001-62K33
|
Active
|
03/16/2026
|
19 / 13 |
|
1
|
1
|
Cook
|
|
(2.03-Mile) The project includes widening and reconstruction of Barrington Road to provide two lanes in each direction separated by a median from Mundhank Road to IL 62, replacing the Poplar Creek box culvert, modernizing and replacing traffic signals, interconnection, sidewalk and shared-use paths, ADA improvements, landscaping. The project is located on Barrington Road from Central Road to IL 62 (Algonquin Road).
|
|
002-62L85
|
Active
|
03/16/2026
|
|
|
1
|
1
|
Cook
|
|
(1,525-Ft) Standard Overlay consists of hot-mix asphalt pavement removal and replacement, combination curb and gutter removal and replacement, thermoplastic pavement marking, sidewalk removal and replacement. Located in the Village of Forest Park, Cook County.
|
|
003-62P51
|
Active
|
03/16/2026
|
1 / 1 |
|
1
|
1
|
Cook
|
|
(3,935-Ft) Traffic Signal Modernization and lighting installation project consists of earth excavation, pavement removal, sidewalk removal, driveway removal, (HMA) surface removal, curb and gutter removal, pavement patching, installation of aggregate and (HMA) shoulders, widening with (HMA) base course, resurfacing with polymerized (HMA) binder and polymerized (HMA) surface courses, structure adjustments, installation of storm sewer, drainage structures, sidewalk, shared-use path, driveways, lighting, and signing, traffic signal modernization, placement of thermoplastic pavement markings. The project is located within the Villages of Bartlett and Streamwood in Cook Co.
|
|
004-62V08
|
Active
|
03/16/2026
|
|
|
1
|
1
|
Cook, DuPage, Kane
|
|
The work on this project consists of ditch regrading, culvert replacement, and various other drainage improvements. This project is in DuPage County, This project is in DuPage County, Cook County and Kane County.
|
|
005-62V71
|
Active
|
03/16/2026
|
1 / 1 |
1 |
1
|
1
|
Will
|
|
(3.87-Mile) Standard overlay and ADA curb ramp improvement project consists of hot-mix asphalt surface removal, placement of hot mix surface course, placement of hot mix binder course, pedestrian ramp improvements, pavement patching, placement of pavement markings. The project is in the Cities of Lockport and Joliet within Will County.
|
|
006-62V98
|
Deleted
|
03/17/2026
|
|
|
1
|
1
|
Will
|
|
This is a parking lot resurfacing improvement consisting of pavement removal, drainage structure adjustment, placement of subbase material, HMA binder course, HMA surface course, thermoplastic pavement markings. This improvement is in the IDOT New Lenox Maintenance Yard in Will County, Illinois.
|
|
007-62X31
|
Active
|
03/16/2026
|
|
|
1
|
1
|
Cook, Will
|
|
(650-Ft) Two culverts (SN 016-2290 and SN 099-0541) will undergo routine maintenance and repairs. Items include structural repair of concrete on headwalls and the removal and replacement of a wingwall. This project is located at FAI Route 57 over Butterfield Creek (0.04 Miles North of Village Commons Drive) and FAI Route 57 over Culvert (0.38 Miles North of Harlem Ave)
|
|
008-62X44
|
Active
|
03/16/2026
|
|
|
1
|
1
|
Cook
|
|
This improvement consists of bridge deck concrete sealer upon the entire top surface of the bridge deck, sidewalks, top of inside vertical faces of the faces of curbs/raised medians, and inside and outside of dividing walls along walkways of the structure, roadway faces of parapets. (41) SN locations along I-90/94 (Edens and Kennedy Expressways) in the City of Chicago, Villages of Skokie and Wilmette, Cook County.
|
|
009-62X57
|
Active
|
03/16/2026
|
1 / 0 |
1 |
1
|
1
|
Cook
|
|
(1.27-Mile) Design Overlay consists of pavement patching, resurfacing with polymerized hot-mix asphalt surface course, binder course, ADA improvement and curb and gutter replacement, thermoplastic pavement marking. This improvement is in the Village of Wilmette, Kenilworth and Winnetka.
|
|
010-62Y28
|
Active
|
03/16/2026
|
27 / 8 |
|
1
|
1
|
Cook
|
|
The work consists of furnishing all labor, materials, equipment, and other incidentals necessary for the conversion of existing ITS equipment to run on cellular communications. This work also consists of installing temporary fiber optic cable. Improvements associated with this project are located with the Villages of Hillside, Bellwood, Westchester, Broadview, Maywood, Forest Park, and Oak Park, as well as the City of Chicago in Cook County, on I-290 between Wolf Road and Racine Avenue.
|
|
011-62Y30
|
Active
|
03/16/2026
|
|
|
1
|
1
|
Cook
|
|
(190-Ft) Bridge Deck Overlay, Bridge Joint Replacement consists of scarify and overlay bridge deck, bridge deck repairs, repair piers and abutments, repair parapets and sidewalk, joint replacement, and graffiti removal on the bridge of US 14 (Peterson Ave) over North Shore Channel. This project is in the City of Chicago in Cook County.
|
|
012-62Y31
|
Active
|
03/16/2026
|
|
|
1
|
1
|
Various
|
|
Roadside development work shall consist of repairing, installing, and establishing landscape materials and features. This work is located within the right-of-way limits along various state-maintained routes located in District One (counties of Cook, DuPage, Kane, Lake, McHenry, and Will).
|
|
013-62Y34
|
Active
|
03/16/2026
|
|
|
1
|
1
|
Various
|
|
This work consists of applying selective and non-selective herbicide mixtures to control weeds within medians, guardrails, interchanges, infields, shoulders and slopes within the limits of the right of way areas in District One.
|
|
014-80B05
|
Active
|
03/16/2026
|
2 / 0 |
|
1
|
1
|
Will
|
|
This improvement consists of class B patches, Diamond Grinding, ADA ramp improvements, pavement marking restriping. This project is located on IL 7 (Theodore Ave) at the asphalt concrete joint approximately 100 ft west of US 30 and extends east approximately 9293 ft east to the concrete asphalt joint at IL 53 in the Cities of Crest Hill and Joliet.
|
|
015-80B07
|
Active
|
03/16/2026
|
1 / 1 |
|
1
|
1
|
DuPage
|
|
(1.52-Mile) Smart Overlay consists of hot-mix asphalt surface removal, pavement patching, resurfacing with hot-mix asphalt surface course, placement of thermoplastic pavement markings. located on Rohlwing Rd (Illinois Route FAP 870 IL 53), beginning south of 75th Street and ending at the Will County Line in the Village of Woodridge in DuPage County.
|
|
016-80B09
|
Active
|
03/16/2026
|
|
1 |
1
|
1
|
Cook
|
|
(9,682.91) Standard Overlay and ADA improvements project consists of (HMA) surface removal, resurfacing with (HMA) surface course, polymerized (HMA) surface course, and polymerized (HMA) binder course, thermoplastic pavement markings and preformed plastic pavement markings, ADA and APS improvements, pavement patching, combination concrete curb and gutter removal and replacement The project is located within the Village of Elk Grove in Elk Grove Township in Cook County.
|
|
017-80B10
|
Active
|
03/16/2026
|
1 / 1 |
|
1
|
1
|
McHenry
|
|
(13,136-Ft) Smart Overlay project consists of milling of the existing hot-mix asphalt (HMA) surface, pavement patching, resurfacing with hot-mix asphalt surface course, longitudinal joint sealing, placement of thermoplastic pavement markings. Located on US Route 14 from State Line Road to North of Oak Grove Road in unincorporated McHenry County.
|
|
018-80B12
|
Active
|
03/16/2026
|
|
|
1
|
1
|
McHenry
|
|
(705.72-Ft) HMA surface removal and overlaying consist of pavement patching, pavement widening, and curb removal and repair. Drainage, grading, and landscaping improvements. Located near the intersection of US 12 and Commercial Street, in the Village of Richmond in McHenry County, Illinois.
|
|
019-80B20
|
Active
|
03/16/2026
|
|
|
1
|
1
|
McHenry
|
|
(2.42-Mile) PCC pavement patching improvement consists of Class B patches, and joint sealing, curb and gutter removal and replacement, drainage structure adjustments, placement of modified urethane pavement markings and raised reflective pavement markers, ADA improvements, APS installation. Located on IL Route 120 (Elm St.) from West of Martin Rd. to E. Green St. within the City of McHenry in McHenry County.
|
|
020-80B21
|
Active
|
03/16/2026
|
2 / 2 |
1 |
1
|
1
|
Cook
|
|
(3,373-Ft) Smart Overlay consists of (HMA) surface removal, (HMA) resurfacing, pavement reconstruction of existing PCC pavement (remove and replace), sidewalk removal, thermoplastic pavement markings, combination curb and gutter removal and replacement, concrete sidewalk and detectable warnings, drainage structure adjustments and pedestrian ramp improvements. This project is in the Village of Schaumburg in Cook County.
|
|
021-80B26
|
Active
|
03/16/2026
|
1 / 1 |
|
1
|
1
|
Cook
|
|
This improvement consists of pavement patching, hot-mix asphalt surface removal resurfacing with binder and surface course, sidewalk ramps improvements, curb and gutter replacement, thermoplastic pavement marking, raised reflective pavement markers located in the City of Blue Island and Village of Calumet Park in Cook County.
|
|
022-80B27
|
Active
|
03/16/2026
|
|
|
1
|
1
|
Cook
|
|
(3.104-Mile) Designed and Smart Overlay and ADA improvements project consists of (HMA) surface removal, resurfacing with polymerized (HMA) surface course, (HMA) binder course, and polymerized (HMA) binder course, thermoplastic pavement markings, ADA and APS improvements, pavement patching, combination concrete curb and gutter removal and replacement and median repair. The project is located within the City of Des Plaines in Maine Township in Cook County.
|
|
023-80B30
|
Active
|
03/16/2026
|
1 / 0 |
1 |
1
|
1
|
Cook
|
|
(2.3-Mile) Design Overlay and shoulder widening project includes HMA removal, earth excavation, pavement patching, resurfacing with HMA, full depth HMA shoulder, placement of pavement markings, installation of raised reflective markers, ADA ramps, pedestrian signals, detector loops. Located on IL 171 (Archer Avenue) in the Village of Lemont, Cook County.
|
|
024-80B31
|
Active
|
03/16/2026
|
|
|
1
|
1
|
Will
|
|
Design Overlay and new Hot-Mix Asphalt Shoulder project includes hot-mix asphalt removal, earth excavation, pavement patching, resurfacing with hot-mix asphalt, full depth hot-mix asphalt shoulder, placement of pavement markings, ADA Improvements, installation of raised reflective pavement markers. Located on US Route 45 (LaGrange Road) in the Township of Green Garden and Village of Manhattan in Will County.
|
|
025-80B39
|
Active
|
03/16/2026
|
|
|
1
|
1
|
Cook
|
|
(4.42-Mile) Designed Overlay, standard overlay, and ADA improvements consists of resurfacing and existing HMA pavement with HMA surface and binder course, thermoplastic pavement markings, sidewalks. Location along US 34 (Ogden Ave) in the Cities of Brookfield, LaGrange, Lyons, and Riverside in Cook County.
|
|
026-80B46
|
Active
|
03/16/2026
|
|
|
1
|
1
|
Will
|
|
(500-Ft) Bridge Repair and Bridge Deck Latex Overlay project consists of concrete removal, concrete superstructure, steel reinforcement bars, finger plate expansion joints, bridge deck scarification, latex overlay, and grooving, structural repair of concrete, deck slab repair and diamond grinding including HMA surface removal, butt joints, HMA surface course, shoulder removal and HMA reconstruction, guardrail removal and replacement, pavement markings, road closure, detour installation and maintenance, temporary traffic signal timing. This project is in New Lenox Township in Will County, Illinois. This project is located at Township 35 N, Range 11 East.
|
|
027-80B48
|
Active
|
03/16/2026
|
|
|
1
|
1
|
Cook
|
|
(1,800-Ft) Bridge Deck Overlay includes hydro scarification of the existing bridge deck, concrete patching. The existing guardrail and bridge rails will be updated to meet standards. Pavement marking will be reestablished at the end of the construction. Project is in the city of Chicago, Cook County, Illinois, along Central Avenue over the North Branch of the Chicago River.
|
|
028-80B54
|
Active
|
03/16/2026
|
|
|
1
|
1
|
DuPage
|
|
Bridge painting on various routes in DuPage County.
|
|
029-80B55
|
Active
|
03/16/2026
|
|
1 |
1
|
1
|
Cook
|
|
This improvement consists of bridge painting of the structures (Roosevelt Rd. over I-90/94 (Dan Ryan Expwy) SN: 016-0478, and Wilson Ave. over I-94 (Edens Expwy) SN: 016-2038. All structures are located at City of Chicago.
|
|
030-80B62
|
Active
|
03/16/2026
|
|
|
1
|
1
|
Cook
|
|
(373.8-Ft) Bridge Deck latex concrete overlay, bridge and approach slab scarification, full and partial depth repairs to bridge slab and approach slab, HMA overlay on approach slabs, bridge deck grooving, concrete repair, maintenance of traffic, pavement marking, ADA ramps located on the Chicago Avenue bridge over I-90/94 in the City of Chicago in Cook County.
|
|
031-80B68
|
Active
|
03/16/2026
|
|
1 |
1
|
1
|
DuPage
|
|
(13,313-Ft) This work consists of concrete surface removal, placement of HMA binder and surface courses, pavement patching, placement of pavement markings, ADA improvements. The project is located along FAP Route 338 (IL 59) and extends from McCoy drive to Artesian Road in DuPage County Illinois.
|
|
032-80B76
|
Active
|
03/16/2026
|
|
|
1
|
1
|
Will
|
|
(500-Ft) Project consists of the removal and replacement of a fixed platform scale includes removal and replacement of pavement and shoulders along the ramp curb and gutter removal and replacement, drainage improvements, sidewalk improvements, pavement marking, landscaping, and erosion control. Location on westbound I-80 at the westbound Frankfort weigh station in Village of Tinley Park, Will County.
|
|
033-80B79
|
Active
|
03/16/2026
|
|
|
1
|
1
|
Cook, Will
|
Mandatory
|
LITTER PICKING consists of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any other rubbish which has accumulated on the highway located on I-94 (Bishop Ford Expwy) from Dan Ryan Expwy to I-80 in Cook County, on IL-394 from I-80 to IL 1 (Dixie Hwy) in Cook and Will Counties, on Stony Island Ave from I-94 to US 12 (95th St) and on 103rd St from Cottage Groove to Stony Island.
|
|
034-80B80
|
Active
|
03/16/2026
|
|
|
1
|
1
|
Cook, Lake
|
Mandatory
|
LITTER PICKING. The work to be done under Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any other rubbish which has accumulated on the highway located on I-94 (Edens Expwy) / US 41 (Skokie Hwy) expressway from Clavey Road to I-90 (Kennedy Expwy) in Cook and Lake Counties.
|
|
035-80C49
|
Active
|
03/16/2026
|
2 / 2 |
|
1
|
1
|
Cook
|
|
(2.66-Mile) Designed Overlay, New shoulders, and curb ramps improvements consists of milling the existing (HMA) surface, pavement patching, resurfacing with (HMA) surface course and (HMA) binder course, replacing aggregate shoulders with (HMA) shoulders, drainage structures adjustments and cleaning, replacement of curb and gutter, longitudinal joint sealing, thermoplastic pavement markings, joint and crack filling, joint or crack routing in (PCC Pavement), restriping with modified urethane pavement markings, curb ramps for sidewalks (ADA) improvements, detector loop replacement, installation of raised reflective pavement markers. Location: IL 171 (Archer Avenue) from Will County line to 123rd Street / McCarthy Road within the Village of Lemont in Cook Co.
|
|
036-80C85
|
Active
|
03/16/2026
|
13 / 11 |
|
1
|
1
|
McHenry
|
|
(15,400-Ft) Roadway Reconstruction Project consists of pavement removal, earth excavation and placement of embankment, box culvert installation, storm sewer installation, new PCC pavement with concrete curb and gutter, sidewalk and shared use path construction, traffic signals and interconnection installations water main relocation, pavement marking, landscaping, erosion and sediment control. Location in the City of McHenry, Village of Prairie Grove, and unincorporated Nunda Township within McHenry County.
|
|
037-80C91
|
Active
|
03/17/2026
|
1 / 1 |
|
1
|
1
|
Various
|
Mandatory
|
FULL EXPRESSWAY CLEANING CYCLE AND SUPPLEMENTAL SWEEPING on various State maintained expressway routes within the counties of Cook, DuPage and Will.
|
|
038-80D22
|
Active
|
03/16/2026
|
|
|
1
|
1
|
Various
|
|
The work to be performed and completed under this contract consists of pruning and/or removing dead, dying, diseased and hazardous trees and limbs, while providing proper traffic control on a work order basis. This work is located within the right-of-way limits of state-maintained routes located in District One.
|
|
039-61L48
|
Active
|
03/17/2026
|
4 / 3 |
|
1
|
1
|
McHenry
|
|
Reconstruct and realign Kreutzer Road from east of IL 47 to Haligus Road in Huntley. Includes; pavement removal, earth excavation, HMA pavement, storm sewer, curb and gutter, sidewalks, box culvert, and highway lighting.
|
|
040-61L54
|
Active
|
03/16/2026
|
|
|
1
|
1
|
Cook
|
|
HMA resurfacing of FAU 1447 (16th St.) from Harlem Ave. to Lombard Ave. in the City of Berwyn. Additional work includes traffic signal improvements, curb and gutter repair, pavement markings and other required work.
|
|
041-61L84
|
Active
|
03/16/2026
|
|
|
1
|
1
|
DuPage
|
|
HMA resurfacing of FAU 1379 (Fullerton Ave.) from Gary Ave. to Schmale Rd. in the Village of Carol Stream. Additional work includes curb and gutter, sidewalks with ADA ramps, street lighting, pavement marking and other required work.
|
|
042-61L86
|
Active
|
03/16/2026
|
1 / 1 |
|
1
|
1
|
McHenry
|
|
Construct a single-span PPC I-girder bridge with RC concrete deck to carry W. Solon Road over the North Branch Nippersink Creek. Includes; HMA approach, driveways, storm sewer, sheet pile retaining wall, and guardrail.
|
|
043-61M11
|
Active
|
03/16/2026
|
|
|
1
|
1
|
Kane
|
|
Construct an HMA path adjacent to South Edgelawn Drive at the BNSF Railroad tracks between Jericho Road and Kingsway Drive.
|
|
044-61M15
|
Active
|
03/16/2026
|
14 / 14 |
1 |
1
|
1
|
Cook
|
|
Construct a prefabricated truss bridge with approach spans to carry a shared-use path over US 14 and Union Pacific Railroad. Includes; MSE walls, HMA path, sidewalk, pavement patching, landscaping, and drainage improvements from Melas Park to Meadows Park in Mount Prospect.
|
|
045-61M17
|
Active
|
03/16/2026
|
1 / 1 |
1 |
1
|
1
|
Kane
|
|
Reconstruction of TR 245 (Boyer Road) from Longmeadow Parkway to County Line Road in the Village of Algonquin. Work includes HMA pavement, sidewalk, pipe and culverts.
|
|
046-61M33
|
Active
|
03/16/2026
|
|
|
1
|
1
|
Kane
|
|
Construction of a single-lane roundabout intersection at the intersection of Highland Ave. and Lyle Ave. in the City of Elgin. Work includes HMA pavement reconstruction, curb and gutter, sidewalks, storm sewer, lighting and other required work.
|
|
047-61M34
|
Active
|
03/16/2026
|
|
|
1
|
1
|
Lake
|
|
Resurfacing Brierwoods Lane from Lake Zurich City Limits to Bruce Circle N; Bruce Circle N from Brierwoods Lane to Acorn Drive and Acorn Drive from Bruce Circle N to Old McHenry Road in the Village of Hawthorn Woods.
|
|
048-61M35
|
Active
|
03/16/2026
|
|
|
1
|
1
|
McHenry
|
|
Construction of sidewalks along FAU 0006 (Marengo Rd.) and FAU 0005 (Ayer St.) in the City of Harvard. Additional work includes curb and gutter, patching, storm sewer and other required work.
|
|
049-61M36
|
Active
|
03/16/2026
|
|
|
1
|
1
|
DuPage
|
|
Resurfacing Mill Pond Drive from Schmale Road to Exchange Boulevard/President Street in Glendale Heights.
|
|
050-61M37
|
Active
|
03/16/2026
|
|
|
1
|
1
|
DuPage
|
|
Resurfacing on North Grace Street from IL 64/North Avenue to East St. Charles Road in Lombard.
|
|
051-61M41
|
Active
|
03/16/2026
|
2 / 2 |
|
1
|
1
|
Lake
|
|
PCC sidewalk along Sheridan Road from Cedar Avenue to roger Williams Avenue in Highland Park. Includes; HMA resurfacing, PCC driveways, retaining wall, and drainage improvements.
|
|
052-61M45
|
Withdrawn
|
03/23/2026
|
|
|
1
|
1
|
Cook
|
|
Construction of a new 5 foot wide PCC sidewalk alogn Camp McDonald Road from Wheeling Road to Wolf Road in Prospect Heights. Includes; earth excavation, curb and gutter, HMA driveways, storm sewer, pedestrian traffic signal improvements, and pavement markings.
|
|
053-46672
|
Active
|
03/16/2026
|
|
|
2
|
2
|
Various
|
|
Placing various widths of Preformed Plastic and Modified Urethane pavement marking lines, letters and symbols within the limits specified on each individual work order within District 2.
|
|
054-46675
|
Active
|
03/16/2026
|
|
|
2
|
2
|
Various
|
|
Maintenance of signs along state maintained routes in District 2.
|
|
055-64L51
|
Active
|
03/16/2026
|
|
|
2
|
2
|
Jo Daviess
|
|
3.98 miles of milling, Cold in Place recycling and HMA overlay from IL 84 from Wisconsin State Line to 0.2 miles north of US 20.
|
|
056-64T06
|
Active
|
03/16/2026
|
|
|
2
|
2
|
Ogle
|
|
Bridge repairs and joint replacement on SN's 071-0046/0047, carrying I-39 over IL 72 3.5 miles south of Winnebago County Line and SN's 071-0048/0049 carrying I-39 over DME RR 0.025 miles south of IL 72.
|
|
057-64T42
|
Active
|
03/16/2026
|
4 / 1 |
|
2
|
2
|
Stephenson
|
|
Bridge repairs and joint replacement on SN'S 089-0048, 089-0049, 089-0050, 089-0055 and 089-00061 along US 20 Freeport Bypass.
|
|
058-64T73
|
Active
|
03/16/2026
|
|
|
2
|
2
|
Lee
|
|
2.32 miles US 30 to Wasson Rd in Amboy (designed overlay, cold milling), 0.80 miles Wasson Rd to Water St in Amboy (standard overlay, cold milling).
|
|
059-64U85
|
Active
|
03/16/2026
|
|
|
2
|
2
|
Lee
|
|
1 mile of patching from Lowell Park Rd. to Fellows St. in Dixon.
|
|
060-64U89
|
Active
|
03/16/2026
|
|
|
2
|
2
|
Winnebago
|
|
Bridge repairs, deck overlay and joint replacement on SN 101-0167, carrying US 20 over Grove Creek; 0.3 miles east of the Stephenson County Line.
|
|
061-64U90
|
Active
|
03/16/2026
|
1 / 0 |
|
2
|
2
|
Winnebago
|
|
Bridge repairs, deck overlay and joint replacement on SN 101-0165, carrying IL 70 over Pecatonica Rd; 1.1 miles north of Cemetery Rd.
|
|
062-64U93
|
Active
|
03/16/2026
|
1 / 1 |
|
2
|
2
|
Various
|
|
Various routes on-call guardrail throughout District 2.
|
|
063-64U99
|
Active
|
03/16/2026
|
|
|
2
|
2
|
Whiteside
|
|
Full cleaning and painting of SN 098-0065 and SN 098-0055.
|
|
064-64V32
|
Active
|
03/16/2026
|
2 / 1 |
|
2
|
2
|
Various
|
|
Repair, replace, maintain, or servicing the Department's Intelligent Transportation Equipment in all counties within Districts 2 and 3.
|
|
065-64V38
|
Active
|
03/16/2026
|
|
|
2
|
2
|
Winnebago
|
|
Overhead sign structure installation on IL 251, 0.3 miles south of Landstrom Rd.
|
|
066-64V43
|
Active
|
03/16/2026
|
|
|
2
|
2
|
Whiteside
|
|
Concrete sealer applied to the deck of SN 098-6003, carrying US 30 over the Mississippi River.
|
|
067-85792
|
Active
|
03/16/2026
|
|
|
2
|
2
|
Stephenson
|
|
Cold-In-Place Recycling on Orangeville Road from McConnell Road to 0.3 miles east of the west corporate limits of Orangeville.
|
|
068-85793
|
Active
|
03/16/2026
|
|
|
2
|
2
|
Lee
|
|
Resurfacing on Brooklyn Road from US 30 to IL 251.
|
|
069-85797
|
Active
|
03/16/2026
|
1 / 1 |
1 |
2
|
2
|
Lee
|
|
Replace the bridge carrying Indian Head Road over Red Oak Ditch.
|
|
070-85798
|
Active
|
03/16/2026
|
1 / 0 |
|
2
|
2
|
Winnebago
|
|
Rehabilitation of the Rock River Bridge carring Roscoe Road over the Rock River . Includes; concrete bridge deck replacement, steel girder repairs, bearing replacement at eaach abutment, guardrail, HMA approach and shoulders.
|
|
071-46671
|
Active
|
03/16/2026
|
|
|
2
|
3
|
Various
|
|
Repairing various widths of pavement marking including lines, letters, numbers, and symbols on various highways, freeways, and expressways throughout District 3.
|
|
072-66M03
|
Active
|
03/16/2026
|
|
|
2
|
3
|
Bureau
|
|
Bridge Deck Replacement (SN 006-0090) over the Hennepin Canal 0.4 Mi south of I-80 in Bureau County.
|
|
073-66M55
|
Active
|
03/16/2026
|
1 / 1 |
|
2
|
3
|
LaSalle
|
|
Bridge Replacement (SN 050-0033) over the Fox River in Ottawa IL and milling and resurfacing to US 6. 1.75 miles gross length.
|
|
074-66N58
|
Active
|
03/16/2026
|
|
|
2
|
3
|
Grundy
|
|
Rehabilitation of SN 032-0025, carrying US 6 over Aux Sable Creek in Grundy County.
|
|
075-66P68
|
Active
|
03/16/2026
|
|
|
2
|
3
|
Iroquois
|
|
6.04 mi of 1.5" milling and hot-mix asphalt surface course pavement rehabilitation and minor drainage repairs including culvert work on Old Route 24 and ADA sidewalk ramp improvements. Project consists of a SMART resurfacing along with an experimental mix design of the eastbound lane.
|
|
076-66P86
|
Active
|
03/16/2026
|
1 / 1 |
|
2
|
3
|
Bureau
|
|
5.75 miles of milling and HMA resurfacing of US 6/34 with 3-4 foot aggregate wedge shoulders when curb and gutter is not present, ADA ramp, and other minor drainage improvements. Located on US 6/34 from 175 ft. east of Hazelwood Dr. in Wyanet to 90 ft. west of Main St. in Princeton, within Bureau County.
|
|
077-66R50
|
Active
|
03/16/2026
|
|
|
2
|
3
|
Iroquois
|
|
Milling and resurfacing (designed overlay) with new shoulders and rumble strip. Additional work includes patching, ditch cleaning, drainage improvements, pavement marking, and rest area milling and resurfacing on US-52 from approximately 200' east of US-45 and IL-49 to approximately 1 mile west of IL-1 in Iroquois County. 5.98 miles gross length.
|
|
078-66R61
|
Active
|
03/16/2026
|
|
|
2
|
3
|
Iroquois
|
|
Scour repair, Deck/Approach, patching, Joint replacement, Slope wall repair and extending deck drains at structure No. 038-0037 carrying US Route 24 over Raymond Creek 2.65 miles east of IL 1 in Iroquois County.
|
|
079-66R63
|
Active
|
03/16/2026
|
1 / 0 |
|
2
|
3
|
Bureau
|
|
Joint replacement, Deck patch, approach repairs, Beam end repairs, bearing retainer and paint, substructure and parapet repairs at structure SN 006-0149 carrying IL 92 over Bureau creek 1.6 miles west of US 34 in Bureau County.
|
|
080-66R64
|
Active
|
03/16/2026
|
|
|
2
|
3
|
LaSalle
|
|
Joint replacement, Deck patch, approach repairs, bearing retainer and paint, substructure repairs, Anti- Graffiti at structure No. 050-0218 carrying IL 351 over Lone Star Cement Railroad and structure No. 050-0019 carrying IL 351 over Lone Star Cement Railroad 2.0 miles South of US 6 in La Salle County.
|
|
081-66R66
|
Active
|
03/16/2026
|
|
|
2
|
3
|
Ford
|
|
Joint replacement, deck patch, substructure repairs, Anti-Graffiti_at structure No: SN 027-0082 carrying IL 115 over Trib. Spring Creek 7.76 miles north of IL 9 and at structure No. 027-0083 carrying IL 115 E. Branch Vermilion_River in Ford County.
|
|
082-66R68
|
Active
|
03/16/2026
|
|
|
2
|
3
|
Kankakee
|
|
Joint replacement, bearing replacement, deck and approach patch, HMA shoulder and concrete repairs at structure No. 046-0021 carrying IL 1 over Trim Creek 0.2 miles west of Grant Park in Kankakee County.
|
|
083-66R69
|
Active
|
03/16/2026
|
|
|
2
|
3
|
Bureau
|
|
Joint replacement, deck and approach patching at structure No. 006-0084 carrying IL 29 over Big Bureau Creek 0.1 miles south of IL 26 in Bureau County.
|
|
084-66T17
|
Active
|
03/16/2026
|
|
|
2
|
3
|
Kankakee
|
|
Work consists of intermittent HMA milling and resurfacing, pavement marking, raised reflective markers, and detector loops on FAP 840 (IL-50) from north of US 45/52 to south of Brookmont Blvd and Indiana Ave to Fair St in Kankakee. 4.09 miles gross length.
|
|
085-66T25
|
Active
|
03/16/2026
|
|
|
2
|
3
|
Bureau
|
|
Replacing the existing high mast tower lighting with 45 ft. light poles at I-180 and IL 26 interchanges of Exit 7 and Exit 12.
|
|
086-66T32
|
Active
|
03/16/2026
|
|
|
2
|
3
|
Livingston
|
|
Herbicide, seeding, landscaping, and maintenance for this pollinator project located along FAI 55 (I-55) at the Limestone Rest Area sites south of Pontiac, IL.
|
|
087-66T58
|
Active
|
03/16/2026
|
|
|
2
|
3
|
LaSalle
|
|
Routing and filling the cracks along the centerline, significant transverse cracks and pavement markings along US 34 from 12th Rd. west of Earlville to west of the US 34 and IL 23 junction in LaSalle County. 6.44 miles gross length.
|
|
088-87893
|
Active
|
03/16/2026
|
2 / 2 |
1 |
2
|
3
|
Grundy
|
|
Construct a three-span PPC deck beam bridge to carry Rice Road over East Fork Mazon River. Includes HMA approach, patching, guardrail and HMA Shoulders.
|
|
089-87899
|
Active
|
03/16/2026
|
1 / 1 |
|
2
|
3
|
Kendall
|
|
Reconstruction of Ridge Road to an HMA four-lane from Holt Road to Black Road. Includes; curb and gutter, raised median, driveways, drainage improvements, traffic signals, and a shared-use path.
|
|
090-87900
|
Active
|
03/16/2026
|
|
|
2
|
3
|
Livingston
|
|
Resurfacing Kangley Road from the LaSalle County line to IL 17.
|
|
091-87907
|
Active
|
03/16/2026
|
|
|
2
|
3
|
Grundy
|
|
Sidewalk construction along East North Street, North Jackson Street, and East Washington Street in Gardner.
|
|
092-87909
|
Active
|
03/16/2026
|
|
|
2
|
3
|
LaSalle
|
|
Sidewalk construction and ADA ramps on various routes near Marseilles Elementary School in Marseilles.
|
|
093-68H43
|
Active
|
03/16/2026
|
|
|
3
|
4
|
Various
|
|
Bridge deck sealing at various locations within District 4.
|
|
094-68J16
|
Active
|
03/16/2026
|
|
|
3
|
4
|
Tazewell
|
|
Bridge joint replace and repair, bridge deck overlay, slope wall repair at SN 090-0152 carrying IL 40 ramp to I-74 WB in East Peoria in Tazewell County.
|
|
095-68J47
|
Active
|
03/16/2026
|
|
|
3
|
4
|
Various
|
|
Crack and joint sealing on various routes in various couties in District 4.
|
|
096-68J60
|
Active
|
03/16/2026
|
|
|
3
|
4
|
Tazewell
|
|
5.86 miles of CIR and design overlay of IL 122 from 2.1 miles east of Hopedale to the McLean County line.
|
|
097-68J88
|
Active
|
03/16/2026
|
1 / 1 |
|
3
|
4
|
Peoria
|
|
3.49 miles of resurfacing of IL 8 (W. Southport Rd) from 0.7 mile east of Taylor Rd to I-474 in Peoria County.
|
|
098-68J89
|
Active
|
03/16/2026
|
1 / 0 |
|
3
|
4
|
Peoria
|
|
6.5 miles of resurfacing and cold in-place recycling on IL 8 from Texas Rd to Taylor Rd in Peoria County.
|
|
099-68J95
|
Active
|
03/16/2026
|
|
|
3
|
4
|
Marshall
|
|
8.4 miles of CIR and design overlay of IL 17 from the eastern city limits of Lacon to IL 89.
|
|
100-68K12
|
Active
|
03/16/2026
|
|
|
3
|
4
|
Tazewell
|
|
5.656 gross miles of microsurfacing on I-474/US 24 from the Illinois River to I-74 in Tazewell County.
|
|
101-68K17
|
Active
|
03/16/2026
|
|
|
3
|
4
|
Fulton
|
|
9.93 miles of 3P resurfacing on US Route 24 from Izaack Walton Road to North of Rut Road in Fulton County.
|
|
102-68K20
|
Active
|
03/16/2026
|
1 / 1 |
|
3
|
4
|
Stark
|
|
6.45 miles of resurfacing from the southern city limit of Bradford to the west leg of IL 17. Milling and resurfacing and minor drainage improvements at the IL 40 Camp Grove Rest Area located 0.6 mile north of the west leg of IL 17 are also included.
|
|
103-68K22
|
Active
|
03/16/2026
|
2 / 2 |
|
3
|
4
|
Woodford
|
|
Bridge repairs on IL 26, south of IL 17:SN 102-0067 over Snag Creek, SN 102-0064 over Dry Creek, SN 102-0063 over Richland Creek, SN 102-0066 over Partridge Creek, SN 102-0065 over Balock Creek in Woodford County.
|
|
104-68K23
|
Active
|
03/16/2026
|
1 / 0 |
|
3
|
4
|
Knox
|
|
5.84 miles of 3P resurfacing on US 34 in Knox County from 0.4 mile west of Interstate 74 to Knox Road 900E.
|
|
105-68K33
|
Active
|
03/16/2026
|
|
|
3
|
4
|
Mercer
|
|
5.93 mile SMART project consisting of resurfacing, replacing guardrail, patching, and all related collateral work along Keithsburg Rd from just north of Main St in Keithsburg to just south of Illinois Route 17 in Mercer County.
|
|
106-68K53
|
Deleted
|
03/19/2026
|
|
|
3
|
4
|
Various
|
|
Placing, grading and compacting an aggregate shoulder wedge level with adjacent HMA pavement or shoulder consistent with the plans on various routes in various counties throughout District 4. 128.7 miles gross length.
|
|
107-68K54
|
Active
|
03/16/2026
|
|
|
3
|
4
|
Various
|
|
Pavement marking throughout District 4.
|
|
108-68K86
|
Active
|
03/16/2026
|
|
|
3
|
4
|
Henderson, Warren
|
|
Removal and replacement of various installations of guardrail in District 4 along Illinois Route 116 (FAP 665), Illinois Route 135 (FAP 546), and Illinois Routes 94/116 (FAP 534) at various locations in Henderson and Warren Counties.
|
|
109-68K87
|
Active
|
03/16/2026
|
|
|
3
|
4
|
Tazewell
|
|
Fence removal and replacement around Operations Yard in Morton.
|
|
110-68K89
|
Active
|
03/16/2026
|
|
|
3
|
4
|
Marshall, Putnam
|
|
8.9 miles of partial and full depth patching on Illinois Route 29 (FAP 318) beginning at the intersection of Illinois Route 29 and Illinois Route 18 in Marshall County to the northern border of Putnam County.
|
|
111-68L05
|
Active
|
03/16/2026
|
|
|
3
|
4
|
Tazewell
|
|
Building demolition at 600 Main St (Parcel No. 4ABL011) in East Peoria, Tazewell County.
|
|
112-89844
|
Active
|
03/16/2026
|
1 / 0 |
|
3
|
4
|
McDonough
|
|
Replace the bridge carrying Berlin Road over Camp Creek, 0.4 mile north of Bellingham Road.
|
|
113-89871
|
Active
|
03/16/2026
|
|
|
3
|
4
|
Henderson
|
|
Construct a three-span PPC deck beam structure to carry CH 15 over Lone Tree Ditch. Includes; HMA approach, and guardrail.
|
|
114-89898
|
Active
|
03/16/2026
|
|
|
3
|
4
|
Tazewell
|
|
Resurfacing on Broadway Road from Springfield Road to the I-55 Interchange.
|
|
115-70574
|
Active
|
03/16/2026
|
|
|
3
|
5
|
McLean
|
|
Remove and replace existing structure SN 057-0077 on FAP 693 IL. 9 with proposed SN 057-2043. This project is located over a stream, 8.8 mile east of ILL 165, beginning at Station 1646+93.90 and ending at Station 1647+47.10.
|
|
116-70E14
|
Active
|
03/16/2026
|
2 / 1 |
|
3
|
5
|
McLean
|
|
SMART/Standard Overlay resurfacing project on FAI-74 from 0.4 mi E of US 51 Bus S of Bloomington to CH 36 (700 N Rd) at Downs. Approximately 7.08 miles.
|
|
117-70E82
|
Active
|
03/16/2026
|
4 / 4 |
|
3
|
5
|
McLean
|
|
Standard Overlay on IL 9 from Tazwell Co Line to IL 122. Approximately 7.155 miles gross length.
|
|
118-70F20
|
Active
|
03/16/2026
|
1 / 0 |
|
3
|
5
|
McLean
|
|
Remove and reconstruct FAP 693 (ILL 9, US 150) from east of Main St Ave to Towanda Avenue in Bloomington, IL. Approximately 1.231 miles gross length.
|
|
119-70H72
|
Active
|
03/16/2026
|
|
|
3
|
5
|
Vermilion
|
|
Wing wall repair at Kickapoo Pond 0.2 mi west of Skykine Dr. west of Tilton.
|
|
120-70H82
|
Active
|
03/16/2026
|
|
|
3
|
5
|
McLean
|
|
0.01 mi patching FAI 39 (I-39) ramps at Hudson Interchange.
|
|
121-70H85
|
Active
|
03/16/2026
|
|
|
3
|
5
|
McLean
|
|
2.19 Miles of Patching from Fox Creek Road to N of Washington St. in Bloomington.
|
|
122-70H87
|
Active
|
03/16/2026
|
|
|
3
|
5
|
Piatt
|
|
9.178 Miles of Mircosurfacing Joint Repair on I-72 from Bridge St in Monticello to Piatt/Champaign Co Line.
|
|
123-91652
|
Active
|
03/16/2026
|
|
|
3
|
5
|
Vermilion
|
|
Replace the bridge carrying TR 13 over Whiskey Creek Branch located 2 miles southeast of Rankin.
|
|
124-72296
|
Active
|
03/16/2026
|
2 / 2 |
|
4
|
6
|
Logan
|
|
Bridge deck overlay on SN 054-0102 carrying Old IL 121 over Sugar Creek, 2.5 miles southeast of CH 18 (2300 ST) in Hartsburg.
|
|
125-72348
|
Active
|
03/16/2026
|
2 / 2 |
1 |
4
|
6
|
Sangamon
|
|
5.7 miles of resurfacing on IL 54 from 0.2 miles east of Prairie School Road to north of Bissell Road, northeast of Springfield.
|
|
126-72441
|
Active
|
03/16/2026
|
|
|
4
|
6
|
Logan
|
|
2.5 miles of resurfacing on IL 121 from 0.2 miles west of CH 6 (west of Latham) to 0.1 miles west of the Macon County line.
|
|
127-72443
|
Active
|
03/16/2026
|
|
|
4
|
6
|
Logan, Tazewell
|
|
2 miles of resurfacing on Armington Road (US 136 Spur) from East Third Street in Armington to north of US 136.
|
|
128-72503
|
Active
|
03/16/2026
|
|
|
4
|
6
|
Sangamon
|
|
Drainage improvements at the intersection of Old US 36 and Mt. Pulaski Road.
|
|
129-72511
|
Active
|
03/16/2026
|
|
|
4
|
6
|
Pike
|
|
Bridge deck patching and curb repairs on SN 075-0139 carrying IL 96 over Walnut Creek, 0.8 miles north of I-72 at the Hull interchange.
|
|
130-72636
|
Active
|
03/16/2026
|
|
|
4
|
6
|
Various
|
|
Maintenance and repair of surveillance cameras, vehicle detectors, dynamic message signs, advanced traffic management systems, fiber optic communications, traffic signal interconnects, ethernet networks, and all peripheral equipment throughout the district.
|
|
131-72638
|
Active
|
03/16/2026
|
|
|
4
|
6
|
Sangamon
|
|
0.1 miles of resurfacing on the IL 29 spur west of Hilltop Road; east of Springfield.
|
|
132-72669
|
Active
|
03/16/2026
|
|
|
4
|
6
|
Macoupin
|
|
Bridge deck overlay, bridge repairs, and bridge painting on SN 059-0049 carrying Shipman Blacktop over Macoupin Creek, 7.7 miles north of IL 16.
|
|
133-72741
|
Active
|
03/16/2026
|
|
|
4
|
6
|
Sangamon
|
|
Drainage improvements on Old US 36 west of Illiopolis.
|
|
134-72B63
|
Active
|
03/16/2026
|
|
|
4
|
6
|
Adams
|
|
9.1 miles of pavement patching, HMA surface removal, HMA surfacing, entrance reconstruction and aggregate wedge shoulders on IL 61 from the IL 94 south junction to 0.2 miles west and on IL 94 from the IL 61 south junction to north of US 24.
|
|
135-72E33
|
Deleted
|
03/18/2026
|
|
|
4
|
6
|
Macoupin
|
|
Tree removal, excavation, patching, pavement replacement, PCC widening, concrete curb and gutter, HMA overlay, pipe culverts and storm sewers on IL 108 in Carlinville approximately 0.2 miles west of Hurricane Creek to east of Taylor Street and 2 miles to 2.3 miles east of IL 111.
|
|
136-72E74
|
Active
|
03/16/2026
|
|
|
4
|
6
|
Adams, Macoupin
|
|
Railroad interconnects on IL 57 at Radio Road south of Qunicy and on IL 108 at Shipman Blacktop in Carlinville.
|
|
137-72E75
|
Active
|
03/16/2026
|
1 / 1 |
|
4
|
6
|
Adams
|
|
Bridge painting on portions of two bridges on US 24 and IL 57 near Quincy. (SN 001-0010 and 001-0012)
|
|
138-72F51
|
Active
|
03/16/2026
|
|
|
4
|
6
|
Various
|
|
Maintenance and repair of traffic signals, flashing beacons and roadway lighting along various routes at various locations in the eastern half of District 6.
|
|
139-72F52
|
Active
|
03/16/2026
|
|
|
4
|
6
|
Various
|
|
Maintenance and repair of traffic signals, flashing beacons and roadway lighting along various routes at various locations in the western half of District 6.
|
|
140-72N43
|
Active
|
03/16/2026
|
6 / 5 |
1 |
4
|
6
|
Sangamon
|
|
Expansion of the Emergency Vehicle Operations Course (EVOC) at the Illinois State Police Training Facility in Pawnee includes site grading, paving, and associated amenities.
|
|
141-93783
|
Active
|
03/16/2026
|
|
|
4
|
6
|
Morgan
|
|
HMA resurfacing on South Diamond Street from Greenwood Avenue to Michigan Avenue in South Jacksonville. Includes; curb and gutter, sidewalks, and storm sewer.
|
|
142-93850
|
Active
|
03/16/2026
|
|
|
4
|
6
|
Montgomery
|
|
Construct PCC sidewalk with ADA ramps along State Street and Taylor Aveue from the Litchfield Public Library to the Litchfield J.D. Colt School in Litchfield.
|
|
143-74433
|
Deleted
|
03/18/2026
|
|
|
4
|
7
|
Clark
|
|
Replacement of SN 012-0014 carrying IL 1 over the CSX Railroad, 0.5 miles north of US 40.
|
|
144-74435
|
Withdrawn
|
04/06/2026
|
12 / 12 |
|
4
|
7
|
Coles
|
|
Reconstructing the I-57 and IL 16 interchange located east of Mattoon from a cloverleaf to a raindrop diamond configuration.
|
|
145-74650
|
Withdrawn
|
03/25/2026
|
|
|
4
|
7
|
Coles
|
|
Superstructure replacement and bridge widening of 2 structures on I-57 over IC Railroad and TR 86 at Jones Switch. (SN 015-0003 and 015-0004)
|
|
146-74705
|
Deleted
|
03/19/2026
|
|
|
4
|
7
|
Macon
|
|
Replacement of 2 structures carrying I-72 over IL 121 and the IC Railroad, northwest of Decatur. (SN 058-0074 and 058-0075)
|
|
147-74856
|
Withdrawn
|
04/06/2026
|
|
|
4
|
7
|
Macon
|
|
Bridge replacement on US 36/IL 121 over Lake Shore Drive in Decatur. (SN 058-0019)
|
|
148-74D08
|
Withdrawn
|
04/06/2026
|
|
|
4
|
7
|
Macon
|
|
Bridge joint replacement, bridge deck patching, bridge deck scarification, bridge deck overlay and slope wall repairs at four four structures located on I-72 / US 51 at Eldorado Street and Grand Avenue North at the Harristown Interchange. (SN 058-0068, 058-0069, 058-0070, 058-0071)
|
|
149-74D10
|
Active
|
03/16/2026
|
|
|
4
|
7
|
Fayette
|
|
2.4 miles of resurfacing and aggregate wedge shoulder on US 51 from 0.5 miles south of Shobonier Spur to the Marion County line.
|
|
150-74D56
|
Active
|
03/16/2026
|
|
|
4
|
7
|
Fayette
|
|
7.4 miles of crack and joint sealing on I-70 from 1 mile west of US 40 at Brownstown to 2 miles west of St Elmo.
|
|
151-74D60
|
Active
|
03/16/2026
|
|
|
4
|
7
|
Fayette
|
|
Installation of fencing at the Fayette County Maintenance Storage Facility.
|
|
152-74D61
|
Active
|
03/16/2026
|
|
|
4
|
7
|
Various
|
|
Painting of 14 bridges on various routes in various counties of District 7.
|
|
153-74D63
|
Active
|
03/16/2026
|
|
|
4
|
7
|
Wayne
|
|
Cleaning and painting 4 bridges carrying various routes over I-64. (SN 096-0036, 096-0041, 096-0042 and 096-0060)
|
|
154-74E17
|
Active
|
03/16/2026
|
|
|
4
|
7
|
Edwards, Wabash
|
|
12.9 miles of tree removal along IL 1 from 0.2 miles south of Empire Street to 0.5 miles north of Browns/Grayville Road.
|
|
155-74E18
|
Active
|
03/16/2026
|
|
|
4
|
7
|
Macon
|
|
3.5 miles of milling and resurfacing on IL 105/IL 121 from north of Eldorado Street to Wood Street in Decatur and on IL 105 from 0.1 miles east of 26th Street to 0.3 miles east of Bender Drive in Decatur.
|
|
156-74E19
|
Active
|
03/16/2026
|
|
|
4
|
7
|
Macon
|
|
3.6 miles of patching on IL 48, IL 121 from north of Cundiff Road to 0.3 miles south of Pershing Road in Decatur.
|
|
157-74E20
|
Active
|
03/16/2026
|
|
|
4
|
7
|
Lawrence
|
|
8.9 miles of patching on US 50 from the Embarrass River to IL 33 and on IL 33 from US 50 to 0.1 miles north of the Indiana state line.
|
|
158-74E22
|
Active
|
03/16/2026
|
|
|
4
|
7
|
Crawford
|
|
0.3 miles of resurfacing, aggregate wedge shoulder and HMA shoulders on IL 1 south of IL 33 to 0.3 miles south of IL 33, including shoulder reconstruction on IL 33 from IL 1 to 1 mile west of IL 1.
|
|
159-74E23
|
Active
|
03/16/2026
|
|
|
4
|
7
|
Crawford, Lawrence
|
|
Tree removal on IL 33 in Crawford and Lawrence Counties.
|
|
160-74E24
|
Active
|
03/16/2026
|
|
|
4
|
7
|
Jasper
|
|
10.6 miles of shoulder reconstruction on IL 33 from IL 130 to the Crawford County line.
|
|
161-74E25
|
Active
|
03/16/2026
|
|
|
4
|
7
|
Richland
|
|
Chip seal at 3 locations on Old US 50: 1) from IL 250 to Suntone Road; 2) 0.4 miles east of Primsrose Road to 0.5 miles west of Claremont Road; 3) Claremount Road to the Lawrence County line.
|
|
162-74E29
|
Active
|
03/16/2026
|
|
|
4
|
7
|
Wabash
|
|
Washing the bridge deck on SN 093-0021 carrying IL 15 over the Wabash River in Mt. Carmel.
|
|
163-74E31
|
Active
|
03/16/2026
|
|
|
4
|
7
|
Various
|
|
Repairing, replacing, servicing and maintaining the electrical systems in good operating conditions throughout District 7.
|
|
164-95A04
|
Active
|
03/16/2026
|
1 / 0 |
|
4
|
7
|
Richland
|
|
Replace existing aggregate shoulder with HMA shoulder with rumble strips on St. Marie Road from the Jasper County Line to IL 150.
|
|
165-95A07
|
Active
|
03/16/2026
|
|
|
4
|
7
|
Lawrence
|
|
Construct HMA shoulders with rumble strips, and replace the existing pipe culverts on Chauncey Road from Poland Lane to Trinity Lane.
|
|
166-95A08
|
Active
|
03/16/2026
|
|
|
4
|
7
|
Wayne
|
|
HMA resurfacing on CH 13 from CR 600 N to CR 875 N in Wayne County. Includes; aggregate wedge shoulders and pavement markings.
|
|
167-46670
|
Active
|
03/16/2026
|
|
|
5
|
8
|
Jersey, Madison, St. Clair
|
|
Pavement marking replacement at various locations in Jersey, Madison and St. Clair Counties.
|
|
168-76M95
|
Active
|
03/16/2026
|
15 / 6 |
|
5
|
8
|
Washington
|
|
Resurfacing on I-64 from 0.5 miles west of Beaver Pond Creek to 0.9 miles west of CH 11.
|
|
169-76N37
|
Active
|
03/16/2026
|
|
1 |
5
|
8
|
Washington
|
|
4 miles of resurfacing on IL 160 / IL 177 from the Clinton County line to the west city limits of Okawville.
|
|
170-76R78
|
Active
|
03/16/2026
|
2 / 2 |
|
5
|
8
|
St. Clair
|
|
Modernization of eight traffic signals along the IL 159 corridor in Fairview Heights.
|
|
171-76U41
|
Active
|
03/16/2026
|
4 / 1 |
|
5
|
8
|
Calhoun
|
|
9.7 miles of resurfacing on IL 100/IL 16 from IL 96 in Kampsville to IL 16 in Hardin.
|
|
172-76U53
|
Active
|
03/16/2026
|
|
|
5
|
8
|
Various
|
|
Lighting and traffic signal modernization at various locations in District 8.
|
|
173-76U66
|
Active
|
03/16/2026
|
4 / 4 |
|
5
|
8
|
Madison
|
|
21.4 miles of underdrain cleaning and headwall replacement on IL 255 from I-270 to US 67 in Godfrey.
|
|
174-76U70
|
Active
|
03/16/2026
|
|
|
5
|
8
|
Greene
|
|
15.5 miles of patching on US 67 from Cain Street in Roodhouse to Jack Pine Drive in Carollton.
|
|
175-76U75
|
Active
|
03/16/2026
|
|
|
5
|
8
|
St. Clair
|
|
Milling and resurfacing the bridge approach for SN 082-0305 carrying IL 163 over S. Prairie DuPont Creek, 2.4 miles north of IL 158.
|
|
176-76U79
|
Active
|
03/16/2026
|
|
|
5
|
8
|
St. Clair
|
|
1 mile of chip seal / fog seal on Bunkum Road from 37th Street in East St. Louis to IL 111 in Washington Park.
|
|
177-76U84
|
Active
|
03/16/2026
|
|
|
5
|
8
|
Madison
|
|
Bridge painting on SN 060-0215 carrying Fairmont Avenue over I-255.
|
|
178-76U85
|
Active
|
03/16/2026
|
|
|
5
|
8
|
Madison
|
|
Bridge painting on SN 060-0213 carrying IL 3 over IL 140 in Alton.
|
|
179-76U87
|
Active
|
03/17/2026
|
|
|
5
|
8
|
Madison
|
|
Bridge painting on SN 060-0073 carrying IL 140 over I-55 in Hamel and SN 060-0077 carrying US 40 over Silver Creek near Troy.
|
|
180-76U93
|
Active
|
03/16/2026
|
2 / 0 |
|
5
|
8
|
Clinton
|
|
0.9 miles of Bureau of Research test pavement alongside US 50 from Crackerneck Road to Russland Road.
|
|
181-76V05
|
Active
|
03/16/2026
|
|
|
5
|
8
|
Randolph
|
|
55.2 miles of patching on IL 3 from the Monroe County line to the Jackson County line and on IL 150 from the Mississippi River in Chester to the Perry County line.
|
|
182-76V07
|
Active
|
03/16/2026
|
|
|
5
|
8
|
St. Clair
|
|
9.4 miles of patching on IL 157 from IL 163 to the Madison County line and on Forest Boulevard from the AandS Railroad to IL 157.
|
|
183-76V10
|
Active
|
03/16/2026
|
1 / 1 |
|
5
|
8
|
Marion
|
|
24.5 miles of patching on I-57 from 0.7 miles north of IL 161 to the Fayette County line.
|
|
184-76V14
|
Active
|
03/16/2026
|
|
|
5
|
8
|
Various
|
|
Various types of patching on State-maintained roads within various counties of District 8.
|
|
185-97877
|
Withdrawn
|
03/23/2026
|
|
|
5
|
8
|
Madison
|
|
Construction of a roundabout at the intersection of IL 162 and Troy Road in the City of Troy. Work includes PCC pavement, storm sewer, curb and gutter, roadway lighting and pavement markings.
|
|
186-97808
|
Active
|
03/16/2026
|
|
|
5
|
8
|
St. Clair
|
|
Resurfacing on Longacre Drive from Union Hill Road to IL 159 in Fairview Heights.
|
|
187-97827
|
Active
|
03/16/2026
|
|
|
5
|
8
|
St. Clair
|
|
Construct a southbound right-turn lane at the intersection of Old Collinsville Road and Ashland Avenue. Includes; concrete pavement, sidewalks, ADA Ramps, and traffic signal modifications.
|
|
188-97840
|
Active
|
03/16/2026
|
|
|
5
|
8
|
Madison
|
|
HMA resurfacing, patching, sidewalks, curb and gutter on Wood River Avenue from Ferguson Avenue to the north city limits of Wood River.
|
|
189-97865
|
Active
|
03/16/2026
|
1 / 1 |
1 |
5
|
8
|
St. Clair
|
|
Sidewalk construction on various streets in Millstadt.
|
|
190-97887
|
Active
|
03/16/2026
|
3 / 3 |
|
5
|
8
|
St. Clair
|
|
Construction of sidewalks and three curb bump-outs along North County Road and W. Madison Street in Mascoutah. Includes; drainage improvements, pavement markings, and seeding.
|
|
191-78495
|
Active
|
03/16/2026
|
|
|
5
|
9
|
Jefferson
|
|
Replacement of existing box culverts (SN 041-7065 and 041-7066) carrying IL 15 over unnamed ditches near Panzier Lane.
|
|
192-78878
|
Deleted
|
03/19/2026
|
|
|
5
|
9
|
Jefferson
|
|
Replacing SN 041-0089 and 041-0090 carrying I-64 over Casey Fork and UP Railroad, 0.2 miles east of IL 37.
|
|
193-78A24
|
Active
|
03/16/2026
|
|
|
5
|
9
|
Union
|
|
Slope repair near the intersection of IL 127 and Chestnut Street in Alto Pass.
|
|
194-78A43
|
Deleted
|
03/18/2026
|
|
|
5
|
9
|
Hardin
|
|
600 feet of slope stabilization on the south side of IL 146, approximately 0.6 miles southwest of Hardin County High School.
|
|
195-78B36
|
Active
|
03/16/2026
|
|
|
5
|
9
|
Franklin
|
|
Joint replacement, repairs and overlay on SN 028-0020 carrying IL 14 over the Big Muddy River, east of Buckner.
|
|
196-78B45
|
Active
|
03/16/2026
|
|
|
5
|
9
|
Alexander
|
|
Bridge work at 2 locations on IL 127: 1) Joint reconstruction/elimination and HMA overlay on SN 002-0033; 2) HMA overlay on SN 002-0035.
|
|
197-78B46
|
Active
|
03/16/2026
|
|
|
5
|
9
|
Hamilton
|
|
Bridge deck overlay with partial and full depth patching on SN 033-0041 carrying IL 142 over Blue Creek and SN 033-0043 carrying IL 142 over Big Creek.
|
|
198-78B47
|
Active
|
03/16/2026
|
|
|
5
|
9
|
Williamson
|
|
Bridge overlay on SN 100-0070 carrying IL 166 over South Fork Saline River.
|
|
199-78B48
|
Active
|
03/16/2026
|
|
|
5
|
9
|
Massac, Pulaski
|
|
Bridge deck overlay on SN 077-0037 carrying IL 37 over Hodges Bayou; on SN 077-0036 carrying IL 169 over tributary; on SN 064-0039 carrying IL 169 over Patterson Branch.
|
|
200-78B50
|
Active
|
03/16/2026
|
|
|
5
|
9
|
Pulaski
|
|
Substructure repairs on SN 077-0002 carrying I-57 southbound over Old US 51 in Pulaski.
|
|
201-78B79
|
Active
|
03/16/2026
|
|
1 |
5
|
9
|
Various
|
|
Removal of existing stop sign panel assemblies and furnishing / installing new solar powered, illuminated LED stop signs at 5 intersections at various locations in District 9.
|
|
202-78B86
|
Active
|
03/16/2026
|
|
|
5
|
9
|
Massac
|
|
Repairs on SN 064-0036 carrying US 45 over Massac Creek, 1.5 miles west of I-24.
|
|
203-78B87
|
Active
|
03/16/2026
|
|
|
5
|
9
|
Saline
|
|
Joint repairs, wingwall repairs and bridge deck overlay on SN 083-0052 and 083-0053 carrying IL 13 over Bankston Fork.
|
|
204-78C09
|
Active
|
03/16/2026
|
|
|
5
|
9
|
Johnson
|
|
Resurfacing on Old US 45 beginning at US 45 and proceeding 0.47 miles to the northeast.
|
|
205-99761
|
Active
|
03/16/2026
|
|
|
5
|
9
|
Williamson
|
|
Reconstruction of South Market Street from Boyton Street to 0.1 mile south of Texas Avenue in Marion.
|
|
206-99764
|
Active
|
03/16/2026
|
4 / 4 |
1 |
5
|
9
|
Pulaski
|
|
HMA overlay and shoulders on Shawnee College Road from Old US 51 to IL 37.
|
|
207-99767
|
Active
|
03/16/2026
|
|
|
5
|
9
|
Franklin
|
|
Resurfacing on North Thompsonville Road from Akin Blacktop to IL 34, north of Thompsonville.
|
|
208-99768
|
Active
|
03/16/2026
|
1 / 1 |
1 |
5
|
9
|
Perry
|
|
Hot-In-PLace recycling, HMA surface, and aggregate shoulders on East Park Street Road from the DuQuoin City limits to the Franklin County line.
|
|
209-46948
|
Active
|
03/19/2026
|
|
|
4
|
7
|
Macon
|
|
HMA resurfacing of roadway and parking lots, striping of parking lots, culvert replacements, storm sewer replacements, sign replacements, and sidewalk and ADA improvements at two IDNR State Parks; Spitler Woods and Lincoln Trail Homestead.
|
|
01A-DU096
|
Active
|
03/17/2026
|
|
|
1
|
1
|
DuPage
|
|
Construct Service Road: Flight Center to South Apron
|
|
02A-CR008
|
Active
|
03/17/2026
|
1 / 1 |
|
5
|
9
|
White
|
|
Replace Rotating Beacon, Wind Cone, PAPI, and Runway 36 REILs; Install Runway 18 REILs
|
|
03A-LK017
|
Active
|
03/17/2026
|
1 / 1 |
|
1
|
1
|
McHenry
|
|
Construct Apron: West Terminal Area, Phase 1
|
|
04A-SD065
|
Active
|
03/17/2026
|
|
|
5
|
8
|
St. Clair
|
|
Relocate/Reconstruct Taxiway B, Phase 4: Construct from Taxiway B1 to B4
|
|
05A-SO088
|
Active
|
03/17/2026
|
|
|
5
|
9
|
Jackson
|
|
Remark Runway 18L/36R and Remark Taxiway A, A1, A2, B, G, H, and J
|
|
06A-DK067
|
Active
|
03/17/2026
|
|
|
2
|
3
|
DeKalb
|
|
Rehabilitate Taxiway B - Construction
|
|
07A-GR014
|
Active
|
03/17/2026
|
|
|
5
|
8
|
Bond
|
|
Reconstruct Runway 18 Visual Guidance System, Install Runway 36 Visual Guidance System
|
|
08A-MB037
|
Active
|
03/17/2026
|
|
|
3
|
4
|
McDonough
|
|
Reconstruct Access Taxilanes
|
|
09A-RB024
|
Active
|
03/17/2026
|
|
|
4
|
7
|
Crawford
|
|
Reconstruct Airport Lighting Vault Equipment and Rehabilitate Airport Rotating Beacon
|
|
10A-CA025
|
Active
|
03/17/2026
|
|
|
4
|
6
|
Sangamon
|
Voluntary
|
Rehabilitate Runway 13/31, Reconstruct Lighting and Signage - Construction Phase 1 and Reconstruct Runway 13 PAPI
|