Home > Notice of Letting > Contract Detail

April 25, 2025 Letting 12:00 PM
05A-VE059

Bulletin Description

Realign Taxiway A, Phase 3
Region District DBE % VBP % Federal Project #
3 5 10.00 0.00 317SBGPTBD
County(s) IL Project # Airport Sponsor City
  • Vermilion
DNV 5169 Vermilion Regional Vermilion Regional Airport Authority Danville
Contract Specifics
A voluntary pre-bid meeting will be held on Monday, April 7, 2025 at 02:00 PM in the Offices of the Vermilion Regional Airport Authority at 22633 N. Bowman Avenue, Danville, IL 61834. Location Notes - None. Meeting Description - For engineering information, contact Hayden Hamilton of Crawford, Murphy and Tilly, Inc. at (217) 572-1079.
The time limit to award this item has been changed from 45 days to 90 days after the scheduled letting.
159 Calendar Days

This project is currently unfunded but actively seeking discretionary funds.

WARNING:  FAA Buy American Preference provisions apply to this contract.  Failure to submit a “Certification of Compliance with FAA Buy American Preference – Construction Projects” form in accordance with the bidding procedures set forth in the proposal document (Appendix A4 BUY AMERICAN PREFERENCE) will result in the bid being declared non-responsive.

No More Contract Specifics

Ask Subscribe Questions and Answers (5 Submitted / 5 Answered ) Questions not accepted as of April 15, 2025 04:30 PM.

  • Just going through the plans and specs for the Vermillion County Airport project on the April letting and trying to make sure that all of the Unclassified Excavation is coming from the site. There is no breakdown in the plans showing where all of the excavation needed to fill in the proposed stockpile area. Page 39 of the specs states that “The quantity of unclassified excavation shall be measured for payment by the number of CY in its original position.” Does this mean that there are enough CY
    See Addendum A, which includes and Earthwork Summary Table to show cut and fill. No material will need to be imported from offsite to build the stockpile. Section 152-4.1a of the Special Provisions (Page 39) revised the Standard Specification to clarify that unclassified excavation is measured by the number of cubic yards in its original position, prior to disturbance. No, A typical section for the construction access road is not included in the plans, nor is there an estimated quantity of aggregate; the Contractor should estimate the quantity/cost for "AR150550 pay item name CONSTRUCTION ACCESS". See Section 105-1.1 of the Special Provisions. See the last sentence of the first paragraph of Section 105-1.5 in the specifications, for Remove Construction Access material removal requirements. (04/17/2025)

  • Please confirm and include which P-209 Spec is required for this project?
    The “Standard Specifications for Construction of Airports”, State of Illinois, Department of Transportation, Division of Aeronautics, adopted March 22, 2023 shall govern the project except as otherwise noted in these Special Provisions. See section 209-2.3 of the specifications for Item 209 gradation requirements. (04/17/2025)

  • Page 63 of the plans shows either a guardrail or concrete barrier at the top of embankment in the typical detail. Will this be required for the stockpile area?
    No, See Sheet 63 of Addendum A. (04/17/2025)

  • The 2023 Standard Airport specification seems to have a mistake in the tables that specify the Liquid AC grades. Page 218 (401) bases the AC grade on the layer location in the pavement structure while Page 284 (403) bases the AC grade on the Design Aircraft. Please clarify.
    The Asphalt Binder Selection tables on pages 218 and 284 are correct as shown. (04/16/2025)

  • The HMA Mix Table on Sheet 2 of 63 shows HMA Surface Mix (401) and HMA Binder Mix (403). This is shown as 2 items. However, this would be 3 items. There should be an item for the 401 surface with SBS PG70-28. There should also be an item for the 403 base with SBS PG70-28. There should also be an item for the 403 base with PG64-22 The 403 base with 2 different AC grades will need to be 2 different items because they will have 2 different unique IDs. Please clarify.
    Pay items AR403610, AS403610, and AS403630 correspond to the entirety of the base course as shown in the Hot Mix Asphalt (HMA) Mixture Requirements Table in the plans. (04/16/2025)

Authorized Bidders

  • 1250 Cross Construction, Inc.
    3615 N Countryview Rd
    Urbana, IL 61802
    Phone: (217) 367-3526 Fax: (217) 337-3066 Email: closchen@crossconstructioncorp.com
    Base $4,174,685.00 is not within a reasonable approximation of the Estimate
    Additive 1 $416,450.00
    Additive 2 $112,500.00

  • 1770 Feutz Contractors, Inc.
    1120 N. Main St.
    Paris, IL 61944
    PO Box 130
    Paris, IL 61944
    Phone: (217) 465-8402 Fax: (217) 463-2256 Email: feutz.shared@feutzcontractors.com

  • 4551 Open Road Paving Company LLC
    1414 W Anthony Drive
    Urbana, IL 61802
    Phone: (217) 356-7280 Fax: (217) 356-1539 Email: cuppinghouse@openroadpaving.com
    Base $4,296,063.90
    Additive 1 $710,308.70
    Additive 2 $116,625.00

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
AR108158 FOOT 1/C #8 5 KV UG CABLE IN UD Base items 3,100.000
AR108258 FOOT 2/C #8 5 KV UG CABLE IN UD Base items 1,850.000
AR108706 FOOT 1/C #6 COUNTERPOISE Base items 3,100.000
AR108960 FOOT REMOVE CABLE Base items 3,400.000
AR125410 EACH MITL-STAKE MOUNTED Base items 16.000
AR125415 EACH MITL-BASE MOUNTED Base items 7.000
AR125444 EACH TAXI GUIDANCE SIGN, 4 CHARACTER Base items 2.000
AR125445 EACH TAXI GUIDANCE SIGN, 5 CHARACTER Base items 1.000
AR125446 EACH TAXI GUIDANCE SIGN, 6 CHARACTER Base items 2.000
AR125565 EACH SPLICE CAN Base items 1.000
AR125904 EACH REMOVE TAXI GUIDANCE SIGN Base items 1.000
AR125906 EACH REMOVE SPLICE CAN Base items 2.000
AR125913 EACH REMOVE EDGE LIGHT Base items 18.000
AR150510 L SUM ENGINEER'S FIELD OFFICE Base items 1.000
AR150520 L SUM MOBILIZATION Base items 1.000
AR150550 L SUM CONSTRUCTION ACCESS Base items 1.000
AR150552 L SUM RESTORE CONSTRUCTION ACCESS Base items 1.000
AR152410 CU YD UNCLASSIFIED EXCAVATION Base items 16,950.000
AR152490 CU YD CRUSHED AGGREGATE BACKFILL Base items 650.000
AR152515 CU YD SUBGRADE UNDERCUT Base items 650.000
AR156510 FOOT SILT FENCE Base items 350.000
AR156513 SQ YD SEPARATION FABRIC Base items 1,300.000
AR156515 FOOT STRAW WATTLE Base items 350.000
AR156520 EACH INLET PROTECTION Base items 4.000
AR209607 SQ YD CRUSHED AGG. BASE COURSE - 7" Base items 6,500.000
AR401010 L SUM CONTRACTOR QUALITY CONTROL PROGRAM (CQCP ) Base items 1.000
AR401610 TON BITUMINOUS SURFACE COURSE Base items 720.000
AR401921 SQ YD REMOVE PAVEMENT Base items 4,900.000
AR403610 TON BITUMINOUS BASE COURSE Base items 1,830.000
AR602510 GALLON BITUMINOUS PRIME COAT Base items 2,000.000
AR603510 GALLON BITUMINOUS TACK COAT Base items 650.000
AR620520 SQ FT PAVEMENT MARKING-WATERBORNE Base items 2,600.000
AR620525 SQ FT PAVEMENT MARKING-BLACK BORDER Base items 2,800.000
AR620900 SQ FT PAVEMENT MARKING REMOVAL Base items 500.000
AR701518 FOOT 18" RCP, CLASS IV Base items 470.000
AR701530 FOOT 30" RCP, CLASS IV Base items 180.000
AR701900 FOOT REMOVE PIPE Base items 650.000
AR705524 FOOT 4" PERFORATED UNDERDRAIN W/SOCK Base items 2,700.000
AR705544 FOOT 4" NON PERFORATED UNDERDRAIN Base items 60.000
AR705635 EACH UNDERDRAIN COLLECTION STRUCTURE Base items 1.000
AR705640 EACH UNDERDRAIN CLEANOUT Base items 7.000
AR705645 EACH UNDERDRAIN CONNECTION Base items 1.000
AR705900 FOOT REMOVE UNDERDRAIN Base items 600.000
AR705904 EACH REMOVE UNDERDRAIN CLEANOUT Base items 3.000
AR751411 EACH INLET-TYPE A Base items 2.000
AR751550 EACH MANHOLE 5' Base items 2.000
AR751900 EACH REMOVE INLET Base items 2.000
AR800194 EACH REMOVE ELEVATED RETROREFLECTIVE MARKER Base items 4.000
AR801456 EACH UNDERDRAIN DIRECT CONNECT Base items 2.000
AR801512 FOOT JUMPER CABLE Base items 300.000
AR901510 ACRE SEEDING Base items 23.500
AR904510 SQ YD SODDING Base items 1,520.000
AR908514 ACRE LIGHT-DUTY HYDRAULIC MULCH Base items 23.500
AS152490 CU YD CRUSHED AGGREGATE BACKFILL Additive 1 180.000
AS152515 CU YD SUBGRADE UNDERCUT Additive 1 180.000
AS156513 SQ YD SEPARATION FABRIC Additive 1 400.000
AS209607 SQ YD CRUSHED AGG. BASE COURSE-7" Additive 1 1,800.000
AS401610 TON BITUMINOUS SURFACE COURSE Additive 1 200.000
AS403610 TON BITUMINOUS BASE COURSE Additive 1 500.000
AS403630 EACH BITUMINOUS BASE TEST SECTION Additive 1 1.000
AS602510 GALLON BITUMINOUS PRIME COAT Additive 1 550.000
AS603510 GALLON BITUMINOUS TACK COAT Additive 1 200.000
AS620520 SQ FT PAVEMENT MARKING-WATERBORNE Additive 1 75.000
AS620525 SQ FT PAVEMENT MARKING-BLACK BORDER Additive 1 150.000
AT152410 CU YD UNCLASSIFIED EXCAVATION Additive 2 100.000
AT156520 EACH INLET PROTECTION Additive 2 1.000
AT701518 FOOT 18" RCP, CLASS IV Additive 2 300.000
AT701900 FOOT REMOVE PIPE Additive 2 530.000
AT751411 EACH INLET-TYPE A Additive 2 1.000
AT901510 ACRE SEEDING Additive 2 2.000
AT908514 ACRE LIGHT-DUTY HYDRAULIC MULCH Additive 2 2.000
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.