20100500
|
ACRE
|
TREE REMOVAL, ACRES
|
Base items
|
1.500
|
|
20200100
|
CU YD
|
EARTH EXCAVATION
|
Base items
|
1,022.000
|
|
20300100
|
CU YD
|
CHANNEL EXCAVATION
|
Base items
|
965.000
|
|
20400800
|
CU YD
|
FURNISHED EXCAVATION
|
Base items
|
7,343.000
|
|
28000250
|
POUND
|
TEMPORARY EROSION CONTROL SEEDING
|
Base items
|
555.000
|
|
28000305
|
FOOT
|
TEMPORARY DITCH CHECKS
|
Base items
|
428.000
|
|
28000400
|
FOOT
|
PERIMETER EROSION BARRIER
|
Base items
|
3,900.000
|
|
28000500
|
EACH
|
INLET AND PIPE PROTECTION
|
Base items
|
4.000
|
|
40200800
|
TON
|
AGGREGATE SURFACE COURSE, TYPE B
|
Base items
|
1,677.000
|
|
44000100
|
SQ YD
|
PAVEMENT REMOVAL
|
Base items
|
1,248.000
|
|
50100100
|
EACH
|
REMOVAL OF EXISTING STRUCTURES
|
Base items
|
1.000
|
|
50105220
|
FOOT
|
PIPE CULVERT REMOVAL
|
Base items
|
90.000
|
|
50200100
|
CU YD
|
STRUCTURE EXCAVATION
|
Base items
|
32.000
|
|
50300225
|
CU YD
|
CONCRETE STRUCTURES
|
Base items
|
50.000
|
|
50300280
|
CU YD
|
CONCRETE ENCASEMENT
|
Base items
|
9.500
|
|
50400505
|
SQ FT
|
PRECAST PRESTRESSED CONCRETE DECK BEAMS (27" DEPTH)
|
Base items
|
4,860.000
|
|
50800205
|
POUND
|
REINFORCEMENT BARS, EPOXY COATED
|
Base items
|
6,800.000
|
|
50900205
|
FOOT
|
STEEL RAILING, TYPE S1
|
Base items
|
364.000
|
|
51200959
|
FOOT
|
FURNISHING METAL SHELL PILES 14" X 0.312"
|
Base items
|
684.000
|
|
51202305
|
FOOT
|
DRIVING PILES
|
Base items
|
684.000
|
|
51203200
|
EACH
|
TEST PILE METAL SHELLS
|
Base items
|
4.000
|
|
51500100
|
EACH
|
NAME PLATES
|
Base items
|
1.000
|
|
54213675
|
EACH
|
PRECAST REINFORCED CONCRETE FLARED END SECTIONS 30"
|
Base items
|
2.000
|
|
54213681
|
EACH
|
PRECAST REINFORCED CONCRETE FLARED END SECTIONS 36"
|
Base items
|
4.000
|
|
542A0235
|
FOOT
|
PIPE CULVERTS, CLASS A, TYPE 1 30"
|
Base items
|
40.000
|
|
542A0241
|
FOOT
|
PIPE CULVERTS, CLASS A, TYPE 1 36"
|
Base items
|
90.000
|
|
542D1069
|
FOOT
|
PIPE CULVERTS, CLASS D, TYPE 2 24"
|
Base items
|
40.000
|
|
59300100
|
CU YD
|
CONTROLLED LOW-STRENGTH MATERIAL
|
Base items
|
45.000
|
|
63100075
|
EACH
|
TRAFFIC BARRIER TERMINAL, TYPE 5A
|
Base items
|
2.000
|
|
63100167
|
EACH
|
TRAFFIC BARRIER TERMINAL, TYPE 1 (SPECIAL) TANGENT
|
Base items
|
2.000
|
|
67100100
|
L SUM
|
MOBILIZATION
|
Base items
|
1.000
|
|
72501000
|
EACH
|
TERMINAL MARKER - DIRECT APPLIED
|
Base items
|
4.000
|
|
LR403200
|
TON
|
BITUMINOUS MATERIALS (PRIME COAT)
|
Base items
|
4.000
|
|
LR403400
|
TON
|
BITUMINOUS MATERIALS (COVER AND SEAL COATS)
|
Base items
|
7.900
|
|
LR403500
|
TON
|
COVER COAT AGGREGATE
|
Base items
|
43.000
|
|
LR403600
|
TON
|
SEAL COAT AGGREGATE
|
Base items
|
43.000
|
|
X2501000
|
ACRE
|
SEEDING, CLASS 2 (SPECIAL)
|
Base items
|
2.000
|
|
X2810206
|
TON
|
STONE RIPRAP, CLASS A3 (SPECIAL)
|
Base items
|
24.000
|
|
X2810208
|
TON
|
STONE RIPRAP, CLASS A4 (SPECIAL)
|
Base items
|
812.000
|
|
X6650208
|
FOOT
|
WOVEN WIRE FENCE REMOVAL AND REPLACEMENT
|
Base items
|
465.000
|
|
X7011800
|
L SUM
|
TRAFFIC CONTROL AND PROTECTION, STANDARD BLR 21
|
Base items
|
1.000
|
|
Z0013798
|
L SUM
|
CONSTRUCTION LAYOUT
|
Base items
|
1.000
|
|
Z0076600
|
HOUR
|
TRAINEES
|
Base items
|
1,000.000
|
$0.80
|
Z0076604
|
HOUR
|
TRAINEES TRAINING PROGRAM GRADUATE
|
Base items
|
1,000.000
|
$15.00
|