001-62P38
|
Executed
|
10/18/2024
|
|
1 |
1
|
1
|
Lake
|
|
This project consists of curb ramps (ADA) improvements on Various Routes at Various locations within the Villages of Mundelein, Libertyville and Vernon Hills in Central Lake County.
|
002-62P40
|
Executed
|
10/18/2024
|
1 / 1 |
|
1
|
1
|
Lake
|
|
This is an ADA curb ramp installation project. This project is located along various State routes in the Villages of Barrington, Beach Park, Lake Zurich and Winthrop Harbor and the Cities of North Chicago, Park City and Waukegan in Lake County.
|
003-62R25
|
Awarded
|
11/01/2024
|
8 / 8 |
1 |
1
|
1
|
Will
|
|
The proposed project scope of work consists of the reconstruction of the following Larkin Avenue ramps to and from I-80: EB I-80 exit ramp to Larkin Avenue, NB Larkin Avenue entrance ramp to EB I-80, WB I-80 exit ramp to Larkin Avenue and SB Larkin entrance ramp to WB I-80. The work also includes reconstruction of the northwest and southeast shoulder approaches to the Larkin Avenue Bridge over I-80 as well as construction of a proposed retaining wall along the EB exit ramp and noise walls. Related work proposed in this contract includes grading, pavement markings, signage, erosion control, landscaping, drainage improvements, lighting and traffic signal. Gross length and net length are 4,049 ft (0.767 mi.).
|
004-62R26
|
Active
|
11/07/2024
|
5 / 5 |
1 |
1
|
1
|
Will
|
|
The proposed project scope of work consists of the partial reconstruction of entrance and exit ramps proposed at the I-80 and I-55 interchange. The work also includes the construction of a new directional ramp for SB I-55 to EB I-80 with flyover bridge crossing over I-55, along with reconstruction of Mound Road Frontage Road, construction of new retaining walls and drainage improvements within the reconstruction limits. Related work proposed in this contract includes grading, pavement markings, signage, erosion control, landscaping, lighting, ITS, and replacement of the existing access control fencing. The project is located in the Village of Shorewood, City of Joliet, and Troy Township in Will County. Gross length is 3,109 ft (0.589 mi.) and net length is 2,919 ft (0.553 mi.).
|
005-62R60
|
Awarded
|
11/01/2024
|
2 / 2 |
1 |
1
|
1
|
DuPage
|
|
The scope of work includes designed overlay, new shoulders and ADA improvements This project is located along IL. 19 (Irving Park Road) from Roselle Road to east of Baker Drive. The gross and net length is 13,262 feet (2.51 miles). It is located in the Villages of Itasca and Roselle and unincorporated Bloomingdale Township in DuPage County.
|
006-62T06
|
Active
|
07/31/2024
|
1 / 1 |
2 |
1
|
1
|
Cook
|
|
This improvement consists of pavement patching, hot-mix asphalt surface removal resurfacing with binder and surface course and sidewalk ramps improvements. Located in the Villages of Rosemont and City of Des Plaines in Cook County. (Project Length 7429 Foot, 1.4 Miles).
|
007-62T07
|
Awarded
|
11/01/2024
|
|
|
1
|
1
|
McHenry
|
|
This is a bridge repair project of SN 056-0038; IL 176 over Fox River. Scope of work includes bridge deck scarification and latex concrete overlay, joint repair, approach slab repair and structural repair of concrete abutments and piers. The project is located within unincorporated McHenry County.
|
008-62T37
|
Executed
|
10/29/2024
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
(335-Ft) Bridge Preservation Project. Work includes bridge deck scarification, repair, overlay, joints repair replacement and incidental and collateral work. Located on Oakton Street at Des Plaines River, just East of River Road, within the City of Des Plaines, in Cook County.
|
009-62T38
|
Executed
|
10/15/2024
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
(231-Ft) Bridge Deck Overlay, Bridge Joint Replacement / Repair at Devon Ave over North Branch Chicago River. This project is in the City of Chicago in Cook County.
|
010-62T94
|
Executed
|
11/01/2024
|
1 / 1 |
1 |
1
|
1
|
Cook
|
|
The proposed improvement consists of culvert replacement at two locations, construction of a retaining wall, guardrail replacement, and construction of paved shoulder located at 123rd Street over Mill Creek and West Branch of Mill Creek, Cook County. Gross length: 1130 Ft (0.214 Mi), Net length: 385 Ft (0.073 Mi)
|
011-62V17
|
Executed
|
10/25/2024
|
10 / 10 |
3 |
1
|
1
|
Cook, Lake
|
|
Project covers 14 miles along I-94 from Montrose Ave to Lake Cook Rd and 3 mile along US Route 41 from Lake Cook Rd to Park Ave. Improvements are within 8 separate cities and villages within Cook and Lake counties from Chicago to Highland Park. Project involves replacing the surveillance vehicle detection system, ramp metering system, 6 sign structures and installing wrong way detection system. Connection to fiberoptic system and network integration is also included.
|
012-62V99
|
Executed
|
10/29/2024
|
1 / 1 |
|
1
|
1
|
Cook
|
|
Maintenance Yard Resurfacing, Reconstruction, Curb and Gutter Replacement, and Parking Improvement in the Rodenburg Maintenance Yard located at 1480 Rodenburg Rd , Schaumburg IL in Cook County.
|
013-62W79
|
Executed
|
10/15/2024
|
23 / 23 |
2 |
1
|
1
|
Various
|
Mandatory
|
Annual maintenance of electrical systems including traffic signals; lighting; pump stations; surveillance; other pertinent electrical systems; subsystems and components; mechanical systems; and buildings, structures, and grounds located within District 1.
|
014-62W80
|
Executed
|
10/15/2024
|
2 / 2 |
1 |
1
|
1
|
DuPage
|
|
Scope of work consists of reconstruction of the northeast wingwall at US 20 (Lake St) over I-290, pavement patching, removing and re-erecting the existing guardrail terminal, maintenance of traffic, and pavement markings. Improvement is located in the City of Elmhurst in DuPage County. Gross Length= 2628 FT (0.5 Miles); Net Length= 12 FT (0.002 Miles).
|
015-62W88
|
Executed
|
11/01/2024
|
1 / 1 |
|
1
|
1
|
Cook
|
|
The length of the project is 2,203 ft (0.417 miles). This project consists of a intersection improvement with pavement widening and resurfacing. The project is in Unincorporated Cook County, Orland Park, Oak Forest and Palos Heights.
|
016-62W94
|
Executed
|
10/25/2024
|
|
2 |
1
|
1
|
Various
|
|
This project consists of tree removal on Various Routes at Various locations within Cook and Will Counties.
|
017-62X07
|
Executed
|
10/18/2024
|
|
|
1
|
1
|
Various
|
|
Dead tree removal work is located within the right-of-way limits of state- maintained routes located in District One counties of Cook, DuPage, Kane, Lake, McHenry, and Will.
|
018-62X16
|
Executed
|
10/15/2024
|
|
|
1
|
1
|
Various
|
|
This improvement consists of temporary traffic control setup on various State maintained expressway and arterial routes district-wide on a work order basis.
|
019-62X17
|
Executed
|
11/01/2024
|
|
|
1
|
1
|
Various
|
|
The work to be completed under this contract consists of installing guardrail at new locations and repairing existing damaged guardrail and traffic barrier terminals on a work order basis throughout District 1.
|
020-64T83
|
Awarded
|
10/08/2024
|
|
|
2
|
2
|
Various
|
|
On-call maintenance of electrical facilities along state maintained routes in the eastern half of District 2.
|
021-64T84
|
Executed
|
10/15/2024
|
|
|
2
|
2
|
Various
|
|
On-call maintenance of electrical facilities along state maintained routes in the western half of District 2.
|
022-64U01
|
Executed
|
10/15/2024
|
1 / 1 |
|
2
|
2
|
Henry
|
|
0.5 mile of partial depth patching on IL 78 from 10th Street to north side of BNSF RR.
|
023-66P11
|
Awarded
|
11/01/2024
|
|
|
2
|
3
|
Kendall, LaSalle
|
|
5.62 miles of milling and resurfacing on US 52 from east of the IL-71 intersection to the north leg of Townhouse Road.
|
024-66P19
|
Executed
|
10/25/2024
|
1 / 1 |
|
2
|
3
|
Ford
|
|
11.01 miles of milling and resurfacing on IL 115 from south of E 1600N RD to IL 9 in Roberts City.
|
025-66P42
|
Awarded
|
11/01/2024
|
|
|
2
|
3
|
LaSalle, Livingston
|
|
16.21 miles of HMA milling and resurfacing on IL 170 from 0.2 mile south of River Road in Seneca to the intersection with IL 17.
|
026-66P50
|
Executed
|
10/22/2024
|
2 / 2 |
1 |
2
|
3
|
LaSalle
|
|
35.55 miles gross of On-Call Class A pavement patching, pavement striping, and other related items to complete the work as described herein on I-39 from the Marshall County Line to the Lee County Line including interchange ramps.
|
027-66P58
|
Executed
|
10/22/2024
|
2 / 2 |
|
2
|
3
|
LaSalle
|
|
Removal of HMA shoulders and replacing with PCC shoulders, striping, and traffic control at SN 050-0195 carrying US Route 6 over I-39 and SN 050-0181 carrying CH 19 over I-39.
|
028-66P72
|
Executed
|
10/29/2024
|
|
|
2
|
3
|
Various
|
|
Tree removal in Bureau, Ford, Iroquois, Kankakee, Kendall, LaSalle, and Grundy Counties.
|
029-66P80
|
Executed
|
10/18/2024
|
|
|
2
|
3
|
LaSalle
|
|
2,596 gross ft of intermittent milling and resurfacing the mainline, merge lanes, and gore areas as show on plan details on F.A.I. Route 80 (I-80) from 0.5 miles west of the I-80/I-39 Interchange (just east of SN 050-0093) to west of SN 050-0178 in LaSalle County.
|
030-68C94
|
Executed
|
10/25/2024
|
1 / 1 |
1 |
3
|
4
|
Tazewell
|
|
5.42 miles of resurfacing on IL 122 from IL 29 to just east of Oak St in Delavan in Tazewell County.
|
031-68J30
|
Executed
|
10/25/2024
|
4 / 4 |
1 |
3
|
4
|
Tazewell
|
|
Building demolition at four locations along Main Street between Cedar and Ravine Streets in East Peoria.
|
032-68J41
|
Executed
|
10/15/2024
|
|
|
3
|
4
|
Tazewell
|
|
2.746 miles of resurfacing, patching, and ADA improvements on Illinois Route 8 and Business US Route 24 (Washington Rd) in Tazewell County.
|
033-70H41
|
Executed
|
10/15/2024
|
|
|
3
|
5
|
Various
|
|
SMART WORK ZONE TECHNOLOGY in the District 5 counties of Champaign, DeWitt, Douglas, Edgar, McLean, Piatt, and Vermilion.
|
034-72627
|
Executed
|
10/25/2024
|
|
|
4
|
6
|
Pike
|
|
Pipe culvert removal and replacement on IL 106, 1 mile north of US 54.
|
035-72750
|
Executed
|
10/22/2024
|
|
|
4
|
6
|
Sangamon
|
|
Pipe culvert removal and replacement on I-55 West Frontage Road, 0.3 miles north of Toronto Road.
|
036-72788
|
Executed
|
10/22/2024
|
|
|
4
|
6
|
Various
|
|
On-call repair of guardrail and impact attenuators at locations throughout District 6.
|
037-72913
|
Deleted
|
08/15/2024
|
|
|
4
|
6
|
Morgan
|
|
Riprap installation for erosion control at SN 069-0019 carrying IL 104 over the NSRR, 0.5 miles south of IL 78 in Jacksonville.
|
038-72994
|
Executed
|
10/29/2024
|
|
|
4
|
6
|
Christian
|
|
Replacement of SN 011-0012 carrying IL 29 over Locust Creek Tributary, 0.3 miles southeast of 700N Road, southeast of Millersville.
|
039-74858
|
Executed
|
10/18/2024
|
|
|
4
|
7
|
Lawrence
|
|
Bridge replacement (SN 051-0001) with a cast-in place box culvert carrying IL 1 over a stream, 0.3 miles north of Birds Road.
|
040-74B52
|
Executed
|
10/18/2024
|
1 / 1 |
1 |
4
|
7
|
Cumberland
|
|
1.8 miles of resurfacing on I-70 from the Effingham County line to 1.8 miles east of the Effingham County line.
|
041-74C53
|
Executed
|
11/01/2024
|
|
|
4
|
7
|
Effingham
|
|
Bridge deck overlay on SN 025-0031 carrying IL 33 over Morris Creek, 0.3 miles west of 500th Street.
|
042-74C54
|
Executed
|
10/15/2024
|
|
|
4
|
7
|
Macon
|
|
Bridge repairs on SN 058-0066 and 058-0067 carrying eastbound I-72 over the westbound spur and southbound US 51 in Decatur.
|
043-74C55
|
Executed
|
11/01/2024
|
|
|
4
|
7
|
Cumberland
|
|
Expansion joint repairs, bridge deck scarification, deck patching, deck overlay, diamond grinding and deck grooving, and scupper modifications on SN 018-0019 carrying IL 121 over the Embarras River, 0.1 miles south of I-70.
|
044-74C57
|
Executed
|
11/01/2024
|
|
|
4
|
7
|
Jasper
|
|
Expansion joint repairs, bridge deck scarification, concrete deck overlay, deck grooving and approach slab patching on SN 040-0019 carrying IL 33 over a stream, 0.1 miles south of IL 33.
|
045-74C58
|
Executed
|
10/22/2024
|
|
|
4
|
7
|
Clark
|
|
Bridge deck overlay on SN 012-0064 carrying IL 49 over a stream, 0.4 miles east of the Cumberland County line.
|
046-74C59
|
Executed
|
10/22/2024
|
|
|
4
|
7
|
Clay
|
|
Bridge deck overlay and slope wall repair on SN 013-0036 carrying the IC Railroad over US 50 at the Marion County line.
|
047-74C60
|
Executed
|
11/01/2024
|
|
|
4
|
7
|
Fayette
|
|
Bridge deck overlay and deck repairs on SN 026-0090 carrying IL 37 over Dismal Creek, 0.5 miles south of the Clay County line.
|
048-74D15
|
Executed
|
10/15/2024
|
|
|
4
|
7
|
Clark, Jasper
|
|
Pedestrian signal upgrades at 3 intersections: IL 1 and Archer Avenue in Marshal, IL 33 and Jackson Street in Newton, and IL 33/130 and Van Buren Street in Newton.
|
049-76F84
|
Deleted
|
08/15/2024
|
|
|
5
|
8
|
Madison
|
|
Intersection reconstruction on IL 3 at Delmar Lane and at Pierce Lane, both in Godfrey.
|
050-76N04
|
Executed
|
11/01/2024
|
|
|
5
|
8
|
St. Clair
|
|
3.5 miles of resurfacing on IL 4 from Center Street in Lebanon to the Madison County line.
|
051-76R46
|
Executed
|
11/01/2024
|
|
|
5
|
8
|
Madison
|
|
Addition of left turn lane and traffic signal modernization at the intersection of IL 111/IL 140 and Fosterburg Road.
|
052-76T31
|
Executed
|
10/29/2024
|
|
|
5
|
8
|
Bond
|
|
Bridge demolition of SN 003-0041 carrying Old IL 127 over Beaver Creek in Greenville.
|
053-76T43
|
Withdrawn
|
10/04/2024
|
1 / 1 |
|
5
|
8
|
Greene
|
|
Electrical repairs at the Joe Page Bridge in Hardin.
|
054-76T67
|
Executed
|
10/18/2024
|
|
|
5
|
8
|
Various
|
|
Construction of GPS base stations at various maintenance yards in District 8.
|
055-76T69
|
Executed
|
10/22/2024
|
4 / 4 |
1 |
5
|
8
|
Randolph
|
|
10.4 miles of resurfacing on IL 3 from IL 150 in Chester to the Jackson County line.
|
056-76T71
|
Executed
|
10/18/2024
|
|
|
5
|
8
|
St. Clair
|
|
Well treatment at 5 locations in East St. Louis.
|
057-76T72
|
Executed
|
10/15/2024
|
|
|
5
|
8
|
Various
|
|
Repair and maintenance of electrical equipment at pump stations in various counties of District 8.
|
058-76T73
|
Executed
|
10/18/2024
|
2 / 2 |
|
5
|
8
|
Madison
|
|
Tree removal at IL 162 and IL 157 in Glen Carbon.
|
059-78942
|
Executed
|
10/25/2024
|
1 / 1 |
|
5
|
9
|
Williamson
|
|
5 miles of resurfacing, patching and shoulder work on IL 37 from 4th Street in Johnson City to IL 13 in Marion.
|
060-78972
|
Executed
|
10/15/2024
|
4 / 4 |
|
5
|
9
|
Massac
|
|
Construction of median crossovers for maintenance of traffic, structural steel repair, bridge painting, joint reconstruction, microsilica concrete overlay, parapet repair and center median barrier on SN 064-0035 carrying I-24 over the Ohio River.
|
061-78A32
|
Executed
|
10/25/2024
|
|
|
5
|
9
|
Saline
|
|
5.4 miles of resurfacing and guardrail repair and replacement on Old IL 13 from Harco Road to Barrett Lane in Harrisburg.
|
062-78A66
|
Executed
|
10/15/2024
|
1 / 1 |
|
5
|
9
|
Jackson
|
|
2.3 miles of milling and resurfacing on Makanda Road from US 51 to the Giant City State Park entrance.
|
063-61J71
|
Active
|
08/02/2024
|
1 / 1 |
|
1
|
1
|
McHenry
|
|
Construction of new sidewalk with ADA improvements, curb and Gutter, driveway reconstruction, storm sewers, pedestrian traffic signals, pavement markings, landscaping, and other work at various locations in Crystal Lake.
|
064-61J74
|
Awarded
|
10/31/2024
|
2 / 2 |
1 |
1
|
1
|
Cook
|
|
Sidewalk replacement with curb and gutter, pavement markings, signage, landscaping and other necessary work along various routes in Niles.
|
065-61K06
|
Active
|
08/02/2024
|
7 / 6 |
|
1
|
1
|
Cook
|
|
Pavement widening, full-depth HMA reconstructon, storm sewers, sidewalk replacement, curb and gutter replacement, guardrail, roadway lighting and pavement markings on Irving Park Road from Schaumburg Road to IL 59 in Streamwood.
|
066-61K44
|
Withdrawn
|
09/06/2024
|
|
|
1
|
1
|
Will
|
|
Construction of an HMA shared-use path with pedestrian bridge, seeding, landscaping, signage, HMA resurfacing, and other work from 265th Street to the parking lot of Plum Valley Preserve
|
067-61K48
|
Deleted
|
08/12/2024
|
|
|
1
|
1
|
Cook
|
|
Full depth HMA pavement with Aggregate subgrade improvement, median construction, driveways, curb and gutter, sidewalks, ADA ramps, drainage improvements, pavement markings, traffic signal installation and other work on 187th Street from Science Road to Pleasant Drive in the Village of Glenwood.
|
068-72715
|
Deleted
|
08/15/2024
|
|
|
4
|
6
|
Sangamon
|
|
Substructure repairs on SN 084-0073 and 084-0178 carrying Dirksen Parkway over NSRR and ICRR in Springfield.
|
069-72732
|
Deleted
|
08/15/2024
|
|
|
4
|
6
|
Morgan
|
|
Deck patching on 4 bridges carrying US 67 over IL 104 ramps and NSRR northwest of Jacksonville. (SN 069-0073, 0074, 0075, 0076)
|
070-62T11
|
Active
|
08/02/2024
|
|
1 |
1
|
1
|
Cook
|
|
This improvement consists of a SMART Overlay of the existing FAP 339 (IL-58 - Golf Road) from I-294 (Tri-State Tollway) to Lincoln Street and a Designed Overlay of OR 1320 (Elk Blvd) from US 12/45 (Lee St/Mannheim Road) to Us 12 (Rand Road) in the City of Des Plaines and Villages of Morton and Niles in Cook County approximately 13,627 Feet (2.58 Mile) in length.
|
071-62X41
|
Executed
|
10/25/2024
|
|
|
1
|
1
|
Various
|
|
This project consists of tree removal on various State routes at various within various Counties in District.
|
072-89803
|
Executed
|
10/25/2024
|
|
|
3
|
4
|
Tazewell
|
|
Resurface Washington Street from Main Street to the I-74 Interchange in the City of East Peoria.
|
073-93822
|
Executed
|
10/25/2024
|
1 / 1 |
|
4
|
6
|
Hancock
|
|
Replace existing structure with a double-barrel box culvert to carry 1900 E. Road over Big Meadow Ditch, 2.5 miles south of Carthage.
|
074-95911
|
Awarded
|
10/24/2024
|
|
|
4
|
7
|
Fayette
|
|
Construct ADA compliant sidewalks with drainage improvements and a pedestrian railroad crossing along Filmore Street, Railroad Drive, and Fletcher Street in Vandalia.
|
075-97708
|
Awarded
|
10/23/2024
|
|
1 |
5
|
8
|
Madison
|
|
Construct a Roundabout at Keebler Road and IL 162 in Maryville.
|
076-99735
|
Executed
|
10/15/2024
|
1 / 1 |
|
5
|
9
|
Williamson
|
|
Resurface TR 298 from Stotar Road to Crenshaw Road.
|
077-99737
|
Executed
|
10/15/2024
|
|
|
5
|
9
|
Williamson
|
|
Resurface Rocky Comfort Road from Grassy Road to West Devils Kitchen Road.
|
078-99738
|
Executed
|
10/22/2024
|
1 / 1 |
|
5
|
9
|
Massac
|
|
Construct a single-span PPC deck beam bridge with HMA approaches, guardrail, and aggregatre shoulders to carry Crestwood Road over Barnes Creek, 5.5 miles northeast of Metropolis.
|
079-99739
|
Executed
|
10/15/2024
|
|
|
5
|
9
|
Massac
|
|
Resurface New Columbia Road from Benton Road to 2.3 miles south of Benton Road.
|
080-72740
|
Executed
|
10/15/2024
|
|
|
4
|
6
|
Logan
|
|
Bridge bearing replacement on SN 054-0062 carrying TR 65A over I-55, I-55 West Frontage Road and the UP Railroad at the Lawndale overhead.
|
081-64S29
|
Executed
|
11/01/2024
|
1 / 1 |
1 |
2
|
2
|
Lee
|
|
Deck repair, joint replacement, deck overlay and other miscellaneous repairs on SN 052-0062 over UP RR at the the south edge of Dixon.
|
082-64S90
|
Executed
|
10/15/2024
|
|
|
2
|
2
|
Lee
|
|
Partial cleaning and painting of structural steel on SN 052-0031 carrying US 30 over UPRR, 0.9 miles east of Whiteside County line.
|
083-66E54
|
Executed
|
10/29/2024
|
|
|
2
|
3
|
Livingston
|
|
About 2.32 miles of milling and resurfacing designed overlay of IL 116 and OR 66 with intersection improvements, drainage and ADA improvements. Along IL-116 from the west leg of Ewing Drive to Old Rt. 66 and along Old Rt. 66 from IL-116 to the south approach slab of the bridge over the Vermilion River in Pontiac.
|
084-70991
|
Deleted
|
08/15/2024
|
|
|
3
|
5
|
Champaign
|
|
3.038 miles of standard overlay with ADA improvements and traffic signal modernization from Springfield Ave in Champaign to Curtis Rd in Savoy.
|
085-62U21
|
Awarded
|
10/29/2024
|
3 / 3 |
1 |
1
|
1
|
Various
|
|
This project consists of pavement marking and traffic signal modernization on US 34 at Ogden Avenue in the Village of Western Springs and unincorporated Proviso Township; US 34 at Saratoga Avenue and US 34 at Main Street in Downers Grove and on IL 59 at Main Street in Barrington. The project is located in Various Counties.
|
086-62W28
|
Rejected
|
10/04/2024
|
|
|
1
|
1
|
Cook
|
|
This improvement consists of the graffiti cleaning on I-290 between Mannheim (US 45) and Wells Street.
|
087-61K60
|
Awarded
|
11/01/2024
|
6 / 6 |
1 |
1
|
1
|
Cook
|
|
HMA Resurfacing with ADA Ramps, lighting, streetscape improvements, and traffic signal modernization on Green Bay Road from Prairie Avenue to Poplar Avenue in Evanston.
|
088-61K63
|
Executed
|
10/29/2024
|
6 / 5 |
2 |
1
|
1
|
Cook
|
|
Full Depth HMA reconstruction with storm sewers, box culvert replacement, curb and gutter, PCC sidewalks, multi-use path, ADA ramps, pavement markings, utility adjustments, and parkway restoration on Bernard Drive from Alington Heights Road to Lincoln Terrace in Buffalo Grove.
|
089-61K70
|
Executed
|
10/29/2024
|
4 / 3 |
1 |
1
|
1
|
Cook
|
|
Resurfacing, shared-use path construction, storm sewers, lighting, traffic signals, and pavement markings on Shermer Road from Walters Avenue to Willow Road in Northbrook.
|
090-61K72
|
Active
|
08/12/2024
|
4 / 4 |
2 |
1
|
1
|
Cook
|
|
Construction of a shared-use path on 25th Avenue from 14th Street to Salt Creek Trail in Broadview.
|
091-85762
|
Executed
|
11/01/2024
|
9 / 9 |
1 |
2
|
2
|
Lee
|
|
Construction of a pedestrian bridge, shared--use path, lighting, HMA pavement, sidewalk, drainage improvements and modular block retaining wall along Page Drive, Lincoln Statue Drive, and through Page Park in Dixon.
|
092-97841
|
Awarded
|
10/18/2024
|
2 / 2 |
|
5
|
8
|
Madison
|
|
Pavement widening, storm sewers, curb and guter and pavement markings at the intersection of Troy O'Fallon Road and Country lane in Troy.
|
093-61G80
|
Executed
|
11/01/2024
|
5 / 5 |
|
1
|
1
|
DuPage
|
|
Replace existing struture with a four-cell cast-in-place box culvert with 10X12 cells, south of the Arlington Drive and Greenbrook Boulevard Intersection in Hanover Park. Work includes roadway reconstruction and replacing water mains.
|
094-97838
|
Executed
|
11/01/2024
|
|
|
5
|
8
|
Madison
|
|
HMA resurfacing, curb and gutter, sidewalks, ADA ramps, driveways, drainage improvements, pavement markings, traffic signal modifications, and other work on Troy Road from Franklin Avenue to 4th Avenue in Edwardsville.
|
01A-WA081
|
Active
|
08/13/2024
|
|
1 |
1
|
1
|
Lake
|
|
Rehabilitate Hangar Pavements in South Hangar Area - Phase 2
|
02A-GR013
|
Active
|
08/13/2024
|
|
|
5
|
8
|
Bond
|
|
Aircraft T-Hangar Apron Expansion
|
03A-RA019
|
Active
|
08/13/2024
|
|
1 |
3
|
5
|
Champaign
|
|
Rehabilitate Runway 9/27
|
04A-PA066
|
Active
|
08/13/2024
|
|
2 |
1
|
1
|
Cook
|
|
Construct Apron (NE Quadrant) and Taxiway Access
|
05A-DU093
|
Active
|
08/13/2024
|
|
1 |
1
|
1
|
DuPage
|
|
Rehabilitate Airfield Pavements/Isolated Pavement Replacement: Runway 2L-20R and 2R-20L, Taxiway C and W
|