March 07, 2025 Letting 12:00 PM
076-70H45

Bulletin Description

Bridge deck repairs to SN's 057-0127, 057-0132, and 057-0161 in McLean County.
Region District DBE % VBP % Federal Project #
3 5 0.00 0.00 N/A
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • McLean
  • FAI 74
  • FAI 55
  • I-74,I-55
  • (57-8,57-22,57-23)BR-1
  • C-95-029-25
  • 0-02179-5010
Contract Specifics
45 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (3 Submitted / 3 Answered ) Questions not accepted as of February 25, 2025 04:30 PM.

  • Please confirm that there is no marked detour route required for the closure at SN 057-0161?
    A marked detour route is not required for the closure at SN 057-0161. This has been previously coordinated with local officials. Note, the interchange ramps shall remain operational. (02/28/2025)

  • Is it the intent of the Department that no interstate lane closure be kept in place overnight? Standards 701401 and 701406 are both included in the contract. Page 3 of the special provisions does note that Standard 701401 will only be implemented if a lane is required to be closed overnight. What requirements are allowable to leave a lane closure up overnight (i.e. convenience.)?
    Yes, the intent is no interstate lane closures be kept in place overnight. Standard 701401 should only be used if work activities extend into dusk as directed by the Engineer. (02/28/2025)

  • Typically when protective shielding is to be permanent there are additional requirements above and beyond what is detailed in Article 501 and a design table is provided in the plans. Is all the material to be treated? Is the system to be designed by the Contractor?
    The protective shield shall be designed, constructed, and installed per Article 501.03, except it is to remain in place at SN's 057-0127 and 0132. (02/28/2025)

Authorized Bidders

  • 5672 Stark Excavating, Inc.
    1805 W Washington St.
    Bloomington, IL 61701
    Phone: (309) 828-5034 Fax: (309) 829-3897 Email: estimating@starkcompanies.com
    $958,365.85

  • 0335 Otto Baum Company, Inc.
    866 N. Main Street
    Morton, IL 61550
    Phone: (309) 266-7114 Fax: (309) 263-1050 Email: timgillette@ottobaum.com

Non Bidders

  • 4677 Path Construction Company, Inc.
    (Pending Authorization)
    125 E. Algonquin Road
    Arlington Heights, IL 60005
    Phone: (847) 997-9147 Fax: (847) 398-7101 Email: PSowa@pathcc.com

Pay Item # UOM Description Type Quantity Unit Price
50102400 CU YD CONCRETE REMOVAL Base items 5.400
50157300 SQ YD PROTECTIVE SHIELD Base items 1,365.000
50300100 EACH FLOOR DRAINS Base items 8.000
50300255 CU YD CONCRETE SUPERSTRUCTURE Base items 5.400
50300260 SQ YD BRIDGE DECK GROOVING Base items 1,232.000
50300300 SQ YD PROTECTIVE COAT Base items 1,392.400
67000500 CAL MO ENGINEER'S FIELD OFFICE, TYPE B Base items 3.000
67100100 L SUM MOBILIZATION Base items 1.000
70100420 EACH TRAFFIC CONTROL AND PROTECTION, STANDARD 701411 Base items 6.000
70100700 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701406 Base items 1.000
70100800 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701401 Base items 1.000
70107025 CAL DA CHANGEABLE MESSAGE SIGN Base items 40.000
X5017311 SQ YD REMOVAL OF EXISTING PROTECTIVE SHIELD Base items 53.000
Z0004556 SQ YD HOT-MIX ASPHALT SURFACE REMOVAL (DECK) Base items 1,351.300
Z0012112 SQ YD BRIDGE DECK FLY ASH OR GGBF SLAG CONCRETE OVERLAY, 2 3/4" Base items 1,351.300
Z0012130 SQ YD BRIDGE DECK SCARIFICATION 3/4" Base items 1,351.300
Z0013798 L SUM CONSTRUCTION LAYOUT Base items 1.000
Z0016001 SQ YD DECK SLAB REPAIR (FULL DEPTH, TYPE I) Base items 4.000
Z0016002 SQ YD DECK SLAB REPAIR (FULL DEPTH, TYPE II) Base items 273.300
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.