| Region | District | DBE % | VBP % | Federal Project # |
|---|---|---|---|---|
| 1 | 1 | 11.00 | 0.00 | N/A |
| County(s) | Key Route(s) | Marked Route(s) | Section(s) | State Job #(s) | PPS #(s) |
|---|---|---|---|---|---|
|
|
|
|
|
|
| Contract Specifics |
|---|
| 15 Working Days |
| No More Contract Specifics |
| Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
|---|---|---|---|---|---|---|---|
| 20200100 | CU YD | EARTH EXCAVATION | Base items | 275.000 | |||
| 21101615 | SQ YD | TOPSOIL FURNISH AND PLACE, 4" | Base items | 400.000 | |||
| 25000210 | ACRE | SEEDING, CLASS 2A | Base items | 0.250 | |||
| 25200110 | SQ YD | SODDING, SALT TOLERANT | Base items | 400.000 | |||
| 31101400 | SQ YD | SUBBASE GRANULAR MATERIAL, TYPE B 6" | Base items | 1,413.000 | |||
| 40600275 | POUND | BITUMINOUS MATERIALS (PRIME COAT) | Base items | 3,178.000 | |||
| 40600290 | POUND | BITUMINOUS MATERIALS (TACK COAT) | Base items | 318.000 | |||
| 40603085 | TON | HOT-MIX ASPHALT BINDER COURSE, IL-19.0, N70 | Base items | 238.000 | |||
| 40604062 | TON | HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "D", N70 | Base items | 119.000 | |||
| 42001300 | SQ YD | PROTECTIVE COAT | Base items | 450.000 | |||
| 42400200 | SQ FT | PORTLAND CEMENT CONCRETE SIDEWALK 5 INCH | Base items | 50.000 | |||
| 44000100 | SQ YD | PAVEMENT REMOVAL | Base items | 1,413.000 | |||
| 44000600 | SQ FT | SIDEWALK REMOVAL | Base items | 50.000 | |||
| 60603500 | FOOT | COMBINATION CONCRETE CURB AND GUTTER, TYPE B-6.06 | Base items | 85.000 | |||
| 66400505 | FOOT | CHAIN LINK FENCE, 8' | Base items | 250.000 | |||
| 66900200 | CU YD | NON-SPECIAL WASTE DISPOSAL | Base items | 240.000 | |||
| 66900530 | EACH | SOIL DISPOSAL ANALYSIS | Base items | 2.000 | |||
| 66901001 | L SUM | REGULATED SUBSTANCES PRE-CONSTRUCTION PLAN | Base items | 1.000 | |||
| 66901003 | L SUM | REGULATED SUBSTANCES FINAL CONSTRUCTION REPORT | Base items | 1.000 | |||
| 66901006 | CAL DA | REGULATED SUBSTANCES MONITORING | Base items | 5.000 | |||
| 67100100 | L SUM | MOBILIZATION | Base items | 1.000 | |||
| 70102620 | L SUM | TRAFFIC CONTROL AND PROTECTION, STANDARD 701501 | Base items | 1.000 | |||
| 72000100 | SQ FT | SIGN PANEL - TYPE 1 | Base items | 2.000 | |||
| 72900100 | FOOT | METAL POST - TYPE A | Base items | 12.000 | |||
| 78000100 | SQ FT | THERMOPLASTIC PAVEMENT MARKING - LETTERS AND SYMBOLS | Base items | 25.000 | |||
| 78000200 | FOOT | THERMOPLASTIC PAVEMENT MARKING - LINE 4" | Base items | 250.000 | |||
| X1200036 | EACH | SANITARY SERVICE CLEANOUT | Base items | 1.000 | |||
| X4400501 | FOOT | COMBINATION CURB AND GUTTER REMOVAL AND REPLACEMENT LESS THAN OR EQUAL TO 10 FEET | Base items | 200.000 | |||
| X6640300 | FOOT | CHAIN LINK FENCE REMOVAL | Base items | 225.000 | |||
| X6700407 | CAL MO | ENGINEER'S FIELD OFFICE, TYPE A (D1) | Base items | 6.000 | |||
| X7240600 | EACH | REMOVE AND RE-ERECT EXISTING SIGN | Base items | 2.000 | |||
| Z0013798 | L SUM | CONSTRUCTION LAYOUT | Base items | 1.000 | |||
| Z0018500 | EACH | DRAINAGE STRUCTURES TO BE CLEANED | Base items | 1.000 | |||
| Z0018600 | EACH | DRAINAGE STRUCTURES TO BE RECONSTRUCTED | Base items | 1.000 | |||
| Z0030850 | SQ FT | TEMPORARY INFORMATION SIGNING | Base items | 51.400 | |||
| No More Pay Items | |||||||