016-68J32
|
Executed
|
02/21/2025
|
|
1 |
3
|
4
|
Various
|
|
Districtwide tree removal on an on call basis.
|
049-78B18
|
Executed
|
02/18/2025
|
|
1 |
5
|
9
|
Various
|
|
Weed spraying for broadleaf weeds along I-57 and I-64 at various locations in various counties.
|
050-78B19
|
Executed
|
02/18/2025
|
|
1 |
5
|
9
|
Various
|
|
Weed spraying for Johnson Grass along I-57 at various locations in various counties.
|
072-70H37
|
Executed
|
02/18/2025
|
|
1 |
3
|
5
|
Various
|
|
567.5 miles of spraying; approximately 2004 acres on State ROW along US 51 and interstate routes including interchanges in Champaign, DeWitt, McLean, Piatt, and Vermilion Counties.
|
073-72007
|
Executed
|
01/17/2025
|
|
1 |
4
|
6
|
Various
|
|
Bridge washing on various Illinois and Mississippi River crossings in various counties of District 6.
|
076-62X75
|
Executed
|
03/04/2025
|
|
1 |
1
|
1
|
Cook, DuPage
|
|
Expressway Cleaning (Litter/Debris Removal) on various routes in D1.
|
077-62X78
|
Executed
|
03/04/2025
|
|
1 |
1
|
1
|
Cook, Will
|
|
Expressway Cleaning (Litter/Debris Removal), This work is located on I-57 expressway from I-90/94 (Dan Ryan Expressway) to Will / Kankakee County Line in Cook and Will Counties.
|
099-62X54
|
Executed
|
03/14/2025
|
1 / 1 |
1 |
1
|
1
|
McHenry
|
|
The scope of work consists of demolition of (2) single family residences (1-two story wood frame with attached garage) and demolition of (2) two commercial properties (1-one story concrete building, 1-story concrete block and wood frame) including site cleanup and any incidental and collateral work necessary to complete the improvements as shown in the plans. The project is in the plans The project is in the City of Woodstock in McHenry County.
|
101-62X81
|
Executed
|
03/14/2025
|
|
1 |
1
|
1
|
Cook, Will
|
|
Expressway Cleaning (Litter/Debris Removal), This work is located on FAI 80, I-80 Expressway from I-294 (Tri-State Tollway) to Will / Kendall County Line in Cook and Will Counties.
|
125-64T75
|
Executed
|
02/14/2025
|
2 / 2 |
1 |
2
|
2
|
Various
|
|
Restoration of turf right-of-way caused by motorist damage on all State and and Interstate routes within the District. Work Orders include fertilizing, seeding, and installing soil retention blanket on disturbed areas.
|