The time limit to award this item has been changed from 45 days to 90 days after the scheduled letting.
181 Calendar Days
This project is currently unfunded but actively seeking discretionary funds.
WARNING: FAA Buy American Preference provisions apply to this contract. Failure to submit a "Certification of Compliance with FAA Buy American Preference - Construction Projects" form in accordance with the bidding procedures set forth in the proposal bidding document (Appendix A4 BUY AMERICAN PREFERENCE) will result in the bid being declared non-responsive
No More Contract Specifics
AskSubscribe
Questions and Answers (2 Submitted / 2 Answered )
Questions not accepted as of June 03, 2025 04:30 PM.
Is there a conterpoise to be installed with the 2" DB conduit? Ductbank? Pleae clarify where this will be required.
A counterpoise conductor is not specified on this project and is not needed with the 2-inch duct nor the duct bank associated with the airfield lighting series circuits. There is no counterpoise specified for this project associated with the airfield lighting series circuits on the airfield. At the interior of the Airport Electrical Vault building, there are however #6 AWG equipment ground wires that are to be run from each constant current regulator output to the respective high voltage wireway containing airfield lighting series circuits. The #6 AWG copper equipment ground wires are to replace existing #8 AWG equipment ground wires to comply with are recent update in 2023 National Electrical Code 250.190(C) (1) “General” which notes “Equipment ground conductors that are not an integral part of a cable assembly shall not be smaller than 6 AWG Copper or 4 AWG aluminum or copper-clad aluminum.” Equipment ground wires shall be copper on this project. (06/03/2025)
I see that this project has three phases. Are there days associated with each of the phases? I see the total is 181 calendar days. Please advise.
Phase 3 is limited to 14 calendar days in order to minimize impacts from construction on airport operations due to the required closure of Runways 12/30 and 6/24 during this phase. Phases 1 and 2 are not limited to specific calendar days since they will only impact one runway during each phase, but contractors shall minimize disruption of standard operating procedures for aeronautical activity by remaining within the prescribed staging, construction, and phasing areas presented on the construction safety and phasing plan sheets during all phases of construction. (06/02/2025)
Authorized Bidders
0972 William Charles Construction Co, LLC (d/b/a) William Charles Electric
833 Featherstone Road Rockford, IL 61107 P.O. Box 2071 Loves Park, IL 61130
Phone: (815) 654-4700 Fax: (815) 637-9123 Email: bids@williamcharles.com $2,176,329.25 is within a reasonable approximation of the Estimate
0518 Bodine Electric of Decatur
1845 N 22nd Street Decatur, IL 62525 PO Box 976 Decatur, IL 62525
Phone: (217) 420-4260 Fax: (217) 420-4296 Email: jday@bodinemail.com $3,171,152.32
1630 J. F. Edwards Construction Company
220 SOUTH CHICAGO STREET Geneseo, IL 61254 220 S Chicago St Geneseo, IL 61254
Phone: (309) 944-4681 Fax: No Record Email: kelliott@jfecc.net
3011 J. Ranck Electric, Inc.
1993 Gover Parkway MT. Pleasant, MI 48858
Phone: (989) 775-7393 Fax: (989) 775-7393 Email: ajranck@jranck.com $2,471,884.00
Non Bidders
No requests received
Pay Item #
UOM
Description
Type
Quantity
Unit Price
AW107508
EACH
L-806 W C 8' INTERNALLY LIT
Base items
2.000
AW107900
EACH
REMOVE WIND CONE
Base items
2.000
AW108108
FOOT
1/C #8 5 KV UG CABLE
Base items
55,671.000
AW109200
L SUM
INSTALL ELECTRICAL EQUIPMENT
Base items
1.000
AW110012
FOOT
2" DIRECTIONAL BORE
Base items
1,835.000
AW110202
FOOT
2" PVC DUCT, DIRECT BURY
Base items
16,674.000
AW110502
FOOT
2-WAY CONCRETE ENCASED DUCT
Base items
4,788.000
AW110509
FOOT
9-WAY CONCRETE ENCASED DUCT
Base items
1,607.000
AW115615
EACH
ELECTRICAL HANDHOLE, HIGH VOLTAGE
Base items
6.000
AW125511
EACH
MIRL, BASE MOUNTED-LED
Base items
72.000
AW125546
EACH
MI THRESHOLD LIGHT BASE MTD-LED
Base items
16.000
AW125565
EACH
SPLICE CAN
Base items
23.000
AW150520
L SUM
MOBILIZATION
Base items
1.000
AW800476
L SUM
REMOVE AIRFIELD LIGHTING
Base items
1.000
AW800564
L SUM
CABLE & CCR TESTING & CALIBRATION
Base items
1.000
No More Pay Items
The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.