,025.00
 2024      Gensini Excavating, Inc.                                        26.6400      870,462.00      870,462.00
 6210      Valley Construction Co.                                         22.0000      718,850.00      718,850.00

    20800150  TRENCH BACKFILL                          6,142.000    CU YD
 0049      Advanced Asphalt Company                                        60.0000      368,520.00      368,520.00
 1799      Fischer Excavating, Inc.                                       100.0000      614,200.00      614,200.00
 2024      Gensini Excavating, Inc.                                        31.9600      196,298.32      196,298.32
 6210      Valley Construction Co.                                         65.0000      399,230.00      399,230.00

    21101615  TOPSOIL F & P  4                        27,038.000    SQ YD
 0049      Advanced Asphalt Company                                         5.0000      135,190.00      135,190.00
 1799      Fischer Excavating, Inc.                                        10.0000      270,380.00      270,380.00
 2024      Gensini Excavating, Inc.                                         9.0400      244,423.52      244,423.52
 6210      Valley Construction Co.                                          7.0000      189,266.00      189,266.00

    25000210  SEEDING CL  2A                               1.080     ACRE
 0049      Advanced Asphalt Company                                     9,500.0000       10,260.00       10,260.00
 1799      Fischer Excavating, Inc.                                     9,500.0000       10,260.00       10,260.00
 2024      Gensini Excavating, Inc.                                    10,420.2200       11,253.84       11,253.84
 6210      Valley Construction Co.                                      9,500.0000       10,260.00       10,260.00

    25000310  SEEDING CL  4                                 .340     ACRE
 0049      Advanced Asphalt Company                                    15,000.0000        5,100.00        5,100.00
 1799      Fischer Excavating, Inc.                                    15,000.0000        5,100.00        5,100.00
 2024      Gensini Excavating, Inc.                                    16,452.9700        5,594.01        5,594.01
 6210      Valley Construction Co.                                     15,000.0000        5,100.00        5,100.00

    25000400  NITROGEN FERT NUTR                         502.720    POUND
 0049      Advanced Asphalt Company                                         2.0000        1,005.44        1,005.44
 1799      Fischer Excavating, Inc.                                         2.0000        1,005.44        1,005.44
 2024      Gensini Excavating, Inc.                                         2.1900        1,100.96        1,100.96
 6210      Valley Construction Co.                                          2.0000        1,005.44        1,005.44

    25000500  PHOSPHORUS FERT NUTR                       502.720    POUND
 0049      Advanced Asphalt Company                                         2.0000        1,005.44        1,005.44
 1799      Fischer Excavating, Inc.                                         2.0000        1,005.44        1,005.44
 2024      Gensini Excavating, Inc.                                         2.1900        1,100.96        1,100.96
 6210      Valley Construction Co.                                          2.0000        1,005.44        1,005.44

    25000600  POTASSIUM FERT NUTR                        502.720    POUND
 0049      Advanced Asphalt Company                                         2.0000        1,005.44        1,005.44
 1799      Fischer Excavating, Inc.                                         2.0000        1,005.44        1,005.44
 2024      Gensini Excavating, Inc.                                         2.1900        1,100.96        1,100.96
 6210      Valley Construction Co.                                          2.0000        1,005.44        1,005.44

    25000750  MOWING                                       1.080     ACRE
 0049      Advanced Asphalt Company                                       550.0000          594.00          594.00
 1799      Fischer Excavating, Inc.                                       550.0000          594.00          594.00
 2024      Gensini Excavating, Inc.                                       603.2800          651.54          651.54
 6210      Valley Construction Co.                                        550.0000          594.00          594.00

    25100630  EROSION CONTR BLANKET                    6,884.000    SQ YD
 0049      Advanced Asphalt Company                                         1.5000       10,326.00       10,326.00
 1799      Fischer Excavating, Inc.                                         1.5000       10,326.00       10,326.00
 2024      Gensini Excavating, Inc.                                         1.6500       11,358.60       11,358.60
 6210      Valley Construction Co.                                          1.5000       10,326.00       10,326.00

    25100900  TURF REINF MAT                             712.000    SQ YD
 0049      Advanced Asphalt Company                                        12.0000        8,544.00        8,544.00
 1799      Fischer Excavating, Inc.                                        12.0000        8,544.00        8,544.00
 2024      Gensini Excavating, Inc.                                        13.1600        9,369.92        9,369.92
 6210      Valley Construction Co.                                         12.0000        8,544.00        8,544.00

    25200110  SODDING SALT TOLERANT                   20,188.000    SQ YD
 0049      Advanced Asphalt Company                                        18.0000      363,384.00      363,384.00
 1799      Fischer Excavating, Inc.                                        18.0000      363,384.00      363,384.00
 2024      Gensini Excavating, Inc.                                        19.7400      398,511.12      398,511.12
 6210      Valley Construction Co.                                         18.0000      363,384.00      363,384.00

    25200200  SUPPLE WATERING                             66.100     UNIT
 0049      Advanced Asphalt Company                                         0.0100            0.66            0.66
 1799      Fischer Excavating, Inc.                                       500.0000       33,050.00       33,050.00
 2024      Gensini Excavating, Inc.                                       548.4300       36,251.22       36,251.22
 6210      Valley Construction Co.                                        500.0000       33,050.00       33,050.00

    28000250  TEMP EROS CONTR SEED                       564.000    POUND
 0049      Advanced Asphalt Company                                         3.2500        1,833.00        1,833.00
 1799      Fischer Excavating, Inc.                                         4.0000        2,256.00        2,256.00
 2024      Gensini Excavating, Inc.                                         3.5600        2,007.84        2,007.84
 6210      Valley Construction Co.                                          3.2500        1,833.00        1,833.00

    28000305  TEMP DITCH CHECKS                          390.000     FOOT
 0049      Advanced Asphalt Company                                        10.0000        3,900.00        3,900.00
 1799      Fischer Excavating, Inc.                                        10.0000        3,900.00        3,900.00
 2024      Gensini Excavating, Inc.                                        10.9700        4,278.30        4,278.30
 6210      Valley Construction Co.                                         10.0000        3,900.00        3,900.00

    28000400  PERIMETER EROS BAR                       4,602.000     FOOT
 0049      Advanced Asphalt Company                                         3.4500       15,876.90       15,876.90
 1799      Fischer Excavating, Inc.                                         3.5000       16,107.00       16,107.00
 2024      Gensini Excavating, Inc.                                         3.7800       17,395.56       17,395.56
 6210      Valley Construction Co.                                          3.4500       15,876.90       15,876.90

    28000500  INLET & PIPE PROTECT                        97.000     EACH
 0049      Advanced Asphalt Company                                       200.0000       19,400.00       19,400.00
 1799      Fischer Excavating, Inc.                                       200.0000       19,400.00       19,400.00
 2024      Gensini Excavating, Inc.                                       219.3700       21,278.89       21,278.89
 6210      Valley Construction Co.                                        200.0000       19,400.00       19,400.00

    28100107  STONE RIPRAP CL A4                         117.000    SQ YD
 0049      Advanced Asphalt Company                                       135.0000       15,795.00       15,795.00
 1799      Fischer Excavating, Inc.                                        82.0000        9,594.00        9,594.00
 2024      Gensini Excavating, Inc.                                       132.6700       15,522.39       15,522.39
 6210      Valley Construction Co.                                        115.0000       13,455.00       13,455.00

    28200200  FILTER FABRIC                              117.000    SQ YD
 0049      Advanced Asphalt Company                                        13.0000        1,521.00        1,521.00
 1799      Fischer Excavating, Inc.                                         3.0000          351.00          351.00
 2024      Gensini Excavating, Inc.                                         6.7700          792.09          792.09
 6210      Valley Construction Co.                                          7.0000          819.00          819.00

    30300112  AGG SUBGRADE IMPR  12                   14,447.000    SQ YD
 0049      Advanced Asphalt Company                                        40.0000      577,880.00      577,880.00
 1799      Fischer Excavating, Inc.                                        32.0000      462,304.00      462,304.00
 2024      Gensini Excavating, Inc.                                        28.1800      407,116.46      407,116.46
 6210      Valley Construction Co.                                         32.0000      462,304.00      462,304.00

    30300118  AGG SUBGRADE IMPR  18                    9,643.000    SQ YD
 0049      Advanced Asphalt Company                                        55.0000      530,365.00      530,365.00
 1799      Fischer Excavating, Inc.                                        45.0000      433,935.00      433,935.00
 2024      Gensini Excavating, Inc.                                        44.1700      425,931.31      425,931.31
 6210      Valley Construction Co.                                         47.5000      458,042.50      458,042.50

    30300124  AGG SUBGRADE IMPR  24                    5,156.000    SQ YD
 0049      Advanced Asphalt Company                                        65.0000      335,140.00      335,140.00
 1799      Fischer Excavating, Inc.                                        59.0000      304,204.00      304,204.00
 2024      Gensini Excavating, Inc.                                        59.4700      306,627.32      306,627.32
 6210      Valley Construction Co.                                         60.0000      309,360.00      309,360.00

    30300130  AGG SUBGRADE IMPR  30                      919.000    SQ YD
 0049      Advanced Asphalt Company                                        90.0000       82,710.00       82,710.00
 1799      Fischer Excavating, Inc.                                        74.0000       68,006.00       68,006.00
 2024      Gensini Excavating, Inc.                                        74.8600       68,796.34       68,796.34
 6210      Valley Construction Co.                                         73.5000       67,546.50       67,546.50

    35102000  AGG BASE CSE B  8                          576.000    SQ YD
 0049      Advanced Asphalt Company                                        35.0000       20,160.00       20,160.00
 1799      Fischer Excavating, Inc.                                        20.0000       11,520.00       11,520.00
 2024      Gensini Excavating, Inc.                                        22.8400       13,155.84       13,155.84
 6210      Valley Construction Co.                                         30.0000       17,280.00       17,280.00

    40201000  AGGREGATE-TEMP ACCESS                      788.000      TON
 0049      Advanced Asphalt Company                                        50.0000       39,400.00       39,400.00
 1799      Fischer Excavating, Inc.                                        50.0000       39,400.00       39,400.00
 2024      Gensini Excavating, Inc.                                        61.8400       48,729.92       48,729.92
 6210      Valley Construction Co.                                         60.0000       47,280.00       47,280.00

    40600275  BIT MATLS PR CT                         54,027.000    POUND
 0049      Advanced Asphalt Company                                         1.0000       54,027.00       54,027.00
 1799      Fischer Excavating, Inc.                                         1.0000       54,027.00       54,027.00
 2024      Gensini Excavating, Inc.                                         1.1000       59,429.70       59,429.70
 6210      Valley Construction Co.                                          0.0100          540.27          540.27

    40600295  P BIT MATLS TACK CT                     22,047.000    POUND
 0049      Advanced Asphalt Company                                         2.7000       59,526.90       59,526.90
 1799      Fischer Excavating, Inc.                                         2.7000       59,526.90       59,526.90
 2024      Gensini Excavating, Inc.                                         2.9600       65,259.12       65,259.12
 6210      Valley Construction Co.                                          0.0100          220.47          220.47

    40600370  LONG JOINT SEALANT                       9,660.000     FOOT
 0049      Advanced Asphalt Company                                         4.0000       38,640.00       38,640.00
 1799      Fischer Excavating, Inc.                                         4.0000       38,640.00       38,640.00
 2024      Gensini Excavating, Inc.                                         4.3900       42,407.40       42,407.40
 6210      Valley Construction Co.                                          3.8700       37,384.20       37,384.20

    40600405  MATL TRANSFER DEVICE                     3,198.000      TON
 0049      Advanced Asphalt Company                                        15.0000       47,970.00       47,970.00
 1799      Fischer Excavating, Inc.                                        15.0000       47,970.00       47,970.00
 2024      Gensini Excavating, Inc.                                        16.4500       52,607.10       52,607.10
 6210      Valley Construction Co.                                          0.0100           31.98           31.98

    40604050  HMA SC IL-9.5 C N50                         97.000      TON
 0049      Advanced Asphalt Company                                       225.0000       21,825.00       21,825.00
 1799      Fischer Excavating, Inc.                                       225.0000       21,825.00       21,825.00
 2024      Gensini Excavating, Inc.                                       246.7900       23,938.63       23,938.63
 6210      Valley Construction Co.                                        130.0000       12,610.00       12,610.00

    40701881  HMA PAVT FD   10                        16,313.000    SQ YD
 0049      Advanced Asphalt Company                                        83.0000    1,353,979.00    1,353,979.00
 1799      Fischer Excavating, Inc.                                        83.0000    1,353,979.00    1,353,979.00
 2024      Gensini Excavating, Inc.                                        91.0400    1,485,135.52    1,485,135.52
 6210      Valley Construction Co.                                         70.0000    1,141,910.00    1,141,910.00

    42300300  PCC DRIVEWAY PAVT  7                     4,985.000    SQ YD
 0049      Advanced Asphalt Company                                        86.0000      428,710.00      428,710.00
 1799      Fischer Excavating, Inc.                                       116.0000      578,260.00      578,260.00
 2024      Gensini Excavating, Inc.                                       112.9800      563,205.30      563,205.30
 6210      Valley Construction Co.                                        110.0000      548,350.00      548,350.00

    42400200  PC CONC SIDEWALK 5                      54,458.000    SQ FT
 0049      Advanced Asphalt Company                                        11.0000      599,038.00      599,038.00
 1799      Fischer Excavating, Inc.                                        14.5000      789,641.00      789,641.00
 2024      Gensini Excavating, Inc.                                        10.1900      554,927.02      554,927.02
 6210      Valley Construction Co.                                         12.5000      680,725.00      680,725.00

    42400800  DETECTABLE WARNINGS                        749.000    SQ FT
 0049      Advanced Asphalt Company                                        28.0000       20,972.00       20,972.00
 1799      Fischer Excavating, Inc.                                        28.0000       20,972.00       20,972.00
 2024      Gensini Excavating, Inc.                                        30.8600       23,114.14       23,114.14
 6210      Valley Construction Co.                                         40.0000       29,960.00       29,960.00

    44000100  PAVEMENT REM                            12,994.000    SQ YD
 0049      Advanced Asphalt Company                                        20.0000      259,880.00      259,880.00
 1799      Fischer Excavating, Inc.                                        15.0000      194,910.00      194,910.00
 2024      Gensini Excavating, Inc.                                        11.8900      154,498.66      154,498.66
 6210      Valley Construction Co.                                         13.5000      175,419.00      175,419.00

    44000200  DRIVE PAVEMENT REM                       3,402.000    SQ YD
 0049      Advanced Asphalt Company                                        15.0000       51,030.00       51,030.00
 1799      Fischer Excavating, Inc.                                        11.0000       37,422.00       37,422.00
 2024      Gensini Excavating, Inc.                                        16.0700       54,670.14       54,670.14
 6210      Valley Construction Co.                                         21.5000       73,143.00       73,143.00

    44000500  COMB CURB GUTTER REM                     5,003.000     FOOT
 0049      Advanced Asphalt Company                                        10.0000       50,030.00       50,030.00
 1799      Fischer Excavating, Inc.                                         7.0000       35,021.00       35,021.00
 2024      Gensini Excavating, Inc.                                        11.1700       55,883.51       55,883.51
 6210      Valley Construction Co.                                          5.0000       25,015.00       25,015.00

    44000600  SIDEWALK REM                            17,851.000    SQ FT
 0049      Advanced Asphalt Company                                         4.0000       71,404.00       71,404.00
 1799      Fischer Excavating, Inc.                                         5.0000       89,255.00       89,255.00
 2024      Gensini Excavating, Inc.                                         2.1400       38,201.14       38,201.14
 6210      Valley Construction Co.                                          1.5000       26,776.50       26,776.50

    44200094  PAVT PATCH T2  8                           747.000    SQ YD
 0049      Advanced Asphalt Company                                       220.0000      164,340.00      164,340.00
 1799      Fischer Excavating, Inc.                                       300.0000      224,100.00      224,100.00
 2024      Gensini Excavating, Inc.                                       241.3100      180,258.57      180,258.57
 6210      Valley Construction Co.                                        185.0000      138,195.00      138,195.00

    48100500  AGGREGATE SHLDS A  6                       456.000    SQ YD
 0049      Advanced Asphalt Company                                        25.0000       11,400.00       11,400.00
 1799      Fischer Excavating, Inc.                                        24.0000       10,944.00       10,944.00
 2024      Gensini Excavating, Inc.                                        22.3800       10,205.28       10,205.28
 6210      Valley Construction Co.                                         19.5000        8,892.00        8,892.00

    48203021  HMA SHOULDERS   6                          868.000    SQ YD
 0049      Advanced Asphalt Company                                        50.0000       43,400.00       43,400.00
 1799      Fischer Excavating, Inc.                                        50.0000       43,400.00       43,400.00
 2024      Gensini Excavating, Inc.                                        54.8400       47,601.12       47,601.12
 6210      Valley Construction Co.                                         50.0000       43,400.00       43,400.00

    50100300  REM EXIST STRUCT  N1                         1.000     EACH
 0049      Advanced Asphalt Company                                     5,000.0000        5,000.00        5,000.00
 1799      Fischer Excavating, Inc.                                     4,500.0000        4,500.00        4,500.00
 2024      Gensini Excavating, Inc.                                    20,180.5500       20,180.55       20,180.55
 6210      Valley Construction Co.                                      4,300.0000        4,300.00        4,300.00

    50100400  REM EXIST STRUCT  N2                         1.000     EACH
 0049      Advanced Asphalt Company                                     5,000.0000        5,000.00        5,000.00
 1799      Fischer Excavating, Inc.                                     4,500.0000        4,500.00        4,500.00
 2024      Gensini Excavating, Inc.                                    20,180.5500       20,180.55       20,180.55
 6210      Valley Construction Co.                                      2,950.0000        2,950.00        2,950.00

    50100500  REM EXIST STRUCT  N3                         1.000     EACH
 0049      Advanced Asphalt Company                                     5,000.0000        5,000.00        5,000.00
 1799      Fischer Excavating, Inc.                                     4,500.0000        4,500.00        4,500.00
 2024      Gensini Excavating, Inc.                                    20,180.5500       20,180.55       20,180.55
 6210      Valley Construction Co.                                      2,950.0000        2,950.00        2,950.00

    50100600  REM EXIST STRUCT  N4                         1.000     EACH
 0049      Advanced Asphalt Company                                     5,000.0000        5,000.00        5,000.00
 1799      Fischer Excavating, Inc.                                     4,500.0000        4,500.00        4,500.00
 2024      Gensini Excavating, Inc.                                    20,180.5500       20,180.55       20,180.55
 6210      Valley Construction Co.                                      3,950.0000        3,950.00        3,950.00

    50100700  REM EXIST STRUCT  N5                         1.000     EACH
 0049      Advanced Asphalt Company                                    20,000.0000       20,000.00       20,000.00
 1799      Fischer Excavating, Inc.                                     6,700.0000        6,700.00        6,700.00
 2024      Gensini Excavating, Inc.                                    50,451.3600       50,451.36       50,451.36
 6210      Valley Construction Co.                                      5,900.0000        5,900.00        5,900.00

    50104400  CONC HEADWALL REMOVAL                        1.000     EACH
 0049      Advanced Asphalt Company                                     1,000.0000        1,000.00        1,000.00
 1799      Fischer Excavating, Inc.                                       500.0000          500.00          500.00
 2024      Gensini Excavating, Inc.                                     5,045.1400        5,045.14        5,045.14
 6210      Valley Construction Co.                                        450.0000          450.00          450.00

    50105220  PIPE CULVERT REMOV                         174.000     FOOT
 0049      Advanced Asphalt Company                                        60.0000       10,440.00       10,440.00
 1799      Fischer Excavating, Inc.                                        32.0000        5,568.00        5,568.00
 2024      Gensini Excavating, Inc.                                        43.3500        7,542.90        7,542.90
 6210      Valley Construction Co.                                         20.0000        3,480.00        3,480.00

    50200100  STRUCTURE EXCAVATION                     2,454.000    CU YD
 0049      Advanced Asphalt Company                                        80.0000      196,320.00      196,320.00
 1799      Fischer Excavating, Inc.                                        80.0000      196,320.00      196,320.00
 2024      Gensini Excavating, Inc.                                        39.1500       96,074.10       96,074.10
 6210      Valley Construction Co.                                         80.0000      196,320.00      196,320.00

    50200400  ROCK EXC STRUCT                             32.000    CU YD
 0049      Advanced Asphalt Company                                       156.0000        4,992.00        4,992.00
 1799      Fischer Excavating, Inc.                                       112.0000        3,584.00        3,584.00
 2024      Gensini Excavating, Inc.                                       300.2400        9,607.68        9,607.68
 6210      Valley Construction Co.                                        350.0000       11,200.00       11,200.00

    50300285  FORM LINER TEX SURF                      5,730.000    SQ FT
 0049      Advanced Asphalt Company                                        47.5000      272,175.00      272,175.00
 1799      Fischer Excavating, Inc.                                        47.5000      272,175.00      272,175.00
 2024      Gensini Excavating, Inc.                                        20.1300      115,344.90      115,344.90
 6210      Valley Construction Co.                                         20.0000      114,600.00      114,600.00

    50300300  PROTECTIVE COAT                            326.000    SQ YD
 0049      Advanced Asphalt Company                                         5.0000        1,630.00        1,630.00
 1799      Fischer Excavating, Inc.                                         5.0000        1,630.00        1,630.00
 2024      Gensini Excavating, Inc.                                         9.0100        2,937.26        2,937.26
 6210      Valley Construction Co.                                          8.0000        2,608.00        2,608.00

    50500505  STUD SHEAR CONNECTORS                      308.000     EACH
 0049      Advanced Asphalt Company                                        35.0000       10,780.00       10,780.00
 1799      Fischer Excavating, Inc.                                        35.0000       10,780.00       10,780.00
 2024      Gensini Excavating, Inc.                                        28.2300        8,694.84        8,694.84
 6210      Valley Construction Co.                                         45.0000       13,860.00       13,860.00

    50800105  REINFORCEMENT BARS                      47,462.000    POUND
 0049      Advanced Asphalt Company                                         3.0000      142,386.00      142,386.00
 1799      Fischer Excavating, Inc.                                         3.0000      142,386.00      142,386.00
 2024      Gensini Excavating, Inc.                                         2.2200      105,365.64      105,365.64
 6210      Valley Construction Co.                                          1.8500       87,804.70       87,804.70

    50800205  REINF BARS, EPOXY CTD                   18,836.000    POUND
 0049      Advanced Asphalt Company                                         4.0000       75,344.00       75,344.00
 1799      Fischer Excavating, Inc.                                         4.0000       75,344.00       75,344.00
 2024      Gensini Excavating, Inc.                                         2.5200       47,466.72       47,466.72
 6210      Valley Construction Co.                                          1.9000       35,788.40       35,788.40

    50901760  PIPE HANDRAIL                              313.000     FOOT
 0049      Advanced Asphalt Company                                       175.0000       54,775.00       54,775.00
 1799      Fischer Excavating, Inc.                                       175.0000       54,775.00       54,775.00
 2024      Gensini Excavating, Inc.                                       205.6600       64,371.58       64,371.58
 6210      Valley Construction Co.                                        175.0000       54,775.00       54,775.00

    51500100  NAME PLATES                                  1.000     EACH
 0049      Advanced Asphalt Company                                       750.0000          750.00          750.00
 1799      Fischer Excavating, Inc.                                       750.0000          750.00          750.00
 2024      Gensini Excavating, Inc.                                     1,096.8600        1,096.86        1,096.86
 6210      Valley Construction Co.                                      1,400.0000        1,400.00        1,400.00

    52200105  FUR SOLDIER PILES WS                     1,084.000     FOOT
 0049      Advanced Asphalt Company                                       150.0000      162,600.00      162,600.00
 1799      Fischer Excavating, Inc.                                       150.0000      162,600.00      162,600.00
 2024      Gensini Excavating, Inc.                                       341.8800      370,597.92      370,597.92
 6210      Valley Construction Co.                                        160.0000      173,440.00      173,440.00

    52200200  DRILL SET SLD PI SOIL                    4,932.000    CU FT
 0049      Advanced Asphalt Company                                        45.0000      221,940.00      221,940.00
 1799      Fischer Excavating, Inc.                                        45.0000      221,940.00      221,940.00
 2024      Gensini Excavating, Inc.                                         9.4900       46,804.68       46,804.68
 6210      Valley Construction Co.                                          9.0000       44,388.00       44,388.00

    52200205  DRILL SET SLD PI ROCK                      939.000    CU FT
 0049      Advanced Asphalt Company                                       130.0000      122,070.00      122,070.00
 1799      Fischer Excavating, Inc.                                       130.0000      122,070.00      122,070.00
 2024      Gensini Excavating, Inc.                                        17.0200       15,981.78       15,981.78
 6210      Valley Construction Co.                                         15.0000       14,085.00       14,085.00

    52200250  UNTREATED TIMBER LAG                     2,212.000    SQ FT
 0049      Advanced Asphalt Company                                        35.0000       77,420.00       77,420.00
 1799      Fischer Excavating, Inc.                                        35.0000       77,420.00       77,420.00
 2024      Gensini Excavating, Inc.                                        29.2600       64,723.12       64,723.12
 6210      Valley Construction Co.                                         35.0000       77,420.00       77,420.00

    52200900  CONC STR RETAIN WALL                       656.700    CU YD
 0049      Advanced Asphalt Company                                     2,000.0000    1,313,400.00    1,313,400.00
 1799      Fischer Excavating, Inc.                                     2,000.0000    1,313,400.00    1,313,400.00
 2024      Gensini Excavating, Inc.                                     1,157.2200      759,946.37      759,946.37
 6210      Valley Construction Co.                                      1,420.0000      932,514.00      932,514.00

    54003000  CONC BOX CUL                                41.000    CU YD
 0049      Advanced Asphalt Company                                     2,775.0000      113,775.00      113,775.00
 1799      Fischer Excavating, Inc.                                     1,500.0000       61,500.00       61,500.00
 2024      Gensini Excavating, Inc.                                     4,232.3500      173,526.35      173,526.35
 6210      Valley Construction Co.                                      3,500.0000      143,500.00      143,500.00

    542D0223  P CUL CL D 1    18                          48.000     FOOT
 0049      Advanced Asphalt Company                                       125.0000        6,000.00        6,000.00
 1799      Fischer Excavating, Inc.                                        90.0000        4,320.00        4,320.00
 2024      Gensini Excavating, Inc.                                       140.3700        6,737.76        6,737.76
 6210      Valley Construction Co.                                         90.0000        4,320.00        4,320.00

    54260315  TRVRS PIPE GRT CON ES                      125.000     FOOT
 0049      Advanced Asphalt Company                                       165.0000       20,625.00       20,625.00
 1799      Fischer Excavating, Inc.                                       150.0000       18,750.00       18,750.00
 2024      Gensini Excavating, Inc.                                       192.8400       24,105.00       24,105.00
 6210      Valley Construction Co.                                        135.0000       16,875.00       16,875.00

    54260518  SLOP MET ES 18", 1:6                         2.000     EACH
 0049      Advanced Asphalt Company                                     2,000.0000        4,000.00        4,000.00
 1799      Fischer Excavating, Inc.                                     1,150.0000        2,300.00        2,300.00
 2024      Gensini Excavating, Inc.                                     3,455.4400        6,910.88        6,910.88
 6210      Valley Construction Co.                                      1,550.0000        3,100.00        3,100.00

    54261336  CONC ES 542001 36 1:3                        1.000     EACH
 0049      Advanced Asphalt Company                                     7,600.0000        7,600.00        7,600.00
 1799      Fischer Excavating, Inc.                                     6,300.0000        6,300.00        6,300.00
 2024      Gensini Excavating, Inc.                                     6,115.2100        6,115.21        6,115.21
 6210      Valley Construction Co.                                     10,900.0000       10,900.00       10,900.00

    54261418  CONC ES 542001 18 1:4                        1.000     EACH
 0049      Advanced Asphalt Company                                     3,800.0000        3,800.00        3,800.00
 1799      Fischer Excavating, Inc.                                     3,800.0000        3,800.00        3,800.00
 2024      Gensini Excavating, Inc.                                     3,724.0400        3,724.04        3,724.04
 6210      Valley Construction Co.                                      5,000.0000        5,000.00        5,000.00

    54261448  CONC ES 542001 48 1:4                        1.000     EACH
 0049      Advanced Asphalt Company                                    15,500.0000       15,500.00       15,500.00
 1799      Fischer Excavating, Inc.                                    15,000.0000       15,000.00       15,000.00
 2024      Gensini Excavating, Inc.                                    12,350.1700       12,350.17       12,350.17
 6210      Valley Construction Co.                                     15,400.0000       15,400.00       15,400.00

    54262718  METAL FL END SEC 18"                         1.000     EACH
 0049      Advanced Asphalt Company                                     1,300.0000        1,300.00        1,300.00
 1799      Fischer Excavating, Inc.                                       460.0000          460.00          460.00
 2024      Gensini Excavating, Inc.                                     2,923.4700        2,923.47        2,923.47
 6210      Valley Construction Co.                                      1,000.0000        1,000.00        1,000.00

    550A0050  STORM SEW CL A 1  12                       115.000     FOOT
 0049      Advanced Asphalt Company                                       160.0000       18,400.00       18,400.00
 1799      Fischer Excavating, Inc.                                       100.0000       11,500.00       11,500.00
 2024      Gensini Excavating, Inc.                                       117.7700       13,543.55       13,543.55
 6210      Valley Construction Co.                                         75.0000        8,625.00        8,625.00

    550A0090  STORM SEW CL A 1  18                        34.000     FOOT
 0049      Advanced Asphalt Company                                       180.0000        6,120.00        6,120.00
 1799      Fischer Excavating, Inc.                                       125.0000        4,250.00        4,250.00
 2024      Gensini Excavating, Inc.                                       130.0000        4,420.00        4,420.00
 6210      Valley Construction Co.                                         93.5000        3,179.00        3,179.00

    550A0140  STORM SEW CL A 1  30                        54.000     FOOT
 0049      Advanced Asphalt Company                                       240.0000       12,960.00       12,960.00
 1799      Fischer Excavating, Inc.                                       190.0000       10,260.00       10,260.00
 2024      Gensini Excavating, Inc.                                       177.7800        9,600.12        9,600.12
 6210      Valley Construction Co.                                        148.0000        7,992.00        7,992.00

    550A0160  STORM SEW CL A 1  36                        68.000     FOOT
 0049      Advanced Asphalt Company                                       260.0000       17,680.00       17,680.00
 1799      Fischer Excavating, Inc.                                       210.0000       14,280.00       14,280.00
 2024      Gensini Excavating, Inc.                                       198.2000       13,477.60       13,477.60
 6210      Valley Construction Co.                                        187.5000       12,750.00       12,750.00

    550A0190  STORM SEW CL A 1  48                        65.000     FOOT
 0049      Advanced Asphalt Company                                       340.0000       22,100.00       22,100.00
 1799      Fischer Excavating, Inc.                                       355.0000       23,075.00       23,075.00
 2024      Gensini Excavating, Inc.                                       293.3600       19,068.40       19,068.40
 6210      Valley Construction Co.                                        275.0000       17,875.00       17,875.00

    550A0340  STORM SEW CL A 2  12                       650.000     FOOT
 0049      Advanced Asphalt Company                                       150.0000       97,500.00       97,500.00
 1799      Fischer Excavating, Inc.                                       160.0000      104,000.00      104,000.00
 2024      Gensini Excavating, Inc.                                       132.0800       85,852.00       85,852.00
 6210      Valley Construction Co.                                         92.0000       59,800.00       59,800.00

    550A0360  STORM SEW CL A 2  15                       546.000     FOOT
 0049      Advanced Asphalt Company                                       155.0000       84,630.00       84,630.00
 1799      Fischer Excavating, Inc.                                       165.0000       90,090.00       90,090.00
 2024      Gensini Excavating, Inc.                                       135.9300       74,217.78       74,217.78
 6210      Valley Construction Co.                                         97.5000       53,235.00       53,235.00

    550A0380  STORM SEW CL A 2  18                     1,599.000     FOOT
 0049      Advanced Asphalt Company                                       180.0000      287,820.00      287,820.00
 1799      Fischer Excavating, Inc.                                       170.0000      271,830.00      271,830.00
 2024      Gensini Excavating, Inc.                                       144.2300      230,623.77      230,623.77
 6210      Valley Construction Co.                                        104.0000      166,296.00      166,296.00

    550A0410  STORM SEW CL A 2  24                       643.000     FOOT
 0049      Advanced Asphalt Company                                       200.0000      128,600.00      128,600.00
 1799      Fischer Excavating, Inc.                                       195.0000      125,385.00      125,385.00
 2024      Gensini Excavating, Inc.                                       159.7400      102,712.82      102,712.82
 6210      Valley Construction Co.                                        120.0000       77,160.00       77,160.00

    550A0430  STORM SEW CL A 2  30                       141.000     FOOT
 0049      Advanced Asphalt Company                                       220.0000       31,020.00       31,020.00
 1799      Fischer Excavating, Inc.                                       250.0000       35,250.00       35,250.00
 2024      Gensini Excavating, Inc.                                       214.3400       30,221.94       30,221.94
 6210      Valley Construction Co.                                        150.0000       21,150.00       21,150.00

    550A0450  STORM SEW CL A 2  36                        53.000     FOOT
 0049      Advanced Asphalt Company                                       260.0000       13,780.00       13,780.00
 1799      Fischer Excavating, Inc.                                       265.0000       14,045.00       14,045.00
 2024      Gensini Excavating, Inc.                                       234.5900       12,433.27       12,433.27
 6210      Valley Construction Co.                                        195.0000       10,335.00       10,335.00

    550A0680  STORM SEW CL A 3  18                       597.000     FOOT
 0049      Advanced Asphalt Company                                       180.0000      107,460.00      107,460.00
 1799      Fischer Excavating, Inc.                                       330.0000      197,010.00      197,010.00
 2024      Gensini Excavating, Inc.                                       201.5400      120,319.38      120,319.38
 6210      Valley Construction Co.                                        120.0000       71,640.00       71,640.00

    550A0710  STORM SEW CL A 3  24                       405.000     FOOT
 0049      Advanced Asphalt Company                                       200.0000       81,000.00       81,000.00
 1799      Fischer Excavating, Inc.                                       405.0000      164,025.00      164,025.00
 2024      Gensini Excavating, Inc.                                       221.4400       89,683.20       89,683.20
 6210      Valley Construction Co.                                        140.0000       56,700.00       56,700.00

    550A0750  STORM SEW CL A 3  36                        80.000     FOOT
 0049      Advanced Asphalt Company                                       260.0000       20,800.00       20,800.00
 1799      Fischer Excavating, Inc.                                       530.0000       42,400.00       42,400.00
 2024      Gensini Excavating, Inc.                                       255.4600       20,436.80       20,436.80
 6210      Valley Construction Co.                                        235.0000       18,800.00       18,800.00

    55100400  STORM SEWER REM  10                        121.000     FOOT
 0049      Advanced Asphalt Company                                       110.0000       13,310.00       13,310.00
 1799      Fischer Excavating, Inc.                                        25.0000        3,025.00        3,025.00
 2024      Gensini Excavating, Inc.                                        50.2900        6,085.09        6,085.09
 6210      Valley Construction Co.                                         24.5000        2,964.50        2,964.50

    55100500  STORM SEWER REM  12                        443.000     FOOT
 0049      Advanced Asphalt Company                                       120.0000       53,160.00       53,160.00
 1799      Fischer Excavating, Inc.                                        25.0000       11,075.00       11,075.00
 2024      Gensini Excavating, Inc.                                        50.2900       22,278.47       22,278.47
 6210      Valley Construction Co.                                         24.5000       10,853.50       10,853.50

    56100003  DI WAT MN TEE,   4X 4                        3.000     EACH
 0049      Advanced Asphalt Company                                     1,200.0000        3,600.00        3,600.00
 1799      Fischer Excavating, Inc.                                       650.0000        1,950.00        1,950.00
 2024      Gensini Excavating, Inc.                                       991.6000        2,974.80        2,974.80
 6210      Valley Construction Co.                                        650.0000        1,950.00        1,950.00

    56100005  DI WAT MN TEE,   6X 6                       10.000     EACH
 0049      Advanced Asphalt Company                                     1,100.0000       11,000.00       11,000.00
 1799      Fischer Excavating, Inc.                                       990.0000        9,900.00        9,900.00
 2024      Gensini Excavating, Inc.                                     1,300.9200       13,009.20       13,009.20
 6210      Valley Construction Co.                                        905.0000        9,050.00        9,050.00

    56100010  DI WAT MN TEE,   8X 4                        2.000     EACH
 0049      Advanced Asphalt Company                                     1,200.0000        2,400.00        2,400.00
 1799      Fischer Excavating, Inc.                                     1,080.0000        2,160.00        2,160.00
 2024      Gensini Excavating, Inc.                                     1,355.7700        2,711.54        2,711.54
 6210      Valley Construction Co.                                        975.0000        1,950.00        1,950.00

    56100015  DI WAT MN TEE,   8X 6                       10.000     EACH
 0049      Advanced Asphalt Company                                     1,200.0000       12,000.00       12,000.00
 1799      Fischer Excavating, Inc.                                     1,135.0000       11,350.00       11,350.00
 2024      Gensini Excavating, Inc.                                     1,407.3100       14,073.10       14,073.10
 6210      Valley Construction Co.                                      1,035.0000       10,350.00       10,350.00

    56100500  WATER MAIN   4                             883.000     FOOT
 0049      Advanced Asphalt Company                                       100.0000       88,300.00       88,300.00
 1799      Fischer Excavating, Inc.                                        80.0000       70,640.00       70,640.00
 2024      Gensini Excavating, Inc.                                        92.9000       82,030.70       82,030.70
 6210      Valley Construction Co.                                         70.0000       61,810.00       61,810.00

    56100600  WATER MAIN   6                           1,622.000     FOOT
 0049      Advanced Asphalt Company                                       110.0000      178,420.00      178,420.00
 1799      Fischer Excavating, Inc.                                        90.0000      145,980.00      145,980.00
 2024      Gensini Excavating, Inc.                                        96.2300      156,085.06      156,085.06
 6210      Valley Construction Co.                                         80.0000      129,760.00      129,760.00

    56100700  WATER MAIN   8                           3,751.000     FOOT
 0049      Advanced Asphalt Company                                       120.0000      450,120.00      450,120.00
 1799      Fischer Excavating, Inc.                                       100.0000      375,100.00      375,100.00
 2024      Gensini Excavating, Inc.                                       107.5800      403,532.58      403,532.58
 6210      Valley Construction Co.                                         86.0000      322,586.00      322,586.00

    56101150  DI WAT MN RED,  8 X 6                        2.000     EACH
 0049      Advanced Asphalt Company                                     1,000.0000        2,000.00        2,000.00
 1799      Fischer Excavating, Inc.                                       720.0000        1,440.00        1,440.00
 2024      Gensini Excavating, Inc.                                     1,079.3600        2,158.72        2,158.72
 6210      Valley Construction Co.                                        675.0000        1,350.00        1,350.00

    56109396  DIWM FTGS 4IN 11.25D                         1.000     EACH
 0049      Advanced Asphalt Company                                     1,150.0000        1,150.00        1,150.00
 1799      Fischer Excavating, Inc.                                       530.0000          530.00          530.00
 2024      Gensini Excavating, Inc.                                       597.2700          597.27          597.27
 6210      Valley Construction Co.                                        510.0000          510.00          510.00

    56109398  DIWM FTGS 6IN 11.25D                         2.000     EACH
 0049      Advanced Asphalt Company                                     1,150.0000        2,300.00        2,300.00
 1799      Fischer Excavating, Inc.                                       610.0000        1,220.00        1,220.00
 2024      Gensini Excavating, Inc.                                       654.3000        1,308.60        1,308.60
 6210      Valley Construction Co.                                        945.0000        1,890.00        1,890.00

    56109407  DIWM FTGS 6IN 22.5D                          1.000     EACH
 0049      Advanced Asphalt Company                                       750.0000          750.00          750.00
 1799      Fischer Excavating, Inc.                                       640.0000          640.00          640.00
 2024      Gensini Excavating, Inc.                                       687.2100          687.21          687.21
 6210      Valley Construction Co.                                        605.0000          605.00          605.00

    56109416  DIWN FTGS 4IN 45DEG                          6.000     EACH
 0049      Advanced Asphalt Company                                       750.0000        4,500.00        4,500.00
 1799      Fischer Excavating, Inc.                                       540.0000        3,240.00        3,240.00
 2024      Gensini Excavating, Inc.                                       608.2300        3,649.38        3,649.38
 6210      Valley Construction Co.                                        520.0000        3,120.00        3,120.00

    56109418  DIWM FTGS 6IN 45DEG                         32.000     EACH
 0049      Advanced Asphalt Company                                       800.0000       25,600.00       25,600.00
 1799      Fischer Excavating, Inc.                                       665.0000       21,280.00       21,280.00
 2024      Gensini Excavating, Inc.                                       708.0400       22,657.28       22,657.28
 6210      Valley Construction Co.                                        625.0000       20,000.00       20,000.00

    56109420  DIWM FTGS 8IN 45DEG                         32.000     EACH
 0049      Advanced Asphalt Company                                       925.0000       29,600.00       29,600.00
 1799      Fischer Excavating, Inc.                                       810.0000       25,920.00       25,920.00
 2024      Gensini Excavating, Inc.                                       794.6900       25,430.08       25,430.08
 6210      Valley Construction Co.                                        750.0000       24,000.00       24,000.00

    56109434  DIWM FTGS 8IN 90DEG                          1.000     EACH
 0049      Advanced Asphalt Company                                       925.0000          925.00          925.00
 1799      Fischer Excavating, Inc.                                       910.0000          910.00          910.00
 2024      Gensini Excavating, Inc.                                       866.0000          866.00          866.00
 6210      Valley Construction Co.                                        840.0000          840.00          840.00

    56400500  FIRE HYDNTS TO BE REM                        5.000     EACH
 0049      Advanced Asphalt Company                                     2,000.0000       10,000.00       10,000.00
 1799      Fischer Excavating, Inc.                                       600.0000        3,000.00        3,000.00
 2024      Gensini Excavating, Inc.                                     1,099.5500        5,497.75        5,497.75
 6210      Valley Construction Co.                                      1,125.0000        5,625.00        5,625.00

    56400710  FIRE HYDNT & VAL SPL                         5.000     EACH
 0049      Advanced Asphalt Company                                     9,500.0000       47,500.00       47,500.00
 1799      Fischer Excavating, Inc.                                     7,800.0000       39,000.00       39,000.00
 2024      Gensini Excavating, Inc.                                     8,200.3000       41,001.50       41,001.50
 6210      Valley Construction Co.                                      6,900.0000       34,500.00       34,500.00

    58600101  GRANULAR BACKFILL STR                      900.000    CU YD
 0049      Advanced Asphalt Company                                        95.0000       85,500.00       85,500.00
 1799      Fischer Excavating, Inc.                                        95.0000       85,500.00       85,500.00
 2024      Gensini Excavating, Inc.                                        37.2900       33,561.00       33,561.00
 6210      Valley Construction Co.                                        135.0000      121,500.00      121,500.00

    59100100  GEOCOMPOSITE WALL DR                       871.000    SQ YD
 0049      Advanced Asphalt Company                                        35.0000       30,485.00       30,485.00
 1799      Fischer Excavating, Inc.                                        35.0000       30,485.00       30,485.00
 2024      Gensini Excavating, Inc.                                        45.2700       39,430.17       39,430.17
 6210      Valley Construction Co.                                         25.5000       22,210.50       22,210.50

    60100060  CONC HDWL FOR P DRAIN                        4.000     EACH
 0049      Advanced Asphalt Company                                     3,400.0000       13,600.00       13,600.00
 1799      Fischer Excavating, Inc.                                       760.0000        3,040.00        3,040.00
 2024      Gensini Excavating, Inc.                                       569.9700        2,279.88        2,279.88
 6210      Valley Construction Co.                                        975.0000        3,900.00        3,900.00

    60108204  PIPE UNDERDR T 2 4                      11,077.000     FOOT
 0049      Advanced Asphalt Company                                        16.5000      182,770.50      182,770.50
 1799      Fischer Excavating, Inc.                                        28.0000      310,156.00      310,156.00
 2024      Gensini Excavating, Inc.                                        23.9800      265,626.46      265,626.46
 6210      Valley Construction Co.                                         22.5000      249,232.50      249,232.50

    60146304  P UNDR FOR STRUCT  4                     2,313.000     FOOT
 0049      Advanced Asphalt Company                                        73.0000      168,849.00      168,849.00
 1799      Fischer Excavating, Inc.                                        45.0000      104,085.00      104,085.00
 2024      Gensini Excavating, Inc.                                        24.9700       57,755.61       57,755.61
 6210      Valley Construction Co.                                         33.5000       77,485.50       77,485.50

    60218400  MAN TA 4 DIA T1F CL                          5.000     EACH
 0049      Advanced Asphalt Company                                     5,700.0000       28,500.00       28,500.00
 1799      Fischer Excavating, Inc.                                     7,000.0000       35,000.00       35,000.00
 2024      Gensini Excavating, Inc.                                     4,954.0300       24,770.15       24,770.15
 6210      Valley Construction Co.                                      4,735.0000       23,675.00       23,675.00

    60221100  MAN TA 5 DIA T1F CL                          3.000     EACH
 0049      Advanced Asphalt Company                                     6,800.0000       20,400.00       20,400.00
 1799      Fischer Excavating, Inc.                                     7,400.0000       22,200.00       22,200.00
 2024      Gensini Excavating, Inc.                                     5,898.5500       17,695.65       17,695.65
 6210      Valley Construction Co.                                      6,400.0000       19,200.00       19,200.00

    60223700  MAN TA 6 DIA T1F OL                          1.000     EACH
 0049      Advanced Asphalt Company                                    12,000.0000       12,000.00       12,000.00
 1799      Fischer Excavating, Inc.                                    13,000.0000       13,000.00       13,000.00
 2024      Gensini Excavating, Inc.                                     9,497.2700        9,497.27        9,497.27
 6210      Valley Construction Co.                                      8,800.0000        8,800.00        8,800.00

    60224446  MAN TA 7 DIA T1F CL                          1.000     EACH
 0049      Advanced Asphalt Company                                    26,000.0000       26,000.00       26,000.00
 1799      Fischer Excavating, Inc.                                    31,500.0000       31,500.00       31,500.00
 2024      Gensini Excavating, Inc.                                    23,107.5800       23,107.58       23,107.58
 6210      Valley Construction Co.                                     19,200.0000       19,200.00       19,200.00

    60240215  INLETS TB T1F CL                             1.000     EACH
 0049      Advanced Asphalt Company                                     4,300.0000        4,300.00        4,300.00
 1799      Fischer Excavating, Inc.                                     4,600.0000        4,600.00        4,600.00
 2024      Gensini Excavating, Inc.                                     2,805.6700        2,805.67        2,805.67
 6210      Valley Construction Co.                                      3,690.0000        3,690.00        3,690.00

    60240303  INLETS TB T9F&G                              2.000     EACH
 0049      Advanced Asphalt Company                                     4,600.0000        9,200.00        9,200.00
 1799      Fischer Excavating, Inc.                                     4,900.0000        9,800.00        9,800.00
 2024      Gensini Excavating, Inc.                                     3,700.7200        7,401.44        7,401.44
 6210      Valley Construction Co.                                      3,965.0000        7,930.00        7,930.00

    60500040  REMOV MANHOLES                               6.000     EACH
 0049      Advanced Asphalt Company                                     3,600.0000       21,600.00       21,600.00
 1799      Fischer Excavating, Inc.                                       550.0000        3,300.00        3,300.00
 2024      Gensini Excavating, Inc.                                       549.7800        3,298.68        3,298.68
 6210      Valley Construction Co.                                      1,355.0000        8,130.00        8,130.00

    60500060  REMOV INLETS                                 3.000     EACH
 0049      Advanced Asphalt Company                                     3,800.0000       11,400.00       11,400.00
 1799      Fischer Excavating, Inc.                                       550.0000        1,650.00        1,650.00
 2024      Gensini Excavating, Inc.                                       549.7800        1,649.34        1,649.34
 6210      Valley Construction Co.                                        900.0000        2,700.00        2,700.00

    60600095  CLASS SI CONC OUTLET                        12.000    CU YD
 0049      Advanced Asphalt Company                                       875.0000       10,500.00       10,500.00
 1799      Fischer Excavating, Inc.                                       875.0000       10,500.00       10,500.00
 2024      Gensini Excavating, Inc.                                       701.5300        8,418.36        8,418.36
 6210      Valley Construction Co.                                      1,825.0000       21,900.00       21,900.00

    60600605  CONC CURB TB                                11.000     FOOT
 0049      Advanced Asphalt Company                                        75.0000          825.00          825.00
 1799      Fischer Excavating, Inc.                                        75.0000          825.00          825.00
 2024      Gensini Excavating, Inc.                                        62.5500          688.05          688.05
 6210      Valley Construction Co.                                        120.0000        1,320.00        1,320.00

    60602800  CONCRETE GUTTER TY B                       348.000     FOOT
 0049      Advanced Asphalt Company                                        60.0000       20,880.00       20,880.00
 1799      Fischer Excavating, Inc.                                        60.0000       20,880.00       20,880.00
 2024      Gensini Excavating, Inc.                                        56.5300       19,672.44       19,672.44
 6210      Valley Construction Co.                                         78.5000       27,318.00       27,318.00

    60603800  COMB CC&G TB6.12                         3,878.000     FOOT
 0049      Advanced Asphalt Company                                        40.0000      155,120.00      155,120.00
 1799      Fischer Excavating, Inc.                                        40.0000      155,120.00      155,120.00
 2024      Gensini Excavating, Inc.                                        42.2600      163,884.28      163,884.28
 6210      Valley Construction Co.                                         65.0000      252,070.00      252,070.00

    60604400  COMB CC&G TB6.18                            42.000     FOOT
 0049      Advanced Asphalt Company                                        70.0000        2,940.00        2,940.00
 1799      Fischer Excavating, Inc.                                        70.0000        2,940.00        2,940.00
 2024      Gensini Excavating, Inc.                                        73.3800        3,081.96        3,081.96
 6210      Valley Construction Co.                                         80.0000        3,360.00        3,360.00

    60605000  COMB CC&G TY B-6.24                      7,707.000     FOOT
 0049      Advanced Asphalt Company                                        50.0000      385,350.00      385,350.00
 1799      Fischer Excavating, Inc.                                        50.0000      385,350.00      385,350.00
 2024      Gensini Excavating, Inc.                                        46.1800      355,909.26      355,909.26
 6210      Valley Construction Co.                                         50.0000      385,350.00      385,350.00

    61000050  CONC THRUST BLOCKS                          97.000     EACH
 0049      Advanced Asphalt Company                                       100.0000        9,700.00        9,700.00
 1799      Fischer Excavating, Inc.                                       200.0000       19,400.00       19,400.00
 2024      Gensini Excavating, Inc.                                       278.8400       27,047.48       27,047.48
 6210      Valley Construction Co.                                          5.0000          485.00          485.00

    63000001  SPBGR TY A  6FT POSTS                      537.500     FOOT
 0049      Advanced Asphalt Company                                       108.0000       58,050.00       58,050.00
 1799      Fischer Excavating, Inc.                                        35.0000       18,812.50       18,812.50
 2024      Gensini Excavating, Inc.                                        42.5400       22,865.25       22,865.25
 6210      Valley Construction Co.                                         35.0000       18,812.50       18,812.50

    63100167  TR BAR TRM T1 SPL TAN                        2.000     EACH
 0049      Advanced Asphalt Company                                     7,500.0000       15,000.00       15,000.00
 1799      Fischer Excavating, Inc.                                     3,700.0000        7,400.00        7,400.00
 2024      Gensini Excavating, Inc.                                     4,058.4000        8,116.80        8,116.80
 6210      Valley Construction Co.                                      3,700.0000        7,400.00        7,400.00

    63200310  GUARDRAIL REMOV                            716.000     FOOT
 0049      Advanced Asphalt Company                                        20.0000       14,320.00       14,320.00
 1799      Fischer Excavating, Inc.                                        14.0000       10,024.00       10,024.00
 2024      Gensini Excavating, Inc.                                        15.3600       10,997.76       10,997.76
 6210      Valley Construction Co.                                         14.0000       10,024.00       10,024.00

    63500105  DELINEATORS                                  4.000     EACH
 0049      Advanced Asphalt Company                                       165.0000          660.00          660.00
 1799      Fischer Excavating, Inc.                                        75.0000          300.00          300.00
 2024      Gensini Excavating, Inc.                                        82.2700          329.08          329.08
 6210      Valley Construction Co.                                         75.0000          300.00          300.00

    64200108  SHOULDER RUM STRIP  8                      382.000     FOOT
 0049      Advanced Asphalt Company                                         7.0000        2,674.00        2,674.00
 1799      Fischer Excavating, Inc.                                        12.0000        4,584.00        4,584.00
 2024      Gensini Excavating, Inc.                                        30.7100       11,731.22       11,731.22
 6210      Valley Construction Co.                                         11.0000        4,202.00        4,202.00

    66407500  CH LK GATES 6X10 DBL                         1.000     EACH
 0049      Advanced Asphalt Company                                    14,500.0000       14,500.00       14,500.00
 1799      Fischer Excavating, Inc.                                     3,500.0000        3,500.00        3,500.00
 2024      Gensini Excavating, Inc.                                    14,825.2100       14,825.21       14,825.21
 6210      Valley Construction Co.                                        500.0000          500.00          500.00

    66500105  WOV W FENCE   4                          1,217.000     FOOT
 0049      Advanced Asphalt Company                                        44.0000       53,548.00       53,548.00
 1799      Fischer Excavating, Inc.                                        30.0000       36,510.00       36,510.00
 2024      Gensini Excavating, Inc.                                        46.6100       56,724.37       56,724.37
 6210      Valley Construction Co.                                         30.0000       36,510.00       36,510.00

    66900200  NON SPL WASTE DISPOSL                      429.000    CU YD
 0049      Advanced Asphalt Company                                       150.0000       64,350.00       64,350.00
 1799      Fischer Excavating, Inc.                                       110.0000       47,190.00       47,190.00
 2024      Gensini Excavating, Inc.                                       118.6900       50,918.01       50,918.01
 6210      Valley Construction Co.                                        125.0000       53,625.00       53,625.00

    66900530  SOIL DISPOSAL ANALY                          7.000     EACH
 0049      Advanced Asphalt Company                                     1,325.0000        9,275.00        9,275.00
 1799      Fischer Excavating, Inc.                                     1,380.0000        9,660.00        9,660.00
 2024      Gensini Excavating, Inc.                                     1,645.3000       11,517.10       11,517.10
 6210      Valley Construction Co.                                      1,325.0000        9,275.00        9,275.00

    66901001  REG SUB P-CONST PLAN                         1.000    L SUM
 0049      Advanced Asphalt Company                                     2,450.0000        2,450.00        2,450.00
 1799      Fischer Excavating, Inc.                                     3,900.0000        3,900.00        3,900.00
 2024      Gensini Excavating, Inc.                                     3,290.5900        3,290.59        3,290.59
 6210      Valley Construction Co.                                      2,450.0000        2,450.00        2,450.00

    66901003  REG SUB F CON REPORT                         1.000    L SUM
 0049      Advanced Asphalt Company                                     2,500.0000        2,500.00        2,500.00
 1799      Fischer Excavating, Inc.                                     1,200.0000        1,200.00        1,200.00
 2024      Gensini Excavating, Inc.                                     1,096.8600        1,096.86        1,096.86
 6210      Valley Construction Co.                                      2,500.0000        2,500.00        2,500.00

    66901006  REG SUB MON                                 17.000   CAL DA
 0049      Advanced Asphalt Company                                     1,325.0000       22,525.00       22,525.00
 1799      Fischer Excavating, Inc.                                     1,500.0000       25,500.00       25,500.00
 2024      Gensini Excavating, Inc.                                     1,480.7700       25,173.09       25,173.09
 6210      Valley Construction Co.                                      1,325.0000       22,525.00       22,525.00

    67000400  ENGR FIELD OFFICE A                         16.000   CAL MO
 0049      Advanced Asphalt Company                                     3,300.0000       52,800.00       52,800.00
 1799      Fischer Excavating, Inc.                                     2,040.2000       32,643.20       32,643.20
 2024      Gensini Excavating, Inc.                                     3,839.0300       61,424.48       61,424.48
 6210      Valley Construction Co.                                      3,000.0000       48,000.00       48,000.00

    67100100  MOBILIZATION                                 1.000    L SUM
 0049      Advanced Asphalt Company                                   975,000.0000      975,000.00      975,000.00
 1799      Fischer Excavating, Inc.                                 1,042,000.0000    1,042,000.00    1,042,000.00
 2024      Gensini Excavating, Inc.                                   560,271.4100      560,271.41      560,271.41
 6210      Valley Construction Co.                                    845,000.0000      845,000.00      845,000.00

    70100450  TRAF CONT-PROT 701201                        1.000    L SUM
 0049      Advanced Asphalt Company                                     6,000.0000        6,000.00        6,000.00
 1799      Fischer Excavating, Inc.                                     3,000.0000        3,000.00        3,000.00
 2024      Gensini Excavating, Inc.                                     3,290.5900        3,290.59        3,290.59
 6210      Valley Construction Co.                                      3,000.0000        3,000.00        3,000.00

    70100500  TRAF CONT-PROT 701326                        1.000    L SUM
 0049      Advanced Asphalt Company                                     4,500.0000        4,500.00        4,500.00
 1799      Fischer Excavating, Inc.                                       100.0000          100.00          100.00
 2024      Gensini Excavating, Inc.                                       109.6900          109.69          109.69
 6210      Valley Construction Co.                                        100.0000          100.00          100.00

    70100600  TRAF CONT-PROT 701336                        1.000    L SUM
 0049      Advanced Asphalt Company                                     3,000.0000        3,000.00        3,000.00
 1799      Fischer Excavating, Inc.                                       100.0000          100.00          100.00
 2024      Gensini Excavating, Inc.                                       109.6900          109.69          109.69
 6210      Valley Construction Co.                                        100.0000          100.00          100.00

    70102620  TR CONT & PROT 701501                        1.000    L SUM
 0049      Advanced Asphalt Company                                    26,000.0000       26,000.00       26,000.00
 1799      Fischer Excavating, Inc.                                    23,750.0000       23,750.00       23,750.00
 2024      Gensini Excavating, Inc.                                    26,050.5600       26,050.56       26,050.56
 6210      Valley Construction Co.                                     23,750.0000       23,750.00       23,750.00

    70102640  TR CONT & PROT 701801                        1.000    L SUM
 0049      Advanced Asphalt Company                                     3,000.0000        3,000.00        3,000.00
 1799      Fischer Excavating, Inc.                                       100.0000          100.00          100.00
 2024      Gensini Excavating, Inc.                                       109.6900          109.69          109.69
 6210      Valley Construction Co.                                        100.0000          100.00          100.00

    70103815  TR CONT SURVEILLANCE                       170.000   CAL DA
 0049      Advanced Asphalt Company                                       100.0000       17,000.00       17,000.00
 1799      Fischer Excavating, Inc.                                       800.0000      136,000.00      136,000.00
 2024      Gensini Excavating, Inc.                                         0.0100            1.70            1.70
 6210      Valley Construction Co.                                        750.0000      127,500.00      127,500.00

    70107025  CHANGEABLE MESSAGE SN                       14.000   CAL DA
 0049      Advanced Asphalt Company                                       100.0000        1,400.00        1,400.00
 1799      Fischer Excavating, Inc.                                       100.0000        1,400.00        1,400.00
 2024      Gensini Excavating, Inc.                                       109.6900        1,535.66        1,535.66
 6210      Valley Construction Co.                                        100.0000        1,400.00        1,400.00

    70300281  TEMP PVT MK LINE 24 - PAINT                 35.000     FOOT
 0049      Advanced Asphalt Company                                         4.0000          140.00          140.00
 1799      Fischer Excavating, Inc.                                        50.0000        1,750.00        1,750.00
 2024      Gensini Excavating, Inc.                                        27.4200          959.70          959.70
 6210      Valley Construction Co.                                         25.0000          875.00          875.00

    72000100  SIGN PANEL T1                              398.200    SQ FT
 0049      Advanced Asphalt Company                                        45.0000       17,919.00       17,919.00
 1799      Fischer Excavating, Inc.                                        45.0000       17,919.00       17,919.00
 2024      Gensini Excavating, Inc.                                        41.7000       16,604.94       16,604.94
 6210      Valley Construction Co.                                         40.0000       15,928.00       15,928.00

    72000200  SIGN PANEL T2                               10.000    SQ FT
 0049      Advanced Asphalt Company                                        50.0000          500.00          500.00
 1799      Fischer Excavating, Inc.                                        50.0000          500.00          500.00
 2024      Gensini Excavating, Inc.                                        63.9500          639.50          639.50
 6210      Valley Construction Co.                                         60.0000          600.00          600.00

    72501000  TERMINAL MARKER - DA                         2.000     EACH
 0049      Advanced Asphalt Company                                        55.0000          110.00          110.00
 1799      Fischer Excavating, Inc.                                        50.0000          100.00          100.00
 2024      Gensini Excavating, Inc.                                        54.8500          109.70          109.70
 6210      Valley Construction Co.                                         50.0000          100.00          100.00

    72800100  TELES STL SIN SUPPORT                      833.000     FOOT
 0049      Advanced Asphalt Company                                        22.0000       18,326.00       18,326.00
 1799      Fischer Excavating, Inc.                                        22.0000       18,326.00       18,326.00
 2024      Gensini Excavating, Inc.                                        32.3900       26,980.87       26,980.87
 6210      Valley Construction Co.                                         15.0000       12,495.00       12,495.00

    73000100  WOOD SIN SUPPORT                           136.000     FOOT
 0049      Advanced Asphalt Company                                        26.0000        3,536.00        3,536.00
 1799      Fischer Excavating, Inc.                                        26.0000        3,536.00        3,536.00
 2024      Gensini Excavating, Inc.                                        31.8600        4,332.96        4,332.96
 6210      Valley Construction Co.                                         20.0000        2,720.00        2,720.00

    78009004  MOD URETH PM LINE  4                    10,067.000     FOOT
 0049      Advanced Asphalt Company                                         0.9900        9,966.33        9,966.33
 1799      Fischer Excavating, Inc.                                         1.0000       10,067.00       10,067.00
 2024      Gensini Excavating, Inc.                                         1.0900       10,973.03       10,973.03
 6210      Valley Construction Co.                                          0.8100        8,154.27        8,154.27

    78009006  MOD URETH PM LINE  6                     1,661.000     FOOT
 0049      Advanced Asphalt Company                                         1.5000        2,491.50        2,491.50
 1799      Fischer Excavating, Inc.                                         1.5000        2,491.50        2,491.50
 2024      Gensini Excavating, Inc.                                         1.6500        2,740.65        2,740.65
 6210      Valley Construction Co.                                          1.2200        2,026.42        2,026.42

    78009012  MOD URETH PM LINE 12                       161.000     FOOT
 0049      Advanced Asphalt Company                                         4.0000          644.00          644.00
 1799      Fischer Excavating, Inc.                                         4.0000          644.00          644.00
 2024      Gensini Excavating, Inc.                                         4.3900          706.79          706.79
 6210      Valley Construction Co.                                          3.5000          563.50          563.50

    78009024  MOD URETH PM LINE 24                       513.000     FOOT
 0049      Advanced Asphalt Company                                         6.0000        3,078.00        3,078.00
 1799      Fischer Excavating, Inc.                                         6.0000        3,078.00        3,078.00
 2024      Gensini Excavating, Inc.                                         6.5800        3,375.54        3,375.54
 6210      Valley Construction Co.                                          7.0000        3,591.00        3,591.00

    78011025  GRV RCSD PVT MRKG   5                    9,638.000     FOOT
 0049      Advanced Asphalt Company                                         0.8000        7,710.40        7,710.40
 1799      Fischer Excavating, Inc.                                         0.8000        7,710.40        7,710.40
 2024      Gensini Excavating, Inc.                                         0.8800        8,481.44        8,481.44
 6210      Valley Construction Co.                                          0.6000        5,782.80        5,782.80

    78011035  GRV RCSD PVT MRKG   7                    1,661.000     FOOT
 0049      Advanced Asphalt Company                                         1.2000        1,993.20        1,993.20
 1799      Fischer Excavating, Inc.                                         1.2000        1,993.20        1,993.20
 2024      Gensini Excavating, Inc.                                         1.3200        2,192.52        2,192.52
 6210      Valley Construction Co.                                          0.8600        1,428.46        1,428.46

    78011065  GRV RCSD PVT MRKG  13                      161.000     FOOT
 0049      Advanced Asphalt Company                                         3.0000          483.00          483.00
 1799      Fischer Excavating, Inc.                                         3.0000          483.00          483.00
 2024      Gensini Excavating, Inc.                                         3.2900          529.69          529.69
 6210      Valley Construction Co.                                          5.8000          933.80          933.80

    78011125  GRV RCSD PVT MRKG  25                      513.000     FOOT
 0049      Advanced Asphalt Company                                         5.0000        2,565.00        2,565.00
 1799      Fischer Excavating, Inc.                                         5.0000        2,565.00        2,565.00
 2024      Gensini Excavating, Inc.                                         5.4800        2,811.24        2,811.24
 6210      Valley Construction Co.                                          7.0000        3,591.00        3,591.00

    89000200  TEMP TR SIG INSTALL                          1.000    L SUM
 0049      Advanced Asphalt Company                                    11,000.0000       11,000.00       11,000.00
 1799      Fischer Excavating, Inc.                                   207,520.0000      207,520.00      207,520.00
 2024      Gensini Excavating, Inc.                                   213,888.7800      213,888.78      213,888.78
 6210      Valley Construction Co.                                    207,520.0000      207,520.00      207,520.00