                                               ILLINOIS DEPARTMENT OF TRANSPORTATION                                      PAGE:    1
 01/30/24  13:01:07                   U N I T  P R I C E   T A B U L A T I O N   O F   B I D S
 LETTING DATE: 11/17/2023  LETTING TYPE: SCHEDULED                                 CONTRACT NUMBER: 61J80  LETTING ITEM NUMBER: 013
 RESPONSIBLE DISTRICT: 01                                                                                  BIDS LOCKED: Y
 SECTION: 20-00069-00-BT                           COUNTY: WILL                                            ESTIMATE:
 STATE JOB NUMBER:   C-91-174-22                   MUNICIPALITY: ROMEOVILLE
 PROJECT NUMBER: APMT-993 /   /
                                                      --------------------------
                                                      SUMMARY OF CONTRACTOR BIDS
                                                      --------------------------

                                                             "AS READ"          SUMMATION    SUMMATION OF                       NBR
 BIDR                     CONTR        COMB  ITEM  CONTR      BIDDER            OF BIDDER     CALCULATED   LOW   BIDR CALC      BLANK
 NBR   BIDDER NAME        GROUP  COMB  GRP   NBR   GROUP      TOTAL PRICE       EXTENSIONS    EXTENSIONS   BID   EXTENSION DIFF BIDS


 1560  R. W. Dunteman Company
                          NO ALT                            3,843,732.94     3,843,732.94   3,843,732.94

 1750  P. T. Ferro Construction Co.
                          NO ALT                            2,979,106.80     2,979,106.80   2,979,106.80

 1950  Gallagher Asphalt Corporation
                          NO ALT                            3,338,037.03     3,338,037.03   3,338,037.03

 3069  K-Five Construction Corporation
                          NO ALT                            2,885,523.00 *   2,885,523.00   2,885,523.00    *

 6117  Austin Tyler Construction, Inc.
                          NO ALT                            3,831,155.46     3,831,155.46   3,831,155.46

 **** TOTAL GROUP NO ALT PAY ITEMS FOR THIS CONTRACT =     116
                                                       ----------------------
                                                       DETAIL CONTRACTOR BIDS
                                                       ----------------------

    ITEM NBR  ITEM DESCRIPTION                                    UNIT OF     UNIT        BIDDER         CALCULATED  BIDR CALC
 BIDR NBR  BIDDER NAME                                  QUANTITY  MEASURE     PRICE       EXTENSION      EXTENSION   EXTENSION DIFF


    XX006343  SEEDING (COMPLETE)                       1,780.000    SQ YD
 6117      Austin Tyler Construction, Inc.                                 11.0000       19,580.00       19,580.00
 1950      Gallagher Asphalt Corporation                                   20.0000       35,600.00       35,600.00
 3069      K-Five Construction Corporation                                 10.6000       18,868.00       18,868.00
 1750      P. T. Ferro Construction Co.                                    18.0000       32,040.00       32,040.00
 1560      R. W. Dunteman Company                                          10.6000       18,868.00       18,868.00

    X0324085  EM VEH P S LSC 20 3C                       254.000     FOOT
 6117      Austin Tyler Construction, Inc.                                  2.1000          533.40          533.40
 1950      Gallagher Asphalt Corporation                                    1.7000          431.80          431.80
 3069      K-Five Construction Corporation                                  1.6400          416.56          416.56
 1750      P. T. Ferro Construction Co.                                     1.6400          416.56          416.56
 1560      R. W. Dunteman Company                                           1.6400          416.56          416.56

    X0326899  SOLAR-POWER FB AS CMP                        4.000     EACH
 6117      Austin Tyler Construction, Inc.                             11,000.0000       44,000.00       44,000.00
 1950      Gallagher Asphalt Corporation                               11,900.0000       47,600.00       47,600.00
 3069      K-Five Construction Corporation                             11,550.4600       46,201.84       46,201.84
 1750      P. T. Ferro Construction Co.                                11,550.4600       46,201.84       46,201.84
 1560      R. W. Dunteman Company                                      11,550.4600       46,201.84       46,201.84

    X0327018  DECORATIVE SIGN POST                        74.000     EACH
 6117      Austin Tyler Construction, Inc.                                730.0000       54,020.00       54,020.00
 1950      Gallagher Asphalt Corporation                                  550.0000       40,700.00       40,700.00
 3069      K-Five Construction Corporation                                375.0000       27,750.00       27,750.00
 1750      P. T. Ferro Construction Co.                                   450.0000       33,300.00       33,300.00
 1560      R. W. Dunteman Company                                         450.0000       33,300.00       33,300.00

    X4404700  SIDEWALK REM SPL                         9,847.000    SQ FT
 6117      Austin Tyler Construction, Inc.                                  3.7500       36,926.25       36,926.25
 1950      Gallagher Asphalt Corporation                                    3.8000       37,418.60       37,418.60
 3069      K-Five Construction Corporation                                  3.5000       34,464.50       34,464.50
 1750      P. T. Ferro Construction Co.                                     3.2500       32,002.75       32,002.75
 1560      R. W. Dunteman Company                                           3.7300       36,729.31       36,729.31

    X6060048  COMB CC&G TB6.18 SPL                     6,047.000     FOOT
 6117      Austin Tyler Construction, Inc.                                 43.0000      260,021.00      260,021.00
 1950      Gallagher Asphalt Corporation                                   42.0000      253,974.00      253,974.00
 3069      K-Five Construction Corporation                                 40.0000      241,880.00      241,880.00
 1750      P. T. Ferro Construction Co.                                    40.0000      241,880.00      241,880.00
 1560      R. W. Dunteman Company                                          43.1000      260,625.70      260,625.70

    X6064200  COMB CC&G TB6.12 SPL                     2,406.000     FOOT
 6117      Austin Tyler Construction, Inc.                                 41.0000       98,646.00       98,646.00
 1950      Gallagher Asphalt Corporation                                   36.0000       86,616.00       86,616.00
 3069      K-Five Construction Corporation                                 34.0000       81,804.00       81,804.00
 1750      P. T. Ferro Construction Co.                                    38.0000       91,428.00       91,428.00
 1560      R. W. Dunteman Company                                          36.5700       87,987.42       87,987.42

    X8730105  ELCBL C SIGNAL 10  3C                      697.000     FOOT
 6117      Austin Tyler Construction, Inc.                                  2.5000        1,742.50        1,742.50
 1950      Gallagher Asphalt Corporation                                    1.8000        1,254.60        1,254.60
 3069      K-Five Construction Corporation                                  1.6600        1,157.02        1,157.02
 1750      P. T. Ferro Construction Co.                                     1.6600        1,157.02        1,157.02
 1560      R. W. Dunteman Company                                           1.6600        1,157.02        1,157.02

    X8760200  ACCESSIBLE PED SIGNAL                        6.000     EACH
 6117      Austin Tyler Construction, Inc.                              1,600.0000        9,600.00        9,600.00
 1950      Gallagher Asphalt Corporation                                  900.0000        5,400.00        5,400.00
 3069      K-Five Construction Corporation                                866.2000        5,197.20        5,197.20
 1750      P. T. Ferro Construction Co.                                   866.2000        5,197.20        5,197.20
 1560      R. W. Dunteman Company                                         866.2000        5,197.20        5,197.20

    X8950090  RELOC EX LIGHT CONTR                         1.000     EACH
 6117      Austin Tyler Construction, Inc.                              7,500.0000        7,500.00        7,500.00
 1950      Gallagher Asphalt Corporation                                5,200.0000        5,200.00        5,200.00
 3069      K-Five Construction Corporation                              4,975.6200        4,975.62        4,975.62
 1750      P. T. Ferro Construction Co.                                 4,975.6200        4,975.62        4,975.62
 1560      R. W. Dunteman Company                                       4,975.6200        4,975.62        4,975.62

    Z0004518  HMA DRIVEWAY PAVT  5                       208.000    SQ YD
 6117      Austin Tyler Construction, Inc.                                 62.0000       12,896.00       12,896.00
 1950      Gallagher Asphalt Corporation                                   86.0000       17,888.00       17,888.00
 3069      K-Five Construction Corporation                                 69.5000       14,456.00       14,456.00
 1750      P. T. Ferro Construction Co.                                    80.0000       16,640.00       16,640.00
 1560      R. W. Dunteman Company                                          74.7100       15,539.68       15,539.68

    Z0017400  DRAIN UTIL STR ADJ                         140.000     EACH
 6117      Austin Tyler Construction, Inc.                                450.0000       63,000.00       63,000.00
 1950      Gallagher Asphalt Corporation                                  680.0000       95,200.00       95,200.00
 3069      K-Five Construction Corporation                                850.0000      119,000.00      119,000.00
 1750      P. T. Ferro Construction Co.                                   500.0000       70,000.00       70,000.00
 1560      R. W. Dunteman Company                                         850.0000      119,000.00      119,000.00

    Z0017700  DRAIN UTIL STR RECON                         1.000     EACH
 6117      Austin Tyler Construction, Inc.                              1,300.0000        1,300.00        1,300.00
 1950      Gallagher Asphalt Corporation                                1,800.0000        1,800.00        1,800.00
 3069      K-Five Construction Corporation                              2,000.0000        2,000.00        2,000.00
 1750      P. T. Ferro Construction Co.                                 1,500.0000        1,500.00        1,500.00
 1560      R. W. Dunteman Company                                       2,000.0000        2,000.00        2,000.00

    Z0030850  TEMP INFO SIGNING                          152.000    SQ FT
 6117      Austin Tyler Construction, Inc.                                 15.0000        2,280.00        2,280.00
 1950      Gallagher Asphalt Corporation                                   15.0000        2,280.00        2,280.00
 3069      K-Five Construction Corporation                                 15.0000        2,280.00        2,280.00
 1750      P. T. Ferro Construction Co.                                    20.0000        3,040.00        3,040.00
 1560      R. W. Dunteman Company                                          20.0000        3,040.00        3,040.00

    Z0073510  TEMP TR SIGNAL TIMING                        1.000     EACH
 6117      Austin Tyler Construction, Inc.                                  0.0100            0.01            0.01
 1950      Gallagher Asphalt Corporation                                  950.0000          950.00          950.00
 3069      K-Five Construction Corporation                                924.0000          924.00          924.00
 1750      P. T. Ferro Construction Co.                                   924.0000          924.00          924.00
 1560      R. W. Dunteman Company                                         924.0000          924.00          924.00

    Z0076600  TRAINEES                                   500.000     HOUR
 6117      Austin Tyler Construction, Inc.                                  0.8000          400.00          400.00
 1950      Gallagher Asphalt Corporation                                    0.8000          400.00          400.00
 3069      K-Five Construction Corporation                                  0.8000          400.00          400.00
 1750      P. T. Ferro Construction Co.                                     0.8000          400.00          400.00
 1560      R. W. Dunteman Company                                           0.8000          400.00          400.00

    Z0076604  TRAINEES TPG                               500.000     HOUR
 6117      Austin Tyler Construction, Inc.                                 15.0000        7,500.00        7,500.00
 1950      Gallagher Asphalt Corporation                                   15.0000        7,500.00        7,500.00
 3069      K-Five Construction Corporation                                 15.0000        7,500.00        7,500.00
 1750      P. T. Ferro Construction Co.                                    15.0000        7,500.00        7,500.00
 1560      R. W. Dunteman Company                                          15.0000        7,500.00        7,500.00

    20200100  EARTH EXCAVATION                           150.000    CU YD
 6117      Austin Tyler Construction, Inc.                                110.0000       16,500.00       16,500.00
 1950      Gallagher Asphalt Corporation                                   86.0000       12,900.00       12,900.00
 3069      K-Five Construction Corporation                                 80.0000       12,000.00       12,000.00
 1750      P. T. Ferro Construction Co.                                    75.0000       11,250.00       11,250.00
 1560      R. W. Dunteman Company                                          75.0000       11,250.00       11,250.00

    20201200  REM & DISP UNS MATL                        240.000    CU YD
 6117      Austin Tyler Construction, Inc.                                110.0000       26,400.00       26,400.00
 1950      Gallagher Asphalt Corporation                                    0.0100            2.40            2.40
 3069      K-Five Construction Corporation                                 10.0000        2,400.00        2,400.00
 1750      P. T. Ferro Construction Co.                                     0.0100            2.40            2.40
 1560      R. W. Dunteman Company                                          41.3600        9,926.40        9,926.40

    28000400  PERIMETER EROS BAR                         350.000     FOOT
 6117      Austin Tyler Construction, Inc.                                  4.5000        1,575.00        1,575.00
 1950      Gallagher Asphalt Corporation                                    5.5000        1,925.00        1,925.00
 3069      K-Five Construction Corporation                                  4.5000        1,575.00        1,575.00
 1750      P. T. Ferro Construction Co.                                     5.0000        1,750.00        1,750.00
 1560      R. W. Dunteman Company                                           4.5000        1,575.00        1,575.00

    31101200  SUB GRAN MAT B  4                          665.000    SQ YD
 6117      Austin Tyler Construction, Inc.                                 17.0000       11,305.00       11,305.00
 1950      Gallagher Asphalt Corporation                                    6.0000        3,990.00        3,990.00
 3069      K-Five Construction Corporation                                  5.0000        3,325.00        3,325.00
 1750      P. T. Ferro Construction Co.                                    10.0000        6,650.00        6,650.00
 1560      R. W. Dunteman Company                                           5.0000        3,325.00        3,325.00

    35101600  AGG BASE CSE B  4                        1,320.000    SQ YD
 6117      Austin Tyler Construction, Inc.                                 10.0000       13,200.00       13,200.00
 1950      Gallagher Asphalt Corporation                                    8.5000       11,220.00       11,220.00
 3069      K-Five Construction Corporation                                  8.2300       10,863.60       10,863.60
 1750      P. T. Ferro Construction Co.                                    10.0000       13,200.00       13,200.00
 1560      R. W. Dunteman Company                                          10.8600       14,335.20       14,335.20

    35800100  PREPARATION OF BASE                      4,897.000    SQ YD
 6117      Austin Tyler Construction, Inc.                                  1.5000        7,345.50        7,345.50
 1950      Gallagher Asphalt Corporation                                    0.0100           48.97           48.97
 3069      K-Five Construction Corporation                                  0.0100           48.97           48.97
 1750      P. T. Ferro Construction Co.                                     0.0100           48.97           48.97
 1560      R. W. Dunteman Company                                           3.7200       18,216.84       18,216.84

    35800200  AGG BASE REPAIR                          1,616.000      TON
 6117      Austin Tyler Construction, Inc.                                 20.0000       32,320.00       32,320.00
 1950      Gallagher Asphalt Corporation                                    0.0100           16.16           16.16
 3069      K-Five Construction Corporation                                  0.0100           16.16           16.16
 1750      P. T. Ferro Construction Co.                                     0.0100           16.16           16.16
 1560      R. W. Dunteman Company                                          28.0800       45,377.28       45,377.28

    40201000  AGGREGATE-TEMP ACCESS                      175.000      TON
 6117      Austin Tyler Construction, Inc.                                 58.0000       10,150.00       10,150.00
 1950      Gallagher Asphalt Corporation                                   52.0000        9,100.00        9,100.00
 3069      K-Five Construction Corporation                                 45.0000        7,875.00        7,875.00
 1750      P. T. Ferro Construction Co.                                     0.0100            1.75            1.75
 1560      R. W. Dunteman Company                                          45.0000        7,875.00        7,875.00

    40600275  BIT MATLS PR CT                          2,600.000    POUND
 6117      Austin Tyler Construction, Inc.                                  0.0100           26.00           26.00
 1950      Gallagher Asphalt Corporation                                    0.0100           26.00           26.00
 3069      K-Five Construction Corporation                                  0.0100           26.00           26.00
 1750      P. T. Ferro Construction Co.                                     0.0100           26.00           26.00
 1560      R. W. Dunteman Company                                           1.3400        3,484.00        3,484.00

    40600290  BIT MATLS TACK CT                       38,400.000    POUND
 6117      Austin Tyler Construction, Inc.                                  0.0100          384.00          384.00
 1950      Gallagher Asphalt Corporation                                    0.0100          384.00          384.00
 3069      K-Five Construction Corporation                                  0.0100          384.00          384.00
 1750      P. T. Ferro Construction Co.                                     0.0100          384.00          384.00
 1560      R. W. Dunteman Company                                           0.6900       26,496.00       26,496.00

    40600370  LONG JOINT SEALANT                      33,600.000     FOOT
 6117      Austin Tyler Construction, Inc.                                  3.7500      126,000.00      126,000.00
 1950      Gallagher Asphalt Corporation                                    3.2000      107,520.00      107,520.00
 3069      K-Five Construction Corporation                                  1.0000       33,600.00       33,600.00
 1750      P. T. Ferro Construction Co.                                     2.8500       95,760.00       95,760.00
 1560      R. W. Dunteman Company                                           2.8100       94,416.00       94,416.00

    40600400  MIX CR JTS FLANGEWYS                        85.000      TON
 6117      Austin Tyler Construction, Inc.                                325.0000       27,625.00       27,625.00
 1950      Gallagher Asphalt Corporation                                   50.0000        4,250.00        4,250.00
 3069      K-Five Construction Corporation                                 50.0000        4,250.00        4,250.00
 1750      P. T. Ferro Construction Co.                                     0.0100            0.85            0.85
 1560      R. W. Dunteman Company                                         360.6400       30,654.40       30,654.40

    40600982  HMA SURF REM BUTT JT                       285.000    SQ YD
 6117      Austin Tyler Construction, Inc.                                 25.0000        7,125.00        7,125.00
 1950      Gallagher Asphalt Corporation                                   36.0000       10,260.00       10,260.00
 3069      K-Five Construction Corporation                                 14.0000        3,990.00        3,990.00
 1750      P. T. Ferro Construction Co.                                     0.0100            2.85            2.85
 1560      R. W. Dunteman Company                                          24.6000        7,011.00        7,011.00

    40603080  HMA BC IL-19.0  N50                        146.000      TON
 6117      Austin Tyler Construction, Inc.                                106.0000       15,476.00       15,476.00
 1950      Gallagher Asphalt Corporation                                  142.0000       20,732.00       20,732.00
 3069      K-Five Construction Corporation                                136.0000       19,856.00       19,856.00
 1750      P. T. Ferro Construction Co.                                   130.0000       18,980.00       18,980.00
 1560      R. W. Dunteman Company                                         106.3600       15,528.56       15,528.56

    40603085  HMA BC IL-19.0  N70                      7,120.000      TON
 6117      Austin Tyler Construction, Inc.                                 84.0000      598,080.00      598,080.00
 1950      Gallagher Asphalt Corporation                                   90.0000      640,800.00      640,800.00
 3069      K-Five Construction Corporation                                 75.0000      534,000.00      534,000.00
 1750      P. T. Ferro Construction Co.                                    66.0000      469,920.00      469,920.00
 1560      R. W. Dunteman Company                                          96.6700      688,290.40      688,290.40

    40604060  HMA SC IL-9.5 D N50                         97.000      TON
 6117      Austin Tyler Construction, Inc.                                112.0000       10,864.00       10,864.00
 1950      Gallagher Asphalt Corporation                                  170.0000       16,490.00       16,490.00
 3069      K-Five Construction Corporation                                140.0000       13,580.00       13,580.00
 1750      P. T. Ferro Construction Co.                                   135.0000       13,095.00       13,095.00
 1560      R. W. Dunteman Company                                         121.6600       11,801.02       11,801.02

    40604062  HMA SC IL-9.5 D N70                      5,540.000      TON
 6117      Austin Tyler Construction, Inc.                                 97.0000      537,380.00      537,380.00
 1950      Gallagher Asphalt Corporation                                   98.5000      545,690.00      545,690.00
 3069      K-Five Construction Corporation                                 83.0000      459,820.00      459,820.00
 1750      P. T. Ferro Construction Co.                                    74.0000      409,960.00      409,960.00
 1560      R. W. Dunteman Company                                         103.9100      575,661.40      575,661.40

    42300400  PCC DRIVEWAY PAVT  8                       308.000    SQ YD
 6117      Austin Tyler Construction, Inc.                                125.0000       38,500.00       38,500.00
 1950      Gallagher Asphalt Corporation                                   88.0000       27,104.00       27,104.00
 3069      K-Five Construction Corporation                                 85.0000       26,180.00       26,180.00
 1750      P. T. Ferro Construction Co.                                   115.0000       35,420.00       35,420.00
 1560      R. W. Dunteman Company                                          85.0000       26,180.00       26,180.00

    42400200  PC CONC SIDEWALK 5                       5,962.000    SQ FT
 6117      Austin Tyler Construction, Inc.                                  9.0000       53,658.00       53,658.00
 1950      Gallagher Asphalt Corporation                                    8.2000       48,888.40       48,888.40
 3069      K-Five Construction Corporation                                  7.5000       44,715.00       44,715.00
 1750      P. T. Ferro Construction Co.                                    12.0000       71,544.00       71,544.00
 1560      R. W. Dunteman Company                                           7.5000       44,715.00       44,715.00

    42400800  DETECTABLE WARNINGS                        730.000    SQ FT
 6117      Austin Tyler Construction, Inc.                                 25.0000       18,250.00       18,250.00
 1950      Gallagher Asphalt Corporation                                   42.0000       30,660.00       30,660.00
 3069      K-Five Construction Corporation                                 40.0000       29,200.00       29,200.00
 1750      P. T. Ferro Construction Co.                                    30.0000       21,900.00       21,900.00
 1560      R. W. Dunteman Company                                          40.0000       29,200.00       29,200.00

    44000100  PAVEMENT REM                               642.000    SQ YD
 6117      Austin Tyler Construction, Inc.                                 30.0000       19,260.00       19,260.00
 1950      Gallagher Asphalt Corporation                                   26.0000       16,692.00       16,692.00
 3069      K-Five Construction Corporation                                 25.0000       16,050.00       16,050.00
 1750      P. T. Ferro Construction Co.                                    20.0000       12,840.00       12,840.00
 1560      R. W. Dunteman Company                                          27.4000       17,590.80       17,590.80

    44000164  HMA SURF REM    3 3/4                   56,500.000    SQ YD
 6117      Austin Tyler Construction, Inc.                                  3.0000      169,500.00      169,500.00
 1950      Gallagher Asphalt Corporation                                    4.6000      259,900.00      259,900.00
 3069      K-Five Construction Corporation                                  3.8000      214,700.00      214,700.00
 1750      P. T. Ferro Construction Co.                                     3.0000      169,500.00      169,500.00
 1560      R. W. Dunteman Company                                           6.6800      377,420.00      377,420.00

    44000200  DRIVE PAVEMENT REM                         536.000    SQ YD
 6117      Austin Tyler Construction, Inc.                                 32.0000       17,152.00       17,152.00
 1950      Gallagher Asphalt Corporation                                   30.0000       16,080.00       16,080.00
 3069      K-Five Construction Corporation                                 32.8100       17,586.16       17,586.16
 1750      P. T. Ferro Construction Co.                                    38.0000       20,368.00       20,368.00
 1560      R. W. Dunteman Company                                          25.0000       13,400.00       13,400.00

    44000500  COMB CURB GUTTER REM                     8,453.000     FOOT
 6117      Austin Tyler Construction, Inc.                                 15.0000      126,795.00      126,795.00
 1950      Gallagher Asphalt Corporation                                    7.5000       63,397.50       63,397.50
 3069      K-Five Construction Corporation                                  7.0000       59,171.00       59,171.00
 1750      P. T. Ferro Construction Co.                                    17.0000      143,701.00      143,701.00
 1560      R. W. Dunteman Company                                           9.5000       80,303.50       80,303.50

    44201761  CL D PATCH T1 10                             4.000    SQ YD
 6117      Austin Tyler Construction, Inc.                                120.0000          480.00          480.00
 1950      Gallagher Asphalt Corporation                                  350.0000        1,400.00        1,400.00
 3069      K-Five Construction Corporation                                 20.0000           80.00           80.00
 1750      P. T. Ferro Construction Co.                                   200.0000          800.00          800.00
 1560      R. W. Dunteman Company                                         228.8900          915.56          915.56

    44201765  CL D PATCH T2 10                           107.000    SQ YD
 6117      Austin Tyler Construction, Inc.                                120.0000       12,840.00       12,840.00
 1950      Gallagher Asphalt Corporation                                  150.0000       16,050.00       16,050.00
 3069      K-Five Construction Corporation                                 20.0000        2,140.00        2,140.00
 1750      P. T. Ferro Construction Co.                                   130.0000       13,910.00       13,910.00
 1560      R. W. Dunteman Company                                         145.4600       15,564.22       15,564.22

    44201769  CL D PATCH T3 10                           377.000    SQ YD
 6117      Austin Tyler Construction, Inc.                                120.0000       45,240.00       45,240.00
 1950      Gallagher Asphalt Corporation                                   60.0000       22,620.00       22,620.00
 3069      K-Five Construction Corporation                                 20.0000        7,540.00        7,540.00
 1750      P. T. Ferro Construction Co.                                   100.0000       37,700.00       37,700.00
 1560      R. W. Dunteman Company                                         121.1400       45,669.78       45,669.78

    44201771  CL D PATCH T4 10                         4,409.000    SQ YD
 6117      Austin Tyler Construction, Inc.                                120.0000      529,080.00      529,080.00
 1950      Gallagher Asphalt Corporation                                   40.0000      176,360.00      176,360.00
 3069      K-Five Construction Corporation                                 20.0000       88,180.00       88,180.00
 1750      P. T. Ferro Construction Co.                                     0.0100           44.09           44.09
 1560      R. W. Dunteman Company                                          85.4300      376,660.87      376,660.87

    60600605  CONC CURB TB                                53.000     FOOT
 6117      Austin Tyler Construction, Inc.                                 50.0000        2,650.00        2,650.00
 1950      Gallagher Asphalt Corporation                                   28.0000        1,484.00        1,484.00
 3069      K-Five Construction Corporation                                 25.0000        1,325.00        1,325.00
 1750      P. T. Ferro Construction Co.                                    65.0000        3,445.00        3,445.00
 1560      R. W. Dunteman Company                                          29.7200        1,575.16        1,575.16

    60619600  CONC MED TSB6.12                           120.000    SQ FT
 6117      Austin Tyler Construction, Inc.                                 24.0000        2,880.00        2,880.00
 1950      Gallagher Asphalt Corporation                                   48.0000        5,760.00        5,760.00
 3069      K-Five Construction Corporation                                 45.0000        5,400.00        5,400.00
 1750      P. T. Ferro Construction Co.                                    28.0000        3,360.00        3,360.00
 1560      R. W. Dunteman Company                                          47.0800        5,649.60        5,649.60

    67100100  MOBILIZATION                                 1.000    L SUM
 6117      Austin Tyler Construction, Inc.                            155,000.0000      155,000.00      155,000.00
 1950      Gallagher Asphalt Corporation                              198,000.0000      198,000.00      198,000.00
 3069      K-Five Construction Corporation                            173,131.0000      173,131.00      173,131.00
 1750      P. T. Ferro Construction Co.                               175,000.0000      175,000.00      175,000.00
 1560      R. W. Dunteman Company                                     173,217.6100      173,217.61      173,217.61

    70102620  TR CONT & PROT 701501                        1.000    L SUM
 6117      Austin Tyler Construction, Inc.                              4,000.0000        4,000.00        4,000.00
 1950      Gallagher Asphalt Corporation                                4,500.0000        4,500.00        4,500.00
 3069      K-Five Construction Corporation                                  1.0000            1.00            1.00
 1750      P. T. Ferro Construction Co.                                   100.0000          100.00          100.00
 1560      R. W. Dunteman Company                                         100.0000          100.00          100.00

    70102622  TR CONT & PROT 701502                        1.000    L SUM
 6117      Austin Tyler Construction, Inc.                              4,000.0000        4,000.00        4,000.00
 1950      Gallagher Asphalt Corporation                                4,500.0000        4,500.00        4,500.00
 3069      K-Five Construction Corporation                                  1.0000            1.00            1.00
 1750      P. T. Ferro Construction Co.                                   100.0000          100.00          100.00
 1560      R. W. Dunteman Company                                         100.0000          100.00          100.00

    70102625  TR CONT & PROT 701606                        1.000    L SUM
 6117      Austin Tyler Construction, Inc.                              4,000.0000        4,000.00        4,000.00
 1950      Gallagher Asphalt Corporation                                4,500.0000        4,500.00        4,500.00
 3069      K-Five Construction Corporation                             89,875.1300       89,875.13       89,875.13
 1750      P. T. Ferro Construction Co.                               235,000.0000      235,000.00      235,000.00
 1560      R. W. Dunteman Company                                      31,325.0000       31,325.00       31,325.00

    70102630  TR CONT & PROT 701601                        1.000    L SUM
 6117      Austin Tyler Construction, Inc.                              4,000.0000        4,000.00        4,000.00
 1950      Gallagher Asphalt Corporation                                4,500.0000        4,500.00        4,500.00
 3069      K-Five Construction Corporation                                  1.0000            1.00            1.00
 1750      P. T. Ferro Construction Co.                                   100.0000          100.00          100.00
 1560      R. W. Dunteman Company                                         100.0000          100.00          100.00

    70102635  TR CONT & PROT 701701                        1.000    L SUM
 6117      Austin Tyler Construction, Inc.                              4,000.0000        4,000.00        4,000.00
 1950      Gallagher Asphalt Corporation                                4,500.0000        4,500.00        4,500.00
 3069      K-Five Construction Corporation                                  1.0000            1.00            1.00
 1750      P. T. Ferro Construction Co.                                   100.0000          100.00          100.00
 1560      R. W. Dunteman Company                                         100.0000          100.00          100.00

    70102640  TR CONT & PROT 701801                        1.000    L SUM
 6117      Austin Tyler Construction, Inc.                              4,000.0000        4,000.00        4,000.00
 1950      Gallagher Asphalt Corporation                                4,500.0000        4,500.00        4,500.00
 3069      K-Five Construction Corporation                                  1.0000            1.00            1.00
 1750      P. T. Ferro Construction Co.                                   100.0000          100.00          100.00
 1560      R. W. Dunteman Company                                         100.0000          100.00          100.00

    70107025  CHANGEABLE MESSAGE SN                       90.000   CAL DA
 6117      Austin Tyler Construction, Inc.                                 30.0000        2,700.00        2,700.00
 1950      Gallagher Asphalt Corporation                                   32.0000        2,880.00        2,880.00
 3069      K-Five Construction Corporation                                 30.0000        2,700.00        2,700.00
 1750      P. T. Ferro Construction Co.                                    60.0000        5,400.00        5,400.00
 1560      R. W. Dunteman Company                                          30.0000        2,700.00        2,700.00

    70300100  SHORT TERM PAVT MKING                   15,225.000     FOOT
 6117      Austin Tyler Construction, Inc.                                  2.0000       30,450.00       30,450.00
 1950      Gallagher Asphalt Corporation                                    0.8500       12,941.25       12,941.25
 3069      K-Five Construction Corporation                                  1.0000       15,225.00       15,225.00
 1750      P. T. Ferro Construction Co.                                     1.5000       22,837.50       22,837.50
 1560      R. W. Dunteman Company                                           0.9800       14,920.50       14,920.50

    70300150  SHRT TRM PAVT MK REM                     3,075.000    SQ FT
 6117      Austin Tyler Construction, Inc.                                  2.0000        6,150.00        6,150.00
 1950      Gallagher Asphalt Corporation                                    0.0100           30.75           30.75
 3069      K-Five Construction Corporation                                  2.0000        6,150.00        6,150.00
 1750      P. T. Ferro Construction Co.                                     1.7500        5,381.25        5,381.25
 1560      R. W. Dunteman Company                                           2.0600        6,334.50        6,334.50

    72000100  SIGN PANEL T1                              455.000    SQ FT
 6117      Austin Tyler Construction, Inc.                                 30.0000       13,650.00       13,650.00
 1950      Gallagher Asphalt Corporation                                   30.0000       13,650.00       13,650.00
 3069      K-Five Construction Corporation                                 23.0000       10,465.00       10,465.00
 1750      P. T. Ferro Construction Co.                                    25.0000       11,375.00       11,375.00
 1560      R. W. Dunteman Company                                          25.0000       11,375.00       11,375.00

    72000200  SIGN PANEL T2                               35.000    SQ FT
 6117      Austin Tyler Construction, Inc.                                 45.0000        1,575.00        1,575.00
 1950      Gallagher Asphalt Corporation                                   45.0000        1,575.00        1,575.00
 3069      K-Five Construction Corporation                                 26.0000          910.00          910.00
 1750      P. T. Ferro Construction Co.                                    30.0000        1,050.00        1,050.00
 1560      R. W. Dunteman Company                                          30.0000        1,050.00        1,050.00

    72400100  REMOV SIN PAN ASSY TA                       18.000     EACH
 6117      Austin Tyler Construction, Inc.                                125.0000        2,250.00        2,250.00
 1950      Gallagher Asphalt Corporation                                  125.0000        2,250.00        2,250.00
 3069      K-Five Construction Corporation                                150.0000        2,700.00        2,700.00
 1750      P. T. Ferro Construction Co.                                    75.0000        1,350.00        1,350.00
 1560      R. W. Dunteman Company                                          75.0000        1,350.00        1,350.00

    72400200  REMOV SIN PAN ASSY TB                        4.000     EACH
 6117      Austin Tyler Construction, Inc.                                150.0000          600.00          600.00
 1950      Gallagher Asphalt Corporation                                  150.0000          600.00          600.00
 3069      K-Five Construction Corporation                                175.0000          700.00          700.00
 1750      P. T. Ferro Construction Co.                                   100.0000          400.00          400.00
 1560      R. W. Dunteman Company                                         100.0000          400.00          400.00

    72400310  REMOV SIGN PANEL T1                         80.000    SQ FT
 6117      Austin Tyler Construction, Inc.                                 22.0000        1,760.00        1,760.00
 1950      Gallagher Asphalt Corporation                                   22.0000        1,760.00        1,760.00
 3069      K-Five Construction Corporation                                 16.0000        1,280.00        1,280.00
 1750      P. T. Ferro Construction Co.                                    10.0000          800.00          800.00
 1560      R. W. Dunteman Company                                          10.0000          800.00          800.00

    72400500  RELOC SIN PAN ASSY TA                        1.000     EACH
 6117      Austin Tyler Construction, Inc.                                150.0000          150.00          150.00
 1950      Gallagher Asphalt Corporation                                  150.0000          150.00          150.00
 3069      K-Five Construction Corporation                                300.0000          300.00          300.00
 1750      P. T. Ferro Construction Co.                                   300.0000          300.00          300.00
 1560      R. W. Dunteman Company                                         300.0000          300.00          300.00

    72400600  RELOC SIN PAN ASSY TB                        1.000     EACH
 6117      Austin Tyler Construction, Inc.                                150.0000          150.00          150.00
 1950      Gallagher Asphalt Corporation                                  150.0000          150.00          150.00
 3069      K-Five Construction Corporation                                350.0000          350.00          350.00
 1750      P. T. Ferro Construction Co.                                   325.0000          325.00          325.00
 1560      R. W. Dunteman Company                                         325.0000          325.00          325.00

    72400710  RELOC SIGN PANEL T1                         13.000    SQ FT
 6117      Austin Tyler Construction, Inc.                                 75.0000          975.00          975.00
 1950      Gallagher Asphalt Corporation                                   75.0000          975.00          975.00
 3069      K-Five Construction Corporation                                 20.0000          260.00          260.00
 1750      P. T. Ferro Construction Co.                                    50.0000          650.00          650.00
 1560      R. W. Dunteman Company                                          50.0000          650.00          650.00

    73100100  BASE TEL STL SIN SUPP                        2.000     EACH
 6117      Austin Tyler Construction, Inc.                                110.0000          220.00          220.00
 1950      Gallagher Asphalt Corporation                                  110.0000          220.00          220.00
 3069      K-Five Construction Corporation                                300.0000          600.00          600.00
 1750      P. T. Ferro Construction Co.                                   225.0000          450.00          450.00
 1560      R. W. Dunteman Company                                         225.0000          450.00          450.00

    78000100  THPL PVT MK LTR & SYM                    3,326.000    SQ FT
 6117      Austin Tyler Construction, Inc.                                  5.7500       19,124.50       19,124.50
 1950      Gallagher Asphalt Corporation                                    5.7500       19,124.50       19,124.50
 3069      K-Five Construction Corporation                                  5.0000       16,630.00       16,630.00
 1750      P. T. Ferro Construction Co.                                     5.7500       19,124.50       19,124.50
 1560      R. W. Dunteman Company                                           5.7500       19,124.50       19,124.50

    78000200  THPL PVT MK LINE  4                     41,620.000     FOOT
 6117      Austin Tyler Construction, Inc.                                  0.5500       22,891.00       22,891.00
 1950      Gallagher Asphalt Corporation                                    0.5500       22,891.00       22,891.00
 3069      K-Five Construction Corporation                                  0.5500       22,891.00       22,891.00
 1750      P. T. Ferro Construction Co.                                     0.5500       22,891.00       22,891.00
 1560      R. W. Dunteman Company                                           0.5500       22,891.00       22,891.00

    78000400  THPL PVT MK LINE  6                      4,620.000     FOOT
 6117      Austin Tyler Construction, Inc.                                  0.8000        3,696.00        3,696.00
 1950      Gallagher Asphalt Corporation                                    0.8000        3,696.00        3,696.00
 3069      K-Five Construction Corporation                                  0.8500        3,927.00        3,927.00
 1750      P. T. Ferro Construction Co.                                     0.8000        3,696.00        3,696.00
 1560      R. W. Dunteman Company                                           0.8000        3,696.00        3,696.00

    78000500  THPL PVT MK LINE  8                        520.000     FOOT
 6117      Austin Tyler Construction, Inc.                                  1.5500          806.00          806.00
 1950      Gallagher Asphalt Corporation                                    1.5500          806.00          806.00
 3069      K-Five Construction Corporation                                  2.2500        1,170.00        1,170.00
 1750      P. T. Ferro Construction Co.                                     1.5500          806.00          806.00
 1560      R. W. Dunteman Company                                           1.5500          806.00          806.00

    78000600  THPL PVT MK LINE 12                      4,265.000     FOOT
 6117      Austin Tyler Construction, Inc.                                  2.3500       10,022.75       10,022.75
 1950      Gallagher Asphalt Corporation                                    2.3500       10,022.75       10,022.75
 3069      K-Five Construction Corporation                                  2.5000       10,662.50       10,662.50
 1750      P. T. Ferro Construction Co.                                     2.3500       10,022.75       10,022.75
 1560      R. W. Dunteman Company                                           2.3500       10,022.75       10,022.75

    78000650  THPL PVT MK LINE 24                        300.000     FOOT
 6117      Austin Tyler Construction, Inc.                                  5.7500        1,725.00        1,725.00
 1950      Gallagher Asphalt Corporation                                    5.7500        1,725.00        1,725.00
 3069      K-Five Construction Corporation                                  5.0000        1,500.00        1,500.00
 1750      P. T. Ferro Construction Co.                                     5.7500        1,725.00        1,725.00
 1560      R. W. Dunteman Company                                           5.7500        1,725.00        1,725.00

    78200020  CURB REFLECTORS                             20.000     EACH
 6117      Austin Tyler Construction, Inc.                                 75.0000        1,500.00        1,500.00
 1950      Gallagher Asphalt Corporation                                  100.0000        2,000.00        2,000.00
 3069      K-Five Construction Corporation                                 30.0000          600.00          600.00
 1750      P. T. Ferro Construction Co.                                    75.0000        1,500.00        1,500.00
 1560      R. W. Dunteman Company                                          75.0000        1,500.00        1,500.00

    80400100  ELECT SERV INSTALL                           2.000     EACH
 6117      Austin Tyler Construction, Inc.                              7,500.0000       15,000.00       15,000.00
 1950      Gallagher Asphalt Corporation                                2,200.0000        4,400.00        4,400.00
 3069      K-Five Construction Corporation                              1,975.2700        3,950.54        3,950.54
 1750      P. T. Ferro Construction Co.                                 1,975.2700        3,950.54        3,950.54
 1560      R. W. Dunteman Company                                       1,975.2700        3,950.54        3,950.54

    80400200  ELECT UTIL SERV CONN                         1.000    L SUM
 6117      Austin Tyler Construction, Inc.                              6,000.0000        6,000.00        6,000.00
 1950      Gallagher Asphalt Corporation                                6,000.0000        6,000.00        6,000.00
 3069      K-Five Construction Corporation                              6,000.0000        6,000.00        6,000.00
 1750      P. T. Ferro Construction Co.                                 6,000.0000        6,000.00        6,000.00
 1560      R. W. Dunteman Company                                       6,000.0000        6,000.00        6,000.00

    81028200  UNDRGRD C GALVS     2                      158.000     FOOT
 6117      Austin Tyler Construction, Inc.                                 34.0000        5,372.00        5,372.00
 1950      Gallagher Asphalt Corporation                                   16.5000        2,607.00        2,607.00
 3069      K-Five Construction Corporation                                 15.9500        2,520.10        2,520.10
 1750      P. T. Ferro Construction Co.                                    15.9500        2,520.10        2,520.10
 1560      R. W. Dunteman Company                                          15.9500        2,520.10        2,520.10

    81028210  UNDRGRD C GALVS 2 1/2                      150.000     FOOT
 6117      Austin Tyler Construction, Inc.                                 44.0000        6,600.00        6,600.00
 1950      Gallagher Asphalt Corporation                                   30.0000        4,500.00        4,500.00
 3069      K-Five Construction Corporation                                 28.8400        4,326.00        4,326.00
 1750      P. T. Ferro Construction Co.                                    28.8400        4,326.00        4,326.00
 1560      R. W. Dunteman Company                                          28.8400        4,326.00        4,326.00

    81028220  UNDRGRD C GALVS     3                       97.000     FOOT
 6117      Austin Tyler Construction, Inc.                                 50.0000        4,850.00        4,850.00
 1950      Gallagher Asphalt Corporation                                   55.0000        5,335.00        5,335.00
 3069      K-Five Construction Corporation                                 53.5800        5,197.26        5,197.26
 1750      P. T. Ferro Construction Co.                                    53.5800        5,197.26        5,197.26
 1560      R. W. Dunteman Company                                          53.5800        5,197.26        5,197.26

    81028240  UNDRGRD C GALVS     4                      229.000     FOOT
 6117      Austin Tyler Construction, Inc.                                 66.0000       15,114.00       15,114.00
 1950      Gallagher Asphalt Corporation                                   64.0000       14,656.00       14,656.00
 3069      K-Five Construction Corporation                                 61.4700       14,076.63       14,076.63
 1750      P. T. Ferro Construction Co.                                    61.4700       14,076.63       14,076.63
 1560      R. W. Dunteman Company                                          61.4700       14,076.63       14,076.63

    81400100  HANDHOLE                                     1.000     EACH
 6117      Austin Tyler Construction, Inc.                              3,500.0000        3,500.00        3,500.00
 1950      Gallagher Asphalt Corporation                                2,170.0000        2,170.00        2,170.00
 3069      K-Five Construction Corporation                              2,114.8400        2,114.84        2,114.84
 1750      P. T. Ferro Construction Co.                                 2,114.8400        2,114.84        2,114.84
 1560      R. W. Dunteman Company                                       2,114.8400        2,114.84        2,114.84

    81400200  HD HANDHOLE                                  4.000     EACH
 6117      Austin Tyler Construction, Inc.                              4,000.0000       16,000.00       16,000.00
 1950      Gallagher Asphalt Corporation                                3,250.0000       13,000.00       13,000.00
 3069      K-Five Construction Corporation                              3,154.9400       12,619.76       12,619.76
 1750      P. T. Ferro Construction Co.                                 3,154.9400       12,619.76       12,619.76
 1560      R. W. Dunteman Company                                       3,154.9400       12,619.76       12,619.76

    81603598  UD 6#6 #8G XLPUSE 1.5                      200.000     FOOT
 6117      Austin Tyler Construction, Inc.                                 35.0000        7,000.00        7,000.00
 1950      Gallagher Asphalt Corporation                                   18.2000        3,640.00        3,640.00
 3069      K-Five Construction Corporation                                 17.6500        3,530.00        3,530.00
 1750      P. T. Ferro Construction Co.                                    17.6500        3,530.00        3,530.00
 1560      R. W. Dunteman Company                                          17.6500        3,530.00        3,530.00

    81702440  EC C XLP USE 3-1C 1                        150.000     FOOT
 6117      Austin Tyler Construction, Inc.                                 20.0000        3,000.00        3,000.00
 1950      Gallagher Asphalt Corporation                                    8.1000        1,215.00        1,215.00
 3069      K-Five Construction Corporation                                  7.8100        1,171.50        1,171.50
 1750      P. T. Ferro Construction Co.                                     7.8100        1,171.50        1,171.50
 1560      R. W. Dunteman Company                                           7.8100        1,171.50        1,171.50

    82110007  LUM LED RDWY G                               4.000     EACH
 6117      Austin Tyler Construction, Inc.                              1,300.0000        5,200.00        5,200.00
 1950      Gallagher Asphalt Corporation                                1,190.0000        4,760.00        4,760.00
 3069      K-Five Construction Corporation                              1,156.9900        4,627.96        4,627.96
 1750      P. T. Ferro Construction Co.                                 1,156.9900        4,627.96        4,627.96
 1560      R. W. Dunteman Company                                       1,156.9900        4,627.96        4,627.96

    83600200  LIGHT POLE FDN 24D                           8.000     FOOT
 6117      Austin Tyler Construction, Inc.                                325.0000        2,600.00        2,600.00
 1950      Gallagher Asphalt Corporation                                  265.0000        2,120.00        2,120.00
 3069      K-Five Construction Corporation                                254.9600        2,039.68        2,039.68
 1750      P. T. Ferro Construction Co.                                   254.9600        2,039.68        2,039.68
 1560      R. W. Dunteman Company                                         254.9600        2,039.68        2,039.68

    84400105  RELOC EX LT UNIT                             1.000     EACH
 6117      Austin Tyler Construction, Inc.                              5,500.0000        5,500.00        5,500.00
 1950      Gallagher Asphalt Corporation                                1,230.0000        1,230.00        1,230.00
 3069      K-Five Construction Corporation                              1,194.6600        1,194.66        1,194.66
 1750      P. T. Ferro Construction Co.                                 1,194.6600        1,194.66        1,194.66
 1560      R. W. Dunteman Company                                       1,194.6600        1,194.66        1,194.66

    85100500  PT NEW TRAF SIG POST                         4.000     EACH
 6117      Austin Tyler Construction, Inc.                                600.0000        2,400.00        2,400.00
 1950      Gallagher Asphalt Corporation                                  210.0000          840.00          840.00
 3069      K-Five Construction Corporation                                198.0000          792.00          792.00
 1750      P. T. Ferro Construction Co.                                   198.0000          792.00          792.00
 1560      R. W. Dunteman Company                                         198.0000          792.00          792.00

    85100600  PT NEW MA&P < 40FT                           4.000     EACH
 6117      Austin Tyler Construction, Inc.                              2,600.0000       10,400.00       10,400.00
 1950      Gallagher Asphalt Corporation                                1,160.0000        4,640.00        4,640.00
 3069      K-Five Construction Corporation                              1,122.0000        4,488.00        4,488.00
 1750      P. T. Ferro Construction Co.                                 1,122.0000        4,488.00        4,488.00
 1560      R. W. Dunteman Company                                       1,122.0000        4,488.00        4,488.00

    87301215  ELCBL C SIGNAL 14  2C                      696.000     FOOT
 6117      Austin Tyler Construction, Inc.                                  2.2500        1,566.00        1,566.00
 1950      Gallagher Asphalt Corporation                                    1.1000          765.60          765.60
 3069      K-Five Construction Corporation                                  1.0300          716.88          716.88
 1750      P. T. Ferro Construction Co.                                     1.0300          716.88          716.88
 1560      R. W. Dunteman Company                                           1.0300          716.88          716.88

    87301225  ELCBL C SIGNAL 14  3C                      992.000     FOOT
 6117      Austin Tyler Construction, Inc.                                  2.3500        2,331.20        2,331.20
 1950      Gallagher Asphalt Corporation                                    1.2000        1,190.40        1,190.40
 3069      K-Five Construction Corporation                                  1.1700        1,160.64        1,160.64
 1750      P. T. Ferro Construction Co.                                     1.1700        1,160.64        1,160.64
 1560      R. W. Dunteman Company                                           1.1700        1,160.64        1,160.64

    87301245  ELCBL C SIGNAL 14  5C                      648.000     FOOT
 6117      Austin Tyler Construction, Inc.                                  2.4500        1,587.60        1,587.60
 1950      Gallagher Asphalt Corporation                                    1.5500        1,004.40        1,004.40
 3069      K-Five Construction Corporation                                  1.4700          952.56          952.56
 1750      P. T. Ferro Construction Co.                                     1.4700          952.56          952.56
 1560      R. W. Dunteman Company                                           1.4700          952.56          952.56

    87301255  ELCBL C SIGNAL 14  7C                    1,420.000     FOOT
 6117      Austin Tyler Construction, Inc.                                  2.5500        3,621.00        3,621.00
 1950      Gallagher Asphalt Corporation                                    1.8000        2,556.00        2,556.00
 3069      K-Five Construction Corporation                                  1.7400        2,470.80        2,470.80
 1750      P. T. Ferro Construction Co.                                     1.7400        2,470.80        2,470.80
 1560      R. W. Dunteman Company                                           1.7400        2,470.80        2,470.80

    87301305  ELCBL C LEAD  14  1PR                      889.000     FOOT
 6117      Austin Tyler Construction, Inc.                                  2.2500        2,000.25        2,000.25
 1950      Gallagher Asphalt Corporation                                    1.2000        1,066.80        1,066.80
 3069      K-Five Construction Corporation                                  1.1500        1,022.35        1,022.35
 1750      P. T. Ferro Construction Co.                                     1.1500        1,022.35        1,022.35
 1560      R. W. Dunteman Company                                           1.1500        1,022.35        1,022.35

    87301900  ELCBL C EGRDC   6  1C                      489.000     FOOT
 6117      Austin Tyler Construction, Inc.                                  3.5000        1,711.50        1,711.50
 1950      Gallagher Asphalt Corporation                                    1.5500          757.95          757.95
 3069      K-Five Construction Corporation                                  1.4700          718.83          718.83
 1750      P. T. Ferro Construction Co.                                     1.4700          718.83          718.83
 1560      R. W. Dunteman Company                                           1.4700          718.83          718.83

    87502500  TS POST GALVS 16                             4.000     EACH
 6117      Austin Tyler Construction, Inc.                              2,700.0000       10,800.00       10,800.00
 1950      Gallagher Asphalt Corporation                                2,350.0000        9,400.00        9,400.00
 3069      K-Five Construction Corporation                              2,273.7100        9,094.84        9,094.84
 1750      P. T. Ferro Construction Co.                                 2,273.7100        9,094.84        9,094.84
 1560      R. W. Dunteman Company                                       2,273.7100        9,094.84        9,094.84

    87702830  STL COMB MAA&P 20                            1.000     EACH
 6117      Austin Tyler Construction, Inc.                             22,000.0000       22,000.00       22,000.00
 1950      Gallagher Asphalt Corporation                               21,400.0000       21,400.00       21,400.00
 3069      K-Five Construction Corporation                             20,860.1700       20,860.17       20,860.17
 1750      P. T. Ferro Construction Co.                                20,860.1700       20,860.17       20,860.17
 1560      R. W. Dunteman Company                                      20,860.1700       20,860.17       20,860.17

    87702870  STL COMB MAA&P 28                            1.000     EACH
 6117      Austin Tyler Construction, Inc.                             23,000.0000       23,000.00       23,000.00
 1950      Gallagher Asphalt Corporation                               21,800.0000       21,800.00       21,800.00
 3069      K-Five Construction Corporation                             21,199.2100       21,199.21       21,199.21
 1750      P. T. Ferro Construction Co.                                21,199.2100       21,199.21       21,199.21
 1560      R. W. Dunteman Company                                      21,199.2100       21,199.21       21,199.21

    87702880  STL COMB MAA&P 30                            1.000     EACH
 6117      Austin Tyler Construction, Inc.                             25,000.0000       25,000.00       25,000.00
 1950      Gallagher Asphalt Corporation                               22,300.0000       22,300.00       22,300.00
 3069      K-Five Construction Corporation                             21,727.6700       21,727.67       21,727.67
 1750      P. T. Ferro Construction Co.                                21,727.6700       21,727.67       21,727.67
 1560      R. W. Dunteman Company                                      21,727.6700       21,727.67       21,727.67

    87702910  STL COMB MAA&P 36                            1.000     EACH
 6117      Austin Tyler Construction, Inc.                             26,000.0000       26,000.00       26,000.00
 1950      Gallagher Asphalt Corporation                               24,900.0000       24,900.00       24,900.00
 3069      K-Five Construction Corporation                             24,226.2000       24,226.20       24,226.20
 1750      P. T. Ferro Construction Co.                                24,226.2000       24,226.20       24,226.20
 1560      R. W. Dunteman Company                                      24,226.2000       24,226.20       24,226.20

    87800100  CONC FDN TY A                               16.000     FOOT
 6117      Austin Tyler Construction, Inc.                                300.0000        4,800.00        4,800.00
 1950      Gallagher Asphalt Corporation                                  350.0000        5,600.00        5,600.00
 3069      K-Five Construction Corporation                                341.1200        5,457.92        5,457.92
 1750      P. T. Ferro Construction Co.                                   341.1200        5,457.92        5,457.92
 1560      R. W. Dunteman Company                                         341.1200        5,457.92        5,457.92

    87800415  CONC FDN TY E 36D                           47.000     FOOT
 6117      Austin Tyler Construction, Inc.                                450.0000       21,150.00       21,150.00
 1950      Gallagher Asphalt Corporation                                  400.0000       18,800.00       18,800.00
 3069      K-Five Construction Corporation                                385.7600       18,130.72       18,130.72
 1750      P. T. Ferro Construction Co.                                   385.7600       18,130.72       18,130.72
 1560      R. W. Dunteman Company                                         385.7600       18,130.72       18,130.72

    87900200  DRILL EX HANDHOLE                            4.000     EACH
 6117      Austin Tyler Construction, Inc.                              2,100.0000        8,400.00        8,400.00
 1950      Gallagher Asphalt Corporation                                  470.0000        1,880.00        1,880.00
 3069      K-Five Construction Corporation                                457.7300        1,830.92        1,830.92
 1750      P. T. Ferro Construction Co.                                   457.7300        1,830.92        1,830.92
 1560      R. W. Dunteman Company                                         457.7300        1,830.92        1,830.92

    88030020  SH LED 1F 3S MAM                             3.000     EACH
 6117      Austin Tyler Construction, Inc.                              1,100.0000        3,300.00        3,300.00
 1950      Gallagher Asphalt Corporation                                  900.0000        2,700.00        2,700.00
 3069      K-Five Construction Corporation                                874.3000        2,622.90        2,622.90
 1750      P. T. Ferro Construction Co.                                   874.3000        2,622.90        2,622.90
 1560      R. W. Dunteman Company                                         874.3000        2,622.90        2,622.90

    88030100  SH LED 1F 5S BM                              5.000     EACH
 6117      Austin Tyler Construction, Inc.                              1,400.0000        7,000.00        7,000.00
 1950      Gallagher Asphalt Corporation                                1,170.0000        5,850.00        5,850.00
 3069      K-Five Construction Corporation                              1,127.5300        5,637.65        5,637.65
 1750      P. T. Ferro Construction Co.                                 1,127.5300        5,637.65        5,637.65
 1560      R. W. Dunteman Company                                       1,127.5300        5,637.65        5,637.65

    88030110  SH LED 1F 5S MAM                             5.000     EACH
 6117      Austin Tyler Construction, Inc.                              1,500.0000        7,500.00        7,500.00
 1950      Gallagher Asphalt Corporation                                1,400.0000        7,000.00        7,000.00
 3069      K-Five Construction Corporation                              1,337.6500        6,688.25        6,688.25
 1750      P. T. Ferro Construction Co.                                 1,337.6500        6,688.25        6,688.25
 1560      R. W. Dunteman Company                                       1,337.6500        6,688.25        6,688.25

    88102717  PED SH LED 1F BM CDT                         6.000     EACH
 6117      Austin Tyler Construction, Inc.                                800.0000        4,800.00        4,800.00
 1950      Gallagher Asphalt Corporation                                  800.0000        4,800.00        4,800.00
 3069      K-Five Construction Corporation                                750.4200        4,502.52        4,502.52
 1750      P. T. Ferro Construction Co.                                   750.4200        4,502.52        4,502.52
 1560      R. W. Dunteman Company                                         750.4200        4,502.52        4,502.52

    88200410  TS BACKPLATE L F PLAS                        8.000     EACH
 6117      Austin Tyler Construction, Inc.                                362.0000        2,896.00        2,896.00
 1950      Gallagher Asphalt Corporation                                  360.0000        2,880.00        2,880.00
 3069      K-Five Construction Corporation                                348.0600        2,784.48        2,784.48
 1750      P. T. Ferro Construction Co.                                   348.0600        2,784.48        2,784.48
 1560      R. W. Dunteman Company                                         348.0600        2,784.48        2,784.48

    88500100  INDUCTIVE LOOP DETECT                        8.000     EACH
 6117      Austin Tyler Construction, Inc.                                400.0000        3,200.00        3,200.00
 1950      Gallagher Asphalt Corporation                                  215.0000        1,720.00        1,720.00
 3069      K-Five Construction Corporation                                207.3800        1,659.04        1,659.04
 1750      P. T. Ferro Construction Co.                                   207.3800        1,659.04        1,659.04
 1560      R. W. Dunteman Company                                         207.3800        1,659.04        1,659.04

    88600100  DET LOOP T1                                779.000     FOOT
 6117      Austin Tyler Construction, Inc.                                 25.0000       19,475.00       19,475.00
 1950      Gallagher Asphalt Corporation                                   16.8000       13,087.20       13,087.20
 3069      K-Five Construction Corporation                                 16.3800       12,760.02       12,760.02
 1750      P. T. Ferro Construction Co.                                    16.3800       12,760.02       12,760.02
 1560      R. W. Dunteman Company                                          16.3800       12,760.02       12,760.02

    89000100  TEMP TR SIG INSTALL                          1.000     EACH
 6117      Austin Tyler Construction, Inc.                             89,000.0000       89,000.00       89,000.00
 1950      Gallagher Asphalt Corporation                               44,800.0000       44,800.00       44,800.00
 3069      K-Five Construction Corporation                             43,670.9600       43,670.96       43,670.96
 1750      P. T. Ferro Construction Co.                                43,670.9600       43,670.96       43,670.96
 1560      R. W. Dunteman Company                                      43,670.9600       43,670.96       43,670.96

    89501400  REL EM VEH PR SYS D U                        2.000     EACH
 6117      Austin Tyler Construction, Inc.                                750.0000        1,500.00        1,500.00
 1950      Gallagher Asphalt Corporation                                  270.0000          540.00          540.00
 3069      K-Five Construction Corporation                                260.6000          521.20          521.20
 1750      P. T. Ferro Construction Co.                                   260.6000          521.20          521.20
 1560      R. W. Dunteman Company                                         260.6000          521.20          521.20

    89501510  RELOC EX FL BEACON                           1.000     EACH
 6117      Austin Tyler Construction, Inc.                              4,500.0000        4,500.00        4,500.00
 1950      Gallagher Asphalt Corporation                                4,400.0000        4,400.00        4,400.00
 3069      K-Five Construction Corporation                              4,281.0400        4,281.04        4,281.04
 1750      P. T. Ferro Construction Co.                                 4,281.0400        4,281.04        4,281.04
 1560      R. W. Dunteman Company                                       4,281.0400        4,281.04        4,281.04

    89502200  MOD EX CONTR                                 1.000     EACH
 6117      Austin Tyler Construction, Inc.                              2,500.0000        2,500.00        2,500.00
 1950      Gallagher Asphalt Corporation                                1,200.0000        1,200.00        1,200.00
 3069      K-Five Construction Corporation                              1,158.6000        1,158.60        1,158.60
 1750      P. T. Ferro Construction Co.                                 1,158.6000        1,158.60        1,158.60
 1560      R. W. Dunteman Company                                       1,158.6000        1,158.60        1,158.60

    89502375  REMOV EX TS EQUIP                            1.000     EACH
 6117      Austin Tyler Construction, Inc.                             20,000.0000       20,000.00       20,000.00
 1950      Gallagher Asphalt Corporation                                6,800.0000        6,800.00        6,800.00
 3069      K-Five Construction Corporation                              6,607.6200        6,607.62        6,607.62
 1750      P. T. Ferro Construction Co.                                 6,607.6200        6,607.62        6,607.62
 1560      R. W. Dunteman Company                                       6,607.6200        6,607.62        6,607.62

    89502380  REMOV EX HANDHOLE                            1.000     EACH
 6117      Austin Tyler Construction, Inc.                                700.0000          700.00          700.00
 1950      Gallagher Asphalt Corporation                                  410.0000          410.00          410.00
 3069      K-Five Construction Corporation                                397.0000          397.00          397.00
 1750      P. T. Ferro Construction Co.                                   397.0000          397.00          397.00
 1560      R. W. Dunteman Company                                         397.0000          397.00          397.00

    89502385  REMOV EX CONC FDN                            7.000     EACH
 6117      Austin Tyler Construction, Inc.                                700.0000        4,900.00        4,900.00
 1950      Gallagher Asphalt Corporation                                  415.0000        2,905.00        2,905.00
 3069      K-Five Construction Corporation                                404.2600        2,829.82        2,829.82
 1750      P. T. Ferro Construction Co.                                   404.2600        2,829.82        2,829.82
 1560      R. W. Dunteman Company                                         404.2600        2,829.82        2,829.82